CN101781891B - 砂衬桩及其施工方法 - Google Patents

砂衬桩及其施工方法 Download PDF

Info

Publication number
CN101781891B
CN101781891B CN 200910095517 CN200910095517A CN101781891B CN 101781891 B CN101781891 B CN 101781891B CN 200910095517 CN200910095517 CN 200910095517 CN 200910095517 A CN200910095517 A CN 200910095517A CN 101781891 B CN101781891 B CN 101781891B
Authority
CN
China
Prior art keywords
pipe
sand
pile
stake
outer tube
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 200910095517
Other languages
English (en)
Other versions
CN101781891A (zh
Inventor
朱奎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Rich green construction group Limited
Original Assignee
叶长青
朱奎
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 叶长青, 朱奎 filed Critical 叶长青
Priority to CN 200910095517 priority Critical patent/CN101781891B/zh
Publication of CN101781891A publication Critical patent/CN101781891A/zh
Application granted granted Critical
Publication of CN101781891B publication Critical patent/CN101781891B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

本发明公开了一种砂衬桩,它包括混凝土内芯,桩体内芯外围带有注浆砂层。本发明还提供了上述砂衬桩的施工方法,该方法包括以下施工步骤包括:1)机具就位,2)锤击桩管至设计位置,3)下发注浆管,4)外管灌砂,5)内管灌混凝土,6)振动拔出桩管至设定位置,7)进行空中加料,包括混凝土和砂,8)振动拔出桩管,9)注浆,10)桩顶附近部位采用插入式振动器振实。由于本发明提高了混凝土桩界面摩阻力,可操作性,适用于黏土地区,而且采用的材料价格低廉,因此可以在不提高材料成本的基础上大幅度提高桩相对黏土层的摩阻力。

Description

砂衬桩及其施工方法
技术领域
本发明涉及一种组合桩,还涉及该组合桩的施工方法。 
背景技术
砂土的摩擦阻力比黏性土摩擦力大。桩与各种黏性土的摩阻力在0.31~0.34之间,而桩与砂摩阻力在0.55~0.6之间,而平常状态下的桩体外围都是由混凝土构成,因此相对黏性土的摩阻力很难达到要求。 
发明内容
本发明解决的技术问题是提供一种桩体外围与黏性土的摩阻力较高,且材料低廉的砂衬桩。 
为此,本发明提供的砂衬桩包括混凝土内芯,桩体内芯外围带有注浆砂层。 
本发明还提供了上述砂衬桩的施工方法,该方法包括以下施工步骤包括: 
1)打桩机就位,该打桩机的桩管包括内管和外管, 
2)锤击桩内管和外管至设计位置, 
3)在桩内管和外管之间插入注浆管, 
4)外管和内管之间灌砂,内管灌注混凝土, 
5)第一次振动上拔内管和外管至设定的中途位置,进行空中加料,加料包括混凝土和砂,在振动上拔的同时在砂层中注浆, 
6)第二次振动上拔内管和外管,在振动上拔的同时在砂层中注浆, 
7)桩顶附近部位采用插入式振动器振实。 
由于本发明提高了混凝土桩界面摩阻力,可操作性,适用于黏土地区,而且采用的材料价格低廉,因此可以在不提高材料成本的基础上大幅度提高桩相对黏 土层的摩阻力。 
附图说明
图1中为砂衬混凝土桩示意图。 
具体实施方式
以下结合附图对本发明进行详细描述。 
如图1所示,本发明提供的砂衬桩包括混凝土内芯,桩体内芯外围带有注浆砂层,注浆成分中包含水泥浆、减水剂和早强剂,砂衬桩直径为600mm~700mm,其中包含的桩内芯直径为300mm~400mm,注浆砂与混凝土的体积比为2.5~5.5。 
上述砂衬桩的施工方法包括: 
1)打桩机就位,该打桩机的桩管包括内管和外管, 
2)锤击桩内管和外管至设计位置, 
3)在桩内管和外管之间插入注浆管, 
4)外管和内管之间灌砂,内管灌注混凝土, 
5)第一次振动上拔内管和外管至设定的中途位置,进行空中加料,加料包括混凝土和砂,在振动上拔的同时在砂层中注浆, 
6)第二次振动上拔内管和外管,在振动上拔的同时在砂层中注浆, 
7)桩顶附近部位采用插入式振动器振实。 
注浆管1采用一寸镀锌管,注浆端开4排孔眼,孔眼直径为6mm。活动加劲圈2控制内外管操作,加劲圈2高为130mm,与外管同内径,加劲圈2厚为150mm。内管3管厚为10mm,外管4管厚为8mm。 
每次拔管前,均应停拔振动10min,每次上拔高度控制在0.3~0.5m,拔管速率控制在0.8m/min以内,反插深度控制在0.3m左右。在淤泥质土层的上下 界面处,要特别注意放慢拔管速度,密击不反插。 
混凝土的坍落度控制在5~7cm,卵石粒径应小于5cm。 
在本实施例中为了使外围砂浆与夯扩混凝土紧密结合,本发明还采取了两次注浆工艺,第一次注浆采用水泥浆水灰比为0.4,其中掺加减水剂,第二次注浆采用水泥浆水灰比为0.5,灌注压力为1.0-2.0MPa,其中掺加早强剂。 
根据工程实例,在相同承载力的情况下,砂衬桩比普通混凝土桩节省混凝土50%~60%,节约经济30%~40%。 

