CN103572701A - 扣锚体系组合式岩锚 - Google Patents

扣锚体系组合式岩锚 Download PDF

Info

Publication number
CN103572701A
CN103572701A CN201310466198.8A CN201310466198A CN103572701A CN 103572701 A CN103572701 A CN 103572701A CN 201310466198 A CN201310466198 A CN 201310466198A CN 103572701 A CN103572701 A CN 103572701A
Authority
CN
China
Prior art keywords
anchor
reinforced concrete
prestressing force
dowel
anchoring part
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201310466198.8A
Other languages
English (en)
Inventor
杨继明
樊秋林
于长彬
贺常松
王新泽
刘利
严德育
王永福
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 18th Bureau Group Co Ltd
Original Assignee
China Railway 18th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 18th Bureau Group Co Ltd filed Critical China Railway 18th Bureau Group Co Ltd
Priority to CN201310466198.8A priority Critical patent/CN103572701A/zh
Publication of CN103572701A publication Critical patent/CN103572701A/zh
Pending legal-status Critical Current

Links

Images

Abstract

一种扣锚体系组合式岩锚,包括钢筋混凝土梁、预应力锚索、预应力锚筋、锚座、锚箱和锚块;锚座和锚箱铰接,锚箱通过P型锚与平衡索连接,锚座通过多根预应力锚筋固定在钢筋混凝土梁的锚块上,预应力锚筋一段穿入钢筋混凝土梁内,另一段穿入锚座内,预应力锚索穿入钢筋混凝土梁内。本发明结构受力明确、安全可靠、施工方便,有效地克服了陡峭边坡条件下设置锚碇的难题。本发明施工过程中无须对边坡进行开挖,混凝土浇筑方量少,弥补了重力式锚碇边坡土石方开挖方量大、影响边坡防护工作、混凝土浇筑方量大和成本高的不足。

