CN101799897A - Intelligent figure error resistant operation ticket management system - Google Patents
Intelligent figure error resistant operation ticket management system Download PDFInfo
- Publication number
- CN101799897A CN101799897A CN201010040034A CN201010040034A CN101799897A CN 101799897 A CN101799897 A CN 101799897A CN 201010040034 A CN201010040034 A CN 201010040034A CN 201010040034 A CN201010040034 A CN 201010040034A CN 101799897 A CN101799897 A CN 101799897A
- Authority
- CN
- China
- Prior art keywords
- ticket
- module
- power transformation
- operation order
- operation ticket
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Supply And Distribution Of Alternating Current (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses an intelligent figure error resistant substation operation ticket management system, which comprises a substation operation ticket preliminary command receiving module, a substation operation ticket simulating module, a substation operation ticket audit module, a positive command receiving module and an substation operation ticket positive ticket positive command executing module. The substation operation ticket preliminary command receiving module is used to dispatch command acceptance. The substation operation ticket simulating module is used for operation ticket simulation and stopping operation ticket flow. In the substation operation ticket audit module, the auditor audits the operation ticket and stops the operation ticket flow. The positive command receiving module is used for the input of positive command dispatch information and stopping the operation ticket flow. The substation operation ticket positive command executing module is used for the input of operation ticket execution information and stopping the operation ticket flow. The invention has reasonable design and can effectively manage the operation ticket in the billing, auditing and executing process.
Description
Technical field
The present invention relates to the intelligent figure error resistant operation ticket management system that a kind of electrical network is used.
Background technology
Existing electric grid operating ticket management system because system design is unreasonable, to the making out an invoice, examine and execution when managing of operation order, is made a fault easily.
Summary of the invention
The objective of the invention is to design a kind of intelligent figure error resistant operation ticket management system.
The present invention will solve be more existing electric grid operating ticket management systems to operation order make out an invoice, examine and carry out management the time problem of making a fault easily.
Technical scheme of the present invention is: it comprises power transformation operation order preliminary command receiver module, and the power transformation operation order is intended ticket module, power transformation operation order auditing module, just made receiver module and power transformation operation order just make execution module;
Power transformation operation order preliminary command receiver module is used for traffic order and receives, and selects task type according to traffic order;
The power transformation operation order is intended the ticket module and is used for operation order and intends ticket and terminating operation ticket flow process, operation order intend ticket comprise import typical operational procedure, to the modification of operation steps; The power transformation operation order is intended the operation when power transformation operation order preliminary command receiver module selects to have the ticket operation of ticket module;
Power transformation operation order auditing module is used for generating automatically the person approving, carries out the operation order audit by the person approving, and limiting the person approving can not be same with plan ticket physiognomy, and checking and terminating operation ticket flow process of historical audit opinion is provided;
Just making receiver module be used for just making the input and the terminating operation ticket flow process of schedule information;
The power transformation operation order is just making execution module be used for input and terminating operation ticket flow process that operation order is carried out information.
Advantage of the present invention is reasonable in design, prevented effectively operation order make out an invoice, error in audit and the implementation, operation order is managed effectively.
Description of drawings
Fig. 1 is a block diagram of the present invention.
Fig. 2 is a workflow diagram of the present invention.
Embodiment
The present invention is further illustrated below in conjunction with drawings and Examples.
As shown in the figure, the present invention includes power transformation operation order preliminary command receiver module, the power transformation operation order is intended ticket module, power transformation operation order auditing module, is just made receiver module and power transformation operation order just make execution module; Power transformation operation order preliminary command receiver module is intended the ticket module with the power transformation operation order and is connected, the electricity operation order is intended the connection of ticket module and is connected with power transformation operation order auditing module, power transformation operation order auditing module connects is just making execution module be connected with just making receiver module, power transformation operation order, and the power transformation operation order is just making execution module and power transformation operation order just make execution module be connected.
Power transformation operation order preliminary command receiver module is used for traffic order and receives, and selects task type according to traffic order;
The power transformation operation order is intended the ticket module and is used for operation order and intends ticket and terminating operation ticket flow process, operation order intend ticket comprise import typical operational procedure, to the modification of operation steps; The power transformation operation order is intended the operation when power transformation operation order preliminary command receiver module selects to have the ticket operation of ticket module; Operation steps is revised and is comprised insertion operation steps, move operation step and replacement operation step.
Power transformation operation order auditing module is used for generating automatically the person approving, carries out the operation order audit by the person approving, and limiting the person approving can not be same with plan ticket physiognomy, and checking and terminating operation ticket flow process of historical audit opinion is provided.
