CN102521701B - Early warning command method of power system - Google Patents

Early warning command method of power system Download PDF

Info

Publication number
CN102521701B
CN102521701B CN201110417364.6A CN201110417364A CN102521701B CN 102521701 B CN102521701 B CN 102521701B CN 201110417364 A CN201110417364 A CN 201110417364A CN 102521701 B CN102521701 B CN 102521701B
Authority
CN
China
Prior art keywords
interface
prediction scheme
early warning
module
data
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201110417364.6A
Other languages
Chinese (zh)
Other versions
CN102521701A (en
Inventor
李志学
王修庆
刘思青
夏传鲲
张荣琴
郭何军
杨彩虹
杨鹏飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hebi Power Supply Co of State Grid Henan Electric Power Co Ltd
Original Assignee
Hebi Power Supply Co of State Grid Henan Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hebi Power Supply Co of State Grid Henan Electric Power Co Ltd filed Critical Hebi Power Supply Co of State Grid Henan Electric Power Co Ltd
Priority to CN201110417364.6A priority Critical patent/CN102521701B/en
Publication of CN102521701A publication Critical patent/CN102521701A/en
Application granted granted Critical
Publication of CN102521701B publication Critical patent/CN102521701B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Alarm Systems (AREA)
  • Telephonic Communication Services (AREA)

Abstract

The invention discloses an early warning command system and an early warning command method of a power system. The early warning command system comprises an early warning command service platform, communication service equipment and user terminal equipment, wherein the early warning command service platform is composed of a peripheral user interface, an application center module and a bottom-layer data interface, wherein the peripheral user interface is connected with the user terminal equipment by the communication service equipment; the application center module is connected with the peripheral user interface and the bottom-layer data interface; the application center module receives and processes the data information of the peripheral user interface and the bottom-layer data interface, and then sends the processing result information to the peripheral user interface or the bottom-layer data interface; and the communication service equipment comprises network communication equipment, telephone voice communication equipment, short message communication equipment, office automation equipment and an electronic email server. The system and the method of the invention improve the reliability and the running efficiency of the early warning system of the power system, and can be used for the power supply management of the power system.

