CN106245670A - Exposed steel column base construction method - Google Patents
Exposed steel column base construction method Download PDFInfo
- Publication number
- CN106245670A CN106245670A CN201610703308.1A CN201610703308A CN106245670A CN 106245670 A CN106245670 A CN 106245670A CN 201610703308 A CN201610703308 A CN 201610703308A CN 106245670 A CN106245670 A CN 106245670A
- Authority
- CN
- China
- Prior art keywords
- cup
- rim
- concrete
- steel
- steel column
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 86
- 239000010959 steel Substances 0.000 title claims abstract description 86
- 238000000034 method Methods 0.000 title claims description 6
- 238000009411 base construction Methods 0.000 title 1
- 239000004567 concrete Substances 0.000 claims abstract description 32
- 238000010276 construction Methods 0.000 claims abstract description 31
- 238000009434 installation Methods 0.000 claims abstract description 4
- 238000012423 maintenance Methods 0.000 claims abstract description 4
- 230000003014 reinforcing effect Effects 0.000 claims description 7
- 230000000903 blocking effect Effects 0.000 claims description 6
- 238000004873 anchoring Methods 0.000 claims description 3
- 230000015572 biosynthetic process Effects 0.000 claims description 3
- 238000004140 cleaning Methods 0.000 claims description 3
- 239000013039 cover film Substances 0.000 claims description 3
- 238000003466 welding Methods 0.000 claims description 3
- 238000000465 moulding Methods 0.000 claims description 2
- 229910001294 Reinforcing steel Inorganic materials 0.000 abstract 1
- 239000011150 reinforced concrete Substances 0.000 description 5
- 239000000725 suspension Substances 0.000 description 4
- 230000000694 effects Effects 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 230000002787 reinforcement Effects 0.000 description 2
- 241000705935 Parophrys vetulus Species 0.000 description 1
- 241000269978 Pleuronectiformes Species 0.000 description 1
- 230000003321 amplification Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 230000015271 coagulation Effects 0.000 description 1
- 238000005345 coagulation Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 239000006185 dispersion Substances 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 239000008267 milk Substances 0.000 description 1
- 210000004080 milk Anatomy 0.000 description 1
- 235000013336 milk Nutrition 0.000 description 1
- 238000003199 nucleic acid amplification method Methods 0.000 description 1
- 238000010008 shearing Methods 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
- 239000004575 stone Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/32—Foundations for special purposes
- E02D27/42—Foundations for poles, masts or chimneys
Abstract
A construction method of an exposed steel column base comprises the following steps: s1: reserving a cup opening at the installation position of the section steel column, and S2: embedding foundation bolts, S3: carrying out layered pouring maintenance on the concrete of the foundation slab, and S4: hoisting the section steel column and adjusting the verticality and elevation, S5: and pouring concrete at the cup mouth. According to the construction method, the cup mouth is formed in the bottom space of the steel column foot, the reserved space is large, the elevation and verticality adjustment of the section steel column is convenient to operate, and the construction efficiency is high; concrete can be directly poured, pressure equipment is not needed, and the construction cost is low; in addition, common concrete pouring can be adopted to replace pressure grouting, high-grade concrete can be poured into the cup mouth according to construction requirements, construction operation is easier to control, and quality is easy to guarantee; because the annular steel plate and the foundation bolt are welded and fixed during construction, and the annular steel plate is laid on the reinforcing steel bar net of the bottom plate, the elevation control is facilitated, the local compressive strength is enhanced, and the column base pressure is uniformly dispersed.
Description
Technical field
The present invention relates to a kind of construction techniques, a kind of exposed steel kind design construction method.
Background technology
In construction steel structure, the effect of steel kind design is that the axle power of steel column bottom, shearing, moment of flexure are passed to basis, makes
Superstructure is effectively connected together with basis;Steel kind design is generally divided into exposed steel kind design, insert-type steel by structural form
Suspension column and outer-enwraped type steel kind design, exposed steel kind design refer to base plate at the bottom of post or boots beam be fixed on by crab-bolt on the basis of suspension column
Form, the most conventional exposed steel kind design construction method is to use foundation bolt construction, owing to the i.e. steel column of reinforced concrete column is installed
Need to carry out reinforced concrete column absolute altitude after in place and perpendicularity adjusts, so one can be reserved bottom reinforced concrete column and between sole plate
The small space of about 5cm, reinforced concrete column absolute altitude and perpendicularity take measure that secondary pressure is in the milk, more i.e. with thin after having adjusted
Stone concrete pressure grouting, grouting quality reaches the closely knit entirety that can form uniform stressed.
