CN101768970B - 混凝土桩的施工方法 - Google Patents
混凝土桩的施工方法 Download PDFInfo
- Publication number
- CN101768970B CN101768970B CN2010100011614A CN201010001161A CN101768970B CN 101768970 B CN101768970 B CN 101768970B CN 2010100011614 A CN2010100011614 A CN 2010100011614A CN 201010001161 A CN201010001161 A CN 201010001161A CN 101768970 B CN101768970 B CN 101768970B
- Authority
- CN
- China
- Prior art keywords
- outer tube
- tube
- mentioned
- inner tamping
- pile
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
Description
Claims (10)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010100011614A CN101768970B (zh) | 2010-01-14 | 2010-01-14 | 混凝土桩的施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010100011614A CN101768970B (zh) | 2010-01-14 | 2010-01-14 | 混凝土桩的施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101768970A CN101768970A (zh) | 2010-07-07 |
CN101768970B true CN101768970B (zh) | 2012-02-01 |
Family
ID=42502056
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010100011614A Active CN101768970B (zh) | 2010-01-14 | 2010-01-14 | 混凝土桩的施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101768970B (zh) |
Families Citing this family (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102797262B (zh) * | 2011-05-26 | 2016-08-03 | 常雷 | 现浇三角形复合地基桩的施工处理方法 |
CN102733377B (zh) * | 2012-04-25 | 2014-01-29 | 王继忠 | 混凝土桩的施工方法 |
CN102720187B (zh) * | 2012-05-10 | 2014-01-29 | 王继忠 | 抗拔桩的施工方法 |
CN103821138B (zh) * | 2012-07-02 | 2016-09-07 | 朱建新 | 复合桩的施工方法 |
CN103114579B (zh) * | 2013-02-22 | 2015-01-07 | 建基建设集团有限公司 | 强夯振动复合扩底桩机及强夯振动复合扩底桩施工方法 |
CN105350525A (zh) * | 2015-11-09 | 2016-02-24 | 朱建新 | 一种桩的施工方法 |
CN106192999A (zh) * | 2016-08-18 | 2016-12-07 | 王继忠 | 抗拔桩的施工方法 |
CN106284316A (zh) * | 2016-10-10 | 2017-01-04 | 启东建筑集团有限公司 | 柴油锤沉管载体桩施工方法 |
CN108894205A (zh) * | 2018-07-26 | 2018-11-27 | 中国电建集团成都勘测设计研究院有限公司 | 内夯扩沉管灌注桩在深厚粘土层中的成桩方法 |
CN109853564A (zh) * | 2019-04-08 | 2019-06-07 | 王磊 | 一种挤密桩的施工方法及专用內夯管锤 |
CN111549767A (zh) * | 2020-05-27 | 2020-08-18 | 刘清洁 | 一种提高混凝土灌注桩承载力的施工方法 |
CN114482027A (zh) * | 2022-03-07 | 2022-05-13 | 中部城市建设有限公司 | 一种混凝土桩身载体桩的施工方法 |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0687777A1 (en) * | 1994-06-16 | 1995-12-20 | Heiwerken P. van 't Wout Waddinxveen B.V. | Method for arranging concrete piles in the ground |
-
2010
- 2010-01-14 CN CN2010100011614A patent/CN101768970B/zh active Active
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0687777A1 (en) * | 1994-06-16 | 1995-12-20 | Heiwerken P. van 't Wout Waddinxveen B.V. | Method for arranging concrete piles in the ground |
Also Published As
Publication number | Publication date |
---|---|
CN101768970A (zh) | 2010-07-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101768970B (zh) | 混凝土桩的施工方法 | |
CN102733377B (zh) | 混凝土桩的施工方法 | |
CN101220592A (zh) | 混凝土桩的施工方法 | |
CN104074186B (zh) | 一种建筑地基中成孔的护筒装置及其施工方法 | |
CN102733378B (zh) | 混凝土桩的施工方法 | |
CN105821836B (zh) | 一种载体桩的施工方法 | |
CN104294818B (zh) | 混凝土桩的施工方法 | |
CN105625294A (zh) | 一种复合地基及其施工方法 | |
CN106192999A (zh) | 抗拔桩的施工方法 | |
CN104314078A (zh) | 混凝土桩的施工设备及其施工方法 | |
CN100375820C (zh) | 混凝土桩的施工方法 | |
CN102635110B (zh) | 混凝土桩的施工方法 | |
CN104099925A (zh) | 混凝土桩的施工装置及其施工方法 | |
CN103321203A (zh) | 锥形夯锤强力冲扩桩法 | |
CN102733379B (zh) | 混凝土桩的施工方法 | |
CN101748720B (zh) | 复合地基的施工方法 | |
CN1191257A (zh) | 混凝土桩的施工方法 | |
CN105064332A (zh) | 一种方形桩身载体桩的施工方法 | |
CN104895078B (zh) | 一种以端承受力为主的预制桩的施工方法 | |
WO2017133373A1 (zh) | 一种用于桩基的小直径桩簇及其施工方法 | |
CN104389305A (zh) | 一种填砂竹节桩及其施工方法 | |
CN106013093A (zh) | 一种桩施工方法 | |
CN101397793A (zh) | 夯扩混凝土加劲水泥搅拌桩及其施工方法 | |
CN105926621A (zh) | 一种静压载体桩的施工方法 | |
CN102535429A (zh) | 组合锤法地基处理施工工艺 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
ASS | Succession or assignment of patent right |
Owner name: BEIJING PUISSANT GEOTECHNICAL ENGINEERING CO., LTD Free format text: FORMER OWNER: WANG JIZHONG Effective date: 20140625 |
|
C41 | Transfer of patent application or patent right or utility model | ||
TR01 | Transfer of patent right |
Effective date of registration: 20140625 Address after: 102218, Beijing, Changping District East small town Taiping homes, building 31 Patentee after: BEIJING PUISSANT GEOTECHNICAL ENGINEERING CO., LTD. Address before: 102218, Beijing, Changping District East small town Taiping homes District No. 31 building Patentee before: Wang Jizhong |