CN201401174Y - 高密度电阻率监测围岩松动圈的系统 - Google Patents

高密度电阻率监测围岩松动圈的系统 Download PDF

Info

Publication number
CN201401174Y
CN201401174Y CN2009201433762U CN200920143376U CN201401174Y CN 201401174 Y CN201401174 Y CN 201401174Y CN 2009201433762 U CN2009201433762 U CN 2009201433762U CN 200920143376 U CN200920143376 U CN 200920143376U CN 201401174 Y CN201401174 Y CN 201401174Y
Authority
CN
China
Prior art keywords
electrical resistivity
electrode
monitoring
rock
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2009201433762U
Other languages
English (en)
Inventor
程桦
荣传新
王桦
姚直书
蔡海兵
王晓健
宋海清
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui University of Science and Technology
Original Assignee
Anhui University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui University of Science and Technology filed Critical Anhui University of Science and Technology
Priority to CN2009201433762U priority Critical patent/CN201401174Y/zh
Application granted granted Critical
Publication of CN201401174Y publication Critical patent/CN201401174Y/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Geophysics And Detection Of Objects (AREA)

Abstract

本实用新型公开了高密度电阻率监测围岩松动圈的系统,它是先在围岩巷道内的多个断面钻孔,孔内埋设带有电极的多芯电缆和排气管,运用注浆装置将钻孔内注满耦合剂,通过连接到多线电缆的外端的电阻率仪测出多组电阻率数据,最后根据采集到的数据运用高密度电阻率法对围岩松动圈实现监测。本实用新型具有施工工艺简单、紧密结合巷道开挖与支护的工艺特点,做到了因地制宜、简便易行,且做到“一次安装,长久监测”。

