CN102521701A - Early warning command system and Early warning command method of power system - Google Patents
Early warning command system and Early warning command method of power system Download PDFInfo
- Publication number
- CN102521701A CN102521701A CN2011104173646A CN201110417364A CN102521701A CN 102521701 A CN102521701 A CN 102521701A CN 2011104173646 A CN2011104173646 A CN 2011104173646A CN 201110417364 A CN201110417364 A CN 201110417364A CN 102521701 A CN102521701 A CN 102521701A
- Authority
- CN
- China
- Prior art keywords
- early warning
- interface
- module
- prediction scheme
- equipment
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Telephonic Communication Services (AREA)
- Alarm Systems (AREA)
Abstract
The invention discloses an early warning command system and an early warning command method of a power system. The early warning command system comprises an early warning command service platform, communication service equipment and user terminal equipment, wherein the early warning command service platform is composed of a peripheral user interface, an application center module and a bottom-layer data interface, wherein the peripheral user interface is connected with the user terminal equipment by the communication service equipment; the application center module is connected with the peripheral user interface and the bottom-layer data interface; the application center module receives and processes the data information of the peripheral user interface and the bottom-layer data interface, and then sends the processing result information to the peripheral user interface or the bottom-layer data interface; and the communication service equipment comprises network communication equipment, telephone voice communication equipment, short message communication equipment, office automation equipment and an electronic email server. The system and the method of the invention improve the reliability and the running efficiency of the early warning system of the power system, and can be used for the power supply management of the power system.
Description
Technical field
The present invention relates to power industry equipment safety control technical field, especially relate to a kind of electric system early warning command system and method thereof.
Background technology
At present, power industry is also increasingly high for the attention degree of production safety, guarantees that the safe and stable operation of electrical network has become the top priority in enterprises of managing electric wire netting's production safety management work.Because power industry is high risk industry; Electrical production is sent out the transmission & distribution electricity consumption and is accomplished simultaneously; Physical connection natural quality that electric system is exclusive and internal operation electric characteristic; Electrical network receives objective factors influences such as extraneous force majeure such as thunderbolt, mountain torrents and rubble flow at any time in addition, and electric power accident often takes place, and brings potential threat for safe, stable, the high-quality of electric power, reliability service.Electrical production department realizes the production safety operation from many aspects; Particularly pay much attention to,, formed a lot of dangerous emergency preplans through development in recent years for the preventive measure of all kinds of dangerous situations; Divided by class of service: the management and running class; Overhaul class, operation class, marketing class; Even relate to public safety and vehicular traffic or the like in addition, by the content branch flood control prediction scheme, the urgent emergency preplan of electric grid large area power cut, the urgent prediction scheme of power grid accident, the urgent prediction scheme of inclement weather are arranged ... Deng kind more than ten.To increasing dangerous emergency preplan, at first need clearly defining responsibilities department, the scheme of regular adaptation current organization and operation, and set up a cover prediction scheme KBM, accomplish that the development of prediction scheme and environment grow with each passing hour.Secondly, from the reason of following several respects, it is also more and more urgent that the demand of the perfect early warning command system of a cover is disposed in electric system:
1, the existence form of these prediction schemes of electric power enterprise is very various; File mode is arranged; The rules mode is arranged, also have some prediction schemes to be present in other the application system, like processing prediction scheme of significant deficiency or the like; This carries out unified management with regard to the program management system that needs a cover specialty, realizes timely change, the issue of prediction scheme version and prediction scheme content.
2, to these dangerous prediction schemes, the pattern phone bulletin or the report that started the accident maintenance prediction scheme are in the past asked for instructions, and mode is more original, and efficient is lower, does not reach the effect of urgent prediction scheme.
3, after prediction scheme started, the aspect of information issue was narrow, and the distribution platform that neither one is perfect carries out publicity with the relevant information of this prediction scheme, so that the related personnel understands information timely.
4, the complete feedback mechanism of carrying out of prediction scheme neither one can't be understood this prediction scheme and run into which problem in the process of implementation, and which has need improved place.
Summary of the invention
In view of this, the object of the present invention is to provide a kind of electric system early warning command system, improve the reliability and the operational efficiency of electric system early warning system.