Claims (2)

1.一种制造砂衬桩的方法,所述砂衬桩的桩体内芯外围带有注浆砂层,其特征是:包括 
1)打桩机就位,该打桩机的桩管包括内管和外管, 
2)锤击桩内管和外管至设计位置, 
3)在桩内管和外管之间插入注浆管, 
4)外管和内管之间灌砂,内管灌注混凝土, 
5)第一次振动上拔内管和外管至设定的中途位置,进行空中加料,加料包括混凝土和砂,在振动上拔的同时在砂层中注浆, 
6)第二次振动上拔内管和外管,在振动上拔的同时在砂层中注浆, 
7)桩顶附近部位采用插入式振动器振实。 
2.根据权利要求1所述的制造砂衬桩的方法,其特征是:在砂层中注浆的步骤采取了两次注浆工艺,第一次注浆采用水泥浆水灰比为0.4,其中掺加减水剂,第二次注浆采用水泥浆水灰比为0.5,灌注压力为1.0-2.0MPa,其中掺加早强剂。 
CN 200910095517 2009-01-15 2009-01-15 砂衬桩及其施工方法 Expired - Fee Related CN101781891B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200910095517 CN101781891B (zh) 2009-01-15 2009-01-15 砂衬桩及其施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200910095517 CN101781891B (zh) 2009-01-15 2009-01-15 砂衬桩及其施工方法

Publications (2)

Publication Number Publication Date
CN101781891A CN101781891A (zh) 2010-07-21
CN101781891B true CN101781891B (zh) 2013-09-04

Family

ID=42522038

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200910095517 Expired - Fee Related CN101781891B (zh) 2009-01-15 2009-01-15 砂衬桩及其施工方法

Country Status (1)

Country Link
CN (1) CN101781891B (zh)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102296593A (zh) * 2011-05-18 2011-12-28 绍兴文理学院 一种圆筒型混凝土碎石复合灌注桩及其施工工艺
CN103556629B (zh) * 2013-10-23 2015-11-25 叶长青 一种异形桩的施工方法
CN111254935B (zh) * 2020-03-07 2021-04-23 安徽安舜水利建设工程有限公司 一种地基注入套管及施工方法
CN116446392A (zh) * 2023-04-18 2023-07-18 中厦建设有限公司 一种微振动沉管劲性复合桩二次搅拌施工方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4397588A (en) * 1981-01-23 1983-08-09 Vibroflotation Foundation Company Method of constructing a compacted granular or stone column in soil masses and apparatus therefor
CN85104918A (zh) * 1985-06-28 1987-01-07 冶金工业部勘察科学技术研究所 砂衬桩与砂衬桩灌震器
CN1052915A (zh) * 1989-12-27 1991-07-10 冶金工业部勘察科学技术研究所 砂衬桩多棒振捣器
CN1490467A (zh) * 2003-08-05 2004-04-21 胡柏英 一种复合摩擦桩的结构及其施工方法
CN2679244Y (zh) * 2004-02-03 2005-02-16 邓亚光 粉喷复合桩
CN101343871A (zh) * 2008-08-22 2009-01-14 北京航空航天大学 具有高耐久性保护层的复合桩及其制作和施工方法

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4397588A (en) * 1981-01-23 1983-08-09 Vibroflotation Foundation Company Method of constructing a compacted granular or stone column in soil masses and apparatus therefor
CN85104918A (zh) * 1985-06-28 1987-01-07 冶金工业部勘察科学技术研究所 砂衬桩与砂衬桩灌震器
CN1052915A (zh) * 1989-12-27 1991-07-10 冶金工业部勘察科学技术研究所 砂衬桩多棒振捣器
CN1490467A (zh) * 2003-08-05 2004-04-21 胡柏英 一种复合摩擦桩的结构及其施工方法
CN2679244Y (zh) * 2004-02-03 2005-02-16 邓亚光 粉喷复合桩
CN101343871A (zh) * 2008-08-22 2009-01-14 北京航空航天大学 具有高耐久性保护层的复合桩及其制作和施工方法

Also Published As

Publication number Publication date
CN101781891A (zh) 2010-07-21

Similar Documents

Publication Publication Date Title
CN103184734B (zh) 一种植入注浆组合桩的施工方法
CN101781891B (zh) 砂衬桩及其施工方法
CN102587358A (zh) 一种高聚物材料后注浆挤扩灌注桩技术
CN106049465B (zh) 一种桩的施工方法
CN102733377A (zh) 混凝土桩的施工方法
CN106049464B (zh) 桩的施工方法
CN102226341A (zh) 一种桩的施工方法
CN104074186A (zh) 一种建筑地基中成孔的护筒装置及其施工方法
CN105839638A (zh) 一种方便高效桩的施工方法
CN101768970A (zh) 混凝土桩的施工方法
CN101220592A (zh) 混凝土桩的施工方法
CN203213101U (zh) 一种植入注浆组合桩
CN102635110B (zh) 混凝土桩的施工方法
CN102080374B (zh) 混凝土灌注桩的施工方法
CN102677657B (zh) 联排浇结薄壁混凝土复合桩墙的施工处理方法
CN102251521A (zh) 加固预应力管桩及其施工方法
CN100429353C (zh) 一种爆扩桩施工工艺
CN108457667A (zh) 一种自密实混凝土管片衬砌结构及其施工方法
CN103452115A (zh) 套管式底送后插管后注浆装置及施工方法
CN106088085B (zh) 桩施工方法
WO2020211286A1 (zh) 全套管全回转内夯桩施工方法
CN216428281U (zh) 薄壁混凝土钢管组合支护桩
CN105421446B (zh) 一种用于软基处理的混合土挤压固化预制桩的施工方法
CN101397793A (zh) 夯扩混凝土加劲水泥搅拌桩及其施工方法
CN102605775B (zh) 一种柔性桩与刚性桩上下同体组合桩及成桩方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Free format text: FORMER OWNER: ZHU KUI

Effective date: 20150625

Owner name: FENGSHENG LVJIAN GROUP CO., LTD.

Free format text: FORMER OWNER: YE CHANGQING

Effective date: 20150625

C41 Transfer of patent application or patent right or utility model
EE01 Entry into force of recordation of patent licensing contract

Application publication date: 20100721

Assignee: Rich green construction group Limited

Assignor: Ye Changqing|Zhu Kui

Contract record no.: 2015330000121

Denomination of invention: Sand-lined pile and construction method thereof

Granted publication date: 20130904

License type: Exclusive License

Record date: 20150520

LICC Enforcement, change and cancellation of record of contracts on the licence for exploitation of a patent or utility model
TR01 Transfer of patent right

Effective date of registration: 20150625

Address after: 210057 No. 8, Heng Fei Road, Nanjing economic and Technological Development Zone, Jiangsu, Nanjing

Patentee after: Rich green construction group Limited

Address before: Ouhai District of Zhejiang city in Wenzhou province 325000 Rong Road No. 39

Patentee before: Ye Changqing

Patentee before: Zhu Kui

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130904

Termination date: 20160115

EXPY Termination of patent right or utility model