CN101858056B - 扣索锚固方法及专用装置 - Google Patents
扣索锚固方法及专用装置 Download PDFInfo
- Publication number
- CN101858056B CN101858056B CN201010197661XA CN201010197661A CN101858056B CN 101858056 B CN101858056 B CN 101858056B CN 201010197661X A CN201010197661X A CN 201010197661XA CN 201010197661 A CN201010197661 A CN 201010197661A CN 101858056 B CN101858056 B CN 101858056B
- Authority
- CN
- China
- Prior art keywords
- cable
- anchorage
- anchor
- anchor cable
- anchoring
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Bridges Or Land Bridges (AREA)
- Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)
Abstract
本发明公开了一种扣索锚固方法及专用装置,用于将扣索锚固在山体上,在该方法中,锚碇通过斜向锚索和竖向锚索分别锚锚固在山体上,且斜向锚索与水平面成12~18°夹角,用于张拉扣索的钢锚箱铰接在锚碇上,上述方法中,斜向锚索和竖向锚索分别按锁定值的1.1倍进行初张拉。本发明用于张拉扣索的钢锚箱铰接在锚碇上,且锚碇内分别设置斜向和竖向预应力锚索,解决了拱肋竖转过程中扣索角度不断变化的问题。
Description
技术领域
本发明涉及扣索锚固方法及专用装置,适用于拱肋转体施工过程中,扣索角度不断变化的扣索锚固。
背景技术
随着我国铁路、高速公路建设电目的日益增多,在深山峡谷修建的大跨度拱桥也越来越多。常用的拱桥施工方法是悬臂扣挂法,当采用此方法进行施工时,扣索角度固定,扣索锚碇受力大小及方向均比较明确。然而,近年来,转体施工法越来越受到施工各界的欢迎,转体施工法优点主要体现在:结构合理、受力明确、节省施工用料、减少安装架设工序,变复杂的、技术性强的水上高空作业为岸边陆上作业,施工速度快,不但施工安全、质量可靠,而且不影响通航,减少施工费用和机具设备,造价低。
当采用转体法施工时,若搭设有扣索塔架,扣索通过塔架转向后,为一固定角度,扣索锚碇受力大小及方向也比较明确;但是,当采取转体法施工,且直接在山体上设置扣索锚碇时,在拱肋转体过程中,扣索的角度会不断变化,因此目前的扣索锚碇结构无法满足施工的需要。
发明内容
本发明所要解决的技术问题是解决转体法施工中,由于扣索的角度会不断变化,因此扣索锚碇结构无法满足施工需要的问题。
为了解决上述技术问题,本发明所采用的技术方案是提供一种扣索锚固方法,锚碇通过斜向锚索和竖向锚索分别锚锚固在山体上,且斜向锚索与水平面成12~18°夹角,用于张拉扣索的钢锚箱铰接在锚碇上。
上述方法中,斜向锚索与水平面的夹角为15度。
上述方法中,斜向锚索和竖向锚索分别按锁定值的1.1倍进行初张拉。
本发明还提供了一种上述扣索锚固方法中所使用的专用装置,用于将扣索锚固在山体上,该扣索锚固装置包括钢筋混凝土锚碇、锚座、斜向锚索和竖向锚索,锚座固定在锚碇的工作面上,钢锚箱的端部与锚座铰接且箱内设有张拉千斤顶,斜向锚索与锚碇的工作面垂直设置且穿过锚座和锚碇锚固在山体上,该斜向拉索与水平面的夹角为12~18度,竖向锚索垂直穿过锚碇的顶面锚固在山体上。
上述装置中,斜向锚索与水平面的夹角为15度。
上述装置中,斜向锚索和竖向锚索分别张拉锁定值1.1倍的张拉力。
本发明,用于张拉扣索的钢锚箱铰接在锚碇上,且锚碇内分别设置斜向和竖向预应力锚索,解决了拱肋竖转过程中扣索角度不断变化的问题。
附图说明
图1为本发明提供的扣索锚固装置结构示意图;
图2为图1的俯视图;
图3为钢锚箱结构示意图。
具体实施方式
下面结合附图对本发明作出详细的说明。
如图1所示,本发明提供的扣索锚固专用装置包括锚碇4、锚座2、钢锚箱1、斜向锚索5和竖向锚索6,锚碇4为钢筋混凝土结构,背部与水平面成75°夹角,与既有山体表面坡线基本平行。
锚座2采用钢板焊接而成,其上设有铰座,锚座2固定在锚碇4的工作面上,锚碇4与锚座2的接触面上焊有预埋角钢,以增加锚座2与锚碇4之间固结力。
钢锚箱1由钢板焊接成空箱式结构,箱内设置有350t千斤顶12,用于连续张拉或释放钢绞线。如图3所示,钢锚箱1的下端为钢板焊接而成的隔板15,用于支承千斤顶,隔板15与腹板14之间均采用坡口焊连接,上端为铰座13,与锚座2上的铰座铰接,钢绞线11从钢锚箱1下端进入,通过千斤顶12后,从钢锚箱1的上端引出。
斜向锚索5与锚碇4的工作面垂直设置且穿过锚座2和锚碇4锚固在山体上,该斜向拉索5与水平面的夹角为12~18度,以抵抗扣索水平拉力,较佳选择为15度,斜向拉索5的另一端通过锚固装置3锚固在锚座2上,锚固装置3为钢板焊接而成的钢箱梁结构。竖向锚索6垂直穿过锚碇4的顶面锚固在山体上。
斜向锚索5和竖向锚索6均采用钢绞线制作,为拉力型锚索结构。锚索自由度长度为20米,锚固段长度为12米,锚索预张拉值为锁定值的1.1倍,斜向锚索5用于抵抗扣索水平拉力,竖向锚索6用于抵抗扣索转动过程中对锚碇4的弯矩。
本发明扣索拉力传递路径为:扣索拉力通过千斤顶传至锚座2,锚座2通过斜向锚索5和竖向锚索6传递至山体岩石内。
本发明还提供了应用上述扣索锚固装置的扣索锚固方法,锚碇通过斜向锚索和竖向锚索分别锚锚固在山体上,且斜向锚索与水平面成12~18°夹角,用于张拉扣索的钢锚箱铰接在锚碇上。具体施工过程如下:
1)采用干钻法施工锚索孔,钻孔需穿过风化岩层,进入山体完整岩石深度不小于锚固段长度,且自由段长度不得小于5米;需做好锚索锚固段的除油除锈及自由段的防腐处理。
2)将锚索放入孔内,设置注浆塞,先用0.4MPa压力将注浆塞注满,待水泥浆强度达到20MPa强度后进行孔内高压注浆,注浆体达到25MPa强度后施工锚碇,确保锚碇内预埋构件位置准确,锚碇应做得顺直、美观。
3)锚碇强度达到0.8倍设计强度后安装钢锚梁B及锚头,分两次进行锚索张拉,最大张拉索力为锁定值的1.1倍,最后封锚,将锚头锁定。
4)安装钢锚箱,使钢锚箱在设计范围内能自由转动。
本发明不局限于上述最佳实施方式,任何人应该得知在本发明的启示下作出的结构变化,凡是与本发明具有相同或相近的技术方案,均落入本发明的保护范围之内。
Claims (4)
1.扣索锚固方法,其特征在于锚碇通过斜向锚索和竖向锚索分别锚固在山体上,且斜向锚索与水平面成12~18°夹角,用于张拉扣索的钢锚箱铰接在锚碇上,其中,锚座由斜向锚索及预埋件固定在锚碇的工作面上,钢锚箱的端部与锚座铰接且内设有张拉千斤顶,斜向锚索与锚碇的工作面垂直设置且穿过锚座和锚碇锚固在山体上,竖向锚索垂直穿过锚碇的顶面锚固在山体上。
2.如权利要求1所述的扣索锚固方法,其特征在于斜向锚索和竖向锚索分别按锁定值的1.1倍进行初张拉。
3.如权利要求1所述的扣索锚固方法所使用的专用装置,用于将扣索锚固在山体上,其特征在于该扣索锚固装置包括:
钢筋混凝土锚碇;
设有铰的锚座,由斜向锚索及预埋件固定在锚碇的工作面上;
钢锚箱,其端部与锚座铰接且箱内设有张拉千斤顶;
斜向锚索,与锚碇的工作面垂直设置且穿过锚座和锚碇锚固在山体上,该斜向拉索与水平面的夹角为12~18度;
竖向锚索,垂直穿过锚碇的顶面锚固在山体上。
4.如权利要求3所述的专用装置,其特征在于斜向锚索和竖向锚索分别张拉锁定值1.1倍的张拉力。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201010197661XA CN101858056B (zh) | 2010-06-11 | 2010-06-11 | 扣索锚固方法及专用装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201010197661XA CN101858056B (zh) | 2010-06-11 | 2010-06-11 | 扣索锚固方法及专用装置 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101858056A CN101858056A (zh) | 2010-10-13 |
CN101858056B true CN101858056B (zh) | 2012-05-30 |
Family
ID=42944194
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201010197661XA Active CN101858056B (zh) | 2010-06-11 | 2010-06-11 | 扣索锚固方法及专用装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101858056B (zh) |
Families Citing this family (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103194981B (zh) * | 2013-04-02 | 2015-06-10 | 中铁大桥局集团有限公司 | 桥梁钢塔海上竖转施工系统及方法 |
CN103397597B (zh) * | 2013-08-14 | 2015-10-21 | 中铁大桥局集团有限公司 | 一种适用于陡岩边坡的大吨位组合锚固体系及方法 |
CN103572701A (zh) * | 2013-10-08 | 2014-02-12 | 中铁十八局集团有限公司 | 扣锚体系组合式岩锚 |
CN106092476B (zh) * | 2016-06-14 | 2018-12-14 | 河海大学 | 土木工程结构抗震试验装置 |
CN106050281B (zh) * | 2016-08-10 | 2018-02-23 | 中国矿业大学(北京) | 一种用于煤矿巷道顶板支护的锚索箱梁桁架结构与支护方法 |
CN106638326B (zh) * | 2017-01-19 | 2018-08-10 | 中铁十六局集团第二工程有限公司 | 一种无索塔桥梁缆索吊装施工系统及施工方法 |
CN107841955A (zh) * | 2017-12-25 | 2018-03-27 | 中铁二局第五工程有限公司 | 一种钢管拱桥扣索联结装置及联结方法 |
CN110042767B (zh) * | 2019-05-30 | 2021-05-25 | 广西路桥工程集团有限公司 | 一种缆索吊装系统的扣索锚固方法 |
CN111119176B (zh) * | 2019-12-05 | 2024-08-13 | 华电曹妃甸重工装备有限公司 | 一种地锚换向装置 |
CN111058387A (zh) * | 2020-01-19 | 2020-04-24 | 四川路桥华东建设有限责任公司 | 一种拱桥缆索吊装扣索弧形锚箱 |
CN111535177A (zh) * | 2020-05-27 | 2020-08-14 | 中国科学院武汉岩土力学研究所 | 一种由预应力群锚和围岩组成的岩锚锚碇及其施工方法 |
CN112520591B (zh) * | 2020-11-24 | 2023-06-23 | 中铁大桥局集团有限公司 | 一种锚碇转向系统及其施工方法 |
Family Cites Families (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN87204005U (zh) * | 1987-03-15 | 1988-01-13 | 湖南省农林工业勘察设计研究院 | 桥梁转体施工装置 |
JP2722322B2 (ja) * | 1994-03-31 | 1998-03-04 | 株式会社橋梁メンテナンス | 橋梁用プレキャスト床版の連結法 |
JP2004225293A (ja) * | 2003-01-21 | 2004-08-12 | Toda Constr Co Ltd | 型枠支保工 |
JP2005283194A (ja) * | 2004-03-29 | 2005-10-13 | Hitachi Plant Eng & Constr Co Ltd | アンカ穴傾斜判別治具 |
CN101224856A (zh) * | 2007-12-20 | 2008-07-23 | 中铁大桥局股份有限公司 | 大跨重载缆索吊机及其安装方法 |
CN101314937B (zh) * | 2008-06-10 | 2010-08-18 | 广西壮族自治区公路桥梁工程总公司 | 向下竖转拱箱的施工设备 |
CN101619563A (zh) * | 2009-07-27 | 2010-01-06 | 中铁大桥局集团第五工程有限公司 | 大跨度钢管拱桥二次竖转施工方法 |
-
2010
- 2010-06-11 CN CN201010197661XA patent/CN101858056B/zh active Active
Also Published As
Publication number | Publication date |
---|---|
CN101858056A (zh) | 2010-10-13 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101858056B (zh) | 扣索锚固方法及专用装置 | |
CN201401174Y (zh) | 高密度电阻率监测围岩松动圈的系统 | |
CN102953341B (zh) | 一种设置于深水急流无覆盖层陡峭裸岩上的高位栈桥结构 | |
CN102966111B (zh) | 一种在深水急流无覆盖层陡峭裸岩上的钢管桩锚固施工方法 | |
CN103572701A (zh) | 扣锚体系组合式岩锚 | |
CN211397620U (zh) | 可回收胀缩式锚杆 | |
CN204000901U (zh) | 一种山体垂直高边坡预应力锚索支护装置 | |
CN102979039B (zh) | 一种在深水急流无覆盖层陡峭裸岩上的高位栈桥施工方法 | |
CN104213509B (zh) | 一种缆索吊装锚索式锚碇施工方法 | |
CN102979069A (zh) | 一种在深水急流无覆盖层陡峭裸岩上的钻孔桩平台施工方法 | |
CN103088819A (zh) | 预应力锚索施工方法 | |
CN108661682B (zh) | 一种弱胶结富水顶板锚索孔注浆堵水方法 | |
CN101058980B (zh) | 一种自进式锚杆的施工方法 | |
CN104895073B (zh) | 可多次拆装的锚索施工系统及其施工方法 | |
CN107503681A (zh) | 岩溶地区长大锚索成孔方法 | |
CN101906780A (zh) | 一种钢管桩锚索防护加固方法 | |
CN208346827U (zh) | 基坑综合支护结构 | |
CN203049443U (zh) | 一种设置于深水急流无覆盖层陡峭裸岩上的高位栈桥结构 | |
CN101838957B (zh) | 整体式t形外悬臂道路及其施工方法 | |
CN204174618U (zh) | 软土地基可回收式预应力锚索结构 | |
CN103615012B (zh) | 钢结构自钻式中空锚杆加固既有线支挡防护结构 | |
CN104947663A (zh) | 一种抢险专用击入式伞型锚及应用方法 | |
CN104457655B (zh) | 一种用于软土地层的折叠叶片刀式多点位移计锚头 | |
CN105507929B (zh) | 一种重复施加预应力的锚索支护的方法 | |
CN201459749U (zh) | 一种深水钢管桩施工平台稳定结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |