CN106760615A - A kind of ruggedized construction and its construction method for shear wall concrete replacement - Google Patents
A kind of ruggedized construction and its construction method for shear wall concrete replacement Download PDFInfo
- Publication number
- CN106760615A CN106760615A CN201611258717.1A CN201611258717A CN106760615A CN 106760615 A CN106760615 A CN 106760615A CN 201611258717 A CN201611258717 A CN 201611258717A CN 106760615 A CN106760615 A CN 106760615A
- Authority
- CN
- China
- Prior art keywords
- steel column
- permanent
- steel plate
- concrete
- shear wall
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G23/00—Working measures on existing buildings
- E04G23/04—Propping of endangered or damaged buildings or building parts, e.g. with respect to air-raid action
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Chemical & Material Sciences (AREA)
- Chemical Kinetics & Catalysis (AREA)
- Electrochemistry (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Working Measures On Existing Buildindgs (AREA)
Abstract
The present invention provides a kind of ruggedized construction for shear wall concrete replacement, it is arranged side by side in the permanent steel column in young concrete metope including young concrete metope, some intervals, permanent steel column is provided with bar-mat reinforcement parallel to metope both sides, and the permanent steel column includes center steel column, the junction steel plate positioned at center steel column upper end, nut and screw mandrel positioned at junction steel plate upper end;Permanent steel column top screw mandrel top welding upper steel plate, steel column bottom welding lower steel plate, upper steel plate is fixed with top floor, and lower steel plate is fixed with ground floor;Horizontal support is provided between adjacent steel column, to increase the smoothness of permanent steel column, prevents steel column from lateral deformation occurring.The present invention does not influence the normal construction of superstructure, i.e. shear wall displacement and Superstructure Construction to carry out simultaneously, it is ensured that integrated engineering progress by the way of segmentation dismantling concrete and built-in permanent steel column, and the overall duration is not influenceed.
Description
Technical field
Architectural engineering reinforcement technique field belonging to of the invention, more particularly to a kind of reinforcing for shear wall concrete replacement
Structure and its construction method.
Background technology
Also known as seismic structural wall, earthquake resistant wall, at present, reinforced concrete shear wall structure has been widely used in skyscraper shear wall, is
The important feature of horizontal loading and vertical load is primarily subjected in building.In architectural engineering, existing building is can be potentially encountered
The situation of shear wall Lack of support is, it is necessary to reinforce.Conventional reinforcement means has increasing section method for strengthening, affixing steel plate reinforcement
Method, displacement concrete strengthening method etc..Increasing section method for strengthening can reduce building free space;Although affixing steel plate reinforcement method is applied
Work speed is fast, but its steel plate pasted is poor with the cooperative ability of original wall body, influences consolidation effect;Displacement concrete strengthening
Although method can fundamentally solve the problems, such as former shear wall, common displacement method is higher and existing to temporary support requirement
Method cannot accomplish that shear wall displacement is constructed simultaneously with superstructure, while the Superstructure Construction duration is influenceed, construction peace
Full property is also relatively difficult to ensure card.In consideration of it, being solved the above problems the invention provides a kind of new method.
The content of the invention
For the technical scheme that the problem that prior art is present, the present invention are used for solution problems of the prior art
It is as follows:
A kind of ruggedized construction for shear wall concrete replacement, including young concrete metope 1, some intervals are arranged side by side
In the permanent steel column 9 in young concrete metope 1, permanent steel column 9 is provided with bar-mat reinforcement 11 parallel to metope both sides, and it is special
Levy and be:The permanent steel column 9 as new shear wall concrete replacement metope inner support, the permanent steel column
9 include center steel column 2, the junction steel plate 3 positioned at the upper end of center steel column 2, nut 4 and screw mandrel 5 positioned at the upper end of junction steel plate 3;
Described nut 4 is engaged with screw mandrel 5, moving up and down for screw mandrel 5 is adjusted by rotary nut 4, to adjust permanent steel column 9
Highly, adapting to different floor heights;The described top of 9 top screw mandrel of permanent steel column 5 welding upper steel plate 8, described permanent steel stands
The bottom welding lower steel plate 7 of 9 times square tubular columns of post 2, described upper steel plate 8 is fixed with top floor, described lower steel plate 7 and ground building
Plate is fixed;Horizontal support 6 is provided between adjacent steel column 2, to increase the smoothness of permanent steel column 9, prevents steel column from occurring
Lateral deformation.