Just making receiver module be used for just making the input and the terminating operation ticket flow process of schedule information.
The power transformation operation order is just making execution module be used for input and terminating operation ticket flow process that operation order is carried out information.
Described task type comprises the ticket operation being arranged and not having the ticket operation of one-level task, and just the make scheduling and the preliminary command of second task are dispatched, and after choosing task type, further selecting is just to make scheduling or preliminary command scheduling again.
Now specify operating process:
Operation power transformation operation order preliminary command receiver module, " task type " is that selection is a kind of in two kinds of " have ticket operation ", " the no ticket operations ", no matter be to select to have ticket or no ticket, further select " just making scheduling ", " preliminary command scheduling " two kinds again, when being the operation of no ticket, no matter selecting " just making scheduling " still is " preliminary command scheduling ", can further select " separating brake ", " combined floodgate ", " tap operation ", " other " four kinds of situations again.When being cannot select " separating brake ", " combined floodgate ", " tap operation ", " other " when the ticket operation is arranged.The scheduling option by: state transfer, net is transferred, province transfers, district's accent, auxiliary tone, county are transferred, stood and transferred.
Operation power transformation operation order is intended the ticket module, imports typical operational procedure, can insert operation steps, on move, move down, replace.Regain as selection scheduling, stop this operation order flow process, and information is imported the power transformation operation daily record.
Operation power transformation operation order auditing module generates person approving and audit time automatically, and the person approving can not be the same with plan ticket people, and the audit number is and the people just must have the several people to examine in the audit link, otherwise flow process to be carried out.Check historical audit opinion, can see the history reason of cancelling the order.Regain as selection scheduling, stop this operation order flow process, and information is imported the power transformation operation daily record.
Operation is just making receiver module, and input is just making scheduling, just makes us, and the guardian that issues an order is just making the time and made us.Regain as selection scheduling, stop this operation order flow process, and information is imported the power transformation operation daily record.
Operation power transformation operation order is just making execution module,, input execution information, operation steps number and Action number import automatically, can revise.Newly-increased person approving.As end to carry out, stop this operation order flow process, and information is imported the power transformation operation daily record.
Claims (3)
1. an intelligent figure error resistant operation ticket management system is characterized in that it comprises power transformation operation order preliminary command receiver module, and the power transformation operation order is intended ticket module, power transformation operation order auditing module, just made receiver module and power transformation operation order just make execution module;
Power transformation operation order preliminary command receiver module is used for traffic order and receives, and selects task type according to traffic order;
The power transformation operation order is intended the ticket module and is used for operation order and intends ticket and terminating operation ticket flow process, operation order intend ticket comprise import typical operational procedure, to the modification of operation steps; The power transformation operation order is intended the operation when power transformation operation order preliminary command receiver module selects to have the ticket operation of ticket module;
Power transformation operation order auditing module is used for generating automatically the person approving, carries out the operation order audit by the person approving, and limiting the person approving can not be same with plan ticket physiognomy, and checking and terminating operation ticket flow process of historical audit opinion is provided;
Just making receiver module be used for just making the input and the terminating operation ticket flow process of schedule information;
The power transformation operation order is just making execution module be used for input and terminating operation ticket flow process that operation order is carried out information.
2. intelligent figure error resistant operation ticket management system according to claim 1, it is characterized in that task type comprises the ticket operation being arranged and not having the ticket operation of one-level task, just the make scheduling and the preliminary command of second task are dispatched, after choosing task type, further selecting is just to make scheduling or preliminary command scheduling again;
3. intelligent figure error resistant operation ticket management system according to claim 1 is characterized in that the operation steps modification comprises insertion operation steps, move operation step and replacement operation step.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201010040034A CN101799897A (en) | 2010-01-19 | 2010-01-19 | Intelligent figure error resistant operation ticket management system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201010040034A CN101799897A (en) | 2010-01-19 | 2010-01-19 | Intelligent figure error resistant operation ticket management system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN101799897A true CN101799897A (en) | 2010-08-11 |
