WO2014158109A1 PCT/TR2014/000061 TR2014000061W WO2014158109A1 WO 2014158109 A1 WO2014158109 A1 WO 2014158109A1 TR 2014000061 W TR2014000061 W TR 2014000061W WO 2014158109 A1 WO2014158109 A1 WO 2014158109A1
Authority
WO
WIPO (PCT)
Prior art keywords
handle
reinforcements
horizontal
coupling
structural
Prior art date
Application number
PCT/TR2014/000061
Other languages
French (fr)
Inventor
Süleyman Bahadir YÜKSEL
Original Assignee
Yüksel Süleyman Bahadir
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yüksel Süleyman Bahadir filed Critical Yüksel Süleyman Bahadir
Publication of WO2014158109A1 publication Critical patent/WO2014158109A1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C5/00Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
    • E04C5/01Reinforcing elements of metal, e.g. with non-structural coatings
    • E04C5/06Reinforcing elements of metal, e.g. with non-structural coatings of high bending resistance, i.e. of essentially three-dimensional extent, e.g. lattice girders
    • E04C5/0645Shear reinforcements, e.g. shearheads for floor slabs
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H9/00Buildings, groups of buildings or shelters adapted to withstand or provide protection against abnormal external influences, e.g. war-like action, earthquake or extreme climate
    • E04H9/02Buildings, groups of buildings or shelters adapted to withstand or provide protection against abnormal external influences, e.g. war-like action, earthquake or extreme climate withstanding earthquake or sinking of ground
    • E04H9/025Structures with concrete columns
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C5/00Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
    • E04C5/01Reinforcing elements of metal, e.g. with non-structural coatings
    • E04C5/02Reinforcing elements of metal, e.g. with non-structural coatings of low bending resistance
    • E04C5/04Mats