Description

Electric system early warning command system
Technical field
The present invention relates to power industry equipment safety control technical field, especially relate to a kind of electric system early warning command system.
Background technology
At present, power industry is also more and more higher for the attention degree of production safety, ensures that the safe and stable operation of electrical network has become the top priority in enterprises of managing electric wire netting's production safety management work.Because power industry is high risk industry, electrical production is sent out transmission & distribution electricity consumption and is completed simultaneously, the physical connection natural quality that electric system is exclusive and internal operation electric characteristic, in addition electrical network is subject to extraneous force majeure at any time as objective factor impacts such as thunderbolt, mountain torrents and rubble flow, electric power accident often occurs, and brings potential threat to safe, stable, high-quality, the reliability service of electric power.Electrical production department realizes production safety and runs from many aspects, preventive measure particularly for all kinds of dangerous situation are paid much attention to, through development in recent years, define a lot of dangerous emergency preplan, divide by class of service: management and running class, maintenance class, run class, marketing class, relate to public safety and vehicular traffic etc. even in addition, dividing by content has the urgent emergency preplan of flood control case in advance, electric grid large area power cut, the urgent prediction scheme of power grid accident, the urgent prediction scheme of inclement weather ... Deng kind more than ten.For increasing dangerous emergency preplan, first need clearly defining responsibilities department, the scheme of regular adaptation current organization and operation, and set up a set of prediction scheme knowledge base management, accomplish that the development of prediction scheme and environment grow with each passing hour.Secondly, for the reason of following several respects, the demand that a set of perfect early warning command system is disposed in electric system is also more and more urgent: 1, the existence form of these prediction schemes of electric power enterprise is very various, there is file mode, there is code mode, also have some prediction schemes to be present in other application system, as the process prediction scheme etc. of significant deficiency, this just needs the program management system of a set of specialty to carry out unified management, realizes the timely change of prediction scheme version and prediction scheme content, issue.
2, for these dangerous prediction schemes, the mode telephone bulletin or the report that start accident maintenance prediction scheme are in the past asked for instructions, and Method compare is original, and efficiency is lower, does not reach the effect of urgent prediction scheme.
3, after prediction scheme starts, the aspect of Information issued is narrow, the distribution platform that neither one is perfect, and the relevant information of this prediction scheme is carried out publicity, so that related personnel understands information timely.
4, the feedback mechanism that the prediction scheme neither one performed is complete, cannot understand this prediction scheme and run into which problem in the process of implementation, have which area for improvement.
Summary of the invention
In view of this, the object of the present invention is to provide a kind of electric system early warning command system, improve reliability and the operational efficiency of electric system early warning system.
For achieving the above object, the present invention by the following technical solutions:
Electric system early warning command system of the present invention, comprise early warning commander service platform, Communications service equipment and subscriber terminal equipment, described early warning commander service platform is by graphical user interface, application center module and bottom data interface are formed, wherein, graphical user interface is connected with subscriber terminal equipment by Communications service equipment, application center module is connected with graphical user interface and bottom data interface respectively, application center module comprises early warning commander module, prediction scheme molded tissue block, program management module, prediction scheme training exercise module, prediction scheme assurance module, infrastructure service administration module, application center module receives and processes the data message of graphical user interface and bottom data interface, then by processing result information sender graphical user interface or bottom data interface, described Communications service equipment comprises network communication equipment, voice call communication equipment, short message communication equipment, business automation equipment, e-mail server.
Further, graphical user interface comprises administrator interface, emergency command office interface, group member's interface and higher level's Information issued interface; Bottom data interface comprises data communication interface, data exchange interface, basic data interface, and bottom data interface is by infrastructure service module and other functional module collaborative works of application center module.
Further, early warning commander module comprises early warning information input acquisition module, prediction scheme starts module, notice announces module, alarm emergency process and closing module, prediction scheme analysis and assessment module.
In addition, the present invention also provides a kind of method of electric system early warning command system, and the method mainly comprises the link that next coming in order carry out: information, confirm to implement, launch emergency provision, notice bulletin, emergency processing, closedown prediction scheme and prediction scheme analysis and assessment link.
Beneficial effect of the present invention and advantage as follows:
1, the forward-looking and maturity of overall system design technology
The design of whole system, should based on adopting mainstream technology advanced, mature and reliable, that represent future thrust, the technical risk in system Construction process can be reduced, the life cycle of system can be extended again, make project investment obtain maximum benefit return.
2, system possesses compatibility and extendability
Compatibility and the extensibility of system is taken into full account in system, the compatibility with existing system should be ensured, ensure that the development for system is later leaves suitable extending space again, the needs of technology and business development change can be met to greatest extent with minimum cost, existing system being grown simultaneously with business demand, making system scale also not need when sharply expanding to re-start systems organization and design.
3, system has higher reliability and stability
The reliability and stability major embodiment of system in the following areas.
(1) reliability of hardware, software platform type selecting itself.
(2) reliability of system interface.
(3) system has fault-tolerant ability, and when various hardware and software failure appears in system, system (or non-faulting module) still can normally be run, and the fault of system is transparent to user.
4, system has opening and maintainability
One of main principle wanting emphasis to follow when the opening of system and maintainability are systems, systemic openness is that system has high maintainable basis.
System should ensure that system can carry out function expansion and amendment easily, and can carry out connecting and exchanges data with other system easily, adopt the powerful maintenance function that the open interface standard of realization and specification, Componentized design and system itself provide again.
5, system has economy and practicality
Practicality is the life of system, requires to adopt various technical method and measure to ensure the practicality of system when design system.It is embodied in rationality, the reliability of system, the integrity of function, the convenience of use, the friendly etc. of man-machine interface of systems organization, in a word, system is wanted can the comprehensive business need meeting user profoundly, with simple, convenient, fast, practical for principle.