Description

高密度电阻率监测围岩松动圈的系统
技术领域:
本实用新型为一种监测系统,具体是高密度电阻率监测围岩松动圈的系统。
背景技术:
近几年来,随着我国经济持续高速稳定发展,能源需求旺盛,煤炭产量大幅度增加,2001年我国煤炭产量为10.98亿t,2003年达到16亿t,2004年达到19亿t,2005年接近22亿t。这使得矿井开采延伸速度加快,采深进一步加大,一些中老矿井及深部矿井,已经进入深部开采阶段,东北及中东部地区的多数矿区开采历史长,开采深度大,如平煤集团十二矿深部已经达到1150m。国际方面,随着经济的发展、人类生活水平的提高,对金属矿产的需求量与日剧增,金属矿产的开采深度不断延伸,南非是世界上矿山开采深度最大的国家,开采深度已达4600m。随着开采深度的增大,矿井开采地质力学环境与浅部开采相比发生明显改变,导致深部开采工程灾害日趋严重。正是由于深部开采地质力学环境的改变,使得深部开采岩石力学行为与浅部明显不同,基于浅部开采形成的岩层控制理论与技术不能适应深部开采。为了保证深部资源的安全高效开采,必须开展深部开采相关问题的研究。深部开采主要研究方向不但包括深部开采岩体力学基本特性、深部开采巷道工程稳定性控制、深部开采动力灾害防治、深部开采岩层移动与开采沉陷控制等方面,而且应包括测试理论与测试技术的研究。
采矿和地下工程都需要在地下开挖,形成一定大小的空间,并保持该空间的稳定。但是,地下空间的开挖将会扰动岩石介质,造成岩石内应力和岩石强度的变化,产生岩石应力转移、集中和岩石强度的减小,使周围岩石发生变形甚至破坏,发生岩石物理状态的改变。这个在开挖的空间周围所形成的破裂区,一般是围绕开挖空间形成环状。这个由于应力作用产生的环状破裂带称为巷道围岩松动圈,简称为松动圈。
松动圈的大小是选择支护方式的重要依据和前提。目前,常用的松动圈测试方法有声波法、多点位移计法、地震波法、地质雷达法和渗透法等。但是,上述方法在峒室(尤其是大断面峒室)松动圈测试大都存在着数据采集速度慢、费用高或操作困难等缺点。因此,有必要研究安装工艺简单、操作简便、快速经济的松动圈探测技术。
实用新型内容:
本实用新型目的就是为了弥补已有技术的缺陷,提供一种高密度电阻率监测围岩松动圈的系统。本实用新型使松动圈探测技术工艺简单、操作简便、快速经济、准确可靠。
本实用新型是通过以下技术方案实现的:
高密度电阻率监测围岩松动圈的系统,其特征在于:在围岩巷道内的多个断面上分别钻孔5~9个,钻孔呈圆周分布,孔的深度为5~7m,孔的直径为45~55mm;将电极按照每间隔0.1-0.3米,按照先里后外的顺序固定于空心导杆上,空心导杆带同各电极置于钻孔内,通过耦合剂将电极、空心导杆与孔壁耦合成一体,所述的各电极均连接到多芯电缆上,所述的多芯电缆接入到电阻率仪。
岩层变形必然导致岩石的孔隙度和孔隙结构发生变化,从而导致岩石电阻率发生变化。当应力在岩石强度极限范围内时,随着应力的增大,干燥或稍许含水的岩石其电阻率会减小,这是因为由于孔隙度降低、颗粒间接触良好的原因;除此之外,岩石中孤立的含水孔隙在压力的作用下闭合形成连续的导电通路,也会使其电阻率减小。当应力超过岩石强度极限时,随着应力的增大,岩石变形破裂,其电阻率会明显增大。根据此原理,可利用在围岩中施工地质钻孔、在孔中埋设电极、采用高密度电阻率法采集数据的方法对覆岩破坏情况进行监测。
本实用新型利用锚杆钻机钻孔、锚固剂封闭孔口、简易压力容器灌注水泥浆、高密度电阻率法采集数据。
本实用新型的优点是:
本实用新型具有施工工艺简单、紧密结合巷道开挖与支护的工艺特点,做到了因地制宜、简便易行,且做到“一次安装,长久监测”。
附图说明:
图1为本实用新型中钻孔的布置图;
附图2为本实用新型的电极与钻孔壁耦合示意图。
具体实施方式:
高密度电阻率监测围岩松动圈的系统,在围岩巷道1内的多个断面上分别钻5~9个孔2,孔2呈圆周分布,孔2的深度为5~7m,孔2的直径为45~55mm;将电极3按照每间隔0.1-0.3米,按照先里后外的顺序固定于空心导杆4上,空心导杆4带同各电极3置于钻孔内,通过耦合剂将电极、空心导杆4与孔2内壁耦合成一体,各电极3均连接到多芯电缆5上,所述的多芯电缆5接入到电阻率仪。
系统施工方法
1、钻孔2施工
深埋的地下峒室所受的地应力较大,为了保持大断面的永久性和地下峒室的稳定性,一般采用锚喷+衬砌的复合衬砌结构进行峒室支护。用锚杆加固围岩时,必须用锚杆钻机施工锚杆钻孔。对于拱高小于10m的地下峒室,目前探测的松动圈厚度一般在4.0m以下。因此,探测孔的深度可控制在6.0m左右,钻孔2直径可控制在50mm左右。根据测试断面的大小可布置5~9个钻孔2,在峒室锚喷支护时,可利用锚杆钻机进行探测钻孔的施工。
2、电极3的放置
钻孔2尽量与峒室壁垂直,如不垂直则按夹角进行换算,为了保证松动圈探测精度,电极距一般为0.1~0.3m左右;电极距过小,则电极长度与电极距的比过大,难以形成理想的点电源,从而产生系统误差;电极距过大,则探测精度较小。钻孔2形成后,将电极3按先里后外的顺序固定在PVC空心导杆4上,各电极3连接到多芯电缆5上,然后送入钻孔2的预定位置,为了减小钻孔孔径,减小钻孔施工的难度,固定电极的PVC空心导杆4兼作排气管。
3、钻孔2封闭
注浆前,先用树脂锚固剂将设置于钻孔口的PVC注浆管6、PVC空心导杆4、连接电极的多芯电缆5与围岩粘结在一起。注浆时使用排气返浆法,一次性由孔口向孔内注满水泥浆直到PVC空心导杆4出水泥浆为止,以避免灌注不实。注浆采用自行研制的简易压力容器,采用的是供风镐、风泵等施工设备所用的风能。具体操作步骤是:
(1)钻孔孔口处的树脂锚固剂固化后,将压力容器用橡胶管分别与进风管、注浆管相联接,并保证连接处密实;
(2)按水泥、水的比例为1~2∶1在压力容器中配制水泥浆;
(3)打开压力容器进风管控制闸阀;当压力容器压力表读数为2.0MPa时,关闭进风管控制闸阀;
(4)打开压力容器输浆管控制闸阀,水泥浆比过注浆管进入钻孔内,当PVC空心导杆出浆时,表明钻孔已经注满水泥浆。此时,关闭压力容器输浆管控制闸阀,将钻孔口处连接注浆管的橡胶管对折扎紧,然后截断多余的橡胶管。
4、将连接各电极引线的多芯电缆接入到电阻率仪,通过监测各断面上电阻率的变化,对围岩松动圈变化情况进行监测。

Claims (1)

1、高密度电阻率监测围岩松动圈的系统,其特征在于:在围岩巷道内的多个断面上分别钻孔5~9个,钻孔呈圆周分布,孔的深度为5~7m,孔的直径为45~55mm;将电极按照每间隔0.1-0.3米,按照先里后外的顺序固定于空心导杆上,空心导杆带同各电极置于钻孔内,通过耦合剂将电极、空心导杆与孔壁耦合成一体,所述的各电极均连接到多芯电缆上,所述的多芯电缆接入到电阻率仪。
CN2009201433762U 2009-03-17 2009-03-17 高密度电阻率监测围岩松动圈的系统 Expired - Fee Related CN201401174Y (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009201433762U CN201401174Y (zh) 2009-03-17 2009-03-17 高密度电阻率监测围岩松动圈的系统

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009201433762U CN201401174Y (zh) 2009-03-17 2009-03-17 高密度电阻率监测围岩松动圈的系统

Publications (1)

Publication Number Publication Date
CN201401174Y true CN201401174Y (zh) 2010-02-10

Family

ID=41660975

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009201433762U Expired - Fee Related CN201401174Y (zh) 2009-03-17 2009-03-17 高密度电阻率监测围岩松动圈的系统

Country Status (1)

Country Link
CN (1) CN201401174Y (zh)

Cited By (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102338889A (zh) * 2011-05-18 2012-02-01 颜廷旭 一种用于勘察地下水源的二维高密度电阻率法
CN102681008A (zh) * 2011-03-08 2012-09-19 中国科学院地质与地球物理研究所 一种在tbm隧洞中安装地质超前预报检波器的方法与装置
CN103018568A (zh) * 2012-12-07 2013-04-03 山东大学 一种稳定含水率岩石试块的电阻率测定方法
CN103217131A (zh) * 2013-04-08 2013-07-24 中国矿业大学(北京) 一种围岩松动圈的测试方法及测试设备
CN103792582A (zh) * 2014-01-22 2014-05-14 中国矿业大学 一种巷道松动圈探测方法
CN104832212A (zh) * 2015-04-07 2015-08-12 中国矿业大学 基于钻进参数考察巷道松动及应力集中范围的方法
CN105318824A (zh) * 2015-11-20 2016-02-10 安徽理工大学 一种基于分布式电阻应变片测量围岩松动圈的方法
CN106246162A (zh) * 2016-09-21 2016-12-21 山东科技大学 工作面底板跨孔成像装置及注浆效果监测方法
CN106989687A (zh) * 2017-04-27 2017-07-28 安徽理工大学 围岩测试方法及测试系统
CN107015282A (zh) * 2017-06-05 2017-08-04 山东理工大学 基于锚杆的地下空间围岩灾害电阻率实时监测方法
CN107203010A (zh) * 2017-06-05 2017-09-26 山东理工大学 地下空间围岩灾害释能及缓冲实时监测方法
CN108368684A (zh) * 2015-12-03 2018-08-03 韩国地质资源研究院 利用电阻率的基岩灌浆监视方法
CN110206534A (zh) * 2019-06-06 2019-09-06 张同德 跨斜孔电阻率ct成像注浆封孔电缆保护装置及使用方法
CN110486023A (zh) * 2019-08-16 2019-11-22 河北鸿锐嘉科技发展有限公司 隧道缺陷治理方法
CN111021337A (zh) * 2019-12-03 2020-04-17 中国水电基础局有限公司 一种射水造混凝土防渗墙施工工艺
RU2736928C1 (ru) * 2018-01-16 2020-11-23 Шандунь Юниверсити Оф Сайенс Энд Текнолоджи Способ определения степени опасности горных пород дорожного свода
CN113008125A (zh) * 2021-02-25 2021-06-22 安徽省交通控股集团有限公司 一种隧道围岩内部变形监测方法
CN113418966A (zh) * 2021-06-28 2021-09-21 北京科技大学 基于直流电法探测的巷道松动圈范围无损测试方法及系统
CN114778948A (zh) * 2022-06-17 2022-07-22 中铁大桥科学研究院有限公司 动水隧道岩体电阻率监测方法及相关设备

Cited By (26)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102681008A (zh) * 2011-03-08 2012-09-19 中国科学院地质与地球物理研究所 一种在tbm隧洞中安装地质超前预报检波器的方法与装置
CN102338889A (zh) * 2011-05-18 2012-02-01 颜廷旭 一种用于勘察地下水源的二维高密度电阻率法
CN103018568A (zh) * 2012-12-07 2013-04-03 山东大学 一种稳定含水率岩石试块的电阻率测定方法
CN103018568B (zh) * 2012-12-07 2015-06-03 黄瑞哲 一种稳定含水率岩石试块的电阻率测定方法
CN103217131B (zh) * 2013-04-08 2015-11-18 中国矿业大学(北京) 一种围岩松动圈的测试方法及测试设备
CN103217131A (zh) * 2013-04-08 2013-07-24 中国矿业大学(北京) 一种围岩松动圈的测试方法及测试设备
CN103792582A (zh) * 2014-01-22 2014-05-14 中国矿业大学 一种巷道松动圈探测方法
CN103792582B (zh) * 2014-01-22 2016-06-15 中国矿业大学 一种巷道松动圈探测方法
CN104832212A (zh) * 2015-04-07 2015-08-12 中国矿业大学 基于钻进参数考察巷道松动及应力集中范围的方法
CN105318824A (zh) * 2015-11-20 2016-02-10 安徽理工大学 一种基于分布式电阻应变片测量围岩松动圈的方法
CN105318824B (zh) * 2015-11-20 2018-07-10 安徽理工大学 一种基于分布式电阻应变片测量围岩松动圈的方法
CN108368684B (zh) * 2015-12-03 2021-01-08 韩国地质资源研究院 利用电阻率的基岩灌浆监视方法
CN108368684A (zh) * 2015-12-03 2018-08-03 韩国地质资源研究院 利用电阻率的基岩灌浆监视方法
CN106246162A (zh) * 2016-09-21 2016-12-21 山东科技大学 工作面底板跨孔成像装置及注浆效果监测方法
CN106246162B (zh) * 2016-09-21 2019-03-22 山东科技大学 工作面底板跨孔成像装置及注浆效果监测方法
CN106989687A (zh) * 2017-04-27 2017-07-28 安徽理工大学 围岩测试方法及测试系统
CN107015282A (zh) * 2017-06-05 2017-08-04 山东理工大学 基于锚杆的地下空间围岩灾害电阻率实时监测方法
CN107203010A (zh) * 2017-06-05 2017-09-26 山东理工大学 地下空间围岩灾害释能及缓冲实时监测方法
RU2736928C1 (ru) * 2018-01-16 2020-11-23 Шандунь Юниверсити Оф Сайенс Энд Текнолоджи Способ определения степени опасности горных пород дорожного свода
CN110206534A (zh) * 2019-06-06 2019-09-06 张同德 跨斜孔电阻率ct成像注浆封孔电缆保护装置及使用方法
CN110486023A (zh) * 2019-08-16 2019-11-22 河北鸿锐嘉科技发展有限公司 隧道缺陷治理方法
CN111021337A (zh) * 2019-12-03 2020-04-17 中国水电基础局有限公司 一种射水造混凝土防渗墙施工工艺
CN113008125A (zh) * 2021-02-25 2021-06-22 安徽省交通控股集团有限公司 一种隧道围岩内部变形监测方法
CN113418966A (zh) * 2021-06-28 2021-09-21 北京科技大学 基于直流电法探测的巷道松动圈范围无损测试方法及系统
CN113418966B (zh) * 2021-06-28 2022-02-11 北京科技大学 基于直流电法探测的巷道松动圈范围无损测试方法及系统
CN114778948A (zh) * 2022-06-17 2022-07-22 中铁大桥科学研究院有限公司 动水隧道岩体电阻率监测方法及相关设备

Similar Documents

Publication Publication Date Title
CN201401174Y (zh) 高密度电阻率监测围岩松动圈的系统
Fairhurst Stress estimation in rock: a brief history and review
CN104181611B (zh) 一种矿井工作面顶底板采动破坏裂隙发育动态监测方法
CN201672998U (zh) 围岩钻孔多点应力计
CN102505965B (zh) 一种岩体破坏失稳预警识别的方法
CN102854525B (zh) 一种微震单向传感器碎裂岩体全方位深孔安装及回收装置
CN103293560B (zh) 一种采动三向应力场的测试方法
CN104790978A (zh) 小净距立体交叉隧道环形导坑施工方法
CN102221332A (zh) 松散地层的光纤光栅多点传感装置及监测系统与监测方法
CN102966111B (zh) 一种在深水急流无覆盖层陡峭裸岩上的钢管桩锚固施工方法
CN102134967A (zh) 一种煤层底板注浆加固水平定向钻孔的施工方法
Kang et al. Safe mining technology of undersea metal mine
CN104694746A (zh) 一种离子吸附型稀土原地浸矿的方法及其浸矿系统
CN104237025A (zh) 一种封闭钻孔采动破坏模拟试验方法
CN105134219B (zh) 软岩地层冻结井筒井壁施工工艺
WO2020057363A1 (zh) 一种巷道表面绝对收敛量的观测装置及观测方法
CN105736022A (zh) 基于深部软弱复合顶板的矩形煤巷的分层支护方法
CN102733812B (zh) 城市江底分岔段小净距隧道侧壁扩挖的隧道施工方法
CN104373154A (zh) 一种巷道顶板稳定性监测方法
CN109387244A (zh) 一种矿山断层稳定性的智能监测方法和系统
CN104863183B (zh) 大断面隧道近接建筑物施工隔离减震桩结构及施工方法
CN109779634B (zh) 煤矿地面垂直井压裂坚硬顶板位置确定方法
CN114108609B (zh) 一种采空区多级分段精准充灌深成桩施工方法
CN103290827B (zh) 一种多点位移计安装埋设注浆方法
Liu et al. Comprehensive research on the failure evolution of the floor in upper mining of deep and thick coal seam

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100210

Termination date: 20110317