Description

扣锚体系组合式岩锚
技术领域
本发明属于一种建筑施工用设备,特别涉及一种扣锚体系组合式岩锚,该装置是钢筋混凝土拱桥劲性骨架悬臂拼装辅助设施,特别适用于陡坡条件下劲性骨架吊装的平衡索锚碇作业。
背景技术
根据目前国内外拱桥施工实践,同类型桥梁锚碇大多采用锚墩、重力式及隧道式等形式的锚碇作为扣锚体系的锚碇,对于需在地质较好但坡度较陡的坡面设置锚碇,同时又要解决平衡索角度控制精度高、对边坡防护施工影响大和施工工期紧等难题的情况下,上述几种结构形式的锚碇均不能很好的满足施工要求,工程质量也不能得到很好的保证。
发明内容
本发明提供了一种扣锚体系组合式岩锚,该装置结构受力明确、安全可靠,施工方便、快捷,并解决了陡坡条件下设置锚碇的难题。
本发明的目的是通过以下技术方案实现的。
一种扣锚体系组合式岩锚,其特征在于:包括钢筋混凝土梁、预应力锚索、预应力锚筋、锚座、锚箱和锚块;锚座和锚箱铰接,锚箱通过P型锚与平衡索连接,锚座通过多根预应力锚筋固定在钢筋混凝土梁的锚块上,预应力锚筋一段穿入钢筋混凝土梁内,另一段穿入锚座内,预应力锚索穿入钢筋混凝土梁内。
上述锚座和锚箱之间通过销轴铰接。
上述预应力锚索选用1860型7
Figure BDA0000392477710000011
5钢绞线,并采用拉力分散型布置。
上述预应力锚索外部套装有波纹管,预应力锚索由锚固段和自由段组成,所述锚固段头部装有注浆管,所述自由段端部锚具与锚块之间装有钢垫板。
上述预应力锚筋采用φ32精扎螺纹钢,每个锚座内布置6根预应力锚筋。
上述预应力锚筋主体外部装有套管,主体两端分别装有锚筋垫板,锚筋垫板上装有预应力锚筋螺帽,主体穿入钢筋混凝土梁一段上带有螺旋筋。
上述锚具外部装有保护罩。
本发明具有如下的优点和积极效果:
1、本发明中锚箱和锚座之间通过销轴连接,其相对转动角度可大于180°,调整方式灵活,有效解决了常规岩锚不利于平衡索角度误差调整的难题。
2、本发明中平衡索角度误差调整幅度较小,只需设置斜向预应力锚索,不设置竖向预应力锚索,通过斜向预应力索产生的水平力及竖向力来平衡由平衡索传递的两个方向的索力。斜向预应力锚索与钢筋混凝土梁处的坡面垂直设置,与水平方向夹角为30°。
3、本发明预应力锚索的锚固段一般设置在弱风化地层中,并根据岩体的容许应力设计值及孔壁与注浆体之间的极限粘结强度等参数,计算锚固段长度,并确保自由段长度不小于5cm。
上述预应力锚索穿越的地层为W2(<14-4-1>T2fb),根据计算,锚固段在W2地层中的锚固深度不得小于10m,采用拉力分散型布置,因此预应力锚索的埋深为35m(3根钢绞线锚固段长10m)和40m(3根钢绞线锚固段长15m)。
上述预应力锚索选用1860型7
Figure BDA0000392477710000021
5钢绞线组成,依据预应力锚索钢绞线自身抗拉强度安全系数大于1.6来锁定单束锚索的锚固力为900KN,并根据通过预应力锚索预张拉可提前验证山体是否满足劲性骨架安装过程中各工况条件下的受力要求。
4、本发明预应力锚筋为φ32精扎螺纹钢,通过预张拉将锚座固定在钢筋混凝土梁的锚块上,初张拉力不大于预应力锚筋本身抗拉强度的0.8倍。根据平衡索的索力、单根预应力锚筋锚固力及预应力锚筋本身抗拉安全系数不小于1.25的要求,将单根预应力锚筋预张拉力锁定为400KN,每个锚座布置6根预应力锚筋。
5、本发明的锚座和锚箱通过销轴进行铰接,两者可相对转动180°以上,达到调整平衡索角度的目的。
6、本发明通过P型锚将锚箱和平衡索连接,并将平衡索索力传递给组合式岩锚体系。
综上,本发明结构受力明确、安全可靠、施工方便,有效地克服了陡峭边坡条件下设置锚碇的难题。本发明施工过程中无须对边坡进行开挖,混凝土浇筑方量少,弥补了重力式锚碇边坡土石方开挖方量大、影响边坡防护工作、混凝土浇筑方量大和成本高的不足。
附图说明:
图1是组合式岩锚总体布置图;
图2是预应力锚索结构图;
图3是预应力锚筋结构图;
图4是锚座结构布置立面图;
图5是锚箱结构布置立面图。
图中1.预应力锚索,2.钢筋混凝土梁,3.预应力锚筋,4.锚座,5.销轴,6.锚箱,7.预应力锚筋螺帽,8.平衡索,9.锚块,10.边坡,11.预应力锚索锚固段,12.预应力锚索自由段,13.注浆管,14.预应力锚索垫板,15.锚具,16.保护罩,17.波纹管,18.预应力锚索钻孔,19.预应力锚筋垫板,20.螺旋筋,21.套管。
具体实施方式:
一种扣锚体系组合式岩锚,由预应力锚索1、钢筋混凝土梁2、预应力锚筋3、锚座4、锚箱6和锚块9组成。锚座和锚箱之间通过销轴5铰接,锚箱通过P型锚与平衡索8连接,锚座通过多根预应力锚筋固定在钢筋混凝土梁的锚块上,预应力锚筋一段穿入钢筋混凝土梁内,另一段穿入锚座内,预应力锚索穿入钢筋混凝土梁内。
上述预应力锚索选用1860型7
Figure BDA0000392477710000031
5钢绞线,并采用拉力分散型布置。预应力锚索外部套装有波纹管17,预应力锚索由锚固段11和自由段12组成,所述锚固段头部装有注浆管13,所述自由段端部锚具15与锚块9之间装有钢垫板14。所述锚具外部装有保护罩16。
上述预应力锚筋采用φ32精扎螺纹钢,每个锚座内布置6根预应力锚筋。预应力锚筋主体外部装有套管21,主体两端分别装有锚筋垫板19,锚筋垫板上装有预应力锚筋螺帽7,主体穿入钢筋混凝土梁一段上带有螺旋筋20。
本发明的施工过程是:
1、预应力锚索1采用拉力分散型,埋深分别为35m(预应力锚索锚固段11长10m)和40m(预应力锚索锚固段11长15m)。首先根据设计角度将钢筋混凝土梁2与边坡10接触面进行清理,坡面与水平方向夹角为60°,采用潜孔钻机干钻法施工预应力锚索钻孔18,钻孔进入弱风化地层深度不小于锚固段长度。
2、将要穿入的预应力锚索锚固段11表面进行除锈、除油处理,预应力锚索自由段12做好防腐处理。穿入预应力锚索1,设置注浆塞,先通过注浆管13用0.4MPa压力将注浆塞注满,待水泥浆强度达到20MPa强度后进行孔内高压注浆。
3、绑扎钢筋混凝土梁2钢筋,安装锚座预应力锚筋3、预埋在钢筋混凝土梁2内部的预应力锚筋螺帽7、垫板19、螺旋筋20及套管21。将外套波纹管17的预应力锚索1穿过锚碇钢筋混凝土梁2,锚具15与锚块之间设置钢垫板以分散对混凝土锚块9的压力。支设模板浇筑钢筋混凝土梁2混凝土;待钢筋混凝土梁2混凝土强度达到设计强度95%、预应力锚索钻孔18内水泥浆液强度达到80%后方可对预应力锚索1进行张拉至900KN,张拉完成后固紧锚具15,并加设锚具保护罩16。
4、安装锚座4,对预应力锚筋3进行张拉至400KN,张拉完成后拧紧与锚座4接触的预应力锚筋螺帽7。
5、通过P型锚将平衡索8与锚箱6连接,通过销轴5将锚箱6与锚座4相连,确保锚箱6与锚座4之间可以在设计范围内能自由转动。
上述过程完成后,即可对根据设计要求索力对平衡索8进行张拉,至此,扣锚体系组合式岩锚正式投入使用。
本发明在劲性骨架吊装过程中,通过扣索将索力传递给扣塔,再利用平衡索来平衡扣塔的不平衡荷载。平衡索通过P型锚与锚箱连接,利用销轴将锚箱与锚座铰接,再通过与锚座连接的预应力锚筋将力传递给钢筋混凝土梁,最后由预应力锚索将混凝土梁承受的力传递给山体,此结构体系受力明确,施工工况有效可控。