While emphasis considers practicality, also will consider the economy of system, the economy of system is embodied in:
(1) system adopts appropriate remaining.
(2) construction cost of system should be considered, consider later system maintenance cost again.
(3) life cycle of system is extended.
6, system possesses higher security
Security refers to that system can be resisted external attack and make system exempt from destruction, and the security information of internal system is not accessed by undelegated user.System will take into full account the security of system by aspects such as network inherently safe, operating system security, application system security, provide perfect authentication and authorization mechanism to ensure that system exempts from illegal invasion and destroys.
Other advantages of the present invention, target and feature will be set forth to a certain extent in the following description, and to a certain extent, based on will be apparent to those skilled in the art to investigating hereafter, or can be instructed from the practice of the present invention.Target of the present invention and other advantages can by instructionss below, claims, and in accompanying drawing, specifically noted structure realizes and obtains.
Accompanying drawing explanation
Fig. 1 is the logic theory block diagram of the electric system early warning command system in the embodiment of the present invention;
Fig. 2 is the business processing flow figure of the electric system early warning command methods in the embodiment of the present invention;
Fig. 3 is the logical organization block diagram of the early warning commander service platform in the embodiment of the present invention.
Embodiment
Specifically practice that the invention will be further described below in conjunction with accompanying drawing and the present invention in Henan Province's Hebi City electric power system.
The early warning command system of the present embodiment causes the prediction schemes such as burst industrial accident plan for emergency handling, large-area power-cuts Response project, flood control and builds for Henan Province's Hebi City inclement weather.According to operating feature classification, the present embodiment emergency plan system structure comprises comprehensive emergency preplan, special emergency preplan and on-site emergency disposal scheme.Except early warning prediction scheme itself, native system also comprises prediction scheme contingency management work, is specially emergency organization system, emergency preplan system, emergency guarantee system, emergency training and rehearsal, emergently implements and the content such as assessment.
As shown in Figure 1, the early warning system of the present embodiment comprises early warning commander service platform, Communications service equipment and subscriber terminal equipment, graphical user interface is connected with subscriber terminal equipment by Communications service equipment, and described Communications service equipment comprises network communication equipment, voice call communication equipment, short message communication equipment, business automation equipment (OA system), e-mail server.
The early warning maneuvering platform of the present embodiment system is from Information Monitoring by all kinds of means, the existing data (weather forecast information etc. as keeper's typing) needing manual entry, also have directly come from other system collection information (as from EMS system acquisition to exception tripping operation information etc.), also have power grid user directly by the failure message of phone report.When after system acquisition to failure message, automatic trigger message transmit mechanism, the danger early warning very first time by analysis and after evaluation grade is informed to the responsible person of relevant prediction scheme responsible department, first this responsible person confirms dangerous situation, ask relevant leader for instructions by the message transmit mechanism of system after confirmation and whether start dangerous prediction scheme, after obtaining reply, OA system, SMS platform, PSTN public network phone (telephone voice communication equipment) can be passed through or be selected in system directly to start corresponding dangerous prediction scheme.Prediction scheme then triggers notice information after starting, and related personnel can pass through the relevant information that the approach such as OA system, SMS platform, voice call, mailing system and electronic large screen obtain prediction scheme.
The Account Dept of the present embodiment is deployed in innings Office Network, the prediction scheme maneuvering platform of a voice is formed by loading sound card, message exchange is carried out by various interface (data-interface, communication interface etc.) and other system, EMS system is owing to being in a dedicated network, interface mode can adopt XML standard or the mode of intermediate database to carry out image data, and other application systems (as OA system) directly can complete the process of message exchange by the interface of database level.
As shown in Figure 2, early warning command methods of the present invention and mainly comprise information when realizing, confirm to implement, launch emergency provision, notice bulletin, emergency processing, closedown prediction scheme and prediction scheme analysis and assessment seven links, specific as follows:
1, information
Specifically can be collected by responsible department; Personnel report responsible department by modes such as phone, mail, notes; By accident pre-alarming system with special line, mail, short message mode report, then send information to responsible department in the mode of note, voice, mail; Client, by 95598 System Reports, is transferred to responsible department; EMS system interface trigger alarm, system sends note, voice, mail to responsible department; Responsible department is reported to by OA system.
2, responsible department confirms to implement
Early warning reports leader's assessment, deciding grade and level, determines whether launch emergency provision.If do not start and provide reply according to source, if launch emergency provision, enter next step.
3, person liable's launch emergency provision
Starting mode is: note, voice, OA system, early warning system.
4, system notifies bulletin automatically
(1) accident emergency commander group, office, accident treatment related personnel is notified
Advice method: advice method is automatically: OA system, voice, note, mail; Manual notifications's mode is: by system dialing, manual telephone system.Advice range: leading group of directorate all personnel, emergent office all personnel, relevant departments of basic unit
(2) higher level relevant departments is reported
Reporting schemes: reporting schemes is automatically: voice, note, mail; Artificial reporting schemes is: manual phone.Report scope: superior unit, relevant government agencies.
(3) client is notified
Advice method: advice method is automatically: voice, note, mail; Manual notifications's mode is: dialled by system, manual phone.
(4) automatically full associate is announced
Bulletin mode: OA Systems Bulletin, early warning system bulletin, production system bulletin, note bulletin, mail notification, giant-screen bulletin.Bulletin scope: company all personnel.
The command and management of 5, early warning, emergent, incident processing procedure
Early warning, emergent, incident processing procedure, the business demand that process is carried out is as follows:
(1) prediction scheme upgrading, degradation: by note, voice, OA system, early warning system bulletin.
(2) prediction scheme processing procedure: progress and major event record, progress is reported.
(3) floor manager, floor manager process possesses following functions:
The communications such as A, voice, note, mail, phone are unimpeded.
B, gather current remote viewing system view data, observation scene of the accident situation.
C, obtain device fault information and equipment wired network figure information by EMS system.
D, production equipment information, device history failure message.
6, prediction scheme is closed
(1) whether the assessment of emergent office can close.
(2) person liable closes prediction scheme: closedown mode is note, voice, OA system, early warning system.