Definitions

  • Invention relates to innovation done in structural walls with coupling beam, diagonal reinforcement that will work as main load-bearing system .vertical reinforcement, horizontal reinforcement, splices, connection region and joining points.
  • the structural walls and structural walls with coupling beams are frequently encountered.
  • the shear walls and coupled shear walls of which stiffness is higher than columns are preferred to respond horizontal force like earthquake and wind force.
  • the structural walls with coupling beams occur when openings are left for doors, windows and corridors.
  • This type of systems are called structural walls with coupling beams, also can be considered as a special version of structural wall systems.
  • coupling beams which are found in multistory reinforced concrete buildings, as they'll show ductile behaviors it behaves more ductile then the structural walls without openings.
  • the main aim of coupling beams is to provide the transfer of the shearing force which is formed by horizontal force that affect the system. Coupling beams exposed to reversed cyclic force that change its direction especially by the affect of earthquake. On structural walls with coupling beams the earthquake damage occur primarily on coupling beams.
  • the experimental searches on the structural walls with coupling beams, has presented conventional beam details have negative efficient on system behaviors.
  • the coupling beam with short spans which is equipped by classical simple reinforcements and stirrups become lack of power because of the failure of the coupling beams due to diagonal tension before reaching the bending capacity.
  • the coupling beam with short spans which is equipped by classical simple reinforcements and stirrups even if the shearing force capacity is kept high by increasing the proportion of shear reinforcement and regulating the stirrups properly it doesn't indicate the intended structural behaviors by the reason of adherence declination on both sides, and sudden consuming power of shearing force on the edge profile.
  • V d 1.5xb w xdxf c td
  • Total reinforcement area in each crosswise reinforcement cluster shall be determined with equitation below in Turkish Earthquake Code Regulations (ABYYHY 2007).
  • a S d V d /(2xf yd xsiny)
  • a sd Total area of each of the crosswise reinforcement cluster in the coupling beam
  • V d Design force caused from vertical load and earthquake load which is multiplied by design coefficients.
  • The angle which crosswise reinforcement cluster made with the horizontal one.
  • minimum amount of stirrup intended and horizontal reinforcement shall be put into the coupling beam.
  • V E d design shear force in the coupling beam
  • a S i total area of the reinforcements in the each diagonal direction in the coupling beam
  • Coupling beams and reinforcements are prepared as precast, that is the coupling beam is brought to the site as the concrete was casted. Embedding reinforcements are extended from coupling beam reinforcements. Precast beams are prepared under the factory conditions and brought to the site, mounting reinforcements are inserted and placed into the structural walls and later structural concrete is casted and monolithic system is sought to be formed. In this case, mounting problems are encountered during the placement of the reinforcements detached from the prefabricated coupling beams.
  • a monolithic crosswise reinforcement was formed as coupling beam reinforcement before in literature, welding of H profiles cross wisely and experimented. Cutting chocks were welded to H profile splices in order to increase the length of embedding at the part remaining within the structural wall. It is almost impossible to mount H profiles welded to each other to the coupling beam and into the wall in monolithic way.
  • the invention relates to the innovations for crosswise reinforcement which are to serve as the main load-bearing system on coupling beams of coupled structural walls, vertical reinforcements, horizontal reinforcements, connection parts, joining parts and connection regions.
  • Coupling beam reinforcements offered to the literature before are constructed in monolithic way. This can not be applied practically as embedment and mounting of the crosswise reinforcements constructed as a whole into the structural walls with dense reinforcement are very difficult and laborious. Therefore, structural steel elements made of fragmental system with this proposal (L profiles, U profiles, I profiles, T profiles, H profiles, box profiles and pipe profile sor L, U, I, T, H, box and pipe profile plates) are used and a new reinforcement type (cross wise reinforcements) is offered to the literature. Each of the fragmental system can be produced in factory or site. If crosswise coupling beam reinforcements are fragmental, mounting becomes easier. Structural steel elements remaining within the coupling beam and structural steel elements remaining inside the structural wall shall be produced fragmentaily and mounted onsite. Thus, cross wise reinforced coupling beams can be applied practically and constructed.
  • the invention is characterized in that it consists of cross wise handle (1 ), connecting plate (2), anchor handle (3), vertical handle (4), horizontal handle (5), horizontal anchor handle (6) parts.
  • Two cross bars (1 ) at least are connected to rectangular, square, eclipse or circle shaped connecting plate with bolt, screw, smart screw, welding and similar connecting elements.
  • Structural steel elements which consist of cross bars (1 ), connecting plate (2), anchor handle (3), vertical handle (4), horizontal handle (5) and horizontal anchor handle (6) parts can be produced from L,U,I,H,T, box and pipe profile or L, U, I, H, T, box and pipe profile twist plate.
  • the invention is formed by mounting cross bars (1 ) which consists of L,
  • Connecting plate (2) may be in convenient width, height and thickness, square, rectangular, oval and circle shaped in a way that it shall meet the incoming loads. Appropriate hole sor channels are left in order to connect the coupling beam cross wise reinforcements to the connecting plate (2). One or two of the cross wise reinforcements may be connected to the connecting plate by welding depending the ease of mounting.
  • Coupling beam crosswise handles (1 ) are prepared from L, U, I, H, T, box, pipe profile or twist plate in accordance with the length of the beam.
  • Vertical handle (4) and horizontal handle (5) consist of structural steel elements in appropriate sizes in order to prevent buckling of coupling beam reinforcements, make more stable and meet some of the inner forces.
  • Anchor handles (3) are built from the structural steel elements in the length to provide sufficient anchor remaining within the wall. Vertical handles (4) and horizontal handles (5) are connected to anchor handles (3) through appropriate holes and channels in the number, frequency appropriate for the project.
  • anchor handles (3) and horizontal anchor handles (6) are placed while preparing structural wall reinforcements (fixed, may be connected to wall reinforcements).
  • a Standard shall be created with vertical handle (4), horizontal handle (5) and cross bars (1 ) to be formed using structural steel elements in coupling beams and much more secure, economic structures may be built for people living in the building resistant to the forces exposed due to the loads on the building or seismic forces.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Business, Economics & Management (AREA)
  • Emergency Management (AREA)
  • Environmental & Geological Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Reinforcement Elements For Buildings (AREA)

Abstract

The invention relates to the innovations for the crosswise reinforcements to serve as the main load-bearing system on the coupling beams of coupled shear walls, vertical reinforcements, horizontal reinforcements, connecting parts and joining parts.

Description

DESCRIPTION
INNOVATION FOR SHEAR REINFORCEMENT OF COUPLING BEAMS OF
COUPLED SHEAR WALLS TECHNICAL FIELD
Invention relates to innovation done in structural walls with coupling beam, diagonal reinforcement that will work as main load-bearing system .vertical reinforcement, horizontal reinforcement, splices, connection region and joining points.
PRIOR ART
In load-bearing systems in which structural walls are used; because the hollows those left for functional reasons like door, window and installation passage, structural walls with coupling beams occur. This type of wall systems are called as coupled shear wall system or structural walls with coupling beams. Not only position but also number and size of hollows along the wall affect the behavior of building and the distribution of its internal force on coupling beams and structural walls. In case of being the openings that left on the structural walls relatively smaller than the size of wall, the affect of openings is ignored and the system is accepted as structural walls without openings. But in the situation that the openings are visibly bigger, by considering the affect of the hollows, the system is designed as a structural wall with coupling beams. In this type of buildings location of openings should de designed by considering its affects to the building behavior. When the structural walls with coupling beam and coupling beams are designed properly they can behave sufficiently ductile.
In buildings, the structural walls and structural walls with coupling beams are frequently encountered. The shear walls and coupled shear walls of which stiffness is higher than columns are preferred to respond horizontal force like earthquake and wind force. The structural walls with coupling beams occur when openings are left for doors, windows and corridors. This type of systems are called structural walls with coupling beams, also can be considered as a special version of structural wall systems. In condition of designing and building coupling beams of structural walls, with coupling beams which are found in multistory reinforced concrete buildings, as they'll show ductile behaviors it behaves more ductile then the structural walls without openings.
With the affect of horizontal force which affect to the structural walls with coupling beams; axial force, shearing force and bending moments are occurred on structural walls on the other hand on coupling beams shearing force and bending moments are occurred. Overturning moment which occurred in the system because of the horizontal forces that affect the structural walls with coupling beam systems is carried by two different forces. These are: bending moments which occurred on structural walls in system and reaction moments which are formed by couple of opposite marked axial and equal value force on structural walls. Magnitude of axial force on wall couples, depend on the ability of transferring the shearing force that occurs on coupling beams to the structural walls without loss of capacity. When the stiffness of coupling beams get higher the mutual work of walls will surface more efficiently on the other hand because of shearing force on the bounding beams, the normal force on the walls increase. With the increasing stiffness of coupling beams the bending moments decreases, the shearing force of coupling beams increases.
The main aim of coupling beams is to provide the transfer of the shearing force which is formed by horizontal force that affect the system. Coupling beams exposed to reversed cyclic force that change its direction especially by the affect of earthquake. On structural walls with coupling beams the earthquake damage occur primarily on coupling beams. The experimental searches on the structural walls with coupling beams, has presented conventional beam details have negative efficient on system behaviors. The coupling beam with short spans which is equipped by classical simple reinforcements and stirrups become lack of power because of the failure of the coupling beams due to diagonal tension before reaching the bending capacity. The coupling beam with short spans which is equipped by classical simple reinforcements and stirrups even if the shearing force capacity is kept high by increasing the proportion of shear reinforcement and regulating the stirrups properly it doesn't indicate the intended structural behaviors by the reason of adherence declination on both sides, and sudden consuming power of shearing force on the edge profile.
On coupled shear wall systems, coupling beams and structural walls are aimed to work together. Special shearing reinforcement to be inserted on the coupling beam in the event that both equitation's given below according to Turkish Earthquake Regulations (ABYYHY 2007) shall be determined by the methods whose validity was proved with experiments or crosswise reinforcements shall be used to meet shearing force on the coupling beam and bending moment it created.
tn≤ 3xhk
Vd > 1.5xbwxdxfctd
In the formula above;
: Clear length between the wall surfaces of the coupling beams,
hk : height of coupling beam,
bw: thicknesses of coupling beam,
d : useful height of coupling beam,
fctd'. design tensile strength of the concrete.
Total reinforcement area in each crosswise reinforcement cluster shall be determined with equitation below in Turkish Earthquake Code Regulations (ABYYHY 2007).
ASd = Vd /(2xfydxsiny)
In this equitation;
Asd : Total area of each of the crosswise reinforcement cluster in the coupling beam,
Vd : Design force caused from vertical load and earthquake load which is multiplied by design coefficients.
fyd : design yield strength of longitudinal reinforcement,
γ : The angle which crosswise reinforcement cluster made with the horizontal one. There shall be four reinforcements at least in the crosswise reinforcements clusters with intended use in Turkish Earthquake Regulations in order to meet the shearing force and bending moment formed by the shearing force and these reinforcements shall be extended one and half time as the clamping in length at least towards the parts of structural wall. Reinforcement clusters shall be wrapped by special earthquake stirrups and the diameter of stirrups shall not be smaller than 8 mm, the distance between each stirrups shall not be more than 8 times of the diameters of the crosswise reinforcement and 100 mm. In addition to crosswise reinforcements, minimum amount of stirrup intended and horizontal reinforcement shall be put into the coupling beam.
According to European Earthquake Code Regulations (Eurosode8 2004) it is required to apply the reinforcements along both diagonals of the coupling beam to meet the seismic impacts in the event that both equations given below under the principles stated below.
l < 3x h
Figure imgf000006_0001
Within the formula above;
/ : clear span remaining between the surfaces of the shear walls of coupled shear wall systems,
h : height of coupling beam,
VEd '■ design shear force in the coupling beam,
bw : width of coupling beam,
d : useful height of the coupling beam,
/ctd ■' Design tensile strength of the concrete.
a) according to Eurocode8, 2004, equation below should be satisfied in crosswise reinforcement of coupling beams.
Figure imgf000006_0002
In the formula above;
VEd : design shear force in the coupling beam, ASi : total area of the reinforcements in the each diagonal direction in the coupling beam,
fyd : yield strength of the longitudinal reinforcement,
a : The angle which crosswise reinforcement cluster made with the horizontal one.
b) It should be reinforced like column element in way that width of diagonal shall be 0.5xbw at least.
c) Stirrups should be used to prevent buckling of the longitudinal reinforcements in this cross wise elements reinforced like column.
d) Vertical and horizontal reinforcements should be placed into both surfaces of coupling beam and meet minimum conditions specified in European Earthquake Regulation (Eurocode8 2004)
It is required to construct the crosswise reinforcements wrapped with dense stirrups intended in the Regulations interpenetrating in the middle of coupling beam and mount in a way that it shall enter into the structural wall splices where dense reinforcements are contained as clamping length. It is impossible to construct the crosswise reinforcements wrapped with dense stirrups interpenetrating in the middle of coupling beam extending as the length of clamping to the dense reinforced structural wall splice. Density of the reinforcement in the structural wall splices and crosswise reinforcements in the coupling beam; this causes serious problems during the phase of preparation of the reinforcements, interpenetrating, placement and mounting, causes the crosswise reinforcements are different from the one intended in the project and renders the construction impossible in many cases.
It is required to construct structural wall splices wrapped with dense stirrups where the dense vertical reinforcements are contained during the first phase in building coupled structural wall due to construction technique and later to construct the crosswise reinforcements wrapped with dense stirrups, embed in and mount the structural wall splices and structural body. These kind of cross wise reinforcements could not find a wide application opportunity because there is no possibility of practical and applicable mounting in site conditions as 000061
construction of the crosswise reinforcements interpenetrating with dense stirrups and instead mounting is almost impossible.
Due to dense of reinforcement practically and difficulty of mounting, cross wise reinforcements intended in regulations can not be applied. Therefore, different coupling beam reinforcements were offered in literature. As the coupling beam in literature; H profile was placed into the coupling beam horizontally and embedded in the structural walls, a kind of composite beam. Here H profile is mounted to the bond beam horizontally in one piece. Steel plates are joined to H profile by welding in order to delay buckling and corrugation of H profile located in the coupling beam. Mounting and embedding problems are also encountered in this steel H profile produced in one piece.
This was offered as coupling beam to the literature before in prefabricated (precast) beams. Coupling beams and reinforcements are prepared as precast, that is the coupling beam is brought to the site as the concrete was casted. Embedding reinforcements are extended from coupling beam reinforcements. Precast beams are prepared under the factory conditions and brought to the site, mounting reinforcements are inserted and placed into the structural walls and later structural concrete is casted and monolithic system is sought to be formed. In this case, mounting problems are encountered during the placement of the reinforcements detached from the prefabricated coupling beams.
A monolithic crosswise reinforcement was formed as coupling beam reinforcement before in literature, welding of H profiles cross wisely and experimented. Cutting chocks were welded to H profile splices in order to increase the length of embedding at the part remaining within the structural wall. It is almost impossible to mount H profiles welded to each other to the coupling beam and into the wall in monolithic way.
BRIEF SUMMARY OF THE INVENTION
The invention relates to the innovations for crosswise reinforcement which are to serve as the main load-bearing system on coupling beams of coupled structural walls, vertical reinforcements, horizontal reinforcements, connection parts, joining parts and connection regions.
Coupling beam reinforcements offered to the literature before are constructed in monolithic way. This can not be applied practically as embedment and mounting of the crosswise reinforcements constructed as a whole into the structural walls with dense reinforcement are very difficult and laborious. Therefore, structural steel elements made of fragmental system with this proposal (L profiles, U profiles, I profiles, T profiles, H profiles, box profiles and pipe profile sor L, U, I, T, H, box and pipe profile plates) are used and a new reinforcement type (cross wise reinforcements) is offered to the literature. Each of the fragmental system can be produced in factory or site. If crosswise coupling beam reinforcements are fragmental, mounting becomes easier. Structural steel elements remaining within the coupling beam and structural steel elements remaining inside the structural wall shall be produced fragmentaily and mounted onsite. Thus, cross wise reinforced coupling beams can be applied practically and constructed.
DESCRIPTION OF THE REFERENCE NUMERALS
Drawing 1. Cross wise Reinforcements Intended to Use in Turkish Earthquake Regulation to Meet Shearing Force and Bending Moment formed by This Force on the Coupling Beam (ABYYHY 2007)
Drawing 2. Diagonally Reinforced Coupling Beams (Eurocode8, 2004)
Drawing 3. Mounted Image from Coupling Beams of Coupled Shear Walls Drawing 4. A Detail Outlook
Drawing 5. B Detail Outlook
Drawing 6. C Detail Outlook
Equivalents of the number of the parts indicated in the figures are given below.
1 . Cross Bar
2. Connecting Plate
3. Anchor Handle
4. Vertical Handle 5. Horizontal Handle ,
6. Horizontal Anchor Handle
DETAILED DESCRIPTION OF THE INVENTION
The invention is characterized in that it consists of cross wise handle (1 ), connecting plate (2), anchor handle (3), vertical handle (4), horizontal handle (5), horizontal anchor handle (6) parts.