For achieving the above object, the present invention adopts following technical scheme:
Electric system early warning command system of the present invention; Comprise early warning commander service platform, Communications service equipment and subscriber terminal equipment; Said early warning commander service platform is made up of peripheral user interface, application center module and bottom data interface; Wherein, Peripheral user interface is connected with subscriber terminal equipment through Communications service equipment, uses center module and is connected with the bottom data interface with peripheral user interface respectively, uses center module and comprises early warning commander module, prediction scheme molded tissue block, program management module, prediction scheme training exercise module, prediction scheme assurance module, infrastructure service administration module; Use the data message that center module received and handled peripheral user interface and bottom data interface, then with peripheral user interface of processing result information sender or bottom data interface; Said Communications service equipment comprises network communication equipment, voice call communication equipment, short message communication equipment, business automation equipment, e-mail server.
Further, peripheral user interface comprises administrator interface, emergency command office interface, group member's interface and higher level's information issuing interface; The bottom data interface comprises data communication interface, data exchange interface, basic data interface, and the bottom data interface is through infrastructure service module and other functional module collaborative works of application center module.
Further, early warning commander module comprises that early warning information input acquisition module, prediction scheme start module, notice bulletin module, early warning emergency processing and closing module, prediction scheme analysis and assessment module.
In addition; The present invention also provides a kind of method of electric system early warning command system, and this method mainly comprises the link that next coming in order carry out: information gathering, affirmation are implemented, are started prediction scheme, notice bulletin, emergency processing, close prediction scheme and prediction scheme analysis and assessment link.
Beneficial effect of the present invention and advantage are following:
1, the forward-looking and maturity of overall system design technology
The design of total system; Should be based on adopting advanced, mainstream technology mature and reliable, that represent future thrust; Can reduce the technical risk in system's process of construction, can prolong the life cycle of system again, make project investment obtain maximum benefit repayment.
2, system possesses compatibility and extendability
Take into full account the compatibility and the extensibility of system in the system design; Should guarantee compatibility with existing system; Guarantee again to leave suitable extending space for the later development of system; Can come to satisfy to greatest extent the needs that technology and business development change with the cost of minimum, existing system can be grown simultaneously with business demand, make system scale when sharply expanding, also not need to carry out again systems organization and design.
3, system has higher reliability and stability
The reliability and stability of system are mainly reflected in following aspect.
(1) reliability of hardware, software platform type selecting itself.
(2) reliability of system interface.
(3) system has fault-tolerant ability, and when various hardware and software failure appearred in system, system's (or non-malfunctioning module) still can normally move, and the fault of system is transparent to the user.
4, system has opening and maintainability
The opening of system and maintainable one of the main principle that emphasis follows of wanting when being system design, systemic openness is the basis that system has high maintainability.
System design should guarantee that system can carry out function expansion and modification easily; And can connect and exchanges data with other system easily, adopt the powerful maintenance function that realizes that open interface standard and standard, Componentized design and system itself provide again.
5, system has economy and practicality
Practicality is the life of system, when design system, requires to adopt various technical methods and measure to guarantee the practicality of system.It is embodied in the rationality of systems organization, the reliability of system, the integrity of function, the convenience of use, the friendly of man-machine interface etc.; In a word; System wants can the comprehensive business need that satisfies the user profoundly, is principle with simple, convenient, fast, practicality.
When emphasis is considered practicality, also want the economy of taking into account system, the economy of system is embodied in:
(1) an amount of remaining is adopted in system design.
(2) construction cost that should taking into account system is considered later system maintenance cost again.
(3) life cycle of prolongation system.
6, system possesses higher security
Security is meant that system can resist the external attack system that makes and exempt from destruction, and the security information of internal system is not by undelegated user capture.System design will take into full account the security of system through aspects such as network inherently safe, operating system security, application system safety, provides perfect authentication and authorization mechanism to guarantee that system exempts from illegal invasion and destroys.
Other advantages of the present invention, target and characteristic will be set forth in instructions subsequently to a certain extent; And to a certain extent; Based on being conspicuous to those skilled in the art, perhaps can from practice of the present invention, obtain instruction to investigating of hereinafter.Target of the present invention and other advantages can be passed through following instructions, claims, and the structure that is particularly pointed out in the accompanying drawing realizes and obtains.