Described upper steel plate 8 and lower steel plate 7 is connected with floor by chemical bolt or adhesion mode.
A kind of construction method for utilizing the above-mentioned ruggedized construction for shear wall concrete replacement, comprises the following steps:
Step 1, shear wall to be removed 10 is segmented, and the middle part ground smearing structure glue of position is being split after removing a section shear wall
Equating;
Step 2, after step 1 is completed, is put into permanent steel column 9 and adjusts and support, then remove next section shear wall, equating
Ground is simultaneously put into next permanent steel column 9 and supports, and repeats above step until whole face shear wall 10 is removed completes, some permanent
The supporting of steel column 9 is completed;
Step 3, weld horizontal support 6 is connected between adjacent permanent steel column 9;
Step 4, lays bar-mat reinforcement 11, and bar-mat reinforcement is arranged in permanent steel column 9 parallel to metope both sides;
Step 5, in both sides bar-mat reinforcement lateral surface installation form, casting concrete in template forms concrete wall surface 1;
Step 6, is conserved to new concrete wall surface, and form removal work is carried out after intensity reaches requirement, is completed shear wall and is mixed
Solidifying soil ruggedized construction displacement.
In described step 1, need to clear up place after a section shear wall is removed, then carry out smearing structure glue and repair
It is flat.
In the step 2, the specific method for being put into permanent steel column 9 and having supported is:Lower steel plate 7 is put in by equating building
Fixed at plate and with ground floor, the lower section of permanent steel column 9 that then will be put into is welded with lower steel plate 7, above adjustable diameter and screw adjusting
Upper steel plate 8 is held out against and upper steel plate 8 is fixed with upper floor by screw mandrel 5 upwards, and screw mandrel 5 is welded to connect with upper steel plate 8 afterwards, is used
The permanent steel column 9 substitutes the load on original shear wall section transmission top.
In the step 4, the specific method for arranging bar-mat reinforcement is:By the local reinforcing bar for loosening again colligation, straightening or put
Change.
In the step 5, permanent steel column 9 need not be removed during installation form, casting concrete should be carried out continuously, and side is struck
Template side is hit to pour.
In the step 6, concrete strength reaches 70% i.e. collapsible die of design strength, is covered and is spilt with straw bag after form removal
Water curing 14 days.
Described permanent steel column is prefabricated components, and must lay permanent steel in the end and corner for being removed shear wall stands
Post support, after casting concrete permanent steel column eventually as shear wall internals.
In the step 5, the concrete grade for pouring should improve one-level than former concrete grade.
The selection of steel column type, size and screw mandrel model in the present invention should meet the requirement of bearing capacity and stability.
Preferably, shear wall segmentation strictly controls every section of size is wide to be no more than between 0.8 meter, i.e., described permanent steel column
Away from no more than 0.8 meter.
Preferably, upper steel plate 8 and lower steel plate 7 are provided with local ribbed stiffener.
The invention has the advantages that:
1st, concrete strengthening method is replaced in present invention utilization can fundamentally solve the problems, such as concrete defect, and remarkable in economical benefits can
Strong by property, replacing process is ripe;
2nd, the supporting way that the present invention is held out against upwards using permanent steel column, and permanent steel column is supported as internal junction
Structure, reduces the step of removing support, enormously simplify the method that existing support is set, easy construction simple to operate, Er Qiean
Quan Xinggao;
3rd, the permanent steel column in the present invention is only supporting construction, need not consider template with support in later stage installation form
Influence each other;
4th, the present invention does not influence the normal of superstructure to apply by the way of segmentation dismantling concrete and built-in permanent steel column
Work, i.e. shear wall are replaced and Superstructure Construction is carried out simultaneously, it is ensured that integrated engineering progress, and the overall duration is not influenceed.
