The content of the invention
It is every to solve existing constructing device it is an object of the present invention to provide a kind of foldable high-altitude construction platform
It is secondary to repeat to set up, it is impossible to reuse, and the technical problem that structure is thin.
It is another object of the present invention to provide a kind of high-altitude construction method, is applied using the foldable high-altitude of above-mentioned offer
Work platform.
In order to solve the above technical problems, present invention employs following technical scheme;What first aspect present invention provided rolls over
Folded high-altitude construction platform, wherein, including workbench, high fence and low fence;Workbench is arranged on joist, and the height encloses
Column and low fence are rotatably arranged on the workbench respectively.
In any of the above-described technical scheme, further, the high fence and low fence can be rotated by rotating shaft respectively
Ground is arranged on the workbench.
In any of the above-described technical scheme, further, in addition to be arranged at the high fence and the workbench it
Between wedge, be also equipped with the wedge between the workbench and the low fence.
In any of the above-described technical scheme, further, in addition to for fixing the hook plate of the workbench and joist.
In any of the above-described technical scheme, further, described hook plate one end is fixed on the workbench, the other end
It is provided with the hook groove matched with the joist.
In any of the above-described technical scheme, further, the through hole matched with the wedge is provided with the hook plate.
In any of the above-described technical scheme, further, population is offered on the high fence.
In any of the above-described technical scheme, further, the upper population is provided with door-plate on the high fence,
The door-plate can be rotatably arranged on the high fence.
Present invention also offers a kind of high-altitude construction method, wherein, using foldable high-altitude construction platform as described above,
Concretely comprise the following steps:
S1, workbench being arranged on joist, low fence is set close to building girder, and high fence is set away from building girder,
Low fence and high fence are finally fixed using wedge;
S2, it is provided with baffle plate between the high fence and the low fence.
In any of the above-described technical scheme, further, in step S1 use and hook plate by the workbench and the support
Beam connects.
Using above-mentioned technical proposal, the present invention has the advantages that:
High fence and low fence are rotatably arranged in institute respectively described in foldable high-altitude construction platform provided by the invention
State on workbench, open fence and constructed, fold and pack up when that need not use.It can ensure that safety, saving repeat to take
It the cost built, can reuse, there are safe and low cost and other advantages.
Further, in addition to the wedge that is arranged between the high fence and the workbench, the workbench
The wedge is also equipped between the low fence.
Further, in addition to for fixing the hook plate of the workbench and joist.
The additional aspect and advantage of the present invention will become obvious in following description section, or the practice by the present invention
Recognize.
Embodiment
Technical scheme is clearly and completely described below in conjunction with accompanying drawing, it is clear that described implementation
Example is part of the embodiment of the present invention, rather than whole embodiments.Based on the embodiment in the present invention, ordinary skill
The every other embodiment that personnel are obtained under the premise of creative work is not made, belongs to the scope of protection of the invention.
It should be noted that in the case where not conflicting, the feature in embodiments herein and embodiment can be mutually combined.
In the description of the invention, it is necessary to explanation, term " " center ", " on ", " under ", "left", "right", " vertical ",
The orientation or position relationship of the instruction such as " level ", " interior ", " outer " be based on orientation shown in the drawings or position relationship, merely to
Be easy to the description present invention and simplify description, rather than instruction or imply signified device or element must have specific orientation,
With specific azimuth configuration and operation, therefore it is not considered as limiting the invention.In addition, term " first ", " second ",
" the 3rd " is only used for describing purpose, and it is not intended that instruction or hint relative importance.
In the description of the invention, it is necessary to illustrate, unless otherwise clearly defined and limited, term " installation ", " phase
Even ", " connection " should be interpreted broadly, for example, it may be being fixedly connected or being detachably connected, or be integrally connected;Can
To be mechanical connection or electrical connection;Can be joined directly together, can also be indirectly connected by intermediary, Ke Yishi
The connection of two element internals.For the ordinary skill in the art, with concrete condition above-mentioned term can be understood at this
Concrete meaning in invention.
With reference to specific embodiment the present invention will be further explained explanation.
