CN109441111A - A kind of superduty embedded part mounting and fixing support method of conticaster - Google Patents

A kind of superduty embedded part mounting and fixing support method of conticaster Download PDF

Info

Publication number
CN109441111A
CN109441111A CN201811577723.2A CN201811577723A CN109441111A CN 109441111 A CN109441111 A CN 109441111A CN 201811577723 A CN201811577723 A CN 201811577723A CN 109441111 A CN109441111 A CN 109441111A
Authority
CN
China
Prior art keywords
embedded
concrete
upright bar
steel slab
steel plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811577723.2A
Other languages
Chinese (zh)
Inventor
严冬
孟凡勇
周放
秦亮
杨子健
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Shougang Construction Group Co Ltd
Original Assignee
Beijing Shougang Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Shougang Construction Group Co Ltd filed Critical Beijing Shougang Construction Group Co Ltd
Priority to CN201811577723.2A priority Critical patent/CN109441111A/en
Publication of CN109441111A publication Critical patent/CN109441111A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/41Connecting devices specially adapted for embedding in concrete or masonry

Abstract

A kind of superduty embedded part mounting and fixing support method of conticaster, belongs to construction installation of embedded parts technical field.First before wall bottom pours concrete, fixation steel plate (1) is mounted on concrete top surface, after concrete placings, concrete reaches intensity, on fixation steel plate (1) weld upright bar (2), upright bar (2) with channel steel [10 manufacture, 1 meter of spacing;After upright bar (2) firm welding, cross bar (3) are welded according to 1.2 meters of horizontal spaces, cross bar (3) firm welding, then weld diagonal brace (4), it is entire to reinforce frame body firm welding, it is connect with all round victory scaffold on the inside of wall;According to wall position control line and pre-embedded steel slab position welding adjustment rod member (5), pre-embedded steel slab and adjustment rod member are welded, and adjust verticality, flatness.The advantage is that method is simple, effective, strong operability improves working efficiency, and pre-embedded steel slab installation accuracy is high, it is ensured that construction quality.