Brief description of the drawings
Fig. 1 is a kind of partial cutaway schematic of ruggedized construction for shear wall concrete replacement of the invention;
Fig. 2 is a kind of permanent steel column support system schematic diagram of ruggedized construction for shear wall concrete replacement of the invention;
Fig. 3 is the lattice column schematic diagram below the permanent steel column in the embodiment of the present invention;
Fig. 4 is the lattice column top view below the permanent steel column in the embodiment of the present invention;
Fig. 5 is square nut, screw mandrel on a kind of permanent steel column of ruggedized construction for shear wall concrete replacement of the invention
Partial schematic diagram;
Fig. 6 is to remove the schematic diagram after the first section shear wall in the present invention;
Fig. 7 is to be put into first schematic diagram of permanent steel column in the present invention;
Fig. 8 is to remove the schematic diagram after the second section shear wall in the present invention;
Fig. 9 is to be put into second schematic diagram of permanent steel column in the present invention;
Label in figure:1- concrete wall surfaces, 2- steel columns, 3- junction steel plates, 4- nuts, 5- screw mandrels, 6- horizontal supports, steel under 7-
Plate, 8- upper steel plates, the permanent steel columns of 9-, 10- shear walls, 11- bar-mat reinforcements.
Specific embodiment
Below by embodiment, and with reference to accompanying drawing, technical scheme is described in further detail, such as Fig. 1-
A kind of ruggedized construction for shear wall concrete replacement shown in 9, including young concrete metope 1, some intervals are side by side
The permanent steel column 9 in young concrete metope 1 is arranged at, permanent steel column 9 is provided with bar-mat reinforcement 11 parallel to metope both sides,
It is characterized in that:The permanent steel column 9 as new shear wall concrete replacement metope inner support, the permanent steel
Column 9 includes center steel column 2, the junction steel plate 3 positioned at the upper end of center steel column 2, nut 4 and silk positioned at the upper end of junction steel plate 3
Bar 5;Nut 4 is respectively welded at the upper and lower surface of junction steel plate 3 with steel column 2;Described nut 4 is engaged with screw mandrel 5, by rotation
Turn moving up and down for the regulation screw mandrel 5 of nut 4, to adjust the height of permanent steel column 9, to adapt to different floor heights;Described is permanent
The spiral of screw mandrel 5 of the top of steel column 9 is held out against upwards, and effective transmission of load is ensured as supporting construction;Described permanent steel
Upper steel plate 8 is welded on the top of 9 top screw mandrel of column 5, and the described bottom welding lower steel plate 7 of 9 times square tubular columns of permanent steel column 2 is described
Upper steel plate 8 fixed with top floor, described lower steel plate 7 is fixed with ground floor;Level branch is provided between adjacent steel column 2
Support 6, to increase the smoothness of permanent steel column 9, prevents steel column from lateral deformation occurring;Described upper steel plate 8 and lower steel plate 7 with
Floor is connected by chemical bolt or adhesion mode;It is parallel that described bar-mat reinforcement 11 is located at the supporting construction of permanent steel column 9
In metope both sides, used as the distribution bar of shear wall after replacement, described concrete wall surface 1 supports bar-mat reinforcement 11 and steel column
Encapsulated by structures is internally;Described steel column 2 is lattice column, and the lattice column is connected by two opposite channel-section steels of notch by batten plate,
As shown in Figure 3 and Figure 4.
A kind of construction method for utilizing the above-mentioned ruggedized construction for shear wall concrete replacement, comprises the following steps:
Step 1, shear wall to be removed 10 is segmented, and the middle part ground smearing structure glue of position is being split after removing a section shear wall
Equating;
Step 2, after step 1 is completed, is put into permanent steel column 9 and adjusts and support, then remove next section shear wall, equating
Ground is simultaneously put into next permanent steel column 9 and supports, and repeats above step until whole face shear wall 10 is removed completes, some permanent
The supporting of steel column 9 is completed;
Step 3, weld horizontal support 6 is connected between adjacent permanent steel column 9;
Step 4, lays bar-mat reinforcement 11, and bar-mat reinforcement is arranged in permanent steel column 9 parallel to metope both sides;
Step 5, in both sides bar-mat reinforcement lateral surface installation form, casting concrete in template forms concrete wall surface 1;
Step 6, new concrete wall surface is conserved, and form removal work is carried out after intensity reaches requirement, completes shear wall coagulation
Native ruggedized construction displacement.