Description of drawings
Fig. 1 is the logic theory block diagram of the electric system early warning command system in the embodiment of the invention;
Fig. 2 is the business processing flow figure of the electric system early warning commander method in the embodiment of the invention;
Fig. 3 is the logical organization block diagram of the early warning commander service platform in the embodiment of the invention.
Embodiment
Practical implementation application below in conjunction with accompanying drawing and the present invention's Hebi City electric power system in Henan Province further describes the present invention.
The early warning command system of present embodiment causes prediction schemes such as burst industrial accident plan for emergency handling, large-area power-cuts disposal prediction scheme, flood control and makes up to Henan Province's Hebi City inclement weather.According to the operating feature classification, present embodiment prediction scheme architecture comprises comprehensive emergency preplan, special emergency preplan and on-the-spot emergency disposal scheme.Except early warning prediction scheme itself, native system also comprises prediction scheme contingency management work, is specially contents such as emergency organization system, emergency preplan system, emergency guarantee system, emergency training and rehearsal, emergent enforcement and assessment.
As shown in Figure 1; The early warning system of present embodiment comprises early warning commander service platform, Communications service equipment and subscriber terminal equipment; Peripheral user interface is connected with subscriber terminal equipment through Communications service equipment, and said Communications service equipment comprises network communication equipment, voice call communication equipment, short message communication equipment, business automation equipment (OA system), e-mail server.
The early warning maneuvering platform of present embodiment system is from Information Monitoring by all kinds of means; The existing data that need manual entry (like weather forecast information of keeper's typing etc.); Also have the information of directly coming from the other system collection (as from the EMS system acquisition to unusual tripping operation information etc.), also have the directly failure message through the phone newspaper of electrical network user.When system acquisition behind failure message; Automatic trigger message transmit mechanism; To through analysis and evaluation grade after the danger early warning very first time notify responsible person to relevant prediction scheme responsible department; This responsible person at first confirms dangerous situation; Ask relevant leader for instructions through the message transmit mechanism of system after confirming and whether start dangerous prediction scheme, after obtaining replying, can or be chosen in the corresponding dangerous prediction scheme of direct startup in the system through OA system, SMS platform, PSTN public network phone (telephone voice communication equipment).Prediction scheme then triggers notice information after starting, and the related personnel can obtain the relevant information of prediction scheme through approach such as OA system, SMS platform, voice call, mailing system and electronic large screens.
The system deployment of present embodiment is in office's office net; Through loading the prediction scheme maneuvering platform of voiceization of sound card formation; Carry out message exchange through various interface (data-interface, communication interface etc.) and other system; The EMS system is owing to be in the dedicated network, and interface mode can adopt the XML standard or the mode of intermediate database to come image data, and other application systems (like the OA system) can directly be accomplished the process of message exchange through the interface of database level.
As shown in Figure 2, mainly comprise information gathering when early warning commander method of the present invention and realization, confirm to implement, start prediction scheme, notice bulletin, emergency processing, close prediction scheme and seven links of prediction scheme analysis and assessment, specific as follows:
1, information gathering
Specifically can collect by responsible department; Personnel report responsible department through modes such as phone, mail, notes; With special line, mail, short message mode report, the mode with note, voice, mail send information to responsible department again through accident pre-alarming system; The client is transferred to responsible department through 95598 System Reports; The EMS system interface triggers reports to the police, and system sends note, voice, mail to responsible department; Be reported to responsible department through the OA system.
2, responsible department confirms to implement
Early warning reports leader's assessment, deciding grade and level, determines whether to start prediction scheme.Do not provide answer if do not start,, get into next step if start prediction scheme according to the source.
3, the person liable starts prediction scheme
Starting mode is: note, voice, OA system, early warning system.
4, system notifies bulletin automatically
(1) notice accident emergency commander group, office, accident treatment related personnel
Advice method: advice method is automatically: OA system, voice, note, mail; Artificial advice method is: through system's dialing, manual telephone system.Advice range: all personnel of leading group of directorate, the emergent all personnel of office, relevant departments of basic unit
(2) report higher level relevant departments
Report mode: report mode to be automatically: voice, note, mail; Manual work reports mode to be: manual phone.Report scope: superior unit, relevant government agencies.
(3) notify the client
Advice method: advice method is automatically: voice, note, mail; Artificial advice method is: through system's dialing, manual phone.
