CN107419824A - The full precast shear wall structural system of regenerative steel skeleton and construction method - Google Patents
The full precast shear wall structural system of regenerative steel skeleton and construction method Download PDFInfo
- Publication number
- CN107419824A CN107419824A CN201710332697.6A CN201710332697A CN107419824A CN 107419824 A CN107419824 A CN 107419824A CN 201710332697 A CN201710332697 A CN 201710332697A CN 107419824 A CN107419824 A CN 107419824A
- Authority
- CN
- China
- Prior art keywords
- reinforcing bar
- shear wall
- steel
- concrete
- edge
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/56—Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/02—Structures consisting primarily of load-supporting, block-shaped, or slab-shaped elements
- E04B1/04—Structures consisting primarily of load-supporting, block-shaped, or slab-shaped elements the elements consisting of concrete, e.g. reinforced concrete, or other stone-like material
- E04B1/043—Connections specially adapted therefor
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C2/00—Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels
- E04C2/02—Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by specified materials
- E04C2/26—Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by specified materials composed of materials covered by two or more of groups E04C2/04, E04C2/08, E04C2/10 or of materials covered by one of these groups with a material not specified in one of the groups
- E04C2/28—Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by specified materials composed of materials covered by two or more of groups E04C2/04, E04C2/08, E04C2/10 or of materials covered by one of these groups with a material not specified in one of the groups combinations of materials fully covered by groups E04C2/04 and E04C2/08
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C2/00—Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels
- E04C2/30—Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by the shape or structure
- E04C2/38—Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by the shape or structure with attached ribs, flanges, or the like, e.g. framed panels
- E04C2/384—Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by the shape or structure with attached ribs, flanges, or the like, e.g. framed panels with a metal frame
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C2/00—Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels
- E04C2/44—Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by the purpose
- E04C2/46—Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by the purpose specially adapted for making walls
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Load-Bearing And Curtain Walls (AREA)
Abstract
The present invention relates to shear wall structure system technical field, discloses a kind of full precast shear wall structural system of regenerative steel skeleton and construction method.Invention unit shear wall is made up of shear wall slab splicing, steel skeleton includes the reinforcing member between the vertical reinforcing bar and vertical reinforcing bar in panel edges area, reinforcing bar includes edge reinforcement and non-edge reinforcing bar, edge reinforcement includes weak edge and indulges muscle, and weak edge indulges muscle and fixed, is set in outside vertical reinforcing bar by horizontal hoop or lacing wire;Non-edge reinforcing bar includes wall body vertical reinforcement and wall body horizontal bar;Neighbouring prefabricated panel indulges muscle by corresponding vertical reinforcing bar, weak edge and wall body Vertical bar connection, junction have poured connection seam;Floor is provided with above coupling beam;Special dissipative member is shored between two adjacent unit shear walls by connector.Present invention construction is convenient, has excellent fire protecting performance and anti-seismic performance concurrently, and construction quality is easy to control, and can improve construction equipment utilization rate and turnover rate.
Description
Technical field
The present invention relates to shear wall structure system technical field, more particularly to a kind of regenerative steel skeleton prefabricated shearing entirely
Wall construction system and construction method.
Background technology
Building industrialization is the emphasis of nation-building development,《Central State Council of China is on further strengthening city rule
Draw some opinions of implementation management work》(On 2 6th, 2016)In explicitly point out " wideling popularize assembled architecture ", " encourage
Building enterprise's fabricated construction, assembled in situ ", " building national level assembled architecture production base ", " increasing policy holding power
Degree, strive with 10 years or so time, making assembled architecture account for the ratio of new building and reaching 30% ".
China is the multiple country of an earthquake, and earthquake disaster is the natural calamity for causing China resident injures and deaths disaster most
Evil, casualties, property loss are the main losses in earthquake disaster wherein caused by megaseisms disaster.Therefore to new building
Anti-seismic performance requires more and more higher, and this requires assembled architecture to have good shearing resistance, ductility, can resist safely certain
The destruction of earthquake magnitude.
The construction that steel construction is combined with concrete structure, design difficulty is larger, steel construction and concrete structure
Advantage to combine the technical barrier that faces more.Steel plate shear force wall is more to be arranged on whole shear wall using steel plate and steel column as skeleton
It is interior, it is necessary to which live progress basic skeleton colligation and fixation, difficulty of construction is big, and steel plate utilization ratio is low, and is not suitable for high-altitude
Construction, the lifting of steel plate, reinforcing bar need to occupy hanging device for a long time, and utilization rate of equipment and installations is not high, and the live rate that is used in turn is low,
It substantially prolongs construction period.The main flow structure of building industrialization at present is partial precast, edge member region or node region
Using cast-in-place shear wall structure system, good integrity of constructing, cost is relatively low, economical and practical, has good durability
And fire resistance, but quality control on construction difficulty is larger, construction period is longer, tensile strength is low, and anti-seismic performance is poor, in earthquake
The lower ductility of effect is poor, and brittle break easily occurs.
A kind of suitable building industrialization technology how is found, and meets industrialization construction requirements, big shake can be successfully managed by having
Even megaseisms is institute's facing challenges in building industrialization.
The content of the invention
A kind of construction of present invention offer is convenient, has excellent fire protecting performance and anti-seismic performance concurrently, and construction quality is easy to control,
The full precast shear wall structural system of regenerative steel skeleton and its construction method of construction equipment utilization rate and turnover rate can be improved.
The technical problem of solution is:The edge member region of existing assembled architecture or node region are cut using cast-in-place
Power wall construction system, construction quality are difficult to control, and construction period is longer, and steel usage amount is big, and tensile strength is low, anti-seismic performance compared with
Difference, ductility is poor, and brittle break easily occurs.
In order to solve the above technical problems, the present invention adopts the following technical scheme that:
The full precast shear wall structural system of regenerative steel skeleton of the present invention, including basis, coupling beam, the unit shear wall at coupling beam both ends
With special dissipative member, the unit shear wall is made up of shear wall slab splicing, steel skeleton of the shear wall slab including inside,
Reinforcing bar and the concrete walls body poured, the steel skeleton are included between the vertical reinforcing bar and vertical reinforcing bar in panel edges area
Reinforcing member, the vertical reinforcing bar are a word steel, angle steel, channel-section steel, I-steel, H-shaped steel, Wang Zigang, special-shaped reinforcing bar, welding steel member
Or combinations of the above, the reinforcing member are horizontal concealed beam and/or supporting member, the reinforcing bar includes edge reinforcement and non-edge steel
Muscle, the edge reinforcement include weak edge and indulge muscle, and the weak edge indulges muscle and fixed by horizontal hoop or lacing wire, is set in vertical steel
Outside bone;The non-edge reinforcing bar includes wall body vertical reinforcement and wall body horizontal bar;The height of the concrete walls body is not higher than weak
Indulge the height of muscle, wall body vertical reinforcement and vertical reinforcing bar in edge;The neighbouring prefabricated panel passes through corresponding vertical steel
Muscle and wall body Vertical bar connection are indulged in bone, weak edge, and junction has poured connection seam, and the connection seam is concrete or filling
Slurry;Floor is provided with above coupling beam;The special dissipative member is connected to by connector between two adjacent unit shear walls.
The full precast shear wall structural system of regenerative steel skeleton of the present invention, further, at the connecting node of vertical reinforcing bar
Horizontally disposed to have connection end carriage, connection end carriage one end is welded or bolted with vertical reinforcing bar and fixes, and the other end stretches out shear wall slab, with
Coupling beam one end connects.
The full precast shear wall structural system of regenerative steel skeleton of the present invention, further, the special dissipative member is steel
One or more combinations in coupling beam, doubly-linked beam, constraint steel plate shear force wall or anti-buckling support.
The full precast shear wall structural system of regenerative steel skeleton of the present invention, further, the floor are precast reinforced mixed
Solidifying Tulou plate, Truss Deck Concrete Slab, profiled sheet in-situ reinforced concrete slab, the cast in place reinforced bar coagulation of live formwork
Tulou plate or prefabricated and cast-in-place combination laminated floor slab;The concrete of the floor is concrete, regeneration concrete, flyash
Concrete, slag concrete or additive concrete;The coupling beam is steel coupling beam, variation rigidity girder steel, precast concrete beam, pre-
Concrete composite beam processed, the precast concrete composite beam or cast-in-place concrete coupling beam of band connection part.
The full precast shear wall structural system of regenerative steel skeleton of the present invention, including by basis, structural column, structural beams and unit
The frame-shear-wall structure system of shear wall connection composition, the unit shear wall are made up of shear wall slab splicing, the shearing
Wallboard includes internal steel skeleton, reinforcing bar and the concrete walls body poured, and the steel skeleton is included positioned at the perpendicular of panel edges area
Reinforcing member between reinforcing bar and vertical reinforcing bar, the vertical reinforcing bar is a word steel, angle steel, channel-section steel, I-steel, H-shaped steel, king's word
Steel, special-shaped reinforcing bar, welding steel member or combinations of the above, the reinforcing bar include edge reinforcement and non-edge reinforcing bar, the edge
Reinforcing bar includes weak edge and indulges muscle, and the weak edge indulges muscle and fixed, is set in outside vertical reinforcing bar by horizontal hoop or lacing wire;It is described non-
Edge reinforcement includes wall body vertical reinforcement and wall body horizontal bar;The height of the concrete walls body indulges muscle, wall not higher than weak edge
The height of body vertical reinforcement and vertical reinforcing bar;The neighbouring prefabricated panel is indulged by corresponding vertical reinforcing bar, weak edge
Muscle and wall body Vertical bar connection, junction have poured connection seam, and the connection seam is concrete or grouting material;The base
Plinth is reinforced concrete foundation, the structural column be steel column, reinforced column, steel-concrete coupled column or steel-concrete-
Reinforcing bar coupled column, the structural beams are girder steel, variation rigidity girder steel, precast concrete beam, precast concrete composite beam, band connection part
Precast concrete composite beam or cast-in-place concrete coupling beam.
The full precast shear wall structural system of regenerative steel skeleton of the present invention, further, the reinforced concrete foundation is
Isolated footing, raft foundation, beam foundation, box foundation, pile foundation or combinations thereof.
The full precast shear wall structural system of regenerative steel skeleton of the present invention, further, the shear wall slab cross section is in
" one " font, " L " shape, T " shapes, " ten " font or combinations of the above, the corner regions of the L-shaped prefabricated panel and T-shaped dry wall
Plate, the node area of cross prefabricated panel, which are vertically arranged with, intersects vertical reinforcing bar.
The full precast shear wall structural system of regenerative steel skeleton of the present invention, further, the vertical reinforcing bar of intersection is different
Shape reinforcing bar, there are at least three vertical contact surfaces, be connected respectively with the vertical reinforcing bar in panel edges area by reinforcing member.
The full precast shear wall structural system of regenerative steel skeleton of the present invention, further, the reinforcing member include horizontal dark
Beam, the quantity of horizontal concealed beam is 1, is arranged on the epimere of vertical reinforcing bar.
The full precast shear wall structural system of regenerative steel skeleton of the present invention, further, the reinforcing member include horizontal dark
Beam and supporting member, the quantity of the horizontal concealed beam is 2, respectively positioned at the epimere and hypomere of vertical reinforcing bar, the support structure
Part is arranged on horizontal concealed beam and encloses to be formed in framework with vertical reinforcing bar.
The full precast shear wall structural system of regenerative steel skeleton of the present invention, further, the supporting member is hound
Or steel plate, the hound are steel plate strip band, shaped steel or welding steel member, the quantity of hound is no less than 1.
The full precast shear wall structural system of regenerative steel skeleton of the present invention, further, the wall body horizontal bar is arranged on
Wallboard non-edge area, both ends are anchored, overlap or are welded and fixed with the horizontal hoop in panel edges area or lacing wire respectively.
The full precast shear wall structural system of regenerative steel skeleton of the present invention, further, sets on the wall body vertical reinforcement
There is tension rib.
The full precast shear wall structural system of regenerative steel skeleton of the present invention, it is further, described neighbouring described to cut
Corresponding vertical reinforcing bar and the vertical reinforcing bar of intersection indulge muscle and wall body vertical steel by welding or bolting fixation, weak edge in power wallboard
Muscle is fixed by sleeve connection, welding or overlap joint, and vertical reinforcing bar, the weak edge of connection are indulged to be provided with the outside of muscle and wall body vertical reinforcement
Reinforce stirrup.
The full precast shear wall structural system of regenerative steel skeleton of the present invention, further, the connecting node area is provided with
Shear key, the shear key are steel plate, shaped steel or armored concrete key.
The full precast shear wall structural system of regenerative steel skeleton of the present invention, further, shear wall slab or structural column and base
Shock isolating pedestal is provided between plinth.
The construction method of the full precast shear wall structural system of regenerative steel skeleton of the present invention, comprises the following steps:
Step 1: shear wall slab is prefabricated:Muscle, horizontal hoop are indulged at the weak edge in factory process making steel skeleton, panel edges area
Or lacing wire, the wall body vertical reinforcement in non-edge area and wall body horizontal bar;Formwork, then colligation edge reinforcement and non-edge reinforcing bar,
Edge reinforcement wraps up steel skeleton, therewith welding or banding fixed;Concreting is carried out in template and is vibrated, treats concrete knot
After structure reaches some strength, form removal is carried out, is conserved stand-by to normal intensity;
Step 2: lower floor's shear wall slab installation:On the architecture basics of completion, measure and position, lift shear wall slab, first
The vertical reinforcing bar of the shear wall slab bottom of lower floor and architecture basics are welded or bolted and is fixed, then by wall body vertical reinforcement and knot
Structure basis is fixed, casting concrete or grouting material;
Step 3: upper strata shear wall slab is installed:The shear wall slab on upper strata is lifted, first will be corresponding after being alignd with lower floor shear wall slab
The welding of vertical reinforcing bar or bolt fix, then will corresponding to weak edge indulge muscle and wall body vertical reinforcement and pass through sleeve connection, weldering
Connect or overlap fixation;
Step 4: connection seam pours:In shear wall slab junction supporting module, pouring and shaking for concrete or grouting material is carried out
Smash, after structure reaches some strength, form removal, maintenance;
Step 5: coupling beam is installed:Coupling beam is lifted, coupling beam both ends are connected with two side unit shear walls;
Step 6: floor slab construction:Hoisting prefabricated floor or the concrete pouring construction for carrying out floor;
Step 7: successively construct:Three-step 6 of construction procedure is repeated to architectural top;
Step 8: special dissipative member installation:According to design requirement, set and special dissipative member is installed.
The construction method of the full precast shear wall structural system of regenerative steel skeleton of the present invention, further, step 8 special secondary school
Included with the set-up mode of dissipative member following two:As construction floor is successively sequentially installed, or unified peace after the completion of construction
Dress.
The construction method of the full precast shear wall structural system of regenerative steel skeleton of the present invention, further, step 2 construction
When shock isolating pedestal is installed on the basis of
The construction method of the full precast shear wall structural system of regenerative steel skeleton of the present invention, comprises the following steps:
Step A, shear wall slab is prefabricated:Factory process make steel skeleton, panel edges area weak edge indulge muscle, horizontal hoop or
Lacing wire, the wall body vertical reinforcement in non-edge area and wall body horizontal bar;Formwork, then colligation edge reinforcement and non-edge reinforcing bar, side
Balsh muscle wraps up steel skeleton, therewith welding or banding fixed;Concreting is carried out in template and is vibrated, treats concrete structure
After reaching some strength, form removal is carried out, is conserved stand-by to normal intensity;
Step B, frame structure is installed:On the architecture basics of completion, measure and position, mounting structure post and structural beams;
Step C, lower floor's shear wall slab is installed:Measure and position, on the architecture basics of completion, while lift shear wall
Plate, first the vertical reinforcing bar of the shear wall slab bottom of lower floor and architecture basics are welded or bolted and is fixed, then by wall body vertical steel
Muscle and weak edge are indulged muscle and fixed with architecture basics, casting concrete or grouting material;
Step D, upper strata shear wall slab is installed:Lift the shear wall slab on upper strata, after being alignd with lower floor shear wall slab, first will corresponding to
Vertical reinforcing bar welding or bolt are fixed, and then muscle is indulged at the weak edge by corresponding to and wall body vertical reinforcement passes through sleeve connection, welding
Or overlap joint is fixed;
Step E, connection seam pours:In shear wall slab junction supporting module, pouring and shaking for concrete or grouting material is carried out
Smash, after structure reaches some strength, form removal, maintenance;
Step F, floor slab construction:Hoisting prefabricated floor or the concrete pouring construction for carrying out floor;
Step G, successively construct:Construction procedure C- steps F is repeated to architectural top.