As shown in Figures 1 to 4, the foldable high-altitude construction platform that the embodiment of first aspect present invention provides, including work
Make platform 102, high fence 103 and low fence 104;Workbench 102 is arranged on joist 300, the high fence 103 and low is enclosed
Column 104 is rotatably arranged on the workbench 102 respectively.
In any of the above-described technical scheme, further, the high fence 103 and low fence 104 pass through rotating shaft 107 respectively
It can be rotatably arranged on the workbench 102.
As shown in fig. 6, size can be designed according to the size of building girder 301 in foldable high-altitude construction platform, can
So that various sizes of foldable high-altitude construction platform is laid out into combination according to the size of building girder 301.Foldable high-altitude construction is flat
Platform includes standard knot 100 and adjustment section 200, and the length×width×height of standard knot 100 is 2m × 1m × 1.2m.Adjustment section
200 size can be designed according to demand, and multiple standard knots 100 are laid out along the surrounding of building girder 301 and start to be laid out, middle
Space is using adjustment section 200.
The both sides of workbench 102 are high fence 103 and low fence 104, are connected as one with workbench 102.High fence
103 in outside, is highly 1200mm, low fence 104 is 200mm in inside height, and the low side of fence 104 is need of work, no
Influence work.The safe altitude of the high side of fence 103 to ensure personal security, and its intensity, rigidity can resist completely personnel,
The dependence or collision of object, will not collapse and damage, to prevent and avoid the generation of the accident of falling at high altitude.
Using rotating shaft 107 low skirt column can be made first to be folded on workbench 102, under then flash fence is folded again
Come, form one with workbench 102, so as to reduce volume, in order to the lifting of foldable high-altitude construction platform, transport,
Storage and keeping.Standard knot 100 after folding is highly only that (the wide x of the long x of the specification of standard knot 100 after folding are high by 200mm
For:2000mm×1263mm×200mm).5 layers of only 1 meter of height are such as piled up when storage and transhipment, by that analogy.Greatly facilitate
Hoisting transportation, storage and the keeping in building site.
In any of the above-described technical scheme, further, in addition to the high fence 103 and the workbench are arranged at
Wedge 105 between 102, the wedge 105 is also equipped between the workbench 102 and the low fence 104.Wedge is set
Plate 105 is easy to high fence 103 and low fence 104 to be perpendicularly fixed on workbench 102.
Wedge is locked by the high fence 103 of both sides and low fence 104, make this state high fence 103 and low fence 104 not
It is foldable, wedge just foldable fence is only beaten when needing and removing.This ensure that construction safety.
In any of the above-described technical scheme, further, in addition to for fixing the workbench 102 and joist 300
Hook plate 106.Standard knot 100 is connected with the joist 300 of bottom using plate 106 is hooked.
In any of the above-described technical scheme, further, described hook plate 106 one end is fixed on the workbench 102,
The other end is provided with the hook groove matched with the joist 300.
In any of the above-described technical scheme, further, it is provided with what is matched with the wedge 105 on the hook plate 106
Through hole.Gap insertion of the plate 106 from workbench is hooked, upper part carries the through hole matched with wedge 105, inserted for wedge,
Lower part is connected by hooking groove with joist 300.
Standard knot 100 is connected with joist 300 using plate 106 is hooked, and is set on the hook plate 106 being arranged on workbench 102
There is through hole, wedge 105 is squeezed into by through hole in the through hole for hooking plate 106, for fixing fence.Foldable high-altitude construction platform can roll over
Stacked design novel and unique, non-bolted joint, only with hook plate 106 plus wedge quickly connect, quick fixed and fast assembling-disassembling.
Pass in and out for the ease of people, in any of the above-described technical scheme, further, offered on the high fence 103
Population.The standard knot for offering population is the special section 201 of band door.
In any of the above-described technical scheme, further, the upper population is provided with door on the high fence 103
Plate, the door-plate can be rotatably arranged on the high fence 103.
In any of the above-described technical scheme, further, the high fence 103 and low fence 104 weld by multiple tubing
Connect and form.
Workbench 102 is welded skeleton by light-duty tubing, and surface is that 3mm thickness checkered steel plate is with the weldering of following skeleton
One.Workmen walks spacious firm, anti-skidding, safety, steady and sure nothing on the workbench that width is 1m and rocked relatively.