(3) all personnel's result is announced: report higher level relevant departments, announce full company, notify client.
7, assessment, analysis and summary
(1) analysis and summary report.(2) innovative approach.(3) prediction scheme edition upgrading is safeguarded.If desired, summary result is passed through Systems Bulletin all personnel of the present invention.
The foregoing describe the basic service flow process that early warning commander implements management, except the basic service flow process realizing system, native system also comprises and makes full use of system resource and realize other and the closely-related business function of system, specifically comprises:
1, prediction scheme organization business: realize the unified management to prediction scheme organizational framework.
2, program management business: realize prediction scheme improvement, revision, version management.
3, prediction scheme ensures business: realize managing the inspection of prediction scheme security system.
4, prediction scheme training exercise business: system resource can be utilized to realize training and learning, simulated maneuver function.
As shown in Figure 3, the early warning command system of the present embodiment is made up of graphical user interface, application center, bottom data interface, and graphical user provides keeper, emergency command office and user operation and the Information issued interface such as all group members, superior Information issued; Application center is the core of system application, achieve early warning command system, prediction scheme organizational framework, program management, the training exercise of prediction scheme, prediction scheme security system, infrastructure service management, these system collaborative works, common formation electric system early warning command system and application management platform, the management of wherein early warning command system, prediction scheme organizational framework, emergency plan system, infrastructure service are the critical functions of this part; Bottom data interface is the important guarantee that system and other system carry out communication and exchanges data, and bottom data interface is worked by infrastructure service and other function synergics of application center.Concrete structure is as follows:
1, graphical user interface provides operation and the Information issued display interface of all users, and operation format, according to the feature of all kinds of business, can directly be operated by system, also can be operated by OA system, voice call, note etc.Information issued, can be issued according to different needs, also can be issued by OA system, also important information can be issued by forms such as giant-screen, voice system, notes in early warning system.
2, application center achieves the application function of whole system, comprises the functions such as early warning commander, early warning organizational framework, program management, training exercise, specific as follows:
Early warning command system: achieve that early warning information input gathers, prediction scheme starts, notice bulletin, alarm emergency process, prediction scheme analysis and assessment the command and management of whole early warning, this part is one of critical function of system.Wherein, prediction scheme contingency management process comprises the upgrading of prediction scheme, reduction, the management of processing procedure logout, commander's communication management of the voice in prediction scheme contingency procedure, note, mail etc., the closedown after prediction scheme completes and notice; Prediction scheme analysis and assessment, comprise analysis and summary report, innovative approach and send notice.
Prediction scheme organization and administration: the organization and administration achieving emergency organization mechanism, Responsibility of Staff, personnel's communication etc. are important guarantees of system cloud gray model, authority process, Information issued.
Emergency plan system: realize the unified management to all prediction schemes, comprises the classification of prediction scheme, upgrade maintenance and version management.This part is the management to prediction scheme basic data, and system is in operation, and can use the various data informations of prediction scheme.
Training exercise system: the training and learning data that every accident prediction is provided, all personnel can pass through e-learning accident prediction basic skills; The command and management function of system is utilized to realize prediction scheme simulated maneuver process easily.In addition, user by the study to data informations such as prediction schemes all in system, implementation record, analysis and assessment, can also deepen the understanding to prediction scheme, improves basic skills.
Whether prediction scheme security system: realize managing the guarantee of the terms and conditions such as the personnel specified in prediction scheme, tissue, technology, vehicle, material, implement completely each condition and check management.
Infrastructure service: infrastructure service realizes the basic management process of organizational structure, personnel's authority, Communications service, system monitoring is the basis that whole system is run.
3, bottom data interface, achieve and the data communication of other system, exchanges data, basic data interface, data communication mainly refers to the data communication of pstn telephone network and SMS platform, the data-interface of office system, EMS system, large screen system is mainly referred to other system exchanges data, basic data interface mainly refers to the data-interface with production MIS, and system and production MIS share a set of organizational structure and personnel.
During the System Implementation of the present embodiment, software environment adopts following configuration:
1, early warning commander server software
(1) operating system: win2003Server
(2) Web service: more than tomcat5.0
(3) Database Systems: Oracle9i
(4) other: office2000/2003, JDK1.4 etc.
2, client software
(1) operating system: office2000/2003, winXP
(2) other: IE6.0, office2000/2003 etc.
System hardware adopts following configuration
(1) server configuration CPU:Intel is to strong double-core 2.0GHZ, internal memory: at least 2G DDR-II internal memory, maximumly can expand to 48G, hard disk: 2 pieces of 146GB SAS hard disks, and can support 4 pieces of hot-plug hard disks.
(2) network interface card: two 1,000 million Fast Ethernet Media Adapters.
(3) sound card: D081A is entered in east
(4) client machine configuration CPU:P3, more than 700MHZ, internal memory: at least 256M, hard disk: at least remaining space of 10G.
The enforcement of the Forewarn evaluation system of this enforcement reaches following target:
1, set up early warning command system, realize early warning information collection, prediction scheme startup, information bulletin, prediction scheme perform feedback, prediction scheme is closed information system management.
2, the management system such as analysis and assessment, improvement, revision, version management to prediction scheme is set up.
3, prediction scheme starts the variation and robotization that perform, and the modes such as artificial, voice, note that comprise start, and automatically send the notice notice informations such as voice, note, mail, OA Systems Bulletin, according to the data automatic early-warning gathered.
4, prediction scheme organization and administration system is set up.
5, set up the training exercise system of prediction scheme, case study, simulated maneuver are provided.
6, set up prediction scheme and ensure management system, realize managing the guarantee situation inspection of personnel, technique preparation, vehicle material etc.
7, the interface of Erecting and improving, realizes the interface with EMS system, OA system, voice system, SMS platform etc.
What finally illustrate is, above embodiment is only in order to illustrate technical scheme of the present invention and unrestricted, other amendments that those of ordinary skill in the art make technical scheme of the present invention or equivalently to replace, only otherwise depart from the spirit and scope of technical solution of the present invention, all should be encompassed in the middle of right of the present invention.