This construction method is disadvantageous in that:
1. reinforced concrete column perpendicularity adjustment enforcement space is less, inconvenient operation;
2. two construction qualities are difficult to ensure that, easily form hollowing, and steel kind design power transmission is uneven;
3. need to use press device and team's group of pressure grouting, cause cost to increase.
Summary of the invention
The back-grouting difficult quality that the purpose of the present invention generally exists in constructing for exposed steel kind design controls, reinforcing bar
Post perpendicularity adjusts the problem of difficulty, improves existing construction technology, thus reaches steel column and be connected more with sole plate
Reliably, perpendicularity adjusts the easiest purpose, improves construction quality.
The present invention adopts the technical scheme that: a kind of exposed steel kind design construction method, comprises the steps:
S1: stay in steel column installation position and set rim of a cup
Lay sole plate reinforcing bar, and press periphery, the steel column position inserting column joint bar of drawing setting, at sole plate reinforcing bar and
After post joint bar has been constructed, within one week, carry out blocking along post joint bar with steel wire or fast-easy closing-up net and set formation rim of a cup, the degree of depth of blocking
The i.e. rim of a cup degree of depth adapts with the lift height of sole plate concreting, for 50-100cm;The shape of rim of a cup and steel column
Unanimously, or it is square column, or is cylinder;
S2: pre-embedded anchoring bolts
S21: the doughnut-shaped steel plate corresponding with steel column sole is set, foundation bolt is weldingly fixed on doughnut-shaped steel plate;
S22: doughnut-shaped steel plate is erected on the reinforced mesh of sole plate, and use spot welding to fix in surrounding, it is positioned at annular steel
The foundation bolt of plate bottom puts in sole plate;
S23: be positioned at the foundation bolt upper ends adjusting nut on doughnut-shaped steel plate top;
S3: sole plate concrete is carried out placement layer by layer, maintenance
S31: placement layer by layer sole plate, first pours rim of a cup underlying layers, pours rim of a cup before rim of a cup underlying layers concrete initial set
Concrete outside block, rim of a cup molding;
S32: timely cover film carries out concrete curing after concreting completes;
S4: lifting steel column also adjusts perpendicularity and absolute altitude
Make its sole be inserted in foundation bolt steel column lifting, nut is installed and fixes temporarily, and draw in surrounding and set guy
It is fixing that rope carries out auxiliary to steel column, then utilizes adjusting nut to carry out the adjustment of perpendicularity and absolute altitude;
S5: pour rim of a cup concrete
Pouring rim of a cup with the pea gravel concreten of a high label, steel kind design has been constructed.
Its further technical scheme is: before carrying out step S5, first that the garbage-cleaning in rim of a cup is clean, as arranged
Use steel wire to block during rim of a cup to set, then need concrete interface is carried out dabbing process, then brush one plain concrete viscous to strengthen
Knot power.
Owing to taking above technical scheme, a kind of exposed steel kind design construction method of the present invention has following useful effect
Really:
1. steel kind design bottom space is carried out " amplification " by block device and is reduced to below sole plate by this construction method, shape
Becoming a rim of a cup, cup mouth size is bigger than conventional headspace, and steel column absolute altitude and perpendicularity adjust easy to operate, efficiency of construction
High;
2. more much bigger than conventional headspace due to steel column bottom space (rim of a cup) size, it is possible to directly to pour coagulation
Soil, material requested equipment is simple, it is not necessary to use press device, it is not necessary to using team's group of pressure grouting, construction cost is low;
The most in addition common concreting can be used to replace pressure grouting, and constructing operation is easier to control, and quality is easily guaranteed that;
4. using doughnut-shaped steel plate to be welded and fixed with foundation bolt time due to construction, doughnut-shaped steel plate can be laid on the bar-mat reinforcement of base plate
On, not only contribute to the fixing of foundation bolt, and beneficially elevation control, the beneficially comprcssive strength of reinforcement local are the most all
Even dispersion column foot press power;
5. can need in rim of a cup, irrigate high-grade concrete according to construction, be more beneficial for suspension column stress.