Present invention also offers a kind of high-altitude construction system, wherein, including foldable high-altitude construction platform as described above,
Also include the baffle plate 302 being arranged between the high fence 103 and the low fence 104.
As shown in figure 5, being provided with multiple joists 300 on bent cap or crossbeam in building girder 301, foldable high-altitude is constructed
Platform is arranged on joist 300.
Present invention also offers a kind of high-altitude construction method, wherein, using foldable high-altitude construction platform as described above,
Concretely comprise the following steps:
S1, workbench 102 is arranged on joist 300, low fence 104 is set close to building girder 301, high fence 103
Set away from building girder 301, low fence 104 and high fence 103 are finally fixed using wedge 105;
S2, in order to ensure the safety of workmen, be provided with gear between the high fence 103 and the low fence 104
Plate 302.
Specifically it is installed as:When building site bent cap or construction of beam, on the anchor ear of pier stud, all made using two large-scale I-steel
For bottom girder, some small shaped steel are laterally laid on two big bottom girder, small shaped steel is generally channel-section steel or I-steel, the interval of small shaped steel
Generally 50cm-60cm, small shaped steel length are generally 6m.With this basis, the foldable high-altitude construction platform be just mounted in by
On the platform of these small shaped steel layings.
The thickness of both sides steel form and the distance for width requirement of constructing separately is added to place standard knot according to bent cap or other crossbeams
100 should consider the length, width and height size requirement of construction beam with adjustment section 200, position, after arranging that particular location is proper on request,
Caught on the joist 300 below hook plate and platform and wedging, wedge 105 are located at four angles of each standard knot 100.Due to
The length, width and height size of every kind of construction concrete beam is not quite similar, it is therefore desirable to has adjustment section 200 to be made up, the standard knot 100 in outside
Carry out fill up the gap provided with baffle plate 302.Installation is simple, reliable, rapid, improves efficiency of construction.It can also use according to demand
The special section 201 of band door replaces a section or more standard section 100, is easy to the discrepancy of workmen.
In any of the above-described technical scheme, further, in step S1 using hook plate 106 by the workbench 102 with
The joist 300 connects.
Foldable high-altitude construction platform provided by the invention solves the various safe skills of difficulty in the presence of site construction
Art problem, and use is can be repeated several times, waste of manpower, material resources are not repeated, have significantly saved construction cost, it is ensured that construction
It is safe efficient, quick.
Reasonable in design, firm welding, process, factorial praluction, materials ensure, can stand slight rush
Hit, it is not easy to collapse, deform, can reuse for a long time.Especially connect the smart design of non-bolt.Bolt will not be produced to lose
Lose, without supplementing new bolt every time.Even if make high fence with hooking plate 106 and catching on the following standard knot 100 of joist 300 and fix and reach
103 and low fence 104 it is fixed.As long as wedge is beaten during dismounting can remove standard knot 100, fence self-locking is also beaten simultaneously
Open, you can fold transhipment.Whole installation, demolition process do not have to bolt, without spanner, only need one iron chains head can be completed, significantly
Simplify work progress.
In summary, high fence 103 and low fence 104 are distinguished described in foldable high-altitude construction platform provided by the invention
It is rotatably arranged on the workbench 102, opens fence and constructed, fold and pack up when that need not use.It can protect
Card safety, save the cost for repeating to build, can reuse, there are safe and low cost and other advantages.
Finally it should be noted that:Various embodiments above is merely illustrative of the technical solution of the present invention, rather than its limitations;To the greatest extent
The present invention is described in detail with reference to foregoing embodiments for pipe, it will be understood by those within the art that:Its according to
The technical scheme described in foregoing embodiments can so be modified, either which part or all technical characteristic are entered
Row equivalent substitution;And these modifications or replacement, the essence of appropriate technical solution is departed from various embodiments of the present invention technology
The scope of scheme.In addition, it will be appreciated by those of skill in the art that although some embodiments described herein include other implementations
Included some features rather than further feature in example, but the combination of the feature of different embodiments means in the present invention
Within the scope of and form different embodiments.For example, in superincumbent claims, embodiment claimed
It is one of any mode to use in any combination.