Claims (1)

1. electric system early warning command system, comprise early warning commander service platform, Communications service equipment and subscriber terminal equipment, described early warning commander service platform is by graphical user interface, application center module and bottom data interface are formed, wherein, graphical user interface is connected with subscriber terminal equipment by Communications service equipment, application center module is connected with graphical user interface and bottom data interface respectively, application center module comprises early warning commander module, prediction scheme molded tissue block, program management module, prediction scheme training exercise module, prediction scheme assurance module, infrastructure service administration module, application center module receives and processes the data message of graphical user interface and bottom data interface, then by processing result information sender graphical user interface or bottom data interface, described Communications service equipment comprises network communication equipment, voice call communication equipment, short message communication equipment, business automation equipment, e-mail server,
Wherein, bottom data interface, for realizing and the data communication of other system, exchanges data and basic data interface, data communication refers to the data communication of pstn telephone network and SMS platform, and basic data interface refers to the data-interface be connected with production MIS;
Wherein, prediction scheme molded tissue block and program management module for realizing the organization and administration of emergency organization mechanism, Responsibility of Staff, personnel's communication, for ensureing the operation of system, authority process and Information issued;
Wherein, prediction scheme training exercise module, for providing the training and learning data of accident prediction, utilizes command and management functional realiey prediction scheme simulated maneuver process;
Prediction scheme assurance module checks management for realizing managing the guarantee of the personnel specified in prediction scheme, tissue, technology, vehicle, material and implementing;
Wherein, graphical user interface comprises administrator interface, emergency command office interface, group member's interface and higher level's Information issued interface; Bottom data interface comprises data communication interface, data exchange interface, basic data interface, and bottom data interface is by infrastructure service module and other functional module collaborative works of application center module;
It is wherein, described that early warning commander module comprises early warning information input acquisition module, prediction scheme starts module, notice announces module, alarm emergency process and closing module, prediction scheme analysis and assessment module;
It is characterized in that: early warning commander service platform is from Information Monitoring by all kinds of means, the existing data needing manual entry, also the information of directly coming from other system collection is had, also has power grid user directly by the failure message of phone report, when after system acquisition to failure message, automatic trigger message transmit mechanism, the danger early warning very first time by analysis and after evaluation grade is informed to the responsible person of relevant prediction scheme responsible department, first this responsible person confirms dangerous situation, ask relevant leader for instructions by the message transmit mechanism of system after confirmation and whether start dangerous prediction scheme, after obtaining reply, OA system can be passed through, SMS platform, PSTN public network phone or to be selected in system and directly to start corresponding dangerous prediction scheme, prediction scheme then triggers notice information after starting, related personnel can pass through OA system, SMS platform, voice call, mailing system and electronic large screen approach obtain the relevant information of prediction scheme,
In Office Network, the prediction scheme maneuvering platform of a voice is formed by loading sound card, message exchange is carried out by various interface and other system, EMS system is owing to being in a dedicated network, interface mode can adopt XML standard or the mode of intermediate database to carry out image data, and other application systems directly can complete the process of message exchange by the interface of database level.
CN201110417364.6A 2011-12-14 2011-12-14 Early warning command method of power system Active CN102521701B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110417364.6A CN102521701B (en) 2011-12-14 2011-12-14 Early warning command method of power system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110417364.6A CN102521701B (en) 2011-12-14 2011-12-14 Early warning command method of power system