Below, in conjunction with accompanying drawing, the technical characteristic of a kind of exposed steel kind design construction method of present invention invention is made further
Explanation.
Accompanying drawing explanation
A kind of exposed steel kind design construction method schematic diagram of Fig. 1~Fig. 3: the present invention:
Fig. 1 is steel kind design construction plan, and Fig. 2 is the A-A sectional view of Fig. 1, and Fig. 3 is the B portion enlarged drawing of Fig. 2;
In figure:
1 steel column, 11 soles, 2 adjusting nuts, 3 reinforced mesh, 4 rims of a cup, 5--blocks device, 6 bases
Base plate, 7 foundation bolts, 8 doughnut-shaped steel plates, 9 post joint bars.
Detailed description of the invention
A kind of exposed steel kind design construction method, comprises the steps:
S1: stay in steel column installation position and set rim of a cup
Lay sole plate reinforcing bar, and press periphery, the steel column position inserting column joint bar of drawing setting, at sole plate reinforcing bar and
After post joint bar has been constructed, within one week, carry out blocking along post joint bar with steel wire or fast-easy closing-up net and set formation rim of a cup, the degree of depth of blocking
The i.e. rim of a cup degree of depth adapts with the lift height of sole plate concreting, for 50-100cm;The shape of rim of a cup and steel column
Unanimously, or it is square column, or is cylinder;Section is straight up and down, or leaves certain slope;
S2: pre-embedded anchoring bolts
S21: the doughnut-shaped steel plate corresponding with steel column sole is set, foundation bolt is weldingly fixed on doughnut-shaped steel plate;
S22: doughnut-shaped steel plate is erected on the reinforced mesh of sole plate, and use spot welding to fix in surrounding, it is positioned at annular steel
The foundation bolt of plate bottom puts in sole plate;
S23: be positioned at the foundation bolt upper ends adjusting nut on doughnut-shaped steel plate top;
S3: sole plate concrete is carried out placement layer by layer, maintenance
S31: placement layer by layer sole plate, first pours rim of a cup underlying layers, pours rim of a cup before rim of a cup underlying layers concrete initial set
Concrete outside block, due to the stop of block, forms a rim of a cup not having concrete under suspension column;
S32: timely cover film carries out concrete curing after concreting completes;
S4: lifting steel column also adjusts perpendicularity and absolute altitude
Steel column lifting makes its sole be inserted in foundation bolt (i.e. sole support is lived by adjusting nut), nut is installed and carries out
Interim fixing, and draw in surrounding and set cable wind rope that steel column carries out auxiliary is fixing, then utilize adjusting nut carry out perpendicularity and
The adjustment of absolute altitude;
S5: pour rim of a cup concrete
Pouring rim of a cup with the pea gravel concreten of a high label, steel kind design has been constructed.
Before carrying out step S5, first that the garbage-cleaning in rim of a cup is clean, set as used steel wire to block when arranging rim of a cup,
Then needing concrete interface carries out dabbing process (setting as blocked with fast-easy closing-up net, be not required to carry out dabbing process), then brush is together
Plain concrete is with reinforced cementitious power.
Illustrate: during construction, outside steel column, need to break concrete form profile steel concrete column, the encirclement that post joint bar is formed
Circle is the concrete outward flange surrounded by steel column, is also the position setting rim of a cup.
Claims (2)
1. an exposed steel kind design construction method, it is characterised in that: comprise the steps:
S1: stay in steel column installation position and set rim of a cup
Lay sole plate reinforcing bar, and press periphery, the steel column position inserting column joint bar of drawing setting, at sole plate reinforcing bar and
After post joint bar has been constructed, within one week, carry out blocking along post joint bar with steel wire or fast-easy closing-up net and set formation rim of a cup, the degree of depth of blocking
The i.e. rim of a cup degree of depth adapts with the lift height of sole plate concreting, for 50-100cm;The shape of rim of a cup and steel column
Unanimously, or it is square column, or is cylinder;Section is straight up and down, or leaves certain slope;
S2: pre-embedded anchoring bolts
S21: the doughnut-shaped steel plate corresponding with steel column sole is set, foundation bolt is weldingly fixed on doughnut-shaped steel plate;
S22: doughnut-shaped steel plate is erected on the reinforced mesh of sole plate, and use spot welding to fix in surrounding, it is positioned at annular steel
The foundation bolt of plate bottom puts in sole plate;
S23: be positioned at the foundation bolt upper ends adjusting nut on doughnut-shaped steel plate top;
S3: sole plate concrete is carried out placement layer by layer, maintenance
S31: placement layer by layer sole plate, first pours rim of a cup underlying layers, pours rim of a cup before rim of a cup underlying layers concrete initial set
Concrete outside block, rim of a cup molding;
S32: timely cover film carries out concrete curing after concreting completes;
S4: lifting steel column also adjusts perpendicularity and absolute altitude
Make its sole be inserted in foundation bolt steel column lifting, nut is installed and fixes temporarily, and draw in surrounding and set guy
It is fixing that rope carries out auxiliary to steel column, then utilizes adjusting nut to carry out the adjustment of perpendicularity and absolute altitude;
S5: pour rim of a cup concrete
Pouring rim of a cup with the pea gravel concreten of a high label, steel kind design has been constructed.