In step 1, need to clear up place after a section shear wall is removed, then carry out smearing structure glue equating.
In step 2, the specific method for being put into permanent steel column 9 and having supported is:Lower steel plate 7 is put in by equating floor
And fixed with ground floor, the lower section of permanent steel column 9 that then will be put into is welded with lower steel plate 7, the screw mandrel 5 above adjustable diameter and screw adjusting
Upper steel plate 8 is held out against upwards and upper steel plate 8 is fixed with upper floor, screw mandrel 5 is welded to connect with upper steel plate 8 afterwards, with this forever
Long steel column 9 substitutes the load on original shear wall section transmission top.
In step 4, the specific method for arranging bar-mat reinforcement is:By local reinforcing bar colligation, straightening or the displacement again for loosening.
In step 5, permanent steel column 9 need not be removed during installation form, casting concrete should be carried out continuously, and side taps mould
Edges of boards are poured.
In step 6, concrete strength reaches 70% i.e. collapsible die of design strength, is covered and is sprinkled water foster with straw bag after form removal
Shield 14 days.
Above-mentioned permanent steel column 9 is prefabricated components, and must lay permanent steel in the end and corner for being removed shear wall stands
Post support, after casting concrete permanent steel column eventually as shear wall internals.
In step 5, the concrete grade for pouring should improve one-level than former concrete grade.
The selection of steel column type, size and screw mandrel model in the present invention should meet the requirement of bearing capacity and stability.
Preferably, calculated and construction experience determines by designing, shear wall segmentation strictly controls every section of size is wide not to be surpassed
0.8 meter is crossed, i.e., described permanent steel column spacing is no more than 0.8 meter.
Preferably, upper steel plate 8 and lower steel plate 7 are provided with local ribbed stiffener.
Protection scope of the present invention is not limited to the above embodiments, it is clear that those skilled in the art can be to this hair
It is bright to carry out various changes and deform without deviating from scope and spirit of the present invention.If these are changed and deformation belongs to power of the present invention
In the range of profit requirement and its equivalent technologies, then the intent of the present invention also comprising these changes and deforms.
Claims (10)
1. a kind of ruggedized construction for shear wall concrete replacement, including young concrete metope(1), it is some interval side by side
It is arranged at young concrete metope(1)Interior permanent steel column(9), permanent steel column(9)Steel is provided with parallel to metope both sides
Muscle net(11), it is characterised in that:The permanent steel column(9)Structure is supported as the inside of new shear wall concrete replacement metope
Part, the permanent steel column(9)Including center steel column(2), positioned at center steel column(2)The junction steel plate of upper end(3), positioned at connection steel
Plate(3)The nut of upper end(4)And screw mandrel(5);Described nut(4)With screw mandrel(5)It is engaged, by rotary nut(4)Regulation
Screw mandrel(5)Move up and down, to adjust permanent steel column(9)Height, to adapt to different floor heights;Described permanent steel column
(9)Top screw mandrel(5)Weld upper steel plate in top(8), described permanent steel column(9)Lower square tubular column(2)Bottom welding lower steel plate
(7), described upper steel plate(8)Fixed with top floor, described lower steel plate(7)Fixed with ground floor;Adjacent steel column(2)It
Between be provided with horizontal support(6), to increase permanent steel column(9)Smoothness, prevent steel column occur lateral deformation.
2. a kind of ruggedized construction for shear wall concrete replacement as claimed in claim 1, it is characterised in that:Described is upper
Steel plate(8)And lower steel plate(7)It is connected by chemical bolt or adhesion mode with floor.
3. the construction method of a kind of ruggedized construction using as described in claim any one of 1-2, it is characterised in that:Including as follows
Step:
Step 1, by shear wall to be removed(10)Segmentation, the middle part ground smearing structure of position is being split after removing a section shear wall
Glue equating;
Step 2, after step 1 is completed, is put into permanent steel column(9)And adjust and support, then remove next section shear wall, repair
Plane earth is simultaneously put into next permanent steel column(9)Support, repeats above step until whole face shear wall(10)Remove and complete, if
Do permanent steel column(9)Supporting is completed;
Step 3, in adjacent permanent steel column(9)Between weld horizontal support(6)It is connected;
Step 4, in permanent steel column(9)Bar-mat reinforcement is laid parallel to metope both sides(11), and bar-mat reinforcement is arranged;
Step 5, in both sides bar-mat reinforcement lateral surface installation form, casting concrete in template forms concrete wall surface(1);
Step 6, to new concrete wall surface(1)Conserved, form removal work is carried out after intensity reaches requirement, completed shear wall
Concrete strengthening structure replacing.