Claims (7)

1.一种扣锚体系组合式岩锚,其特征在于:包括钢筋混凝土梁、预应力锚索、预应力锚筋、锚座、锚箱和锚块;锚座和锚箱铰接,锚箱通过P型锚与平衡索连接,锚座通过多根预应力锚筋固定在钢筋混凝土梁的锚块上,预应力锚筋一段穿入钢筋混凝土梁内,另一段穿入锚座内,预应力锚索穿入钢筋混凝土梁内。
2.根据权利要求1所述的一种扣锚体系组合式岩锚,其特征在于:上述锚座和锚箱之间通过销轴铰接。
3.根据权利要求1所述的一种扣锚体系组合式岩锚,其特征在于:上述预应力锚索选用1860型7
Figure FDA0000392477700000011
5钢绞线,并采用拉力分散型布置。
4.根据权利要求1或3所述的一种扣锚体系组合式岩锚,其特征在于:上述预应力锚索外部套装有波纹管,预应力锚索由锚固段和自由段组成,所述锚固段头部装有注浆管,所述自由段端部锚具与锚块之间装有钢垫板。
5.根据权利要求1所述的一种扣锚体系组合式岩锚,其特征在于:上述预应力锚筋采用φ32精扎螺纹钢,每个锚座内布置6根预应力锚筋。
6.根据权利要求1或5所述的一种扣锚体系组合式岩锚,其特征在于:上述预应力锚筋主体外部装有套管,主体两端分别装有锚筋垫板,锚筋垫板上装有预应力锚筋螺帽,主体穿入钢筋混凝土梁一段上带有螺旋筋。
7.根据权利要求4所述的一种扣锚体系组合式岩锚,其特征在于:上述锚具外部装有保护罩。
CN201310466198.8A 2013-10-08 2013-10-08 扣锚体系组合式岩锚 Pending CN103572701A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310466198.8A CN103572701A (zh) 2013-10-08 2013-10-08 扣锚体系组合式岩锚