Publications (2)

Publication Number Publication Date
CN102521701A CN102521701A (en) 2012-06-27
CN102521701B true CN102521701B (en) 2015-02-18

Family

ID=46292612

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110417364.6A Active CN102521701B (en) 2011-12-14 2011-12-14 Early warning command method of power system

Country Status (1)

Country Link
CN (1) CN102521701B (en)

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102904756A (en) * 2012-09-29 2013-01-30 浙江省电力公司 Power information communication scheduling-operation-inspection integrated processing method
CN103123714B (en) * 2012-12-27 2015-10-21 衡水供电公司 Electric Power Customer Credit Rank Appraisal system
CN103500422A (en) * 2013-09-22 2014-01-08 国家电网公司 Modularization table top drills virtual training system and training method thereof
CN105023200A (en) * 2015-08-04 2015-11-04 中国南方电网有限责任公司 Power emergency drilling system and emergency drilling method thereof
CN105447636A (en) * 2015-11-23 2016-03-30 国网智能电网研究院 Multisource information management system and method for power emergencies
CN106911745A (en) * 2015-12-23 2017-06-30 国网智能电网研究院 A kind of electric power mobile is met an urgent need platform and its implementation
CN108957212B (en) * 2018-08-16 2024-06-11 元工电力技术有限公司 10 Kilovolt distribution network broken line fault detection system
CN109685519A (en) * 2018-11-07 2019-04-26 国家电网有限公司客户服务中心 A kind of method and system for use in carrying towards multi-tenant integration of services monitoring
CN112418639A (en) * 2020-11-18 2021-02-26 广东赛意信息科技有限公司 Autonomous controllable exception management system and method
CN112564288A (en) * 2020-12-10 2021-03-26 国网上海市电力公司 Power failure active first-aid repair system based on Internet of things and geographic information technology