Description

A kind of superduty embedded part mounting and fixing support method of conticaster
Technical field
The invention belongs to construction installation of embedded parts technical field, in particular to the superduty embedded part of a kind of conticaster is pacified Fill fixed frame method.
Background technique
Shoudu Iron and Steel Co capital Tang second phase steel-making continuous casting engineering, a construction unit is steel-making continuous casting 1# slab caster in this engineering, Structure type is reinforced concrete structure.Fan-shaped section width of wall body be 1000mm and 800mm, wall height by -1.5 meters extremely 14.21 meters, wall inside is abound with pre-embedded steel slab, and fan-shaped arrangement, and pre-embedded steel slab full-size is 6800 × 670 × 20, And integral installation is needed, guarantees that pre-embedded steel slab verticality, flatness are difficult.
Summary of the invention
The purpose of the present invention is to provide a kind of superduty embedded part mounting and fixing support methods of conticaster, solve pre-buried steel The problems such as board size is big, and integral installation difficulty is big is effectively controlled pre-embedded steel slab verticality, flatness using the method, protects Pre-embedded steel slab precision is demonstrate,proved.
The present invention includes fixation steel plate, upright bar, cross bar, diagonal brace, adjustment rod member etc., the specific steps are as follows:
1) first before wall bottom pours concrete, fixation steel plate 1 is mounted on concrete top surface, after concrete placings, concrete reaches strong Degree, welded on fixation steel plate 1 [10 channel steel upright bars 2,1 meter of spacing.
2) after 2 firm welding of upright bar, cross bar 3,3 firm welding of cross bar are welded according to 1.2 meters of horizontal spaces, then weld diagonal brace 4, it is entire to reinforce frame body firm welding, it is simply connect with all round victory scaffold on the inside of wall;
3) adjustment rod member 5 is welded according to wall position control line and pre-embedded steel slab position, pre-embedded steel slab and adjustment rod member are welded It connects, and adjusts verticality, flatness.
Step 1) 2) described in fixation steel plate 1, upright bar 2, cross bar 3 and diagonal brace 4 form entire frame body, guarantee steel plate installation Stability.
Adjustment rod member 5 described in step 3) and pre-embedded steel slab weld, and adjustable, guarantee the essence of pre-embedded steel slab Degree.
The present invention has the advantages that construction method is simple, effective, strong operability improves working efficiency, pre-embedded steel slab peace It is high to fill precision, it is ensured that construction quality.
Detailed description of the invention
Fig. 1 is the fixed schematic diagram of frame body.Wherein, fixation steel plate 1
Fig. 2 is frame body upright bar scheme of installation.Wherein, upright bar 2
Fig. 3 is frame body cross bar scheme of installation.Wherein, cross bar 3
Fig. 4 is frame body diagonal brace scheme of installation.Wherein, diagonal brace 4
Fig. 5 is pre-embedded steel slab scheme of installation.Wherein, adjustment rod member 5
Specific embodiment
Embodiment 1
FIG. 1 to FIG. 5 is a kind of specific embodiment of the invention patent.It is further to the invention patent with reference to the accompanying drawing Explanation.
1, Fig. 1 is construction step 1: first before wall bottom pours concrete, and fixation steel plate 1 is mounted on concrete top surface, Gu Steel plate 1 is determined having a size of 150mm × 150mm × 12mm, fixation steel plate 1 is placed on the inside of wall steel bar, and 1 meter of horizontal space.
2, Fig. 2 is construction step 2: pouring wall lower concrete, after concrete strength reaches 80%, carries out frame body Upright bar 2 is welded, and using channel steel, [10 are manufactured, 1 meter of 2 spacing of upright bar, when upright bar 2 is welded, with all round victory foot hand on the inside of wall for upright bar 2 Frame is fixed temporarily, and prevents upright bar from tilting.
3, Fig. 3 is construction step 3: after upright bar 2 and 1 firm welding of fixation steel plate, and horizontal cross bar 3 and upright bar 2 are fully welded, [10, horizontal cross bar 3 is in 2 outside of upright bar, 1.2 meters of vertical spacing using channel steel for horizontal cross bar 3.
4, Fig. 4 is construction step 4: after 3 firm welding of upright bar 2 and cross bar, is carrying out frame body reinforcing, diagonal brace 4 and upright bar 2, The welding of the oblique drawknot of cross bar 3,4 Cai Yong ∟ of diagonal brace, 50 × 5 angle steel, 2 meters of 4 horizontal space of diagonal brace, entire frame body is firm after having welded Reliably.
5, Fig. 5 is construction step 5: after entire frame body has welded, and is adjusted the welding of rod piece 5, first carries out wall pre-embedded Measurement of the steel plate line setting welds adjustment rod member 5 and frame body according to pre-embedded steel slab position, and adjustment rod member 5 uses 25 steel of screw thread Muscle leans out wall 5cm in pre-embedded steel slab side, pedestal is welded in pre-embedded steel slab bottommost, by pre-embedded steel slab position in adjustment rod member 5 Drawn on pedestal with slate pencil, and hanging wire, be ready for pre-embedded steel slab lifting, according to position it is in place after, by pre-embedded steel slab and adjust Whole rod piece 5 and tube chamber welds with base are secured, and the position that adjustment rod member 5 is leant out is cut, concordant with pre-embedded steel slab.

Claims (3)

1. a kind of superduty embedded part mounting and fixing support method of conticaster, which is characterized in that specific step is as follows:
1) first before wall bottom pours concrete, fixation steel plate (1) is mounted on concrete top surface, after concrete placings, concrete reaches intensity, On fixation steel plate (1) weld upright bar (2), upright bar (2) with channel steel [10 manufacture, 1 meter of spacing;
2) after upright bar (2) firm welding, cross bar (3) are welded according to 1.2 meters of horizontal spaces, cross bar (3) firm welding, then weld tiltedly It supports (4), it is entire to reinforce frame body firm welding, it is connect with all round victory scaffold on the inside of wall;
3) it is welded according to wall position control line and pre-embedded steel slab position welding adjustment rod member (5), pre-embedded steel slab and adjustment rod member, And adjust verticality, flatness.
2. the method according to claim 1, wherein step 1), 2) described in fixation steel plate (1), upright bar (2), cross bar (3) and diagonal brace (4) form entire frame body, guarantee the stability of steel plate installation.
3. the method according to claim 1, wherein adjustment rod member described in step 3) (5) and pre-embedded steel slab Welding, and can adjust, guarantee the precision of pre-embedded steel slab.
CN201811577723.2A 2018-12-20 2018-12-20 A kind of superduty embedded part mounting and fixing support method of conticaster Pending CN109441111A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811577723.2A CN109441111A (en) 2018-12-20 2018-12-20 A kind of superduty embedded part mounting and fixing support method of conticaster

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811577723.2A CN109441111A (en) 2018-12-20 2018-12-20 A kind of superduty embedded part mounting and fixing support method of conticaster

Publications (1)

Publication Number Publication Date
CN109441111A true CN109441111A (en) 2019-03-08

Family

ID=65535308

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811577723.2A Pending CN109441111A (en) 2018-12-20 2018-12-20 A kind of superduty embedded part mounting and fixing support method of conticaster

Country Status (1)

Country Link
CN (1) CN109441111A (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202031339U (en) * 2011-04-27 2011-11-09 中国五冶集团有限公司 High-precision equipment installing and positioning tool
CN103790377A (en) * 2012-10-29 2014-05-14 五冶集团上海有限公司 Heavy embedded part ultrahigh mounting precision control method
CN104234385A (en) * 2014-08-25 2014-12-24 中国十七冶集团有限公司 Mounting and construction method for terrace large-size steel plate embedded part
CN105350654A (en) * 2015-11-13 2016-02-24 中国水利水电第十四工程局有限公司 Construction method for adjusting steel plate embedded parts to reach design and construction accuracy
CN206090854U (en) * 2016-10-21 2017-04-12 中冶华天工程技术有限公司 Dismantled and assembled support device
CN206570949U (en) * 2017-03-08 2017-10-20 中铁四局集团第四工程有限公司 It is a kind of precisely to adjust the device of pre-embedded steel slab elevation
CN207047889U (en) * 2017-08-11 2018-02-27 马鞍山钢铁建设集团有限公司 A kind of device for installing forging machine main frame embedded part

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202031339U (en) * 2011-04-27 2011-11-09 中国五冶集团有限公司 High-precision equipment installing and positioning tool
CN103790377A (en) * 2012-10-29 2014-05-14 五冶集团上海有限公司 Heavy embedded part ultrahigh mounting precision control method
CN104234385A (en) * 2014-08-25 2014-12-24 中国十七冶集团有限公司 Mounting and construction method for terrace large-size steel plate embedded part
CN105350654A (en) * 2015-11-13 2016-02-24 中国水利水电第十四工程局有限公司 Construction method for adjusting steel plate embedded parts to reach design and construction accuracy
CN206090854U (en) * 2016-10-21 2017-04-12 中冶华天工程技术有限公司 Dismantled and assembled support device
CN206570949U (en) * 2017-03-08 2017-10-20 中铁四局集团第四工程有限公司 It is a kind of precisely to adjust the device of pre-embedded steel slab elevation
CN207047889U (en) * 2017-08-11 2018-02-27 马鞍山钢铁建设集团有限公司 A kind of device for installing forging machine main frame embedded part

Similar Documents

Publication Publication Date Title
CN208219413U (en) A kind of bridge pad pinner adjustable template device
CN201258496Y (en) One-column and one-pile correcting device
CN103352476B (en) Large-scale bolt high-precision pre-burying construction method
WO2009125070A1 (en) Scaffold element, arrangement and method of use
CN112127637A (en) Construction method for pre-buried vertical component steel bars of foundation layer of fabricated building
CN105317052B (en) Tower crane foundation bolt fixing method
CN205894490U (en) Steel core concrete column and pile foundation connection structure
CN109441111A (en) A kind of superduty embedded part mounting and fixing support method of conticaster
CN208310244U (en) A kind of device for control panel surface evenness
CN212641437U (en) Pile-forming orifice operation device for large-diameter ultra-deep cast-in-place pile
CN206815369U (en) Built-in fitting Fast Installation precise adjusting device
KR101777746B1 (en) A support
CN205955239U (en) Calibrated mount is used in lattice column construction
CN106958233B (en) For pouring the hydraulic self-lifting formula cantilever form construction method of Arch Dam Concrete
CN206667042U (en) Bridge expanssion joint installation and adjustment instrument
EP1925757A1 (en) Method for prefabricating the metal reinforcement of beams and columns for standard-length mixed steel/concrete structures and a telescopic beam
CN215925688U (en) Adjustable inclined tower column construction support
CN113107100B (en) Leveling method for tower crane embedded joint
CN209243975U (en) A kind of prefabricated Kan Tai stirrup bracket
CN205024709U (en) Buried bolt's device is in advance suspended in midair on basis
CN212000638U (en) Overhead cover beam type steel supporting structure
CN209874513U (en) Auxiliary device for accurately positioning embedded steel plate of support
CN209779457U (en) Supporting device for box girder side template
CN207878662U (en) Combined type pre-embedded steel slab
JP2011256610A (en) Formwork device and method for relocating formwork device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20190308

WD01 Invention patent application deemed withdrawn after publication