4. construction method as claimed in claim 3, it is characterised in that:In the step 1, it is right to be needed after a section shear wall is removed
Place is cleared up, then carries out smearing structure glue equating.
5. construction method as claimed in claim 3, it is characterised in that:In the step 2, permanent steel column is put into(9)And prop up
The specific method for having supportted is:By lower steel plate(7)It is put in and is fixed at equating floor and with ground floor, it is then permanent by what is be put into
Steel column(9)Lower section and lower steel plate(7)Welding, the screw mandrel above adjustable diameter and screw adjusting(5)By upper steel plate(8)Hold out against upwards and by upper steel
Plate(8)Fixed with upper floor, afterwards by screw mandrel(5)With upper steel plate(8)It is welded to connect, with the permanent steel column(9)Substitute original
Shear wall section transmission top load.
6. construction method as claimed in claim 3, it is characterised in that:In the step 4, the specific method of bar-mat reinforcement is arranged
For:By local reinforcing bar colligation, straightening or the displacement again for loosening.
7. construction method as claimed in claim 3, it is characterised in that:Need not remove permanent in the step 5, during installation form
Steel column(9), casting concrete should be carried out continuously, and be poured in tapping template.
8. construction method as claimed in claim 3, it is characterised in that:In the step 6, concrete strength reaches design strength
70% i.e. collapsible die, covered with straw bag and sprinkled water maintenance 14 days after form removal.
9. construction method as claimed in claim 3, it is characterised in that:Described permanent steel column is prefabricated components, split
Except the end and corner of shear wall must lay permanent steel column support, permanent steel column is eventually as shearing after casting concrete
The internals of wall, the spacing between adjacent permanent steel column is no more than 0.8 meter.
10. construction method as claimed in claim 3, it is characterised in that:In the step 5, the concrete grade ratio for pouring
Former concrete grade improves one-level.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611258717.1A CN106760615A (en) | 2016-12-30 | 2016-12-30 | A kind of ruggedized construction and its construction method for shear wall concrete replacement |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611258717.1A CN106760615A (en) | 2016-12-30 | 2016-12-30 | A kind of ruggedized construction and its construction method for shear wall concrete replacement |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106760615A true CN106760615A (en) | 2017-05-31 |
Family
ID=58953703
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611258717.1A Withdrawn CN106760615A (en) | 2016-12-30 | 2016-12-30 | A kind of ruggedized construction and its construction method for shear wall concrete replacement |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106760615A (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108130825A (en) * | 2017-12-31 | 2018-06-08 | 天津市金荣通核修护工程有限公司 | Subgrade of metro concrete replacement technique in special limiting condition |
CN110821176A (en) * | 2018-08-07 | 2020-02-21 | 中国水利水电第十六工程局有限公司 | Construction method of temporary house for construction site |
CN111236682A (en) * | 2019-12-31 | 2020-06-05 | 广东最安建筑科技有限公司 | Local wall body replacement method of shear wall and shear wall replacement method thereof |
CN111236690A (en) * | 2020-01-15 | 2020-06-05 | 安徽安德建筑设计有限公司 | House building upright column structure and construction method thereof |
CN112593720A (en) * | 2020-06-16 | 2021-04-02 | 山东筑峰建筑工程有限公司 | Shear wall replacement support system and application thereof |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105507612A (en) * | 2016-01-22 | 2016-04-20 | 陕西省建筑科学研究院 | Hydraulic supporting method for concrete replacement of shear walls in high-rise building |
-
2016
- 2016-12-30 CN CN201611258717.1A patent/CN106760615A/en not_active Withdrawn
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105507612A (en) * | 2016-01-22 | 2016-04-20 | 陕西省建筑科学研究院 | Hydraulic supporting method for concrete replacement of shear walls in high-rise building |
Non-Patent Citations (3)
Title |
---|