The construction method of the full precast shear wall structural system of regenerative steel skeleton of the present invention, further, step B and step
C installs shock isolating pedestal when constructing on the basis of.
The full precast shear wall structural system of regenerative steel skeleton of the present invention compared with prior art, has following beneficial to effect
Fruit:
The full precast shear wall structural system of regenerative steel skeleton of the present invention is combined composition shearing with coupling beam using precast shear wall plate
Wall construction system, light weight, intensity is big, and energy dissipation capacity is strong, has preferable anti-seismic performance;And it is provided with shear wall system
Special dissipative member, the anti-seismic performance of shear wall system is can further improve, after earthquake, it is only necessary to change the special of destruction
Dissipative member can be completed to repair, and substantially reduce the rehabilitation cost after shake, improve the anti-seismic performance of structural system.
Precast shear wall plate of the present invention is combined using steel construction with reinforced concrete structure, eliminates conventional steel plates shearing
The built-in steel plate in whole face within the walls, vertical reinforcing bar is connected by wall body horizontal bar, shear wall steel reinforced concrete skeleton is formed, greatly reduces steel
The usage amount of material;Improve the fire protecting performance of shear wall structure system;It is vertically arranged in the termination of wall, bent angle area or node area
Shaped steel reinforcing bar, it is combined with the longitudinal reinforcement or stirrup of reduction;Calculating compared to national shear wall edge member defined is matched somebody with somebody
Muscle area, the panel edges area of reinforcement of the invention reduce more than 5%;Shear wall slab formed by integrally casting forms, and improves shear wall
Shearing strength and anti-bending bearing capacity;Compared with steel plate shear force wall, ensureing that there is identical shearing strength and anti-bending bearing capacity
Execution conditions under, the steel effective rate of utilization in shear wall of the present invention is higher.
Prefabricated reinforcing bar reinforced concrete shear wall prefabricated construction is invented, scene splicing is easy to use, improves applying for scene
Work environment, substantially reduces construction period, improves efficiency of construction;Liftable between adjacent shear wall, it is welded and fixed in advance perpendicular
The shaped steel reinforcing bar directly set, makes shaping structures, substantially reduces the difficulty of high-altitude construction, is easy to high-altitude application.
The prefabricated reinforcing bar reinforced concrete shear wall of the present invention is also provided with reinforcing member between the reinforcing bar of shear wall, by oblique
Strut and horizontal concealed beam etc., the shearing strength and anti-bending bearing capacity of shear wall are improved, improve the anti-seismic performance of building structure.
The full precast shear wall structural system of regenerative steel skeleton to the present invention and its construction method are made below in conjunction with the accompanying drawings
Further illustrate.
Brief description of the drawings
Fig. 1 is the structural representation of the full precast shear wall structural system of the regenerative steel skeleton of embodiment 1;
Fig. 2 is the front view of the shear wall slab of embodiment 1;
Fig. 3 is the cross-sectional view of the shear wall slab of embodiment 1 and embodiment 2;
Fig. 4 is the structural representation of the steel skeleton of the shear wall slab of embodiment 1;
Fig. 5 is the schematic diagram of the construction method step three of embodiment 1;
Fig. 6 is the schematic diagram of the construction method step four of embodiment 1;
Fig. 7 is the schematic diagram of the construction method step five of embodiment 1;
Fig. 8 is the schematic diagram of the construction method step six of embodiment 1;
Fig. 9 is the structural representation of the full precast shear wall structural system of the regenerative steel skeleton of embodiment 2;
Figure 10 is the structural representation of the steel skeleton of the shear wall slab of embodiment 2;
Figure 11 is the structural representation of shear wall slab in embodiment 3;
Figure 12 is the structural representation of the steel skeleton of shear wall slab in embodiment 3;
Figure 13 is the structural representation of the steel skeleton of the shear wall slab of embodiment 4;
Figure 14 is the structural representation of shear wall slab in embodiment 5 and embodiment 6;
Figure 15 is the structural representation of the steel skeleton of shear wall slab in embodiment 5;
Figure 16 is the structural representation of the steel skeleton of the shear wall slab of embodiment 6.
Reference:
1- shear wall slabs;2- steel skeletons;The vertical reinforcing bars of 21-;The horizontal concealed beams of 22-;23- supporting members;31- wall body horizontal bars;32-
Wall body vertical reinforcement;33- tension ribs;Indulge muscle in the weak edges of 34-;4- concrete walls bodies;41- shear keies;5- intersects vertical reinforcing bar;
61- coupling beams;62- structural columns;63- structural beams;The special dissipative members of 7-;81- reinforces stirrup;82- connection seams;83- connection ends
Beam;9- floors.
Embodiment
Embodiment 1
As shown in figure 1, the full precast shear wall structural system of regenerative steel skeleton of the present invention includes basis, coupling beam 61,61 liang of coupling beam
The unit shear wall at end and the special dissipative member 7 for being arranged on the lower section of coupling beam 61.
Unit shear wall is made up of the splicing of shear wall slab 1, and shock isolating pedestal, such as Fig. 2 are provided between shear wall slab 1 and basis
Shown in Fig. 4, the cross section of shear wall slab 1 is in " one " font;Shear wall slab 1 includes internal steel skeleton 2, reinforcing bar and poured
Concrete walls body 4, steel skeleton 2 include the reinforcing member between the vertical reinforcing bar 21 and vertical reinforcing bar 21 in panel edges area, erected
It is I-steel to reinforcing bar 21, reinforcing member is horizontal concealed beam 22, and the quantity of horizontal concealed beam 22 is 1, positioned at the upper of vertical reinforcing bar 21
Section, is welded or bolt connection with vertical reinforcing bar 21;Reinforcing bar includes edge reinforcement and non-edge reinforcing bar, and edge reinforcement includes weak edge
Vertical muscle 34, weak edge indulge muscle 34 and are fixed, are set in outside vertical reinforcing bar 21 by horizontal hoop or lacing wire, by colligation or welding and erect
Fixed to reinforcing bar 21;Non-edge reinforcing bar includes wall body vertical reinforcement 32 and wall body horizontal bar 31, wall body vertical reinforcement 32 and wall body
Horizontal bar 31 is arranged in a crossed manner, and wall body horizontal bar 32 is arranged on wallboard non-edge area, and both ends are bound round with the level in panel edges area respectively
Muscle or lacing wire are anchored, overlap or be welded and fixed;The height of concrete walls body 4 indulges muscle 34, wall body vertical reinforcement not higher than weak edge
32 and the height of vertical reinforcing bar 21.
As shown in figure 1, neighbouring shear wall slab 1 indulges muscle 34 and wall body by corresponding vertical reinforcing bar 21, weak edge
Vertical reinforcement 32 connects, and corresponding vertical reinforcing bar 21 indulges muscle 34 and wall body vertical reinforcement by welding or bolting fixation, weak edge
32 are fixed by sleeve connection, welding or overlap joint, and vertical reinforcing bar 21, the weak edge of connection are indulged outside muscle 34 and wall body vertical reinforcement 32
Side, which is provided with, reinforces stirrup 81;The junction of shear wall slab 1 has poured connection seam 82;It is concrete or grouting material to connect seam 82;
Shear key 41 is provided with connecting node, shear key 41 is steel plate, shaped steel or armored concrete key.
Being horizontally disposed with the connecting node of vertical reinforcing bar 21 has connection end carriage 83, connection one end of end carriage 83 and vertical reinforcing bar 21
Welding or bolt are fixed, and the other end stretches out shear wall slab 1, and connection end carriage 83 is shaped steel, can be in I-steel, channel-section steel or square steel
One kind;Connection end carriage 83 is bolted or is welded and fixed with the one end of coupling beam 61, and the top of coupling beam 61 sets floor 9, floor 9
For precast floor slab or the reinforced concrete floor of cast in situs;Floor 9 is prefabricated reinforced concrete floor, steel bar girder concrete
Floor, profiled sheet in-situ reinforced concrete slab, the in-situ reinforced concrete slab of live formwork or prefabricated and cast-in-place knot
The laminated floor slab of conjunction;The concrete of floor is concrete, regeneration concrete, flyash concrete, slag concrete or addition
Agent concrete.Coupling beam 61 be steel coupling beam, variation rigidity girder steel, precast concrete beam, precast concrete composite beam, band connection part it is pre-
Concrete composite beam processed or cast-in-place concrete coupling beam.