In the known technique, four reinforcements are required in cross wise reinforcement cluster and these reinforcements should be extended one and half times as clamping length towards the parts of the shear wall. Reinforcement clusters should be wrapped with special earthquake stirrups. There are splices of the wall of structural walls on the right and left surface of the coupling beam. Dense vertical reinforcements on the structural wall splices are wrapped with frequent interval stirrups. This becomes almost impossible to mount the cross wise reinforcements by embedding the cross wise reinforcement clusters wrapped with stirrups to the structural walls with dense reinforcement rate.
As a result of my studies in order to minimize the negative effects of the forces on the coupling beams exposed by the coupled structural walls due to horizontal forces such as seismic effects and wind effects and additionally vertical loads, ground effect, temperature changes and such loads; it was put forward to hold together structural steel elements as cross reinforcements (L profiles, U profiles, I profiles, T profiles, H profiles, H profiles, box profiles and pipe profile, L, U, I, T, H box and pipe profile plates) with structural steel elements designed as vertical and horizontal reinforcement and new reinforcements which provides opportunity to join the system with connecting elements such as screwed, bolted, high resistant bolted, riveted, smart secrewed, welded etc. among structural steel elements.
Two cross bars (1 ) at least are connected to rectangular, square, eclipse or circle shaped connecting plate with bolt, screw, smart screw, welding and similar connecting elements. R2014/000061
Structural steel elements which consist of cross bars (1 ), connecting plate (2), anchor handle (3), vertical handle (4), horizontal handle (5) and horizontal anchor handle (6) parts can be produced from L,U,I,H,T, box and pipe profile or L, U, I, H, T, box and pipe profile twist plate.
The invention is formed by mounting cross bars (1 ) which consists of L,
U, H, T, I, box, pipe profile steel elements on one connecting plate (2) at least and connecting horizontal handle (5) and vertical handles (4) between the cross bars (1 ) with the mounting elements such as screw, smart screw, bolt, high resistant bolt, rivet, welding etc. after the connection of these cross bars (1 ) to four anchor handles.
Connecting plate (2) may be in convenient width, height and thickness, square, rectangular, oval and circle shaped in a way that it shall meet the incoming loads. Appropriate hole sor channels are left in order to connect the coupling beam cross wise reinforcements to the connecting plate (2). One or two of the cross wise reinforcements may be connected to the connecting plate by welding depending the ease of mounting. Coupling beam crosswise handles (1 ) are prepared from L, U, I, H, T, box, pipe profile or twist plate in accordance with the length of the beam. Vertical handle (4) and horizontal handle (5) consist of structural steel elements in appropriate sizes in order to prevent buckling of coupling beam reinforcements, make more stable and meet some of the inner forces. Prepared structural steel elements are placed in length, width and thickness appropriate for the project and in appropriate intervals and frequency. Suitable hole sor channels are left in order to ensure connection of vertical handle (4) and horizontal handles (5) with the crosswise handles (1 ). Anchor handles (3) are built from the structural steel elements in the length to provide sufficient anchor remaining within the wall. Vertical handles (4) and horizontal handles (5) are connected to anchor handles (3) through appropriate holes and channels in the number, frequency appropriate for the project.
Application of the invention; anchor handles (3) and horizontal anchor handles (6) are placed while preparing structural wall reinforcements (fixed, may be connected to wall reinforcements). Connection of crosswise handles (1 ) to anchor handles (3) with appropriate number of connecting elements (screw, bolt, high resistant bolt, rivet, smart screw and welding etc.) and its sustainability. This is connected to connecting plate (2) with crosswise handle (1 ) connecting elements in number appropriate for the project. Vertical handle
(4) and horizontal handle (5) are connected to cross bars (1 ) and anchor handles (3) with connecting elements through the appropriate hole and channels. Anchor handle is connected to all or several of the horizontal handles
(5) joined between the cross bars (1 ) in a way that it shall enter inside the wall in order to increase embedment feature of the system in the number and feature appropriate for the project. Sequence of the structural steel elements to be joined according to ease of mounting.
A Standard shall be created with vertical handle (4), horizontal handle (5) and cross bars (1 ) to be formed using structural steel elements in coupling beams and much more secure, economic structures may be built for people living in the building resistant to the forces exposed due to the loads on the building or seismic forces.
In the event that reinforcements of coupling beams with the system described in our invention on the coupling beams of the coupled shear walls, more economic, more quickly constructed and more secure industrial structure systems can be created. Today coupling beams are constructed by passing crosswise reinforcements, formed like a column by wrapping dense stirrups, through the dense vertical reinforcements in the structural wall splices and embedding to the structural wall. Serious problems are encountered during the stages of construction of the crosswise reinforcements built like a column wrapped with frequent intervals, during the stages of reinforcement placement, concreting and pressing. Secure, industrial buildings shall be constructed minimizing the costs, without any difficulty of mounting, construction, without any density of reinforcement on the coupling beams formed using cross bars (1 ), connecting plate (2), anchor handles (3), vertical handles (4), horizontal handles (5) and horizontal anchor handles made of structural steel elements in our invention. Moreover, problems faced during the stages of reinforcement preparation, reinforcement placement, concreting and pressing because resistance to horizontal and vertical forces. Workmanship costs and time loss is one of the serious problems economically and industrially as construction and placement of the crosswise reinforcements wrapped with stirrups specified in the regulations in construction of coupling beams of coupled shear walls. Industrial crosswise reinforcements in compliance with standards prevent workmanship and time loss as horizontal and vertical reinforcements become possible with our invention.