(4) announce full associate automatically
Bulletin mode: OA system bulletin, early warning system bulletin, production system bulletin, note bulletin, mail bulletin, giant-screen bulletin.Bulletin scope: all personnel of company.
The command and management of 5, early warning, emergent, accident treatment process
Early warning, emergent, accident treatment process, the business demand that process is carried out is following:
(1) prediction scheme upgrading, degradation: through note, voice, OA system, early warning system bulletin.
(2) prediction scheme processing procedure: progress and major event record, progress is reported.
(3) floor manager, the floor manager process possesses following function:
Communications such as A, voice, note, mail, phone are unimpeded.
B, the current remote viewing system view data of collection, observation scene of the accident situation.
C, obtain device fault information and equipment wiring network chart information through the EMS system.
D, production equipment information, the device history failure message.
6, close prediction scheme
(1) whether the assessment of emergent office can close.
(2) person liable closes prediction scheme: the mode of closing is note, voice, OA system, early warning system.
(3) bulletin all personnel result: report higher level relevant departments, announce full company, notify the client.
7, assessment, analysis and summary
(1) analysis and summary report.(2) innovative approach.(3) the prediction scheme edition upgrading is safeguarded.In case of necessity, summary result is announced all personnel through system of the present invention.
More than described the basic service flow process that the early warning commander implements management, except that the basic service flow process of the system of realization, native system comprises that also making full use of system resource realizes specifically comprising other and system closely-related business function:
1, prediction scheme organization business: realize unified management to the prediction scheme organizational framework.
2, program management is professional: realize prediction scheme improvement, revision, version management.
3, prediction scheme ensures professional: realize the inspection management to the prediction scheme security system.
4, the prediction scheme training exercise is professional: can utilize system resource to realize training and learning, simulated maneuver function.
As shown in Figure 3; The early warning command system of present embodiment is made up of peripheral user interface, application center, bottom data interface, and peripheral user provides keeper, emergency command office and all group members, operated and the information issuing interface to users such as higher level's information issues; The application center is the core of system applies; Early warning command system, prediction scheme organizational framework, program management, the training exercise of prediction scheme, prediction scheme security system, infrastructure service management have been realized; These system collaborative works; Common formation electric system early warning command system and application management platform, wherein early warning command system, prediction scheme organizational framework, prediction scheme system management, infrastructure service are the critical functions of this part; The bottom data interface is the important assurance that system and other system carry out communication and exchanges data, and the bottom data interface is through infrastructure service and other function synergic work of application center.Concrete structure is following:
1, peripheral user interface provides all users' operation and information issue display interface, and operation format can directly be operated through system according to all kinds of business features, also can operate through OA system, voice call, note etc.The information issue can be issued in early warning system, also can issue through the OA system, also can important information be issued through forms such as giant-screen, voice system, notes according to different needs.
2, the application function of total system has been realized at the application center, comprises functions such as early warning commander, early warning organizational framework, program management, training exercise, and is specific as follows:
The early warning command system: realized that early warning information input collection, prediction scheme start, notify the command and management of the whole early warning of bulletin, early warning contingency procedure, prediction scheme analysis and assessment, this part is one of critical function of system.Wherein, prediction scheme contingency management process comprises upgrading, reduction, the management of processing procedure logout of prediction scheme, commander's communication management of the voice in the prediction scheme contingency procedure, note, mail etc., closing and notice after prediction scheme is accomplished; The prediction scheme analysis and assessment comprise analysis and summary report, innovative approach and send notice.
The prediction scheme organization and administration: having realized the organization and administration of emergency organization mechanism, personnel's responsibility, personnel's communication etc., is that system's operation, authority are handled, the important assurance of information issue.
Prediction scheme system: realize unified management, comprise classification, upgrade maintenance and the version management of prediction scheme to all prediction schemes.This part is that system is in operation to the management of prediction scheme basic data, can use the various data informations of prediction scheme.
The training exercise system: the training and learning data of each item accident prediction is provided, and all personnel can pass through e-learning accident prediction basic skills; Utilize the command and management function of system to realize prediction scheme simulated maneuver process easily.In addition, the user can also deepen the understanding to prediction scheme through the study to data informations such as all prediction schemes, implementation record, analysis and assessment in the system, improves basic skills.