One the most according to claim 1 exposed steel kind design construction method, it is characterised in that: carry out step S5 it
Before, first that the garbage-cleaning in rim of a cup is clean, set as used steel wire to block when arranging rim of a cup, then need concrete interface is dug
Hair processes, and then brushes one plain concrete with reinforced cementitious power.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610703308.1A CN106245670B (en) | 2016-08-22 | 2016-08-22 | Exposed steel column base construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610703308.1A CN106245670B (en) | 2016-08-22 | 2016-08-22 | Exposed steel column base construction method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106245670A true CN106245670A (en) | 2016-12-21 |
CN106245670B CN106245670B (en) | 2018-10-02 |
Family
ID=57594569
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610703308.1A Active CN106245670B (en) | 2016-08-22 | 2016-08-22 | Exposed steel column base construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106245670B (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108385987A (en) * | 2018-02-09 | 2018-08-10 | 中建五局第三建设有限公司 | The construction method of installation of thin and long shafts steel column and its matching used steel sleeve |
CN110016926A (en) * | 2018-01-10 | 2019-07-16 | 云南中乾集成房屋有限公司 | A kind of arrangement and method for construction of bearing capacity and the compound isolated footing of Floor screw under the steel column of duration simultaneous growth |
CN110230320A (en) * | 2019-05-30 | 2019-09-13 | 中铁二院工程集团有限责任公司 | A kind of construction method of high-speed railway touching net footing of a pillar structure |
CN111305470A (en) * | 2020-02-24 | 2020-06-19 | 中国建筑第二工程局有限公司 | Construction method of super high-rise first-section open-web type geometric steel concrete column |
CN112982471A (en) * | 2021-02-26 | 2021-06-18 | 中国能源建设集团江苏省电力设计院有限公司 | Connecting joint of crossing tower and foundation and construction method thereof |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202266034U (en) * | 2011-10-13 | 2012-06-06 | 武汉建工股份有限公司 | Fixing device for anchor bolts of embedded type diamond combined steel and concrete column feet |
CN202866002U (en) * | 2012-09-26 | 2013-04-10 | 苏州工业园区设计研究院股份有限公司 | Steel reinforced concrete non-embedded type pillar base |
CN203200914U (en) * | 2013-04-10 | 2013-09-18 | 上海嘉实(集团)有限公司 | Steel structure socle outward exposed connecting structure |
CN104234070A (en) * | 2014-07-23 | 2014-12-24 | 冠鲁建设股份有限公司 | Steel structure and foundation pre-burying connection structure and construction method |
US20150259913A1 (en) * | 2014-03-17 | 2015-09-17 | Hitachi Metals Techno, Ltd. | Column structure and base member |
-
2016
- 2016-08-22 CN CN201610703308.1A patent/CN106245670B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202266034U (en) * | 2011-10-13 | 2012-06-06 | 武汉建工股份有限公司 | Fixing device for anchor bolts of embedded type diamond combined steel and concrete column feet |
CN202866002U (en) * | 2012-09-26 | 2013-04-10 | 苏州工业园区设计研究院股份有限公司 | Steel reinforced concrete non-embedded type pillar base |
CN203200914U (en) * | 2013-04-10 | 2013-09-18 | 上海嘉实(集团)有限公司 | Steel structure socle outward exposed connecting structure |
US20150259913A1 (en) * | 2014-03-17 | 2015-09-17 | Hitachi Metals Techno, Ltd. | Column structure and base member |
CN104234070A (en) * | 2014-07-23 | 2014-12-24 | 冠鲁建设股份有限公司 | Steel structure and foundation pre-burying connection structure and construction method |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110016926A (en) * | 2018-01-10 | 2019-07-16 | 云南中乾集成房屋有限公司 | A kind of arrangement and method for construction of bearing capacity and the compound isolated footing of Floor screw under the steel column of duration simultaneous growth |
CN108385987A (en) * | 2018-02-09 | 2018-08-10 | 中建五局第三建设有限公司 | The construction method of installation of thin and long shafts steel column and its matching used steel sleeve |
CN110230320A (en) * | 2019-05-30 | 2019-09-13 | 中铁二院工程集团有限责任公司 | A kind of construction method of high-speed railway touching net footing of a pillar structure |
CN111305470A (en) * | 2020-02-24 | 2020-06-19 | 中国建筑第二工程局有限公司 | Construction method of super high-rise first-section open-web type geometric steel concrete column |
CN112982471A (en) * | 2021-02-26 | 2021-06-18 | 中国能源建设集团江苏省电力设计院有限公司 | Connecting joint of crossing tower and foundation and construction method thereof |
Also Published As
Publication number | Publication date |
---|---|
CN106245670B (en) | 2018-10-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106245670A (en) | Exposed steel column base construction method | |
CN105113389B (en) | Assembled type bridge pier column member with steel-concrete composite structure | |
CN104234385B (en) | Construction method of installation after a kind of terrace heavy steel plate built-in fitting | |
CN102864795B (en) | Light steel factory post foundation suitable for sedimentation of filled-in ground and construction method | |
US11365523B2 (en) | Methods for constructing tensionless concrete pier foundations and foundations constructed thereby | |
CN103669598A (en) | Layer added steel framework column base node on top of multi-layer concrete framework structure and construction method thereof | |
CN108035376B (en) | Anti-deformation rectification foundation applicable to goaf site wind turbine generator and construction method thereof | |
CN108005401A (en) | A kind of support and change method of the column of existing frame structure base isolation reinforcement | |
CN203669112U (en) | Added-storey steel frame column base joint on top of multilayer concrete frame structure | |
CN107044142B (en) | Adjustable reinforcement deviation correcting method and structure for reducing uneven settlement of house | |
CN109137762A (en) | A kind of waveform arch bar Strengthening Method of Two-way Curved Arch Bridges | |
CN106760615A (en) | A kind of ruggedized construction and its construction method for shear wall concrete replacement | |
CN202247711U (en) | Adjustable and controllable reinforced type bridge | |
CN108930224A (en) | Punching stick method bent cap supports regulating system construction method | |
CN207109593U (en) | A kind of T-shaped high pier Cast-in-place Bent Cap formwork erecting structure | |
KR101282333B1 (en) | Cross-type supporting structure and method for super-structure of bridge | |
CN109989395A (en) | A kind of large-scale storage tank bored concrete pile assembled pile cover and its construction method | |
KR100966639B1 (en) | Manhole repair method | |
EP3124705A1 (en) | Formers | |
CN211772879U (en) | Spacing top of steel case roof beam hoist and mount pushes away construction structures | |
CN108978697B (en) | Terrace template system and construction method | |
CN202577138U (en) | Integrated support suitable for mounting precast beams | |
KR101213404B1 (en) | Concrete structure for bridge and its manufacturing method | |
CN206467557U (en) | Soil pressure and the Integral Abutment structure for sedimentation of banketing after console | |
KR101756965B1 (en) | Height adjusting type maintanable rail track construction method and maintanance method using the same |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder | ||
CP01 | Change in the name or title of a patent holder |
Address after: No. 167, Donghuan Avenue, Liuzhou City, Guangxi Zhuang Autonomous Region Patentee after: Guangxi construction engineering Fifth Construction Engineering Group Co.,Ltd. Address before: No. 167, Donghuan Avenue, Liuzhou City, Guangxi Zhuang Autonomous Region Patentee before: THE FIFTH CONSTRUCTION ENGINEERING COMPANY OF GUANGXI CONSTRUCTION ENGINEERING Group |
|
PP01 | Preservation of patent right | ||
PP01 | Preservation of patent right |
Effective date of registration: 20240314 Granted publication date: 20181002 |