Claims

C L A I M S
1. Shear reinforcement system of coupling beams of coupled shear wall characterized in that it consists of two cross bars (1 ) at least, one connecting plate (2) at least, a vertical handle (4) at least, a horizontal handle (5) at least and a horizontal anchor handle (6) at least.
2. Crosswise handle according to claim 1 ; characterized in that it can be mounted in two pieces on the connecting plate (2).
3. Connecting plate (2) according to claim 2 characterized in that; it is the part combining cross bars (1 ) and maintaining sustainability.
4. Vertical handle (4) according to claim 1 characterized in that; it is the part placed between the cross bars (1 ) on the vertical axis.
5. Vertical handle (4) according to claim 1 characterized in that; it is the part meeting some part of inner forces coming to the coupling beams and decreasing the twisting length of cross bars (1 ).
6. Horizontal handle according to claim 1 characterized in that; it is the part placed between cross bars (1 ) on horizontal axis.
7. Horizontal handle according to claim 1 characterized in that; it is the part meeting some part of inner forces coming to the coupling beams and decreasing the buckling length of cross bars (1 ).
8. Anchor handle (3) according to claim 1 characterized in that it is the part ensuring continuality between the structural wall and cross bars
(1 ).
9. Horizontal anchor handle (6) according to claim 1 characterized in that; it is the part ensuring continuality between the structural handle and horizontal handle (5).
PCT/TR2014/000061 2013-03-24 2014-02-28 Innovation for shear reinforcement of coupling beams of coupled shear walls WO2014158109A1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
TR201303544 2013-03-24
TR2013/03544 2013-03-24