Prediction scheme security system: realize whether the guarantee management of terms and conditions such as the personnel that stipulate in the prediction scheme, tissue, technology, vehicle, material is implemented completely the inspection management to each condition.
Infrastructure service: infrastructure service realizes the basic management process of organizational structure, personnel's authority, Communications service, system monitoring, is the basis of total system operation.
3, bottom data interface; Data communication, exchanges data, basic data interface have been realized with other system; Data communication mainly refers to the data communication of pstn telephone network and SMS platform; Refer to mainly that with the other system exchanges data data-interface of office system, EMS system, large screen system, basic data interface mainly refer to and the data-interface of producing mis system, system with produce a shared cover organizational structure and the personnel of mis system.
Configuration below software environment adopts during the system implementation of present embodiment:
1, early warning commander server software
(1) operating system: win2003 Server
(2) Web service: more than the tomcat5.0
(3) Database Systems: Oracle9i
(4) other: office2000/2003, JDK1.4 etc.
2, client software
(1) operating system: office2000/2003, winXP
(2) other: IE6.0, office2000/2003 etc.
Configuration below system hardware adopts
(1) server configures CPU:Intel is to strong double-core 2.0GHZ, internal memory: 2G DDR-II internal memory at least, and maximum can expand to 48G, hard disk: 2 146GB SAS hard disks, and can support 4 hot plug hard disks.
(2) network interface card: two 1,000 million Fast Ethernet Media Adapters.
(3) sound card: D081A is advanced in east
(4) client machine configuration CPU:P3, more than the 700MHZ, internal memory: 256M at least, hard disk: the remaining space of 10G at least.
The enforcement of the early warning evaluating system of this enforcement has reached following target:
1, sets up the early warning command system, realize the information system management that early warning information collection, prediction scheme startup, information bulletin, prediction scheme execution feedback, prediction scheme are closed.
2, set up management systems such as analysis and assessment to prediction scheme, improvement, revision, version management.
3, prediction scheme starts variation and the robotization of carrying out, and the modes such as manual work, voice, note that comprise start, and sends voice, note, mail, OA system bulletin untill further notice notice information automatically, according to the data automatic early-warning of gathering.
4, set up prediction scheme organization and administration system.
5, set up the training exercise system of prediction scheme, case study, simulated maneuver are provided.
6, set up prediction scheme and ensure management system, realize guarantee situation inspection management personnel, technology preparation, vehicle material etc.
7, set up perfect interface, realize interface with EMS system, OA system, voice system, SMS platform etc.
Explanation is at last; Above embodiment is only unrestricted in order to technical scheme of the present invention to be described; Other modifications that those of ordinary skills make technical scheme of the present invention perhaps are equal to replacement; Only otherwise break away from the spirit and the scope of technical scheme of the present invention, all should be encompassed in the middle of the claim scope of the present invention.
Claims (4)
1. electric system early warning command system; Comprise early warning commander service platform, Communications service equipment and subscriber terminal equipment; It is characterized in that: said early warning commander service platform is made up of peripheral user interface, application center module and bottom data interface; Wherein, Peripheral user interface is connected with subscriber terminal equipment through Communications service equipment, uses center module and is connected with the bottom data interface with peripheral user interface respectively, uses center module and comprises early warning commander module, prediction scheme molded tissue block, program management module, prediction scheme training exercise module, prediction scheme assurance module, infrastructure service administration module; Use the data message that center module received and handled peripheral user interface and bottom data interface, then with peripheral user interface of processing result information sender or bottom data interface; Said Communications service equipment comprises network communication equipment, voice call communication equipment, short message communication equipment, business automation equipment, e-mail server.
2. electric system early warning command system according to claim 1 is characterized in that: peripheral user interface comprises administrator interface, emergency command office interface, group member's interface and higher level's information issuing interface; The bottom data interface comprises data communication interface, data exchange interface, basic data interface, and the bottom data interface is through infrastructure service module and other functional module collaborative works of application center module.
3. according to claim 1 or 2 described electric system early warning command systems, it is characterized in that: early warning commander module comprises that early warning information input acquisition module, prediction scheme start module, notice bulletin module, early warning emergency processing and closing module, prediction scheme analysis and assessment module.