Family
ID=42595569
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201010040034A Pending CN101799897A (en) | 2010-01-19 | 2010-01-19 | Intelligent figure error resistant operation ticket management system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101799897A (en) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102064611A (en) * | 2011-01-06 | 2011-05-18 | 国电南瑞科技股份有限公司 | Transformer substation sequentialization control system with visualization and interactivity |
CN103065215A (en) * | 2012-12-19 | 2013-04-24 | 云南电力调度控制中心 | Power grid dispatching method |
CN103077479A (en) * | 2013-01-04 | 2013-05-01 | 湖州电力局 | Method for temporarily changing electric network topology structure in pattern dispatching operation ticket system |
CN104393678A (en) * | 2014-11-25 | 2015-03-04 | 国家电网公司 | Intelligent power dispatching operation order system |
CN104600840A (en) * | 2014-12-30 | 2015-05-06 | 国家电网公司 | Intelligent dispatching and mis-operation preventing management system and method |
CN104966150A (en) * | 2015-05-26 | 2015-10-07 | 国网山东省电力公司青岛供电公司 | Intelligent anti-error analysis method and system |
CN105809571A (en) * | 2015-04-02 | 2016-07-27 | 国网山东省电力公司青岛供电公司 | Intelligent monitoring method and system for outputting scheduling operation tickets |
-
2010
- 2010-01-19 CN CN201010040034A patent/CN101799897A/en active Pending
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102064611A (en) * | 2011-01-06 | 2011-05-18 | 国电南瑞科技股份有限公司 | Transformer substation sequentialization control system with visualization and interactivity |
CN102064611B (en) * | 2011-01-06 | 2012-12-05 | 国电南瑞科技股份有限公司 | Transformer substation sequentialization control system with visualization and interactivity |
CN103065215A (en) * | 2012-12-19 | 2013-04-24 | 云南电力调度控制中心 | Power grid dispatching method |
CN103065215B (en) * | 2012-12-19 | 2015-07-01 | 云南电力调度控制中心 | Power grid dispatching method |
CN103077479A (en) * | 2013-01-04 | 2013-05-01 | 湖州电力局 | Method for temporarily changing electric network topology structure in pattern dispatching operation ticket system |
CN103077479B (en) * | 2013-01-04 | 2015-01-21 | 湖州电力局 | Method for temporarily changing electric network topology structure in pattern dispatching operation ticket system |
CN104393678A (en) * | 2014-11-25 | 2015-03-04 | 国家电网公司 | Intelligent power dispatching operation order system |
CN104600840A (en) * | 2014-12-30 | 2015-05-06 | 国家电网公司 | Intelligent dispatching and mis-operation preventing management system and method |
CN104600840B (en) * | 2014-12-30 | 2018-05-08 | 国家电网公司 | A kind of intelligent scheduling anti-misoperation management system and method |
CN105809571A (en) * | 2015-04-02 | 2016-07-27 | 国网山东省电力公司青岛供电公司 | Intelligent monitoring method and system for outputting scheduling operation tickets |
CN104966150A (en) * | 2015-05-26 | 2015-10-07 | 国网山东省电力公司青岛供电公司 | Intelligent anti-error analysis method and system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101799897A (en) | Intelligent figure error resistant operation ticket management system | |
CN103488138B (en) | Generate the method and system that scheduling makes operation order item by item | |
CN109740837B (en) | Power grid province and land network command and safety error prevention method based on regulation and control integration | |
CN103489062B (en) | Scheduled outage method and device based on CIM | |
Atasoy et al. | An analysis on smart grid applications and grid integration of renewable energy systems in smart cities | |
CN103065215B (en) | Power grid dispatching method | |
CN103578039B (en) | A kind of power networks risk prewarning analysis system | |
CN105184442A (en) | Power distribution network dispatching management statistical analysis system | |
CN201947061U (en) | Distribution network dispatching intelligent anti-mistake and real-time management system | |
AU2011250809A1 (en) | Methods and systems involving power system grid management | |
CN104133443A (en) | Method for automatically generating power grid dispatching operation order through power grid overhaul application forms | |
CN103595816A (en) | Integrated electric marketing charge-reminding platform system | |
CN102999975A (en) | Intelligent power consumption payment management system | |
CN108510242A (en) | Worksheet method, system and terminal device | |
CN106651643A (en) | Power security management and control method for whole process based on distribution and adjustment | |
CN102521701A (en) | Early warning command system and Early warning command method of power system | |
CN106374458A (en) | Intelligent analysis method for identifying unreasonable power-failure management | |
CN104881737A (en) | Control figure billing system | |
CN103065269A (en) | Marketing and distribution main data management system | |
CN107171438A (en) | A kind of net level matches somebody with somebody electricity consumption monitoring and management system | |
CN109840675B (en) | Intelligent power transfer application system and method in power distribution network fault state | |
CN202150946U (en) | Bank self-service equipment monitoring short message query apparatus | |
US9047757B2 (en) | Systems and methods for remotely controlling an advanced metering infrastructure | |
CN107122834B (en) | Intelligent order dispatching system and method | |
CN116470645A (en) | Operation and maintenance management system for power distribution network automation equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C12 | Rejection of a patent application after its publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20100811 |