CN106245670A - Exposed steel column base construction method - Google Patents

Exposed steel column base construction method Download PDF

Info

Publication number
CN106245670A
CN106245670A CN201610703308.1A CN201610703308A CN106245670A CN 106245670 A CN106245670 A CN 106245670A CN 201610703308 A CN201610703308 A CN 201610703308A CN 106245670 A CN106245670 A CN 106245670A
Authority
CN
China
Prior art keywords
cup
rim
concrete
steel
steel column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610703308.1A
Other languages
Chinese (zh)
Other versions
CN106245670B (en
Inventor
李书文
吴炳豪
黄鸣
何本升
郑勇林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangxi Construction Engineering Fifth Construction Engineering Group Co ltd
Original Assignee
Fifth Construction Engineering Co of Guangxi Construction Engineering Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fifth Construction Engineering Co of Guangxi Construction Engineering Group filed Critical Fifth Construction Engineering Co of Guangxi Construction Engineering Group
Priority to CN201610703308.1A priority Critical patent/CN106245670B/en
Publication of CN106245670A publication Critical patent/CN106245670A/en
Application granted granted Critical
Publication of CN106245670B publication Critical patent/CN106245670B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/42Foundations for poles, masts or chimneys

Abstract

A construction method of an exposed steel column base comprises the following steps: s1: reserving a cup opening at the installation position of the section steel column, and S2: embedding foundation bolts, S3: carrying out layered pouring maintenance on the concrete of the foundation slab, and S4: hoisting the section steel column and adjusting the verticality and elevation, S5: and pouring concrete at the cup mouth. According to the construction method, the cup mouth is formed in the bottom space of the steel column foot, the reserved space is large, the elevation and verticality adjustment of the section steel column is convenient to operate, and the construction efficiency is high; concrete can be directly poured, pressure equipment is not needed, and the construction cost is low; in addition, common concrete pouring can be adopted to replace pressure grouting, high-grade concrete can be poured into the cup mouth according to construction requirements, construction operation is easier to control, and quality is easy to guarantee; because the annular steel plate and the foundation bolt are welded and fixed during construction, and the annular steel plate is laid on the reinforcing steel bar net of the bottom plate, the elevation control is facilitated, the local compressive strength is enhanced, and the column base pressure is uniformly dispersed.

Description

A kind of exposed steel kind design construction method
Technical field
The present invention relates to a kind of construction techniques, a kind of exposed steel kind design construction method.
Background technology
In construction steel structure, the effect of steel kind design is that the axle power of steel column bottom, shearing, moment of flexure are passed to basis, makes Superstructure is effectively connected together with basis;Steel kind design is generally divided into exposed steel kind design, insert-type steel by structural form Suspension column and outer-enwraped type steel kind design, exposed steel kind design refer to base plate at the bottom of post or boots beam be fixed on by crab-bolt on the basis of suspension column Form, the most conventional exposed steel kind design construction method is to use foundation bolt construction, owing to the i.e. steel column of reinforced concrete column is installed Need to carry out reinforced concrete column absolute altitude after in place and perpendicularity adjusts, so one can be reserved bottom reinforced concrete column and between sole plate The small space of about 5cm, reinforced concrete column absolute altitude and perpendicularity take measure that secondary pressure is in the milk, more i.e. with thin after having adjusted Stone concrete pressure grouting, grouting quality reaches the closely knit entirety that can form uniform stressed.
This construction method is disadvantageous in that:
1. reinforced concrete column perpendicularity adjustment enforcement space is less, inconvenient operation;
2. two construction qualities are difficult to ensure that, easily form hollowing, and steel kind design power transmission is uneven;
3. need to use press device and team's group of pressure grouting, cause cost to increase.
Summary of the invention
The back-grouting difficult quality that the purpose of the present invention generally exists in constructing for exposed steel kind design controls, reinforcing bar Post perpendicularity adjusts the problem of difficulty, improves existing construction technology, thus reaches steel column and be connected more with sole plate Reliably, perpendicularity adjusts the easiest purpose, improves construction quality.
The present invention adopts the technical scheme that: a kind of exposed steel kind design construction method, comprises the steps:
S1: stay in steel column installation position and set rim of a cup
Lay sole plate reinforcing bar, and press periphery, the steel column position inserting column joint bar of drawing setting, at sole plate reinforcing bar and After post joint bar has been constructed, within one week, carry out blocking along post joint bar with steel wire or fast-easy closing-up net and set formation rim of a cup, the degree of depth of blocking The i.e. rim of a cup degree of depth adapts with the lift height of sole plate concreting, for 50-100cm;The shape of rim of a cup and steel column Unanimously, or it is square column, or is cylinder;
S2: pre-embedded anchoring bolts
S21: the doughnut-shaped steel plate corresponding with steel column sole is set, foundation bolt is weldingly fixed on doughnut-shaped steel plate;
S22: doughnut-shaped steel plate is erected on the reinforced mesh of sole plate, and use spot welding to fix in surrounding, it is positioned at annular steel The foundation bolt of plate bottom puts in sole plate;
S23: be positioned at the foundation bolt upper ends adjusting nut on doughnut-shaped steel plate top;
S3: sole plate concrete is carried out placement layer by layer, maintenance
S31: placement layer by layer sole plate, first pours rim of a cup underlying layers, pours rim of a cup before rim of a cup underlying layers concrete initial set Concrete outside block, rim of a cup molding;
S32: timely cover film carries out concrete curing after concreting completes;
S4: lifting steel column also adjusts perpendicularity and absolute altitude
Make its sole be inserted in foundation bolt steel column lifting, nut is installed and fixes temporarily, and draw in surrounding and set guy It is fixing that rope carries out auxiliary to steel column, then utilizes adjusting nut to carry out the adjustment of perpendicularity and absolute altitude;
S5: pour rim of a cup concrete
Pouring rim of a cup with the pea gravel concreten of a high label, steel kind design has been constructed.
Its further technical scheme is: before carrying out step S5, first that the garbage-cleaning in rim of a cup is clean, as arranged Use steel wire to block during rim of a cup to set, then need concrete interface is carried out dabbing process, then brush one plain concrete viscous to strengthen Knot power.
Owing to taking above technical scheme, a kind of exposed steel kind design construction method of the present invention has following useful effect Really:
1. steel kind design bottom space is carried out " amplification " by block device and is reduced to below sole plate by this construction method, shape Becoming a rim of a cup, cup mouth size is bigger than conventional headspace, and steel column absolute altitude and perpendicularity adjust easy to operate, efficiency of construction High;
2. more much bigger than conventional headspace due to steel column bottom space (rim of a cup) size, it is possible to directly to pour coagulation Soil, material requested equipment is simple, it is not necessary to use press device, it is not necessary to using team's group of pressure grouting, construction cost is low;
The most in addition common concreting can be used to replace pressure grouting, and constructing operation is easier to control, and quality is easily guaranteed that;
4. using doughnut-shaped steel plate to be welded and fixed with foundation bolt time due to construction, doughnut-shaped steel plate can be laid on the bar-mat reinforcement of base plate On, not only contribute to the fixing of foundation bolt, and beneficially elevation control, the beneficially comprcssive strength of reinforcement local are the most all Even dispersion column foot press power;
5. can need in rim of a cup, irrigate high-grade concrete according to construction, be more beneficial for suspension column stress.
Below, in conjunction with accompanying drawing, the technical characteristic of a kind of exposed steel kind design construction method of present invention invention is made further Explanation.
Accompanying drawing explanation
A kind of exposed steel kind design construction method schematic diagram of Fig. 1~Fig. 3: the present invention:
Fig. 1 is steel kind design construction plan, and Fig. 2 is the A-A sectional view of Fig. 1, and Fig. 3 is the B portion enlarged drawing of Fig. 2;
In figure:
1 steel column, 11 soles, 2 adjusting nuts, 3 reinforced mesh, 4 rims of a cup, 5--blocks device, 6 bases Base plate, 7 foundation bolts, 8 doughnut-shaped steel plates, 9 post joint bars.
Detailed description of the invention
A kind of exposed steel kind design construction method, comprises the steps:
S1: stay in steel column installation position and set rim of a cup
Lay sole plate reinforcing bar, and press periphery, the steel column position inserting column joint bar of drawing setting, at sole plate reinforcing bar and After post joint bar has been constructed, within one week, carry out blocking along post joint bar with steel wire or fast-easy closing-up net and set formation rim of a cup, the degree of depth of blocking The i.e. rim of a cup degree of depth adapts with the lift height of sole plate concreting, for 50-100cm;The shape of rim of a cup and steel column Unanimously, or it is square column, or is cylinder;Section is straight up and down, or leaves certain slope;
S2: pre-embedded anchoring bolts
S21: the doughnut-shaped steel plate corresponding with steel column sole is set, foundation bolt is weldingly fixed on doughnut-shaped steel plate;
S22: doughnut-shaped steel plate is erected on the reinforced mesh of sole plate, and use spot welding to fix in surrounding, it is positioned at annular steel The foundation bolt of plate bottom puts in sole plate;
S23: be positioned at the foundation bolt upper ends adjusting nut on doughnut-shaped steel plate top;
S3: sole plate concrete is carried out placement layer by layer, maintenance
S31: placement layer by layer sole plate, first pours rim of a cup underlying layers, pours rim of a cup before rim of a cup underlying layers concrete initial set Concrete outside block, due to the stop of block, forms a rim of a cup not having concrete under suspension column;
S32: timely cover film carries out concrete curing after concreting completes;
S4: lifting steel column also adjusts perpendicularity and absolute altitude
Steel column lifting makes its sole be inserted in foundation bolt (i.e. sole support is lived by adjusting nut), nut is installed and carries out Interim fixing, and draw in surrounding and set cable wind rope that steel column carries out auxiliary is fixing, then utilize adjusting nut carry out perpendicularity and The adjustment of absolute altitude;
S5: pour rim of a cup concrete
Pouring rim of a cup with the pea gravel concreten of a high label, steel kind design has been constructed.
Before carrying out step S5, first that the garbage-cleaning in rim of a cup is clean, set as used steel wire to block when arranging rim of a cup, Then needing concrete interface carries out dabbing process (setting as blocked with fast-easy closing-up net, be not required to carry out dabbing process), then brush is together Plain concrete is with reinforced cementitious power.
Illustrate: during construction, outside steel column, need to break concrete form profile steel concrete column, the encirclement that post joint bar is formed Circle is the concrete outward flange surrounded by steel column, is also the position setting rim of a cup.

Claims (2)

1. an exposed steel kind design construction method, it is characterised in that: comprise the steps:
S1: stay in steel column installation position and set rim of a cup
Lay sole plate reinforcing bar, and press periphery, the steel column position inserting column joint bar of drawing setting, at sole plate reinforcing bar and After post joint bar has been constructed, within one week, carry out blocking along post joint bar with steel wire or fast-easy closing-up net and set formation rim of a cup, the degree of depth of blocking The i.e. rim of a cup degree of depth adapts with the lift height of sole plate concreting, for 50-100cm;The shape of rim of a cup and steel column Unanimously, or it is square column, or is cylinder;Section is straight up and down, or leaves certain slope;
S2: pre-embedded anchoring bolts
S21: the doughnut-shaped steel plate corresponding with steel column sole is set, foundation bolt is weldingly fixed on doughnut-shaped steel plate;
S22: doughnut-shaped steel plate is erected on the reinforced mesh of sole plate, and use spot welding to fix in surrounding, it is positioned at annular steel The foundation bolt of plate bottom puts in sole plate;
S23: be positioned at the foundation bolt upper ends adjusting nut on doughnut-shaped steel plate top;
S3: sole plate concrete is carried out placement layer by layer, maintenance
S31: placement layer by layer sole plate, first pours rim of a cup underlying layers, pours rim of a cup before rim of a cup underlying layers concrete initial set Concrete outside block, rim of a cup molding;
S32: timely cover film carries out concrete curing after concreting completes;
S4: lifting steel column also adjusts perpendicularity and absolute altitude
Make its sole be inserted in foundation bolt steel column lifting, nut is installed and fixes temporarily, and draw in surrounding and set guy It is fixing that rope carries out auxiliary to steel column, then utilizes adjusting nut to carry out the adjustment of perpendicularity and absolute altitude;
S5: pour rim of a cup concrete
Pouring rim of a cup with the pea gravel concreten of a high label, steel kind design has been constructed.
One the most according to claim 1 exposed steel kind design construction method, it is characterised in that: carry out step S5 it Before, first that the garbage-cleaning in rim of a cup is clean, set as used steel wire to block when arranging rim of a cup, then need concrete interface is dug Hair processes, and then brushes one plain concrete with reinforced cementitious power.
CN201610703308.1A 2016-08-22 2016-08-22 Exposed steel column base construction method Active CN106245670B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610703308.1A CN106245670B (en) 2016-08-22 2016-08-22 Exposed steel column base construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610703308.1A CN106245670B (en) 2016-08-22 2016-08-22 Exposed steel column base construction method

Publications (2)

Publication Number Publication Date
CN106245670A true CN106245670A (en) 2016-12-21
CN106245670B CN106245670B (en) 2018-10-02

Family

ID=57594569

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610703308.1A Active CN106245670B (en) 2016-08-22 2016-08-22 Exposed steel column base construction method

Country Status (1)

Country Link
CN (1) CN106245670B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108385987A (en) * 2018-02-09 2018-08-10 中建五局第三建设有限公司 The construction method of installation of thin and long shafts steel column and its matching used steel sleeve
CN110016926A (en) * 2018-01-10 2019-07-16 云南中乾集成房屋有限公司 A kind of arrangement and method for construction of bearing capacity and the compound isolated footing of Floor screw under the steel column of duration simultaneous growth
CN110230320A (en) * 2019-05-30 2019-09-13 中铁二院工程集团有限责任公司 A kind of construction method of high-speed railway touching net footing of a pillar structure
CN111305470A (en) * 2020-02-24 2020-06-19 中国建筑第二工程局有限公司 Construction method of super high-rise first-section open-web type geometric steel concrete column
CN112982471A (en) * 2021-02-26 2021-06-18 中国能源建设集团江苏省电力设计院有限公司 Connecting joint of crossing tower and foundation and construction method thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202266034U (en) * 2011-10-13 2012-06-06 武汉建工股份有限公司 Fixing device for anchor bolts of embedded type diamond combined steel and concrete column feet
CN202866002U (en) * 2012-09-26 2013-04-10 苏州工业园区设计研究院股份有限公司 Steel reinforced concrete non-embedded type pillar base
CN203200914U (en) * 2013-04-10 2013-09-18 上海嘉实(集团)有限公司 Steel structure socle outward exposed connecting structure
CN104234070A (en) * 2014-07-23 2014-12-24 冠鲁建设股份有限公司 Steel structure and foundation pre-burying connection structure and construction method
US20150259913A1 (en) * 2014-03-17 2015-09-17 Hitachi Metals Techno, Ltd. Column structure and base member

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202266034U (en) * 2011-10-13 2012-06-06 武汉建工股份有限公司 Fixing device for anchor bolts of embedded type diamond combined steel and concrete column feet
CN202866002U (en) * 2012-09-26 2013-04-10 苏州工业园区设计研究院股份有限公司 Steel reinforced concrete non-embedded type pillar base
CN203200914U (en) * 2013-04-10 2013-09-18 上海嘉实(集团)有限公司 Steel structure socle outward exposed connecting structure
US20150259913A1 (en) * 2014-03-17 2015-09-17 Hitachi Metals Techno, Ltd. Column structure and base member
CN104234070A (en) * 2014-07-23 2014-12-24 冠鲁建设股份有限公司 Steel structure and foundation pre-burying connection structure and construction method

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110016926A (en) * 2018-01-10 2019-07-16 云南中乾集成房屋有限公司 A kind of arrangement and method for construction of bearing capacity and the compound isolated footing of Floor screw under the steel column of duration simultaneous growth
CN108385987A (en) * 2018-02-09 2018-08-10 中建五局第三建设有限公司 The construction method of installation of thin and long shafts steel column and its matching used steel sleeve
CN110230320A (en) * 2019-05-30 2019-09-13 中铁二院工程集团有限责任公司 A kind of construction method of high-speed railway touching net footing of a pillar structure
CN111305470A (en) * 2020-02-24 2020-06-19 中国建筑第二工程局有限公司 Construction method of super high-rise first-section open-web type geometric steel concrete column
CN112982471A (en) * 2021-02-26 2021-06-18 中国能源建设集团江苏省电力设计院有限公司 Connecting joint of crossing tower and foundation and construction method thereof

Also Published As

Publication number Publication date
CN106245670B (en) 2018-10-02

Similar Documents

Publication Publication Date Title
CN106245670A (en) Exposed steel column base construction method
CN105113389B (en) Assembled type bridge pier column member with steel-concrete composite structure
CN104234385B (en) Construction method of installation after a kind of terrace heavy steel plate built-in fitting
CN102864795B (en) Light steel factory post foundation suitable for sedimentation of filled-in ground and construction method
US11365523B2 (en) Methods for constructing tensionless concrete pier foundations and foundations constructed thereby
CN103669598A (en) Layer added steel framework column base node on top of multi-layer concrete framework structure and construction method thereof
CN108035376B (en) Anti-deformation rectification foundation applicable to goaf site wind turbine generator and construction method thereof
CN108005401A (en) A kind of support and change method of the column of existing frame structure base isolation reinforcement
CN203669112U (en) Added-storey steel frame column base joint on top of multilayer concrete frame structure
CN107044142B (en) Adjustable reinforcement deviation correcting method and structure for reducing uneven settlement of house
CN109137762A (en) A kind of waveform arch bar Strengthening Method of Two-way Curved Arch Bridges
CN106760615A (en) A kind of ruggedized construction and its construction method for shear wall concrete replacement
CN202247711U (en) Adjustable and controllable reinforced type bridge
CN108930224A (en) Punching stick method bent cap supports regulating system construction method
CN207109593U (en) A kind of T-shaped high pier Cast-in-place Bent Cap formwork erecting structure
KR101282333B1 (en) Cross-type supporting structure and method for super-structure of bridge
CN109989395A (en) A kind of large-scale storage tank bored concrete pile assembled pile cover and its construction method
KR100966639B1 (en) Manhole repair method
EP3124705A1 (en) Formers
CN211772879U (en) Spacing top of steel case roof beam hoist and mount pushes away construction structures
CN108978697B (en) Terrace template system and construction method
CN202577138U (en) Integrated support suitable for mounting precast beams
KR101213404B1 (en) Concrete structure for bridge and its manufacturing method
CN206467557U (en) Soil pressure and the Integral Abutment structure for sedimentation of banketing after console
KR101756965B1 (en) Height adjusting type maintanable rail track construction method and maintanance method using the same

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: No. 167, Donghuan Avenue, Liuzhou City, Guangxi Zhuang Autonomous Region

Patentee after: Guangxi construction engineering Fifth Construction Engineering Group Co.,Ltd.

Address before: No. 167, Donghuan Avenue, Liuzhou City, Guangxi Zhuang Autonomous Region

Patentee before: THE FIFTH CONSTRUCTION ENGINEERING COMPANY OF GUANGXI CONSTRUCTION ENGINEERING Group

PP01 Preservation of patent right
PP01 Preservation of patent right

Effective date of registration: 20240314

Granted publication date: 20181002