4. the method for electric system early warning command system according to claim 3 is characterized in that this method comprises the link that next coming in order carry out: information gathering, affirmation are implemented, are started prediction scheme, notice bulletin, emergency processing, close prediction scheme and prediction scheme analysis and assessment link.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110417364.6A CN102521701B (en) | 2011-12-14 | 2011-12-14 | Early warning command method of power system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110417364.6A CN102521701B (en) | 2011-12-14 | 2011-12-14 | Early warning command method of power system |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102521701A true CN102521701A (en) | 2012-06-27 |
CN102521701B CN102521701B (en) | 2015-02-18 |
Family
ID=46292612
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201110417364.6A Active CN102521701B (en) | 2011-12-14 | 2011-12-14 | Early warning command method of power system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102521701B (en) |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102904756A (en) * | 2012-09-29 | 2013-01-30 | 浙江省电力公司 | Power information communication scheduling-operation-inspection integrated processing method |
CN103123714A (en) * | 2012-12-27 | 2013-05-29 | 衡水供电公司 | Power customer credit rating evaluation system |
CN103500422A (en) * | 2013-09-22 | 2014-01-08 | 国家电网公司 | Modularization table top drills virtual training system and training method thereof |
CN105023200A (en) * | 2015-08-04 | 2015-11-04 | 中国南方电网有限责任公司 | Power emergency drilling system and emergency drilling method thereof |
CN105447636A (en) * | 2015-11-23 | 2016-03-30 | 国网智能电网研究院 | Multisource information management system and method for power emergencies |
CN106911745A (en) * | 2015-12-23 | 2017-06-30 | 国网智能电网研究院 | A kind of electric power mobile is met an urgent need platform and its implementation |
CN108957212A (en) * | 2018-08-16 | 2018-12-07 | 山西元工电力工程设计有限公司 | A kind of 10 KV distribution net disconnection fault detection systems |
CN109685519A (en) * | 2018-11-07 | 2019-04-26 | 国家电网有限公司客户服务中心 | A kind of method and system for use in carrying towards multi-tenant integration of services monitoring |
CN112418639A (en) * | 2020-11-18 | 2021-02-26 | 广东赛意信息科技有限公司 | Autonomous controllable exception management system and method |
CN112564288A (en) * | 2020-12-10 | 2021-03-26 | 国网上海市电力公司 | Power failure active first-aid repair system based on Internet of things and geographic information technology |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101216926A (en) * | 2008-01-09 | 2008-07-09 | 深圳市海力特科技有限责任公司 | An urban emergency commanding operation system and the corresponding implementation method |
CN101349903A (en) * | 2008-08-06 | 2009-01-21 | 兖矿国泰化工有限公司 | Safety production early-warning system of coal chemical engineering enterprise |
CN102110277A (en) * | 2009-12-28 | 2011-06-29 | 河南省电力公司商丘供电公司 | Early-warning and processing method for accident of power-supply system |
CN102184311A (en) * | 2011-02-14 | 2011-09-14 | 北京东方正通科技有限公司 | Mobile personal digital assistant (PDA) field emergency command system |
-
2011
- 2011-12-14 CN CN201110417364.6A patent/CN102521701B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101216926A (en) * | 2008-01-09 | 2008-07-09 | 深圳市海力特科技有限责任公司 | An urban emergency commanding operation system and the corresponding implementation method |
CN101349903A (en) * | 2008-08-06 | 2009-01-21 | 兖矿国泰化工有限公司 | Safety production early-warning system of coal chemical engineering enterprise |
CN102110277A (en) * | 2009-12-28 | 2011-06-29 | 河南省电力公司商丘供电公司 | Early-warning and processing method for accident of power-supply system |
CN102184311A (en) * | 2011-02-14 | 2011-09-14 | 北京东方正通科技有限公司 | Mobile personal digital assistant (PDA) field emergency command system |
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102904756A (en) * | 2012-09-29 | 2013-01-30 | 浙江省电力公司 | Power information communication scheduling-operation-inspection integrated processing method |
CN103123714A (en) * | 2012-12-27 | 2013-05-29 | 衡水供电公司 | Power customer credit rating evaluation system |
CN103123714B (en) * | 2012-12-27 | 2015-10-21 | 衡水供电公司 | Electric Power Customer Credit Rank Appraisal system |
CN103500422A (en) * | 2013-09-22 | 2014-01-08 | 国家电网公司 | Modularization table top drills virtual training system and training method thereof |