吴晓东: ""剪力墙结构中置换混凝土加固法新技术"", 《施工技术》 * |
赖秉洪等: ""住宅楼剪力墙混凝土分段置换加固技术"", 《建筑技术》 * |
马健华等: ""置换混凝土加固法在剪力墙加固中的应用"", 《河南城建学院学报》 * |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108130825A (en) * | 2017-12-31 | 2018-06-08 | 天津市金荣通核修护工程有限公司 | Subgrade of metro concrete replacement technique in special limiting condition |
CN108130825B (en) * | 2017-12-31 | 2019-03-19 | 天津市金荣通核修护工程有限公司 | Subgrade of metro concrete replacement technique in special limiting condition |
CN110821176A (en) * | 2018-08-07 | 2020-02-21 | 中国水利水电第十六工程局有限公司 | Construction method of temporary house for construction site |
CN110821176B (en) * | 2018-08-07 | 2024-02-27 | 中国水利水电第十六工程局有限公司 | Method for constructing temporary house for construction site |
CN111236682A (en) * | 2019-12-31 | 2020-06-05 | 广东最安建筑科技有限公司 | Local wall body replacement method of shear wall and shear wall replacement method thereof |
CN111236690A (en) * | 2020-01-15 | 2020-06-05 | 安徽安德建筑设计有限公司 | House building upright column structure and construction method thereof |
CN111236690B (en) * | 2020-01-15 | 2021-07-16 | 安徽安德建筑设计有限公司 | House building upright column structure and construction method thereof |
CN112593720A (en) * | 2020-06-16 | 2021-04-02 | 山东筑峰建筑工程有限公司 | Shear wall replacement support system and application thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106760615A (en) | A kind of ruggedized construction and its construction method for shear wall concrete replacement | |
CN103469733B (en) | A kind of from falling molding box joist steel Guan Beilei door opening support and bearing method thereof | |
CN104806011B (en) | Raft board post poured band formwork for placing | |
CN107419824A (en) | The full precast shear wall structural system of regenerative steel skeleton and construction method | |
CN102864795A (en) | Light steel factory post foundation suitable for sedimentation of filled-in ground and construction method | |
CN107574762A (en) | A kind of construction method for strengthening Cast-in-situ Beam 0# block construction qualities | |
CN109610817B (en) | Cross beam formwork support and design and construction method thereof | |
CN102839601A (en) | Fixed connection structure for steel pier column and cushion cap of portal rigid frame overbridge and construction method of fixed connection structure | |
CN107974942B (en) | A kind of abrupt slope side rigid frame-continuous girder end bay construction method | |
CN101994293A (en) | High pier coping construction method | |
CN211517947U (en) | Bridge case roof beam is prefabricated with shaped steel pedestal | |
CN112411391A (en) | Single-column capping beam steel pipe column Bailey beam construction supporting system and construction method thereof | |
CN207553318U (en) | A kind of anti-displacement constructing structure of wall column reinforcing bar | |
CN106836463A (en) | The constructing device and construction method of cushion cap and ground girder construction | |
CN203021923U (en) | Big cantilever bent cap steel truss construction platform | |
CN204899204U (en) | Mouthful structure concrete structure's of department a template system fetches earth among reverse construction method | |
CN103410102A (en) | H-shaped double column pier wide-bridge-surface cantilever temporary consolidation structure and construction method thereof | |
CN103321155B (en) | Viaduct pier operation platform system and build this system and pour into a mould the method for bridge pier | |
CN104099934A (en) | Supporting structure of large foundation pit | |
CN207829006U (en) | Sizing moves retaining wall mould bases | |
CN107905111A (en) | A kind of rigid frame-continuous girder end bay construction technology | |
CN211173077U (en) | Cast-in-place multi-curved surface double-layer diagonal concrete grid structure formwork system | |
CN206438529U (en) | Beam and slab type raft foundation formwork support structure | |
CN108265749A (en) | A kind of combined steel template and application method for municipal administration synthesis pipe gallery | |
CN105401960B (en) | A kind of mould bases and its construction method for the construction of railway tunnel inverted arch |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WW01 | Invention patent application withdrawn after publication | ||
WW01 | Invention patent application withdrawn after publication |
Application publication date: 20170531 |