Publications (1)

Publication Number Publication Date
WO2014158109A1 true WO2014158109A1 (en) 2014-10-02

Family

ID=50483461

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/TR2014/000061 WO2014158109A1 (en) 2013-03-24 2014-02-28 Innovation for shear reinforcement of coupling beams of coupled shear walls

Country Status (1)

Country Link
WO (1) WO2014158109A1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107419824A (en) * 2017-05-12 2017-12-01 姚攀峰 The full precast shear wall structural system of regenerative steel skeleton and construction method
CN108049690A (en) * 2018-02-02 2018-05-18 中国地震局工程力学研究所 A kind of new shearing steel truss coupling beam for assembling replacement

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3512329A (en) * 1967-03-07 1970-05-19 Francois De Barbuat Du Plessis Metal connector for reinforcement rods
CN201343782Y (en) * 2008-12-05 2009-11-11 北京工业大学 Combined coupling beam for inclined steel bracing strut concrete shear wall
US7934347B2 (en) * 2006-07-28 2011-05-03 Paul Brienen Coupling beam and method of use in building construction

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3512329A (en) * 1967-03-07 1970-05-19 Francois De Barbuat Du Plessis Metal connector for reinforcement rods
US7934347B2 (en) * 2006-07-28 2011-05-03 Paul Brienen Coupling beam and method of use in building construction
CN201343782Y (en) * 2008-12-05 2009-11-11 北京工业大学 Combined coupling beam for inclined steel bracing strut concrete shear wall

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
"European Earthquake Regulation", EUROCODE8, 2004

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107419824A (en) * 2017-05-12 2017-12-01 姚攀峰 The full precast shear wall structural system of regenerative steel skeleton and construction method
CN108049690A (en) * 2018-02-02 2018-05-18 中国地震局工程力学研究所 A kind of new shearing steel truss coupling beam for assembling replacement

Similar Documents

Publication Publication Date Title
US5561956A (en) Concrete elements and connectors therefor
EP2270288B1 (en) Reinforcement device for increasing buckling resistance and method of fastening the same
WO2014193323A1 (en) Shear and bending reinforcements of coupling beams of coupled shear walls
Mortazavi et al. Lateral behaviour of hybrid cold-formed and hot-rolled steel wall systems: Experimental investigation
BR112016017131B1 (en) THREE-DIMENSIONAL LIGHTWEIGHT STEEL STRUCTURE FORMED BY TWO-WAY CONTINUOUS DOUBLE BEAMS
JP2005330802A (en) Frame with buckling-restrained brace
US11352790B2 (en) Method of introducing prestress to beam-column joint of PC structure in triaxial compression
KR20120074130A (en) Compisite column structure for steel and concrete
US11111664B2 (en) Method of introducing prestress to beam-column joint in triaxial compression
KR101456411B1 (en) Reinforcement Assembly For Coupling Beam Linked With Coupled Shear Wall
AU2020260386A1 (en) Connection system
US20050229509A1 (en) Structural braced frame wall panel system
CZ2018310A3 (en) Stacked steel structure for lifting equipment
EP3088635A1 (en) Reinforcement structure for existing buildings
KR20120085641A (en) Assembling structure for beam and slab and method for constructing cosstructure using it
KR20200004056A (en) Device for reinforcing the Earthquake of a concrete columns and Methods
WO2014204419A2 (en) Coupling beam to coupled shear (hollow) wall connection system
JP4917179B1 (en) Seismic maintenance method for existing buildings
RU2567797C1 (en) Complete delivered building
KR20180090230A (en) Device for reinforcing the Earthquake of a concrete columns and Methods
WO2014158109A1 (en) Innovation for shear reinforcement of coupling beams of coupled shear walls
KR100939970B1 (en) A method of constructing a complex girder and its structure
WO2014182262A1 (en) Beams, columns and beam-column joints structural elements innovation
KR101991938B1 (en) Device for reinforcing the Earthquake of a concrete columns and Methods
CN109235772B (en) Assembled buckling-restrained steel plate energy-consumption connecting beam and assembling method thereof

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 14717227

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 14717227

Country of ref document: EP

Kind code of ref document: A1