Special dissipative member 7 is arranged on the lower section of coupling beam 61, is connected to by connector between two adjacent unit shear walls,
Special dissipative member 7 is one kind in steel coupling beam, doubly-linked beam constraint steel plate shear force wall or anti-buckling support.
As shown in Figures 1 to 8, the construction method of the full precast shear wall structural system of regenerative steel skeleton of the present invention, specifically
Comprise the following steps:
Step 1: shear wall slab is prefabricated:Muscle 34, horizontal hoop are indulged at the weak edge in factory process bearing steel skeleton 2, panel edges area
Muscle or lacing wire, the wall body vertical reinforcement 32 and wall body horizontal bar 31 in non-edge area;Formwork, then colligation edge reinforcement and non-edge
Reinforcing bar, edge reinforcement wrap up steel skeleton 2, therewith welding or banding fixed;Concreting is carried out in template and is vibrated, waits to mix
After Xtah Crude Clay structure reaches some strength, form removal is carried out, is conserved stand-by to normal intensity;
Step 2: lower floor's shear wall slab installation:On the architecture basics of completion, measure and position, shock isolating pedestal is installed, so
Shear wall slab 1 is lifted afterwards, and first the vertical reinforcing bar 21 of the bottom of shear wall slab 1 of lower floor and shock isolating pedestal are welded or bolted and is fixed,
Then wall body vertical reinforcement 32 is fixed with architecture basics, casting concrete or grouting material;
Step 3: upper strata shear wall slab is installed:The shear wall slab 1 on upper strata is lifted, first will be right after being alignd with lower floor shear wall slab 1
The vertical reinforcing bar 21 answered welds or bolted fixation, and corresponding weak edge then is indulged into muscle 34 and wall body vertical reinforcement 32 passes through sleeve
Connection, welding or overlap joint are fixed;Shear key 41 is set, and shear key 41 is steel plate, shaped steel or armored concrete key;
Step 4: connection seam pours:In the junction supporting module of shear wall slab 1, carry out concreting and vibrate, treat coagulation
After soil structure reaches some strength, form removal, maintenance;
Step 5: coupling beam is installed:Coupling beam 61 is lifted, the both ends of coupling beam 61 pass through the reserved connection end of bolt and two side unit shear walls
Beam 83 is fixed;
Step 6: floor slab construction:Hoisting prefabricated floor or the concrete pouring construction for carrying out floor;
Step 7: successively construct:Construction procedure three is repeated to step 6 to architectural top;
Step 8: special dissipative member installation:According to design requirement, set and special dissipative member 7 is installed;Special dissipative member
7 set-up mode includes following two:As construction floor is successively sequentially installed, or unified installation after the completion of construction.
According to the different designs of building, the shear wall slab 1 of different shape or construction can be used to carry out concatenation construction, specifically
The mechanism of shear wall slab 1 may also include scheme described in following examples or approximate schemes.
Embodiment 2
As shown in figure 9, different from embodiment 1, the full precast shear wall structural system of regenerative steel skeleton of the present invention is included by base
Plinth, structural column 62, structural beams 63 and unit shear wall connect the frame-shear-wall structure system of composition.
Unit shear wall is made up of the splicing of shear wall slab 1, and as shown in figs. 3 and 10, the cross section of shear wall slab 1 is in " one "
Font;Shear wall slab 1 includes internal steel skeleton 2, reinforcing bar and the concrete walls body 4 poured, and steel skeleton 2 includes being located at wallboard side
Reinforcing member between the vertical reinforcing bar 21 in edge area and vertical reinforcing bar 21, vertical reinforcing bar 21 is I-steel, and reinforcing member is horizontal concealed beam
22 and supporting member 23, the quantity of horizontal concealed beam 22 is 2, respectively positioned at the epimere and hypomere of vertical reinforcing bar 21, with vertical steel
Bone 21 welds or bolt connection;Supporting member 23 is arranged on horizontal concealed beam 22 and encloses to be formed in framework with vertical reinforcing bar 21, with erecting
Welded to reinforcing bar 21 or bolt connection;Supporting member 23 is hound, and hound is steel plate strip band, shaped steel or welds steel member,
The quantity of hound is 2, arranged in a crossed manner along framework diagonal;Reinforcing bar includes edge reinforcement and non-edge reinforcing bar, edge reinforcement
Muscle 34 is indulged including weak edge, weak edge indulges muscle 34 and fixed, is set in outside vertical reinforcing bar 21 by horizontal hoop or lacing wire, passes through colligation
Or welding is fixed with vertical reinforcing bar 21;Non-edge reinforcing bar includes wall body vertical reinforcement 32 and wall body horizontal bar 31, wall body vertical steel
Muscle 32 and wall body horizontal bar 31 are arranged in a crossed manner, are interval with tension rib 33 on wall body vertical reinforcement 32, tension rib 33 be stirrup or
Lacing wire;The height of concrete walls body 4 indulges the height of muscle 34, wall body vertical reinforcement 32 and vertical reinforcing bar 21 not higher than weak edge.
Neighbouring shear wall slab 1 indulges muscle 34 and wall body vertical reinforcement 32 by corresponding vertical reinforcing bar 21, weak edge
Connection, corresponding vertical reinforcing bar 21 is by welding or bolting fixation, and muscle 34 is indulged at weak edge and wall body vertical reinforcement 32 passes through sleeve
Connection, welding or overlap joint are fixed, and the vertical muscle 34 in vertical reinforcing bar 21, weak edge of connection and the outside of wall body vertical reinforcement 32 are provided with and reinforced
Stirrup 81;The junction of shear wall slab 1 has poured connection seam 82;It is concrete or grouting material to connect seam 82;At connecting node
Provided with shear key 41, shear key 41 is steel plate, shaped steel or armored concrete key.
Basis is reinforced concrete foundation, and reinforced concrete foundation is isolated footing, raft foundation, beam foundation or box
Basis;Structural column 62 is steel column, reinforced column, steel-concrete coupled column or steel-concrete-reinforcing bar coupled column, structural beams
63 be girder steel, variation rigidity girder steel, precast concrete beam, precast concrete composite beam, the precast concrete composite beam of band connection part
Or cast-in-place concrete coupling beam.
The construction method of the full precast shear wall structural system of regenerative steel skeleton of the present invention, specifically includes following steps:
Step A, shear wall slab is prefabricated:Muscle 34, non-edge are indulged at the weak edge in the prefabricated steel skeleton 2 of factory process, panel edges area
The wall body vertical reinforcement 32 and wall body horizontal bar 31 in area;Formwork, then colligation edge reinforcement and non-edge reinforcing bar, edge reinforcement bag
Steel skeleton 2 is wrapped up in, therewith welding or banding fixed;Concreting is carried out in template and is vibrated, treats that concrete structure reaches one
After determining intensity, form removal is carried out, is conserved stand-by to normal intensity;
Step B, frame structure is installed:On the architecture basics of completion, measure and position, mounting structure post 62 and structural beams
63;
Step C, lower floor's shear wall slab is installed:On the architecture basics of completion, measure and position, while lift shear wall slab
1, first the vertical reinforcing bar 21 of the bottom of shear wall slab 1 of lower floor and architecture basics are welded or bolted and is fixed, it is then that wall body is vertical
Reinforcing bar 32 is fixed with architecture basics, casting concrete or grouting material;
Step D, upper strata shear wall slab is installed:The shear wall slab 1 on upper strata is lifted, first will be corresponding after being alignd with lower floor shear wall slab 1
Vertical reinforcing bar 21 weld or bolt fixation, then will corresponding to weak edge indulge muscle 34 and wall body vertical reinforcement 32 and connected by sleeve
Connect, weld or overlap fixation;Shear key 41 is set, and shear key 41 is steel plate, shaped steel or armored concrete key;
Step E, connection seam pours:In the junction supporting module of shear wall slab 1, pouring and shaking for concrete or grouting material is carried out
Smash, after structure reaches some strength, form removal, maintenance;
Step F, floor slab construction:Hoisting prefabricated floor or the concrete pouring construction for carrying out floor;
Step G, successively construct:Construction procedure C- steps F is repeated to architectural top.