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310466198.8A CN103572701A (zh) 2013-10-08 2013-10-08 扣锚体系组合式岩锚

Publications (1)

Publication Number Publication Date
CN103572701A true CN103572701A (zh) 2014-02-12

Family

ID=50045358

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310466198.8A Pending CN103572701A (zh) 2013-10-08 2013-10-08 扣锚体系组合式岩锚

Country Status (1)

Country Link
CN (1) CN103572701A (zh)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103866691A (zh) * 2014-03-27 2014-06-18 中交一公局第一工程有限公司 一种大型缆索吊承重索群锚装置
CN105648921A (zh) * 2016-02-18 2016-06-08 长江水利委员会长江科学院 悬索桥岩体与钢筋混凝土板复合式锚碇及其施工方法
CN105696464A (zh) * 2016-04-27 2016-06-22 中国电建集团昆明勘测设计研究院有限公司 悬索桥锚碇锚固装置
CN105714678A (zh) * 2014-11-30 2016-06-29 郑州大学 一种复合式重力锚碇
CN108867382A (zh) * 2018-06-14 2018-11-23 张学武 预应力型后锚系统及施工方法
CN111485493A (zh) * 2020-03-25 2020-08-04 中国电建集团中南勘测设计研究院有限公司 一种悬索桥锚碇结构及其实施方法
CN111535177A (zh) * 2020-05-27 2020-08-14 中国科学院武汉岩土力学研究所 一种由预应力群锚和围岩组成的岩锚锚碇及其施工方法
CN113073554A (zh) * 2021-03-08 2021-07-06 中国葛洲坝集团路桥工程有限公司 一种陡峭边坡上的大吨位锚碇结构及其施工方法
CN114809040A (zh) * 2022-06-09 2022-07-29 中国电建集团中南勘测设计研究院有限公司 一种边坡加固结构及其施工方法

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05331809A (ja) * 1992-05-28 1993-12-14 Taisei Corp 吊り斜材の定着装置
CN2331700Y (zh) * 1998-04-30 1999-08-04 杨俊志 自由式拉压复合型预应力锚索
JP2002349012A (ja) * 2001-05-25 2002-12-04 Oriental Construction Co Ltd 施工時期の異なるコンクリート部材同士を一体化してなるpc構造とその施工方法
CN1487149A (zh) * 2003-08-12 2004-04-07 葛修润 岩土工程密实型索体预应力高档锚索
CN101285309A (zh) * 2008-06-06 2008-10-15 南通华汇建筑工程有限公司 高层建筑深基坑复合支护方法
JP4391011B2 (ja) * 2000-12-28 2009-12-24 大成建設株式会社 架設鋼材定着用治具
CN101858056A (zh) * 2010-06-11 2010-10-13 中铁大桥局集团有限公司 扣索锚固方法及专用装置
CN102704405A (zh) * 2012-06-21 2012-10-03 中铁大桥局集团有限公司 一种利用扣、锚索平衡额外水平力的方法
CN203846399U (zh) * 2013-10-08 2014-09-24 中铁十八局集团有限公司 扣锚体系组合式岩锚

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05331809A (ja) * 1992-05-28 1993-12-14 Taisei Corp 吊り斜材の定着装置
CN2331700Y (zh) * 1998-04-30 1999-08-04 杨俊志 自由式拉压复合型预应力锚索
JP4391011B2 (ja) * 2000-12-28 2009-12-24 大成建設株式会社 架設鋼材定着用治具
JP2002349012A (ja) * 2001-05-25 2002-12-04 Oriental Construction Co Ltd 施工時期の異なるコンクリート部材同士を一体化してなるpc構造とその施工方法
CN1487149A (zh) * 2003-08-12 2004-04-07 葛修润 岩土工程密实型索体预应力高档锚索
CN101285309A (zh) * 2008-06-06 2008-10-15 南通华汇建筑工程有限公司 高层建筑深基坑复合支护方法
CN101858056A (zh) * 2010-06-11 2010-10-13 中铁大桥局集团有限公司 扣索锚固方法及专用装置
CN102704405A (zh) * 2012-06-21 2012-10-03 中铁大桥局集团有限公司 一种利用扣、锚索平衡额外水平力的方法
CN203846399U (zh) * 2013-10-08 2014-09-24 中铁十八局集团有限公司 扣锚体系组合式岩锚

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
樊秋林: "南盘江特大桥扣锚体系组合式岩锚施工设计", 《四川建材》 *

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103866691A (zh) * 2014-03-27 2014-06-18 中交一公局第一工程有限公司 一种大型缆索吊承重索群锚装置
CN103866691B (zh) * 2014-03-27 2015-09-09 中交一公局第一工程有限公司 一种大型缆索吊承重索群锚装置
CN105714678A (zh) * 2014-11-30 2016-06-29 郑州大学 一种复合式重力锚碇
CN105648921A (zh) * 2016-02-18 2016-06-08 长江水利委员会长江科学院 悬索桥岩体与钢筋混凝土板复合式锚碇及其施工方法
CN105648921B (zh) * 2016-02-18 2017-04-26 长江水利委员会长江科学院 悬索桥岩体与钢筋混凝土板复合式锚碇的施工方法
CN105696464A (zh) * 2016-04-27 2016-06-22 中国电建集团昆明勘测设计研究院有限公司 悬索桥锚碇锚固装置
CN108867382A (zh) * 2018-06-14 2018-11-23 张学武 预应力型后锚系统及施工方法
CN111485493A (zh) * 2020-03-25 2020-08-04 中国电建集团中南勘测设计研究院有限公司 一种悬索桥锚碇结构及其实施方法
CN111485493B (zh) * 2020-03-25 2022-05-24 中国电建集团中南勘测设计研究院有限公司 一种悬索桥锚碇结构及其实施方法
CN111535177A (zh) * 2020-05-27 2020-08-14 中国科学院武汉岩土力学研究所 一种由预应力群锚和围岩组成的岩锚锚碇及其施工方法
CN113073554A (zh) * 2021-03-08 2021-07-06 中国葛洲坝集团路桥工程有限公司 一种陡峭边坡上的大吨位锚碇结构及其施工方法
CN114809040A (zh) * 2022-06-09 2022-07-29 中国电建集团中南勘测设计研究院有限公司 一种边坡加固结构及其施工方法

Similar Documents

Publication Publication Date Title
CN103572701A (zh) 扣锚体系组合式岩锚
CN101614125B (zh) V级围岩隧道施工方法
CN204266121U (zh) 扣锚体系组合式桩基承台锚碇
CN102828518B (zh) 一种人工挖孔支护桩预应力锚索锚固构造的施工方法
CN106498950B (zh) 锚头置于桩身的深基坑桩锚支护体系的实施方法
CN204000901U (zh) 一种山体垂直高边坡预应力锚索支护装置
CN104213509B (zh) 一种缆索吊装锚索式锚碇施工方法
CN110821513B (zh) 一种对隧道局部塌方进行超前注浆并进行支撑的施工方法
CN203080518U (zh) 自钻式可回收锚索
CN104481552B (zh) 特大溶洞洞顶落石防护施工方法
CN105442605B (zh) 拔出phc桩再利用于深基坑支护施工方法
CN109837895A (zh) 一种深大压力分散型锚索施工工法
CN110374633A (zh) 隧道穿越松散体的洞口段施工方法
CN104018490B (zh) 一种z字型矩形截面抗滑桩及其施工方法
CN102587367A (zh) 一种采用机械连接式锚杆
CN102650212A (zh) 一种利用中导洞临时支护保护连拱隧道中隔墙的施工方法
CN105350531A (zh) 可承受拉压双向荷载的管桩-锚杆复合基础及施工工艺
CN110629671A (zh) 一种悬索桥锚碇及其施工方法
CN203049443U (zh) 一种设置于深水急流无覆盖层陡峭裸岩上的高位栈桥结构
CN107420104A (zh) 浅埋隧道超大直径水平预钻孔静态爆破开挖施工方法
CN203846399U (zh) 扣锚体系组合式岩锚
CN105714678B (zh) 一种复合式重力锚碇
CN108385715A (zh) 一种装配式桩拱组合挡土墙及其施工方法
CN104947663A (zh) 一种抢险专用击入式伞型锚及应用方法
CN104863613B (zh) 岩质地层暗挖地下结构高边墙锚拉初支结构及施工方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20140212