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101216926A (en) * 2008-01-09 2008-07-09 深圳市海力特科技有限责任公司 An urban emergency commanding operation system and the corresponding implementation method
CN101349903A (en) * 2008-08-06 2009-01-21 兖矿国泰化工有限公司 Safety production early-warning system of coal chemical engineering enterprise
CN102110277A (en) * 2009-12-28 2011-06-29 河南省电力公司商丘供电公司 Early-warning and processing method for accident of power-supply system
CN102184311A (en) * 2011-02-14 2011-09-14 北京东方正通科技有限公司 Mobile personal digital assistant (PDA) field emergency command system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101216926A (en) * 2008-01-09 2008-07-09 深圳市海力特科技有限责任公司 An urban emergency commanding operation system and the corresponding implementation method
CN101349903A (en) * 2008-08-06 2009-01-21 兖矿国泰化工有限公司 Safety production early-warning system of coal chemical engineering enterprise
CN102110277A (en) * 2009-12-28 2011-06-29 河南省电力公司商丘供电公司 Early-warning and processing method for accident of power-supply system
CN102184311A (en) * 2011-02-14 2011-09-14 北京东方正通科技有限公司 Mobile personal digital assistant (PDA) field emergency command system

Also Published As

Publication number Publication date
CN102521701A (en) 2012-06-27

Similar Documents

Publication Publication Date Title
CN102521701B (en) Early warning command method of power system
CN105871605A (en) Operation and maintenance monitoring platform based on big power marketing data
CN105564465B (en) A kind of railway electric signal plant maintenance operation control system and method
US8595831B2 (en) Method and system for cyber security management of industrial control systems
CN103049826B (en) Automated system is safeguarded in operation of power networks
CN107092222B (en) Based on the integrated power grid regulation operational administrative system of anti-error check analysis
CN109670982A (en) A kind of electric service plateform system of fusion fortune inspection intelligence control system
CN103578039B (en) A kind of power networks risk prewarning analysis system
CN102916839A (en) Automatic monitoring system for agricultural work in sugarhouse
CN102185895A (en) Cross-platform remote control method and system of UPSs (uninterruptible power supply)
CN105515187A (en) Working method of remote control system of substation automation system
WO2021114856A1 (en) Multisource data-based uninterruptible power supply system
CN107798489A (en) A kind of electric network operation site safety management method based on wechat platform
CN106055984A (en) Hierarchical management method applied to security baseline software
CN106056302A (en) Modeling method based on petrochemical enterprise industrial site hazard source and risk information
CN112071032A (en) Dangerous chemical major hazard source alarm hierarchical management system
CN112348729A (en) Intelligent security-eliminating integrated big data cloud platform system
CN201741234U (en) City fire-fighting remote monitoring management system
Jiang et al. System hazard analysis of tower crane in different phases on construction site
CN115313662A (en) Distribution automation intelligence auxiliary tool that patrols and examines
CN101713974A (en) Integrated application platform using information flow monitoring as core
CN103489073A (en) Enterprise safe production monitoring information system
CN207748684U (en) One kind managing system based on Internet of Things intelligent remote monitoring fault diagnosis
CN109656187A (en) More power station opening and closing device long-distance intelligent total management systems and method
CN102110277A (en) Early-warning and processing method for accident of power-supply system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent for invention or patent application
CB02 Change of applicant information

Address after: No. 164 Hebi City, Henan province 458030 Qibin Avenue

Applicant after: HEBI POWER SUPPLY COMPANY OF STATE GRID HENAN ELECTRIC POWER COMPANY

Address before: No. 164 Hebi City, Henan province 458030 Qibin Avenue

Applicant before: Hunan Electric Power Company, Hebi Power Supply Company

COR Change of bibliographic data

Free format text: CORRECT: APPLICANT; FROM: HUNAN ELECTRIC POWER COMPANY, HEBI POWER SUPPLY COMPANY TO: HEBI POWER SUPPLY COMPANY, STATE GRID HENAN ELECTRIC POWER COMPANY

C14 Grant of patent or utility model
GR01 Patent grant