According to the different designs of building, the shear wall slab 1 of different shape or construction can be used to carry out concatenation construction, specifically
The mechanism of shear wall slab 1 may also include scheme described in following examples or approximate schemes.
Embodiment 3
As is illustrated by figs. 11 and 12, different from embodiment 1 or embodiment 2, the cross section of the shear wall slab 1 in the present invention is in L
Shape;Shear wall slab 1 includes internal steel skeleton 2, reinforcing bar and the concrete walls body 4 poured, and steel skeleton 2 includes being located at L-shaped both ends
The vertical reinforcing bar 21 of head, positioned at the vertical reinforcing bar 5 of intersection of L-shaped prefabricated panel corner regions and the reinforcing between vertical reinforcing bar 21
Part, vertical reinforcing bar 21 are H-shaped steel, and it is special-shaped reinforcing bar to intersect vertical reinforcing bar 5, have at least two vertical contact surfaces, respectively with wall
The vertical reinforcing bar 11 of plate marginal zone is connected by reinforcing member;Reinforcing member is horizontal concealed beam 22, and the quantity of horizontal concealed beam 22 is 2,
It is located at the epimere and hypomere of vertical reinforcing bar 21 respectively, is welded with vertical reinforcing bar 21 or bolt connection;Reinforcing bar include edge reinforcement and
Non-edge reinforcing bar, edge reinforcement include weak edge indulge muscle 34, weak edge indulge muscle 34 fixed by horizontal hoop or lacing wire, be set in it is perpendicular
To outside reinforcing bar 21, fixed by colligation or welding with vertical reinforcing bar 21;Non-edge reinforcing bar includes wall body vertical reinforcement 32 and wall body
Horizontal bar 31, wall body vertical reinforcement 32 and wall body horizontal bar 31 are arranged in a crossed manner, and wall body horizontal bar 32 is arranged on wallboard non-edge area,
Both ends are anchored respectively with the horizontal hoop in panel edges area or lacing wire or overlap joint is fixed;The height of concrete walls body 4 is not higher than weak
Indulge the height of muscle 34, wall body vertical reinforcement 32 and vertical reinforcing bar 21 in edge.
Embodiment 4
As illustrated in figures 11 and 13, different from embodiment 1 or embodiment 2, the cross section of the shear wall slab 1 in the present invention is in L
Shape;Shear wall slab 1 includes internal steel skeleton 2, reinforcing bar and the concrete walls body 4 poured, and steel skeleton 2 includes being located at L-shaped both ends
The vertical reinforcing bar 21 of head, positioned at the vertical reinforcing bar 5 of intersection of L-shaped prefabricated panel corner regions and the reinforcing between vertical reinforcing bar 21
Part, vertical reinforcing bar 21 are H-shaped steel, and it is special-shaped reinforcing bar to intersect vertical reinforcing bar 5, have at least two vertical contact surfaces, respectively with wall
The vertical reinforcing bar 11 of plate marginal zone is connected by reinforcing member;Reinforcing member is horizontal concealed beam 22 and supporting member 23, horizontal concealed beam 22
Quantity be 2, respectively positioned at the epimere and hypomere of vertical reinforcing bar 21, welded with vertical reinforcing bar 21 or bolt connection;Support structure
Part 23 is arranged on horizontal concealed beam 22 and vertical reinforcing bar 21 and encloses to be formed in framework, is welded with vertical reinforcing bar 21 or bolt connection;Branch
Support component 23 is hound, and hound is steel plate strip band, shaped steel or welding steel member, and the quantity of hound is 2, along framework pair
Linea angulata is arranged in a crossed manner;Reinforcing bar includes edge reinforcement and non-edge reinforcing bar, and edge reinforcement includes weak edge and indulges muscle 34, and muscle is indulged at weak edge
34 are fixed by horizontal hoop or lacing wire, are set in outside vertical reinforcing bar 21, are fixed by colligation or welding with vertical reinforcing bar 21;Non- side
Balsh muscle includes wall body vertical reinforcement 32 and wall body horizontal bar 31, and wall body vertical reinforcement 32 and wall body horizontal bar 31 are arranged in a crossed manner,
Wall body horizontal bar 32 is arranged on wallboard non-edge area, and both ends are anchored respectively with the horizontal hoop in panel edges area or lacing wire or overlap joint
It is fixed;The height of concrete walls body 4 indulges the height of muscle 34, wall body vertical reinforcement 32 and vertical reinforcing bar 21 not higher than weak edge.
Embodiment 5
As shown in Figure 14 and Figure 15, different from embodiment 1 or embodiment 2, the cross section of the shear wall slab 1 in the present invention is in T
Shape;Shear wall slab 1 includes internal steel skeleton 2, reinforcing bar and the concrete walls body 4 poured, and steel skeleton 2 includes three positioned at T-shaped
The vertical reinforcing bar 21 of individual termination, the vertical reinforcing bar 5 of intersection positioned at T-shaped prefabricated panel node area and between vertical reinforcing bar 21 plus
Firmware, vertical reinforcing bar 21 are Wang Zigang, and it is special-shaped reinforcing bar to intersect vertical reinforcing bar 5, have at least three vertical contact surfaces, respectively with
The vertical reinforcing bar 11 in panel edges area is connected by reinforcing member;Reinforcing member is horizontal concealed beam 22, and the quantity of horizontal concealed beam 22 is 2
Root, respectively positioned at the epimere and hypomere of vertical reinforcing bar 21, welded with vertical reinforcing bar 21 or bolt connection;Reinforcing bar includes edge reinforcement
With non-edge reinforcing bar, edge reinforcement includes weak edge and indulges muscle 34, and weak edge indulges muscle 34 and fixed, be set in by horizontal hoop or lacing wire
Outside vertical reinforcing bar 21, fixed by colligation or welding with vertical reinforcing bar 21;Non-edge reinforcing bar includes wall body vertical reinforcement 32 and wall
Body horizontal bar 31, wall body vertical reinforcement 32 and wall body horizontal bar 31 are arranged in a crossed manner, and wall body horizontal bar 32 is arranged on wallboard non-edge
Area, both ends are anchored respectively with the horizontal hoop in panel edges area or lacing wire or overlap joint is fixed;The height of concrete walls body 4 is not higher than
Indulge the height of muscle 34, wall body vertical reinforcement 32 and vertical reinforcing bar 21 in weak edge.
Embodiment 6
As shown in Figure 14 and Figure 16, different from embodiment 1 or embodiment 2, the cross section of the shear wall slab 1 in the present invention is in T
Shape;Shear wall slab 1 includes internal steel skeleton 2, reinforcing bar and the concrete walls body 4 poured, and steel skeleton 2 includes being located at T-shaped three
The vertical reinforcing bar 21 of termination, positioned at the vertical reinforcing bar 5 of intersection in T-shaped prefabricated panel node area and the reinforcing between vertical reinforcing bar 21
Part, vertical reinforcing bar 21 are Wang Zigang, and it is special-shaped reinforcing bar to intersect vertical reinforcing bar 5, have at least three vertical contact surfaces, respectively with wall
The vertical reinforcing bar 11 of plate marginal zone is connected by reinforcing member;Reinforcing member is horizontal concealed beam 22 and supporting member 23, horizontal concealed beam 22
Quantity be 2, respectively positioned at the epimere and hypomere of vertical reinforcing bar 21, welded with vertical reinforcing bar 21 or bolt connection;Support structure
Part 23 is arranged on horizontal concealed beam 22 and vertical reinforcing bar 21 and encloses to be formed in framework, is welded with vertical reinforcing bar 21 or bolt connection;Branch
Support component 23 is hound, and hound is steel plate strip band, shaped steel or welding steel member, and the quantity of hound is 2, along framework pair
Linea angulata is arranged in a crossed manner;Reinforcing bar includes edge reinforcement and non-edge reinforcing bar, and edge reinforcement includes weak edge and indulges muscle 34, and muscle is indulged at weak edge
34 are fixed by horizontal hoop or lacing wire, are set in outside vertical reinforcing bar 21, are fixed by colligation or welding with vertical reinforcing bar 21;Non- side
Balsh muscle includes wall body vertical reinforcement 32 and wall body horizontal bar 31, and wall body vertical reinforcement 32 and wall body horizontal bar 31 are arranged in a crossed manner,
Wall body horizontal bar 32 is arranged on wallboard non-edge area, and both ends are anchored respectively with the horizontal hoop in panel edges area or lacing wire or overlap joint
It is fixed;The height of concrete walls body 4 indulges the height of muscle 34, wall body vertical reinforcement 32 and vertical reinforcing bar 21 not higher than weak edge.
Supporting member can be equally replaced using hound using equivalent steel plate in above example.
Embodiment described above is only that the preferred embodiment of the present invention is described, not to the model of the present invention
Enclose and be defined, on the premise of design spirit of the present invention is not departed from, technical side of the those of ordinary skill in the art to the present invention
The various modifications and improvement that case is made, it all should fall into the protection domain of claims of the present invention determination.
Claims (21)
1. the full precast shear wall structural system of regenerative steel skeleton, including basis, coupling beam(61), coupling beam(61)The unit at both ends is cut
Power wall and special dissipative member, it is characterised in that:The unit shear wall is by shear wall slab(1)Splicing composition, the shear wall
Plate(1)Include the steel skeleton of inside(2), reinforcing bar and the concrete walls body poured(4), the steel skeleton(2)Including positioned at wallboard
The vertical reinforcing bar of marginal zone(21)With vertical reinforcing bar(21)Between reinforcing member, the vertical reinforcing bar(21)For a word steel, angle steel,
Channel-section steel, I-steel, H-shaped steel, Wang Zigang, special-shaped reinforcing bar, welding steel member or combinations of the above, the reinforcing member are horizontal concealed beam
(22)And/or supporting member(23);The reinforcing bar includes edge reinforcement and non-edge reinforcing bar, and the edge reinforcement includes weak edge
Vertical muscle(34), muscle is indulged at the weak edge(34)Fixed by horizontal hoop or lacing wire, be set in vertical reinforcing bar(21)Outside;The non-side
Balsh muscle includes wall body vertical reinforcement(32)With wall body horizontal bar(31);The concrete walls body(4)Height be not higher than weak side
Edge indulges muscle(34), wall body vertical reinforcement(32)With vertical reinforcing bar(21)Height;The neighbouring prefabricated panel(9)Pass through phase
Corresponding vertical reinforcing bar(21), weak edge indulge muscle(34)With wall body vertical reinforcement(32)Connection, junction has poured connection seam
(7), the connection seam(7)For concrete or grouting material;Coupling beam(61)Top is provided with floor(9);The special dissipative member
(7)It is connected to by connector between two adjacent unit shear walls.
2. the full precast shear wall structural system of regenerative steel skeleton according to claim 1, it is characterised in that:It is described vertical
Reinforcing bar(21)Connecting node at be horizontally disposed with have connection end carriage(83), connect end carriage(83)One end and vertical reinforcing bar(21)Welding
Or bolt is fixed, the other end stretches out shear wall slab(1), with coupling beam(61)One end connects.
3. the full precast shear wall structural system of regenerative steel skeleton according to claim 1, it is characterised in that:It is described special
Dissipative member(7)For one or more combinations in steel coupling beam, doubly-linked beam, constraint steel plate shear force wall or anti-buckling support.
4. the full precast shear wall structural system of regenerative steel skeleton according to claim 1, it is characterised in that:The floor
(9)For prefabricated reinforced concrete floor, Truss Deck Concrete Slab, profiled sheet in-situ reinforced concrete slab, scene branch
The in-situ reinforced concrete slab of mould or prefabricated and cast-in-place combination laminated floor slab;The floor(9)Concrete be coagulation
Soil, regeneration concrete, flyash concrete, slag concrete or additive concrete;The coupling beam(61)For steel coupling beam, become
Rigidity girder steel, precast concrete beam, precast concrete composite beam, the precast concrete composite beam of band connection part or cast-in-place concrete
Coupling beam.
5. the full precast shear wall structural system of regenerative steel skeleton, including by basis, structural column(62), structural beams(63)And unit
The frame-shear-wall structure system of shear wall connection composition, it is characterised in that:The unit shear wall is by shear wall slab(1)Splicing
Composition, the shear wall slab(1)Include the steel skeleton of inside(2), reinforcing bar and the concrete walls body poured(4), the steel skeleton
(2)Including the vertical reinforcing bar positioned at panel edges area(21)With vertical reinforcing bar(21)Between reinforcing member, the vertical reinforcing bar
(21)For a word steel, angle steel, channel-section steel, I-steel, H-shaped steel, Wang Zigang, special-shaped reinforcing bar, welding steel member or combinations of the above, institute
It is horizontal concealed beam to state reinforcing member(22)And/or supporting member(23), the reinforcing bar includes edge reinforcement and non-edge reinforcing bar, described
Edge reinforcement includes weak edge and indulges muscle(34), muscle is indulged at the weak edge(34)Fixed, be set in vertically by horizontal hoop or lacing wire
Reinforcing bar(21)Outside;The non-edge reinforcing bar includes wall body vertical reinforcement(32)With wall body horizontal bar(31);The concrete walls body
(4)Height not higher than weak edge indulge muscle(34), wall body vertical reinforcement(32)With vertical reinforcing bar(21)Height;Neighbouring institute
State prefabricated panel(9)Pass through corresponding vertical reinforcing bar(21), weak edge indulge muscle(34)With wall body vertical reinforcement(32)Connection, even
The place of connecing has poured connection seam(7), the connection seam(7)For concrete or grouting material;The basis is reinforced concrete
Plinth, the structural column(62)For steel column, reinforced column, steel-concrete coupled column or steel-concrete-reinforcing bar coupled column, institute
State structural beams(63)Mixed for girder steel, variation rigidity girder steel, precast concrete beam, precast concrete composite beam, the prefabricated of band connection part
Coagulate native composite beam or cast-in-place concrete coupling beam.
6. the full precast shear wall structural system of regenerative steel skeleton according to claim 5, it is characterised in that:The reinforcing bar
Concrete foundation is isolated footing, raft foundation, beam foundation, box foundation, pile foundation or combinations thereof.
7. the full precast shear wall structural system of regenerative steel skeleton according to claim 1 or 5, it is characterised in that:It is described
Shear wall slab(1)Cross section is in " one " font, " L " shape, T " shapes, " ten " font or combinations of the above, the L-shaped prefabricated panel
Corner regions and T-shaped prefabricated panel, the node area of cross prefabricated panel, which are vertically arranged with, intersects vertical reinforcing bar(5).
8. the full precast shear wall structural system of regenerative steel skeleton according to claim 7, it is characterised in that:The intersection
Vertical reinforcing bar(5)For special-shaped reinforcing bar, there are at least three vertical contact surfaces, respectively with the vertical reinforcing bar in panel edges area(21)It is logical
Cross reinforcing member connection.
9. the full precast shear wall structural system of regenerative steel skeleton according to claim 7, it is characterised in that:The reinforcing
Part includes horizontal concealed beam(22), horizontal concealed beam(22)Quantity be 1, be arranged on vertical reinforcing bar(21)Epimere.
10. the full precast shear wall of steel skeleton of weak edge member arrangement of reinforcement according to claim 7, it is characterised in that:It is described
Reinforcing member includes horizontal concealed beam(22)And supporting member(23), the horizontal concealed beam(22)Quantity be 2, respectively positioned at vertical
Reinforcing bar(21)Epimere and hypomere, the supporting member(23)It is arranged on horizontal concealed beam(22)With vertical reinforcing bar(21)Enclose to be formed
In framework.
11. the full precast shear wall structural system of regenerative steel skeleton according to claim 7, it is characterised in that:The branch
Support component(23)For hound or steel plate, the hound is steel plate strip band, shaped steel or welding steel member, and the quantity of hound is not
Less than 1.
12. the full precast shear wall structural system of regenerative steel skeleton according to claim 7, it is characterised in that:The wall
Body horizontal bar(31)Wallboard non-edge area is arranged on, both ends are anchored with the horizontal hoop in panel edges area or lacing wire respectively, overlap joint
Or it is welded and fixed.
13. the full precast shear wall structural system of regenerative steel skeleton according to claim 7, it is characterised in that:The wall
Body vertical reinforcement(32)It is provided with tension rib(33).
14. the full precast shear wall structural system of regenerative steel skeleton according to claim 7, it is characterised in that:Phase up and down
The adjacent shear wall slab(1)Vertical reinforcing bar corresponding to interior(21)With the vertical reinforcing bar of intersection(5)It is weak by welding or bolting fixation
Indulge muscle in edge(34)With wall body vertical reinforcement(32)Fixed by sleeve connection, welding or overlap joint, the vertical reinforcing bar of connection(21)、
Indulge muscle in weak edge(34)With wall body vertical reinforcement(32)Outside, which is provided with, reinforces stirrup(81).
15. the full precast shear wall structural system of regenerative steel skeleton according to claim 7, it is characterised in that:The company
Meet node area and be provided with shear key(41), the shear key(41)For steel plate, shaped steel or armored concrete key.
16. the full precast shear wall structural system of regenerative steel skeleton according to claim 7, it is characterised in that:It is described to cut
Power wallboard(1)Or structural column(62)Shock isolating pedestal is provided between basis.
17. the construction party of the full precast shear wall structural system of regenerative steel skeleton described in claim 1-4,8-16 any one
Method, it is characterised in that:Comprise the following steps:
Step 1: shear wall slab is prefabricated:In the prefabricated steel skeleton of factory process(2), panel edges area weak edge indulge muscle(34), it is non-
The wall body vertical reinforcement of marginal zone(32)With wall body horizontal bar(31);Formwork, then colligation edge reinforcement and non-edge reinforcing bar, side
Balsh muscle wraps up steel skeleton(2), therewith welding or banding fixed;Concreting is carried out in template and is vibrated, treats concrete
After structure reaches some strength, form removal is carried out, is conserved stand-by to normal intensity;
Step 2: lower floor's shear wall slab installation:On the architecture basics of completion, measure and position, lift shear wall slab
(1), first by the shear wall slab of lower floor(1)The vertical reinforcing bar of bottom(21)Weld or bolt with architecture basics and fix, then by wall
Body vertical reinforcement(32)Fixed with architecture basics, casting concrete or grouting material;
Step 3: upper strata shear wall slab is installed:Lift the shear wall slab on upper strata(1), with lower floor's shear wall slab(1)After alignment, first
The vertical reinforcing bar by corresponding to(21)Welding or bolt are fixed, and then muscle is indulged at weak edge by corresponding to(34)With wall body vertical reinforcement
(32)Fixed by sleeve connection, welding or overlap joint;
Step 4: connection seam pours:In shear wall slab(1)Junction supporting module, progress concrete or grouting material pour
With vibrate, after structure reaches some strength, form removal, maintenance;
Step 5: coupling beam is installed:Lift coupling beam(61), coupling beam(61)Both ends are connected with two side unit shear walls;
Step 6: floor slab construction:Hoisting prefabricated floor or the concrete pouring construction for carrying out floor;
Step 7: successively construct:Three-step 6 of construction procedure is repeated to architectural top;
Step 8: special dissipative member installation:According to design requirement, set and special dissipative member is installed(7).
18. the construction method of the full precast shear wall structural system of regenerative steel skeleton according to claim 17, its feature
It is:Special dissipative member in step 8(7)Set-up mode include it is following two:As construction floor is successively sequentially installed,
Or unified installation after the completion of construction.
19. the construction method of the full precast shear wall structural system of regenerative steel skeleton according to claim 17, its feature
It is:Step 2 installs shock isolating pedestal when constructing on the basis of.
20. the construction party of the full precast shear wall structural system of regenerative steel skeleton described in claim 5-6,8-16 any one
Method, it is characterised in that:Comprise the following steps:
Step A, shear wall slab is prefabricated:Steel skeleton is made in factory process(2), panel edges area weak edge indulge muscle(34), water
Flat stirrup or lacing wire, the wall body vertical reinforcement in non-edge area(32)With wall body horizontal bar(31);Formwork, then colligation edge reinforcement
With non-edge reinforcing bar, edge reinforcement parcel steel skeleton(2), therewith welding or banding fixed;Concreting is carried out in template
With vibrate, after concrete structure reaches some strength, carry out form removal, conserve stand-by to normal intensity;
Step B, frame structure is installed:On the architecture basics of completion, measure and position, mounting structure post(62)And structure
Beam(63);
Step C, lower floor's shear wall slab is installed:Measure and position, on the architecture basics of completion, while lift shear wall slab
(1), first by the shear wall slab of lower floor(1)The vertical reinforcing bar of bottom(21)Weld or bolt with architecture basics and fix, then by wall
Body vertical reinforcement(32)Muscle is indulged with weak edge(34)Fixed with architecture basics, casting concrete or grouting material;
Step D, upper strata shear wall slab is installed:Lift the shear wall slab on upper strata(1), with lower floor's shear wall slab(1)After alignment, first will
Corresponding vertical reinforcing bar(21)Welding or bolt are fixed, and then muscle is indulged at weak edge by corresponding to(34)With wall body vertical reinforcement(32)
Fixed by sleeve connection, welding or overlap joint;
Step E, connection seam pours:In shear wall slab(1)Junction supporting module, carry out concrete or grouting material pour and
Vibrate, after structure reaches some strength, form removal, maintenance;
Step F, floor slab construction:Hoisting prefabricated floor or the concrete pouring construction for carrying out floor;
Step G, successively construct:Construction procedure C- steps F is repeated to architectural top.
21. the construction method of the full precast shear wall structural system of regenerative steel skeleton according to claim 20, its feature
It is:Step B and step C installs shock isolating pedestal when constructing on the basis of.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710332697.6A CN107419824A (en) | 2017-05-12 | 2017-05-12 | The full precast shear wall structural system of regenerative steel skeleton and construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710332697.6A CN107419824A (en) | 2017-05-12 | 2017-05-12 | The full precast shear wall structural system of regenerative steel skeleton and construction method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107419824A true CN107419824A (en) | 2017-12-01 |
Family
ID=60424927
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710332697.6A Pending CN107419824A (en) | 2017-05-12 | 2017-05-12 | The full precast shear wall structural system of regenerative steel skeleton and construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107419824A (en) |
Cited By (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108005410A (en) * | 2017-12-20 | 2018-05-08 | 中冶建筑研究总院有限公司 | A kind of assembled Residential System of Steel-concrete Composite Structure and its construction method |
CN108104263A (en) * | 2017-12-28 | 2018-06-01 | 清华大学 | A kind of novel fabricated steel-regeneration concrete combination frame structural system |
CN108571093A (en) * | 2018-06-15 | 2018-09-25 | 浙江绿筑集成科技有限公司 | The connecting structure of PEC combined shear wall limbs |
CN108589931A (en) * | 2018-07-25 | 2018-09-28 | 浙江大学 | The precast construction connecting node that concrete is combined with steel construction |
CN109339283A (en) * | 2018-11-16 | 2019-02-15 | 华侨大学 | A kind of prefabricated assembled steel reinforced concrete shear walls vertically splice node structure and its construction method |
CN110106967A (en) * | 2019-04-23 | 2019-08-09 | 清华大学 | A kind of high-performance steel pipe regeneration concrete is put more energy into mixed column-wall construction system |
CN110499846A (en) * | 2019-09-02 | 2019-11-26 | 中国五冶集团有限公司 | Combined type shear wall and damping wall construction |
CN110541500A (en) * | 2019-09-30 | 2019-12-06 | 陕西省建筑科学研究院有限公司 | fabricated shear wall structure and construction method |
CN111119377A (en) * | 2020-01-14 | 2020-05-08 | 韩静 | Prefabricated hollow superposed shear wall with vertical steel bars not protruding out of ribs and formed holes of shaped pipeline |
CN111379374A (en) * | 2019-11-11 | 2020-07-07 | 徐州宏禄建筑科技有限公司 | Self-heat-preservation ceramsite concrete assembled outer wall |
CN111734010A (en) * | 2020-06-02 | 2020-10-02 | 长春工程学院 | Assembly type double-limb shear wall with inner arch type connecting beams and assembly method |
CN112814205A (en) * | 2021-02-18 | 2021-05-18 | 海南大学 | Prefabricated assembly type shear wall and construction method thereof |
CN114412013A (en) * | 2022-01-20 | 2022-04-29 | 江苏沪宁钢机股份有限公司 | Building wall segment and construction method |
CN114955794A (en) * | 2022-06-08 | 2022-08-30 | 江西欣诚电梯有限公司 | Elevator shaft prefabricated frame and elevator shaft construction method |
CN116771037A (en) * | 2023-06-16 | 2023-09-19 | 中铁广州工程局集团有限公司 | Assembled steel structure door building integrated rapid installation construction method |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101560791A (en) * | 2009-04-03 | 2009-10-21 | 华南理工大学 | Shear wall truss hybrid type lateral resisting structure system |
CN103590512A (en) * | 2013-11-06 | 2014-02-19 | 长江大学 | Frame shear wall comprising steel-reinforced concrete special-shaped embedded column |
WO2014158109A1 (en) * | 2013-03-24 | 2014-10-02 | Yüksel Süleyman Bahadir | Innovation for shear reinforcement of coupling beams of coupled shear walls |
CN205653923U (en) * | 2016-01-11 | 2016-10-19 | 湖南大学 | Novel big board shear wall structure is secretly supported in prefabricated assembled area of connecting from top to bottom |
CN106223461A (en) * | 2016-08-30 | 2016-12-14 | 姚攀峰 | A kind of hybrid industrialized building structural system and construction method thereof |
CN207017483U (en) * | 2017-05-12 | 2018-02-16 | 姚攀峰 | The full precast shear wall structural system of regenerative steel skeleton |
-
2017
- 2017-05-12 CN CN201710332697.6A patent/CN107419824A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101560791A (en) * | 2009-04-03 | 2009-10-21 | 华南理工大学 | Shear wall truss hybrid type lateral resisting structure system |
WO2014158109A1 (en) * | 2013-03-24 | 2014-10-02 | Yüksel Süleyman Bahadir | Innovation for shear reinforcement of coupling beams of coupled shear walls |
CN103590512A (en) * | 2013-11-06 | 2014-02-19 | 长江大学 | Frame shear wall comprising steel-reinforced concrete special-shaped embedded column |
CN205653923U (en) * | 2016-01-11 | 2016-10-19 | 湖南大学 | Novel big board shear wall structure is secretly supported in prefabricated assembled area of connecting from top to bottom |
CN106223461A (en) * | 2016-08-30 | 2016-12-14 | 姚攀峰 | A kind of hybrid industrialized building structural system and construction method thereof |
CN207017483U (en) * | 2017-05-12 | 2018-02-16 | 姚攀峰 | The full precast shear wall structural system of regenerative steel skeleton |
Non-Patent Citations (1)
Title |
---|
桂国庆: "《建筑结构抗震设计》", 重庆大学出版社, pages: 125 * |
Cited By (21)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108005410A (en) * | 2017-12-20 | 2018-05-08 | 中冶建筑研究总院有限公司 | A kind of assembled Residential System of Steel-concrete Composite Structure and its construction method |
CN108104263A (en) * | 2017-12-28 | 2018-06-01 | 清华大学 | A kind of novel fabricated steel-regeneration concrete combination frame structural system |
CN108104263B (en) * | 2017-12-28 | 2023-12-29 | 清华大学 | Novel assembled steel-recycled concrete mixed frame structure system |
CN108571093B (en) * | 2018-06-15 | 2023-11-28 | 浙江绿筑集成科技有限公司 | Connection structure of PEC combined shear wall limb |
CN108571093A (en) * | 2018-06-15 | 2018-09-25 | 浙江绿筑集成科技有限公司 | The connecting structure of PEC combined shear wall limbs |
CN108589931A (en) * | 2018-07-25 | 2018-09-28 | 浙江大学 | The precast construction connecting node that concrete is combined with steel construction |
CN109339283A (en) * | 2018-11-16 | 2019-02-15 | 华侨大学 | A kind of prefabricated assembled steel reinforced concrete shear walls vertically splice node structure and its construction method |
CN110106967A (en) * | 2019-04-23 | 2019-08-09 | 清华大学 | A kind of high-performance steel pipe regeneration concrete is put more energy into mixed column-wall construction system |
CN110106967B (en) * | 2019-04-23 | 2024-01-26 | 清华大学 | High-performance steel tube recycled concrete stiffening mixed column-wall structure system |
CN110499846A (en) * | 2019-09-02 | 2019-11-26 | 中国五冶集团有限公司 | Combined type shear wall and damping wall construction |
CN110541500B (en) * | 2019-09-30 | 2024-03-15 | 陕西省建筑科学研究院有限公司 | Assembled shear wall structure and construction method |
CN110541500A (en) * | 2019-09-30 | 2019-12-06 | 陕西省建筑科学研究院有限公司 | fabricated shear wall structure and construction method |
CN111379374A (en) * | 2019-11-11 | 2020-07-07 | 徐州宏禄建筑科技有限公司 | Self-heat-preservation ceramsite concrete assembled outer wall |
CN111119377A (en) * | 2020-01-14 | 2020-05-08 | 韩静 | Prefabricated hollow superposed shear wall with vertical steel bars not protruding out of ribs and formed holes of shaped pipeline |
CN111734010A (en) * | 2020-06-02 | 2020-10-02 | 长春工程学院 | Assembly type double-limb shear wall with inner arch type connecting beams and assembly method |
CN111734010B (en) * | 2020-06-02 | 2024-05-28 | 长春工程学院 | Assembled double-limb shear wall with inner arch type connecting beam and assembling method |
CN112814205A (en) * | 2021-02-18 | 2021-05-18 | 海南大学 | Prefabricated assembly type shear wall and construction method thereof |
CN114412013B (en) * | 2022-01-20 | 2024-03-29 | 江苏沪宁钢机股份有限公司 | Building wall segment and construction method |
CN114412013A (en) * | 2022-01-20 | 2022-04-29 | 江苏沪宁钢机股份有限公司 | Building wall segment and construction method |
CN114955794A (en) * | 2022-06-08 | 2022-08-30 | 江西欣诚电梯有限公司 | Elevator shaft prefabricated frame and elevator shaft construction method |
CN116771037A (en) * | 2023-06-16 | 2023-09-19 | 中铁广州工程局集团有限公司 | Assembled steel structure door building integrated rapid installation construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107419824A (en) | The full precast shear wall structural system of regenerative steel skeleton and construction method | |
CN107090925A (en) | Reinforced precast reinforced concrete shear wall, structural system and its construction method | |
CN207017483U (en) | The full precast shear wall structural system of regenerative steel skeleton | |
CN109680835B (en) | Self-supporting precast concrete wallboard, concrete wall, structural system and construction method | |
CN208430661U (en) | A kind of vertical piece construction of line-styled self-heat conserving overlapped shear wall | |
CN107327065A (en) | The hollow groined slab floor frame structure seat of large span assembled integral and preparation method | |
CN207017484U (en) | Reinforced precast reinforced concrete shear wall and structural system | |
CN107654021A (en) | A kind of assembling prefabricated reinforced concrete column and assembled combination frame building system | |
CN106368348A (en) | Overlapped combined shear wall with double-phase stress characteristic | |
CN205875394U (en) | Antidetonation concrete beam column that dry process is connected | |
CN108086535B (en) | A kind of assembled square steel tube steel plate concrete combined shear wall | |
CN113585053A (en) | Prefabricated assembled concrete-filled steel tube pier with out-of-site tension prestress and construction method thereof | |
CN109469204A (en) | Fabricated steel reinforced concrete mixed frame structure based on superposed beams and construction method | |
CN210066504U (en) | Large-span cantilever truss type bent cap support system | |
CN107419825A (en) | The full precast shear wall of steel skeleton and its construction method of weak edge member arrangement of reinforcement | |
CN110173127A (en) | The ruggedized construction and its construction technology of parts of shear wall structure wall body concrete replacement | |
CN212897482U (en) | Construction platform for high-rise building overhanging structural layer | |
CN106639151B (en) | Built-in X-type is to drawing steel plate type welding rectangular steel-tube concrete column and construction method | |
CN207032466U (en) | A kind of superposed type prefabricated reinforced concrete structure system | |
CN206157892U (en) | Hybrid industrialised building structure system | |
CN211395960U (en) | Multilayer large-span improved concrete honeycomb-shaped space grid box type structure | |
CN208105474U (en) | A kind of assembly node of upper and lower interior wall and floor | |
CN108412036B (en) | Assembled H profile steel column-isolated footing-concrete collar tie beam cross connecting node | |
CN218596920U (en) | Face empty assembled concrete bent cap cast-in-place construction support | |
CN206189657U (en) | Assembled steel sheet net outsourcing concrete shear wall structure based on pre -fabricated steel frame |