CN105023200A (en) * | 2015-08-04 | 2015-11-04 | 中国南方电网有限责任公司 | Power emergency drilling system and emergency drilling method thereof |
CN105447636A (en) * | 2015-11-23 | 2016-03-30 | 国网智能电网研究院 | Multisource information management system and method for power emergencies |
CN106911745A (en) * | 2015-12-23 | 2017-06-30 | 国网智能电网研究院 | A kind of electric power mobile is met an urgent need platform and its implementation |
CN108957212A (en) * | 2018-08-16 | 2018-12-07 | 山西元工电力工程设计有限公司 | A kind of 10 KV distribution net disconnection fault detection systems |
CN108957212B (en) * | 2018-08-16 | 2024-06-11 | 元工电力技术有限公司 | 10 Kilovolt distribution network broken line fault detection system |
CN109685519A (en) * | 2018-11-07 | 2019-04-26 | 国家电网有限公司客户服务中心 | A kind of method and system for use in carrying towards multi-tenant integration of services monitoring |
CN112418639A (en) * | 2020-11-18 | 2021-02-26 | 广东赛意信息科技有限公司 | Autonomous controllable exception management system and method |
CN112564288A (en) * | 2020-12-10 | 2021-03-26 | 国网上海市电力公司 | Power failure active first-aid repair system based on Internet of things and geographic information technology |
Also Published As
Publication number | Publication date |
---|---|
CN102521701B (en) | 2015-02-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102521701A (en) | Early warning command system and Early warning command method of power system | |
CN105564465B (en) | A kind of railway electric signal plant maintenance operation control system and method | |
CN100588580C (en) | Track traffic synthetic monitoring system and method | |
CN102509245B (en) | Temporary grounding wire management method and system | |
CN103368760B (en) | A kind of railway electrical and the comprehensive operational system of signal of communication and method | |
CN105871605A (en) | Operation and maintenance monitoring platform based on big power marketing data | |
US20150263522A1 (en) | Powergrid operation and supervision system | |
CN109747682A (en) | Rail traffic light current integral system | |
CN103578039B (en) | A kind of power networks risk prewarning analysis system | |
CN105184442A (en) | Power distribution network dispatching management statistical analysis system | |
CN105262210A (en) | System and method for analysis and early warning of substation network security | |
CN102361354A (en) | Remote intensive management and control system of unattended converting station automatic system | |
WO2021114856A1 (en) | Multisource data-based uninterruptible power supply system | |
CN107798489A (en) | A kind of electric network operation site safety management method based on wechat platform | |
CN102185895A (en) | Cross-platform remote control method and system of UPSs (uninterruptible power supply) | |
CN104599049A (en) | Method and device for gridding managing polices | |
CN111047143A (en) | Power grid OMS-based regional and county team index management system | |
CN110288176A (en) | Distribution monitoring analysis and repairing maneuvering platform based on power grid GIS | |
CN103366500A (en) | Alarm method and device for power grid system | |
Wu et al. | Enterprise Digital Intelligent Remote Control System Based on Industrial Internet of Things | |
CN112348729A (en) | Intelligent security-eliminating integrated big data cloud platform system | |
Jiang et al. | System hazard analysis of tower crane in different phases on construction site | |
CN102110277A (en) | Early-warning and processing method for accident of power-supply system | |
CN104240137A (en) | Intelligent management method for electrical equipment | |
CN103489073A (en) | Enterprise safe production monitoring information system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C53 | Correction of patent of invention or patent application | ||
CB02 | Change of applicant information |
Address after: No. 164 Hebi City, Henan province 458030 Qibin Avenue Applicant after: HEBI POWER SUPPLY COMPANY OF STATE GRID HENAN ELECTRIC POWER COMPANY Address before: No. 164 Hebi City, Henan province 458030 Qibin Avenue Applicant before: Hunan Electric Power Company, Hebi Power Supply Company |
|
COR | Change of bibliographic data |
Free format text: CORRECT: APPLICANT; FROM: HUNAN ELECTRIC POWER COMPANY, HEBI POWER SUPPLY COMPANY TO: HEBI POWER SUPPLY COMPANY, STATE GRID HENAN ELECTRIC POWER COMPANY |
|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |