CN101220592A - 混凝土桩的施工方法 - Google Patents
混凝土桩的施工方法 Download PDFInfo
- Publication number
- CN101220592A CN101220592A CNA2008100091876A CN200810009187A CN101220592A CN 101220592 A CN101220592 A CN 101220592A CN A2008100091876 A CNA2008100091876 A CN A2008100091876A CN 200810009187 A CN200810009187 A CN 200810009187A CN 101220592 A CN101220592 A CN 101220592A
- Authority
- CN
- China
- Prior art keywords
- mentioned
- outer tube
- inner tamping
- tube
- pile
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
Abstract
本发明的目的在于提供一种混凝土桩的施工方法,采取内夯管在外管底底端的外部进行连续的填料夯实,填充料为散体材料,从而有效形成复合载体,充分调动桩端土体参与受力,使桩的承载能力大幅提高。施工方法包括下述步骤:1)在桩位处将外管与内夯管套叠;2)通过柴油锤同时击打外管和内夯管向下沉入,直至设计深度;3)通过柴油锤将内夯管击出外管底端一定距离;4)向外管底端填入散体填充料,通过柴油锤击打内夯管对填入的散体填充料进行夯实,反复进行该填充和击打夯实操作,直至形成满足十击贯入度设计值所需要求的最优的挤密土体;5)向外管底端分次填充干硬性混凝土并通过柴油锤击打内夯管进行夯实;6)进行桩身的施工。
Description
技术领域
本发明涉及土木工程领域,特别是涉及桩的施工技术。
背景技术
夯扩桩是我国目前采用的一种桩型,其采用夯扩的方式(一次、二次、多次夯扩等)将桩端现浇混凝土扩成大头型,使桩端的承载面积加大,从而提升桩端阻力。但是夯扩桩也存在一些缺点和局限,比如扩大头的开头很难保证与确定,由于夯扩的是湿混凝土,并且是在内管中挤扩,故挤扩时存在一定难度。尤其是夯扩桩是以增加桩端的承载面积为目的,在挤扩湿混凝土时,虽然也会产生一些对桩端持力层的挤密,但效果不明显,没有充分调动桩端周围的土体参与受力,因此桩的承载能力虽有提高但没有本质改变,对于土层浅部有较好持力层和单桩承载力要求较高时,夯扩桩没有应用优势。
发明内容
本发明是为了解决上述的问题而提出的,目的在于提供一种混凝土桩的施工方法,采取内夯管在外管底底端的外部进行连续的填料夯实,填充料为散体材料而非湿混凝土,从而有效形成复合载体,充分调动桩端土体参与受力,使桩的承载能力大幅提高。
为了实现上述目的,本发明的混凝土桩的施工方法包括下述步骤:
1)在地基中的预定桩位处,将外管与内夯管套叠;
2)通过柴油锤同时击打上述外管和内夯管,使外管与内夯管同时向下沉入,直至桩的设计深度;
3)通过上述柴油锤击打内夯管,将内夯管击出外管底端一定距离;
4)提出上述内夯管,通过外管向外管底端填入一定数量的散体填充料,然后通过柴油锤击打内夯管,对填入的散体填充料进行夯实;反复进行该填充和击打夯实操作,对外管底端,即桩端下方的一定深度和范围的地基土体进行密实加固,直至满足十击贯入度设计值,形成所需要求的最优的挤密土体;
5)通过上述外管,向外管底端分次填充预定量的干硬性混凝土,通过柴油锤击打内夯管,对干硬性混凝土进行夯实;
6)进行桩身的施工。
最好,在上述的混凝土桩的施工方法中,上述步骤1)中内夯管的外径小于护筒的内径,且该内管的底端封闭,底端为平底或尖底。
最好,在上述的混凝土桩的施工方法中,上述步骤1)中将外管与内夯管套叠时,根据土质情况,在内夯管上端放置直径与外管直径相同、高度为100~250mm的加颈圈。
最好,在上述的混凝土桩的施工方法中,上述步骤4)中内夯管对填入的散体填充料进行的夯实,是通过内夯管在外管底端外部一定距离的情况下实现的。
最好,在上述的混凝土桩的施工方法中,上述步骤4)中满足所需要求的最优的挤密土体是指符合下述条件a),同时地基表面没有隆起、不对相邻桩已形成的挤密土体造成影响,从而在桩端形成由夯实的散体填充料,挤密土体和影响土体构成的载体,由此获得桩端的最大扩散面积Ae,以获得最大的承载能力;该条件a)指上述填充料的最终填充夯实程度由十击贯入量控制,即在不投料的情况下,以预定的能量测试夯锤连续空打十击的贯入量,上述十击总贯入量应小于设计值。
最好,在上述的混凝土桩的施工方法中,上述步骤4)中散体填充料指碎砖烂瓦或干硬性混凝土或各种废弃骨料或卵石或钢渣,或上述材料的混合料。
最好,在上述的混凝土桩的施工方法中,上述步骤6)中桩身的施工是指,先提出内夯管后在外管内放置钢筋笼,再在外管内灌注桩身所需的混凝土,然后将内夯管压在外管内混凝土面上,边压边缓缓起拔外管,最后将双管同步拔出地表,完成桩身的施工。
最好,在上述的混凝土桩的施工方法中,上述步骤6)中桩身的施工包括预制混凝土桩身。
通过以上方法形成的混凝土桩的特点和优势在于:
①桩的承载力高。相对一般的夯扩桩,由于在桩端形成有效的复合载体,相当与深层复合地基,显著提高桩的承载力并减小桩的沉降量。
②缩短桩的长度。相对于一般的夯扩桩,桩端复合载体可设地基中浅部的相对较好的土层,因此可有效缩短桩的长度。
③提高工效,保证质量。由于填充料为散体填充料,并且夯实过程是在外管底端的外部进行,相对于一般的夯扩桩所采用的在外管内挤扩混凝土,施工更为容易便捷。同时在柴油锤和内夯管的自重作用下,桩身混凝土更易压密成型,保证桩身质量。同时还可采用预制桩身。
附图说明
图1作为本发明的一个实施例的混凝土桩的施工方法的工序图。
具体实施方式
作为本发明的一个实施例的混凝土桩的施工方法,其包括下述步骤,首先,如图1a所示,在地基中的预定桩位处,将外管1中套叠入内夯管2,并采用固定装置3将外管1与内夯管2固定,再通过柴油锤4击打内夯管2,使内夯管2与外管1同时向下沉入;接着,如图1b所示,通过柴油锤4的不断击打,使内夯管2与外管1同时沉到设计标高,拆除固定装置3后,通过柴油锤将内夯管2击出外管1底端一定距离;然后,如图1c所示,提出内夯管2,向外管1中填入散体填充料5;然后如图1d所示,通过柴油锤击打内夯管2,对填入的散体填充料5进行夯实;然后,如图1e所示,反复进行该填充和击打夯实操作,对外管1的底端,即桩端下一定深度、范围和体积的地基土体进行密实加固;然后,如图1f所示,形成满足所需要求的承载体,该承载体由夯实的散体填充料5,挤密土体6和影响土体7构成;然后,如图1g所示,通过外管1向外管底端分次填充预定量的干硬性混凝土8,通过柴油锤击打内夯管2,将干硬性混凝土8夯扩出外管底端;然后,如图1h所示,在外管1中下钢筋笼9,向外管1内灌注混凝土10,对混凝土10进行压密成型后,提出外管1和内夯管2,完成桩身施工。
Claims (8)
1.一种混凝土桩的施工方法,该方法包括下述步骤:
1)在地基中的预定桩位处,将外管与内夯管套叠;
2)通过柴油锤同时击打上述外管和内夯管,使外管与内夯管同时向下沉入,直至桩的设计深度;
3)通过上述柴油锤击打内夯管,将内夯管击出外管底端一定距离;
4)提出上述内夯管,通过外管向外管底端填入一定数量的散体填充料,然后通过柴油锤击打内夯管,对填入的散体填充料进行夯实;反复进行该填充和击打夯实操作,对外管底端,即桩端下方的一定深度和范围的地基土体进行密实加固,直至满足十击贯入度设计值,形成所需要求的最优的挤密土体;
5)通过上述外管,向外管底端分次填充预定量的干硬性混凝土,通过柴油锤击打内夯管,对干硬性混凝土进行夯实;
6)进行桩身的施工。
2.根据权利要求1所述的混凝土桩的施工方法,其特征在于上述步骤1)中,上述内夯管的外径小于护筒的内径,且该内管的底端封闭,底端为平底或尖底。
3.根据权利要求1所述的混凝土桩的施工方法,其特征在于上述步骤1)中,上述将外管与内夯管套叠时,根据土质情况,在内夯管上端放置直径与外管直径相同、高度为100~250mm的加颈圈。
4.根据权利要求1所述的混凝土桩的施工方法,其特征在于上述步骤4)中,上述内夯管对填入的散体填充料进行的夯实,是通过内夯管在外管底端外部一定距离的情况下实现的。
5.根据权利要求1所述的施工方法,其特征在于上述步骤4)中,上述满足所需要求的最优的挤密土体是指符合下述条件a),同时地基表面没有隆起、不对相邻桩已形成的挤密土体造成影响,从而在桩端形成由夯实的散体填充料,挤密土体和影响土体构成的载体,由此获得桩端的最大扩散面积Ae,以获得最大的承载能力;该条件a)指上述填充料的最终填充夯实程度由十击贯入量控制,即在不投料的情况下,以预定的能量测试夯锤连续空打十击的贯入量,上述十击总贯入量应小于设计值。
6.根据权利要求1所述的施工方法,其特征在于上述步骤4)中,上述散体填充料指碎砖烂瓦或干硬性混凝土或各种废弃骨料或卵石或钢渣,或上述材料的混合料。
7.根据权利要求1所述的施工方法,其特征在于上述步骤6)中,上述桩身的施工是指,先提出内夯管后在外管内放置钢筋笼,再在外管内灌注桩身所需的混凝土,然后将内夯管压在外管内混凝土面上,边压边缓缓起拔外管,最后将双管同步拔出地表,完成桩身的施工。
8.根据权利要求1所述的施工方法,其特征在于上述步骤6)中,上述桩身的施工包括预制混凝土桩身。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNA2008100091876A CN101220592A (zh) | 2008-02-04 | 2008-02-04 | 混凝土桩的施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNA2008100091876A CN101220592A (zh) | 2008-02-04 | 2008-02-04 | 混凝土桩的施工方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN101220592A true CN101220592A (zh) | 2008-07-16 |
Family
ID=39630641
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNA2008100091876A Pending CN101220592A (zh) | 2008-02-04 | 2008-02-04 | 混凝土桩的施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101220592A (zh) |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101748720B (zh) * | 2009-12-17 | 2012-02-01 | 王继忠 | 复合地基的施工方法 |
CN102720187A (zh) * | 2012-05-10 | 2012-10-10 | 王继忠 | 抗拔桩的施工方法 |
CN102733377A (zh) * | 2012-04-25 | 2012-10-17 | 王继忠 | 混凝土桩的施工方法 |
CN103114579A (zh) * | 2013-02-22 | 2013-05-22 | 建基建设集团有限公司 | 强夯振动复合扩底桩机及强夯振动复合扩底桩施工方法 |
CN104294817A (zh) * | 2014-08-06 | 2015-01-21 | 王继忠 | 混凝土桩的施工方法 |
CN104294818A (zh) * | 2014-08-07 | 2015-01-21 | 王继忠 | 混凝土桩的施工方法 |
CN105040692A (zh) * | 2015-06-27 | 2015-11-11 | 王继忠 | 一种预制混凝土桩身载体桩的施工方法 |
CN105821834A (zh) * | 2016-03-16 | 2016-08-03 | 杨涅 | 一种混凝土桩的施工方法 |
CN111549767A (zh) * | 2020-05-27 | 2020-08-18 | 刘清洁 | 一种提高混凝土灌注桩承载力的施工方法 |
CN113585245A (zh) * | 2021-08-05 | 2021-11-02 | 贵州建工集团第一建筑工程有限责任公司 | 一种夯扩桩施工工艺 |
-
2008
- 2008-02-04 CN CNA2008100091876A patent/CN101220592A/zh active Pending
Cited By (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101748720B (zh) * | 2009-12-17 | 2012-02-01 | 王继忠 | 复合地基的施工方法 |
CN102733377A (zh) * | 2012-04-25 | 2012-10-17 | 王继忠 | 混凝土桩的施工方法 |
CN102733377B (zh) * | 2012-04-25 | 2014-01-29 | 王继忠 | 混凝土桩的施工方法 |
CN102720187A (zh) * | 2012-05-10 | 2012-10-10 | 王继忠 | 抗拔桩的施工方法 |
CN102720187B (zh) * | 2012-05-10 | 2014-01-29 | 王继忠 | 抗拔桩的施工方法 |
CN103114579A (zh) * | 2013-02-22 | 2013-05-22 | 建基建设集团有限公司 | 强夯振动复合扩底桩机及强夯振动复合扩底桩施工方法 |
CN104294817A (zh) * | 2014-08-06 | 2015-01-21 | 王继忠 | 混凝土桩的施工方法 |
CN104294817B (zh) * | 2014-08-06 | 2016-06-29 | 王继忠 | 混凝土桩的施工方法 |
CN104294818B (zh) * | 2014-08-07 | 2016-06-29 | 王继忠 | 混凝土桩的施工方法 |
CN104294818A (zh) * | 2014-08-07 | 2015-01-21 | 王继忠 | 混凝土桩的施工方法 |
CN105040692A (zh) * | 2015-06-27 | 2015-11-11 | 王继忠 | 一种预制混凝土桩身载体桩的施工方法 |
CN105040692B (zh) * | 2015-06-27 | 2018-01-19 | 王继忠 | 一种预制混凝土桩身载体桩的施工方法 |
CN105821834A (zh) * | 2016-03-16 | 2016-08-03 | 杨涅 | 一种混凝土桩的施工方法 |
CN111549767A (zh) * | 2020-05-27 | 2020-08-18 | 刘清洁 | 一种提高混凝土灌注桩承载力的施工方法 |
WO2021237766A1 (zh) * | 2020-05-27 | 2021-12-02 | 刘清洁 | 一种提高混凝土灌注桩承载力的施工方法 |
CN113585245A (zh) * | 2021-08-05 | 2021-11-02 | 贵州建工集团第一建筑工程有限责任公司 | 一种夯扩桩施工工艺 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101768970B (zh) | 混凝土桩的施工方法 | |
CN101220592A (zh) | 混凝土桩的施工方法 | |
CN102733377B (zh) | 混凝土桩的施工方法 | |
CN102733378B (zh) | 混凝土桩的施工方法 | |
CN104074186B (zh) | 一种建筑地基中成孔的护筒装置及其施工方法 | |
US7201540B2 (en) | Construction process for composite pile foundation | |
CN105821836B (zh) | 一种载体桩的施工方法 | |
CN110318394B (zh) | 复合桩的施工方法 | |
CN104294818B (zh) | 混凝土桩的施工方法 | |
CN101298772B (zh) | 静压沉管扩底混凝土桩的施工方法 | |
CN106192999A (zh) | 抗拔桩的施工方法 | |
CN100375820C (zh) | 混凝土桩的施工方法 | |
CN102635110B (zh) | 混凝土桩的施工方法 | |
CN1052284C (zh) | 混凝土桩的施工方法 | |
CN104099925A (zh) | 混凝土桩的施工装置及其施工方法 | |
CN102733379B (zh) | 混凝土桩的施工方法 | |
CN101748720B (zh) | 复合地基的施工方法 | |
CN101397793A (zh) | 夯扩混凝土加劲水泥搅拌桩及其施工方法 | |
CN106013093B (zh) | 一种桩施工方法 | |
CN105064332A (zh) | 一种方形桩身载体桩的施工方法 | |
CN104895078B (zh) | 一种以端承受力为主的预制桩的施工方法 | |
CN105926621A (zh) | 一种静压载体桩的施工方法 | |
CN101487253B (zh) | 压浆内夯扩底桩的成桩装置及成桩方法 | |
CN1884712A (zh) | 一种爆扩桩施工工艺 | |
CN106088085B (zh) | 桩施工方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Open date: 20080716 |