CN102733377A - 混凝土桩的施工方法 - Google Patents

混凝土桩的施工方法 Download PDF

Info

Publication number
CN102733377A
CN102733377A CN201210123043XA CN201210123043A CN102733377A CN 102733377 A CN102733377 A CN 102733377A CN 201210123043X A CN201210123043X A CN 201210123043XA CN 201210123043 A CN201210123043 A CN 201210123043A CN 102733377 A CN102733377 A CN 102733377A
Authority
CN
China
Prior art keywords
outer tube
mentioned
inner tamping
tube
job practices
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201210123043XA
Other languages
English (en)
Other versions
CN102733377B (zh
Inventor
王继忠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BEIJING PUISSANT GEOTECHNICAL ENGINEERING Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201210123043.XA priority Critical patent/CN102733377B/zh
Publication of CN102733377A publication Critical patent/CN102733377A/zh
Application granted granted Critical
Publication of CN102733377B publication Critical patent/CN102733377B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

本发明的目的在于提供一种混凝土桩的施工方法,通过在重锤和外管之间再加入内夯管,并在填料挤密时进行能量控制,以提高桩基质量和减少污染。施工方法包括下述步骤:1)在外管中通过重锤冲击成孔后反压外管向下沉入,直至距设计深度一定距离;2)提出重锤,将内夯管放入到外管内,内夯管上端设有夯击盘;3)内夯管中放入重锤,锤击内夯管下沉,并带动外管沉至设计深度;4)连接内夯管和重锤并同时提升,向外管填入填充料,通过重锤的自由落体锤击内夯管对填充料进行挤密;5)反复进行填充和锤击操作,直至满足密实度的要求;6)分次填充预定量的干硬性混凝土并进行挤密;7)提出内夯管,立即灌入少量混凝土,然后进行桩身的施工;8)提出外管并振捣密实。

Description

混凝土桩的施工方法
技术领域
本发明涉及土木工程领域,特别是涉及桩的施工技术。
背景技术
随着我国城市建设的飞速发展,越来越多的建筑物将坐落于人口密度较大和邻近建筑物较多的地区,这种情况下,对地基处理工程施工的要求相对较高,特别是施工中产生的噪声、振感和环境污染等环节必须得到很好的控制,以避免出现扰民纠纷,影响工程施工建设。面对这种情况,一些施工噪声较大的施工方法,如振动沉管桩、锤击摩擦桩等,和一些施工振感较大的施工方法,如强夯、柴油锤、夯扩桩等,以及一些环境污染较重的施工方法,如振冲碎石桩等,均不适宜在上述情况下采用。
因此,需要有一种承载力较高、施工噪声和震动较小、造价低廉的施工方法,满足上述的条件要求。
在公开号CN1191257A、专利号ZL98101041.5专利文献中,公开了一种混凝土桩的施工技术,该桩包括复合载体和混凝土桩身,该工艺的特点是注重对桩端下土体最大最优的加固挤密,并通过形成复合载体,使上部荷载有效地通过桩和的复合载体,传递到较好持力层上,从而提高了桩的承载力。但是在实际施工中发现,上述施工方法在对填充料进行夯扩加固时,采用的重锤质量较大,并且始终是以大能量在进行夯击,其不足处一是传出较强烈的震感,影响周围居民和建筑;二是当地下水较丰富时容易使桩身土体产生液化或软化,影响桩端结合部质量;三是容易对相邻桩造成影响,产生质量问题。
发明内容
本发明是为了解决上述的问题而提出的,目的在于提供一种混凝土桩的施工方法,通过在重锤和外管之间再加入内夯管,并且在进行填料挤密时进行能量控制,在有效形成复合载体的同时可确实地保证桩端结合部质量,提高桩的合格率,减小桩的沉降量。
为了实现上述目的,本发明的混凝土桩的施工方法包括下述步骤:
1)在地基中的预定桩位处,将外管放置在桩位上,在外管中放入重锤,通过重锤的自由落体运动,对桩位处土体冲击出一定深度的孔洞,通过外管的外连接装置反压外管向下沉入,反复进行上述操作,直至外管底端距设计深度一定距离;
2)提出重锤,采用内夯管放入到外管内,内夯管上端设有固定的夯击盘,夯击盘的直径大于外管的直径,且夯击盘距内夯管底端的长度大于外管长度;
3)在上述内夯管中放入上述重锤,通过重锤的自由落体运动锤击内夯管中的胶垫,使内夯管向下沉入,并通过夯击盘逐渐带动外管下沉至设计深度;
4)连接上述内夯管和重锤,提升重锤的同时提升内夯管至外管填料口,向外管底端填入一定数量的散体填充料,通过重锤的自由落体运动,锤击内夯管对填入的散体填充料进行挤密;
5)反复进行上述填充和锤击操作,对外管底端,即桩端下方的一定深度和范围的地基土体进行连续的挤密加固,直至满足密实度的要求以达到设计承载力;
6)通过上述外管,向外管底端分次填充预定量的干硬性混凝土,通过重锤的自由落体运动,锤击内夯管对填入的干硬性混凝土进行挤密;
7)提出上述内夯管,通过外管立即灌入一定数量的拌合混凝土,然后进行桩身的施工;
8)提出外管,振捣密实混凝土。
最好,在上述的混凝土桩的施工方法,其特征在于,上述内夯管的底端内部填入一定数量的散粒材料,散粒材料上方放置钢板,钢板上方放置胶垫。
最好,在上述的混凝土桩的施工方法中,上述步骤1)中,外管的外连接装置是指在外管顶端设有耳状固定物,通过绳索与卷扬机连接,由卷扬机带动使外管下沉。
最好,在上述的混凝土桩的施工方法中,上述步骤2)中,内夯管的外径小于外管的内径,长度大于外管长度,且该内管的底端封闭,底端为平底。
最好,在上述的混凝土桩的施工方法中,上述步骤3)中,由于上述内夯管上部设有固定的夯击盘,当重锤在进行上下作功动作时,带动夯击盘击打外管顶端,使外管和内夯管同时逐渐向下沉入。
最好,在上述的混凝土桩的施工方法中,上述步骤3)中,外管沉至设计深度时,内夯管底端应超出外管底端10~50cm。
最好,在上述的混凝土桩的施工方法中,上述步骤4)中,散体填充料是指碎砖或碎瓦或碎石或渣土或卵石或钢渣或水泥土或灰土或干硬性混凝土,或上述材料的混合料。
最好,在上述的混凝土桩的施工方法中,上述步骤4)中,填料和锤击的操作,可以是在低落距、低能量的情况下进行的,即重锤的提升高度不超过6m,再以自由落体落下。
最好,在上述的混凝土桩的施工方法中,上述步骤4)中,内夯管和重锤始终是连接固定的。
最好,在上述的混凝土桩的施工方法中,上述步骤5)中,密实度的要求是指,在不投料的情况下,以预定的能量测试内夯管连续空打3击~10击的贯入量,总贯入量应小于设计值;如未满足贯入量设计值,则继续进行填料挤密操作,直至达到上述贯入量设计值。
最好,在上述的混凝土桩的施工方法中,上述步骤6)中,当预定量的干硬性混凝土被填充挤密结束时,内夯管底端与外管底端持平。
最好,在上述的混凝土桩的施工方法中,上述步骤7)中,灌入的拌合混凝土数量,在外管内部的高度为30~70cm。
最好,在上述的混凝土桩的施工方法中,上述步骤7)中,桩身的施工是指,在外管内放置钢筋笼后灌注桩身所需的混凝土。
最好,在上述的混凝土桩的施工方法中,上述步骤7)中,桩身的施工包括预制混凝土桩身。
最好,在上述的混凝土桩的施工方法中,上述步骤8)中,提出外管是通过外管的外连接装置进行的。
通过以上方法形成的混凝土桩的特点和优势在于:
①无噪声污染。由于在外管和重锤之间加入了特制的内夯管,使重锤不再直接击打桩端填充料和土体,而是击打内夯管中设置的胶垫,再将力量传递到内夯管,其降低和消除噪声的效果非常显著。
②无震感传出。由于在对填充料和干硬性混凝土进行夯击时,重锤可以采用低落距,作功能量较低,相比大能量夯击的震感降低明显,再通过土体的消减作用,使得地面上感受不到震感传出。
③提高桩端结合部质量。由于在对填充料和干硬性混凝土进行夯击时,重锤采用低落距,作功能量较低,使得填充料是在慢慢挤压的状态下得到加固挤密的,相比反复的进行大能量夯击,即使在地下水丰富情况下,也不会造成的土体液化,软化的现象,避免了淤泥或水进入桩身底端与载体的结合部的可能,显著提高桩端结合部质量。
附图说明
图1是作为本发明的一个实施例的混凝土桩的施工方法的工序图。
具体实施方式
作为本发明的一个实施例的混凝土桩的施工方法,其包括下述步骤,首先,如图1a所示,将外管1放置在桩位上,在外管中放入重锤2,通过重锤2的自由落体运动,对桩位处土体进行大能量剪切,形成一定深度的孔洞后,通过外管1的外连接装置反压外管1向下沉入。然后,如图1b所示,反复进行上述操作,直至外管1底端距设计深度一定距离。然后,如图1c所示,提出重锤2,采用特制的内夯管3插入到外管内,然后,如图1d所示,在内夯管3中放入重锤2,通过重锤2的自由落体运动锤击内夯管3向下沉入,并通过内夯管3上部的夯击盘4逐渐带动外管1下沉至设计深度。然后,如图1e所示,将内夯管3和重锤2通过绳索连接,提升重锤2的同时提升内夯管3至外管填料口。然后,如图1f所示,向外管1底端填入一定数量的散体填充料5,通过重锤2的自由落体运动,锤击内夯管3对填入的散体填充料5进行挤密。然后,如图1g所示,反复进行上述填充和锤击操作,对桩端下方的一定深度和范围的地基土体进行连续的挤密加固,直至满足密实度的要求以达到设计承载力。然后,如图1h所示,向外管底端分次填充预定量的干硬性混凝土6,通过重锤2的自由落体运动,锤击内夯管3对填入的干硬性混凝土6进行挤密;然后,如图1i所示,提出内夯管3,通过外管立即灌入一定数量的拌合混凝土7,在外管1内放置钢筋笼4后灌注桩身所需的混凝土7。最后,如图1j所示,提出外管1,振捣密实混凝土7。

Claims (15)

1.一种混凝土桩的施工方法,该方法包括下述步骤:
1)在地基中的预定桩位处,将外管放置在桩位上,在外管中放入重锤,通过重锤的自由落体运动,对桩位处土体冲击出一定深度的孔洞,通过外管的外连接装置反压外管向下沉入,反复进行上述操作,直至外管底端距设计深度一定距离;
2)提出重锤,采用内夯管放入到外管内,内夯管上端设有固定的夯击盘,夯击盘的直径大于外管的直径,且夯击盘距内夯管底端的长度大于外管长度;
3)在上述内夯管中放入上述重锤,通过重锤的自由落体运动锤击内夯管中的胶垫,使内夯管向下沉入,并通过夯击盘逐渐带动外管下沉至设计深度;
4)连接上述内夯管和重锤,提升重锤的同时提升内夯管至外管填料口,向外管底端填入一定数量的散体填充料,通过重锤的自由落体运动,锤击内夯管对填入的散体填充料进行挤密;
5)反复进行上述填充和锤击操作,对外管底端,即桩端下方的一定深度和范围的地基土体进行连续的挤密加固,直至满足密实度的要求以达到设计承载力;
6)通过上述外管,向外管底端分次填充预定量的干硬性混凝土,通过重锤的自由落体运动,锤击内夯管对填入的干硬性混凝土进行挤密;
7)提出上述内夯管,通过外管立即灌入一定数量的拌合混凝土,然后进行桩身的施工;
8)提出外管,振捣密实混凝土。
2.根据权利要求1所述的混凝土桩的施工方法,其特征在于,上述内夯管的底端内部填入一定数量的散粒材料,散粒材料上方放置钢板,钢板上方放置胶垫。
3.根据权利要求1所述的混凝土桩的施工方法,其特征在于上述步骤1)中,上述外管的外连接装置,是指在外管顶端设有耳状固定物,通过绳索与卷扬机连接,由卷扬机带动使外管下沉。
4.根据权利要求1所述的混凝土桩的施工方法,其特征在于上述步骤2)中,上述内夯管的外径小于外管的内径,长度大于外管长度,且该内管的底端封闭,底端为平底。
5.根据权利要求1所述的混凝土桩的施工方法,其特征在于上述步骤3)中,由于上述内夯管上部设有固定的夯击盘,当重锤在进行上下作功动作时,带动夯击盘击打外管顶端,使外管和内夯管同时逐渐向下沉入。
6.根据权利要求1所述的混凝土桩的施工方法,其特征在于上述步骤3)中,上述的外管沉至设计深度时,内夯管底端应超出外管底端10~50cm。
7.根据权利要求1所述的混凝土桩的施工方法,其特征在于上述步骤4)中,上述散体填充料是指碎砖或碎瓦或碎石或渣土或卵石或钢渣或水泥土或灰土或干硬性混凝土,或上述材料的混合料。
8.根据权利要求1所述的混凝土桩的施工方法,其特征在于上述步骤4)中,上述填料和锤击的操作,可以是在低落距、低能量的情况下进行的,即重锤的提升高度不超过6m,再以自由落体落下。
9.根据权利要求1所述的混凝土桩的施工方法,其特征在于上述步骤4)中,上述内夯管和重锤始终是连接固定的。
10.根据权利要求1所述的施工方法,其特征在于上述步骤5)中,上述密实度的要求是指,在不投料的情况下,以预定的能量测试内夯管连续空打3击~10击的贯入量,总贯入量应小于设计值;如未满足贯入量设计值,则继续进行填料挤密操作,直至达到上述贯入量设计值。
11.根据权利要求1所述的施工方法,其特征在于上述步骤6)中,当预定量的干硬性混凝土被填充挤密结束时,内夯管底端与外管底端持平。
12.根据权利要求1所述的施工方法,其特征在于上述步骤7)中,上述灌入的拌合混凝土数量,在外管内部的高度为30~70cm。
13.根据权利要求1所述的施工方法,其特征在于上述步骤7)中,上述桩身的施工是指,在外管内放置钢筋笼后灌注桩身所需的混凝土。
14.根据权利要求1所述的施工方法,其特征在于上述步骤7)中,上述桩身的施工包括预制混凝土桩身。
15.根据权利要求1所述的施工方法,其特征在于上述步骤8)中,上述提出外管是通过外管的外连接装置进行的。
CN201210123043.XA 2012-04-25 2012-04-25 混凝土桩的施工方法 Active CN102733377B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210123043.XA CN102733377B (zh) 2012-04-25 2012-04-25 混凝土桩的施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210123043.XA CN102733377B (zh) 2012-04-25 2012-04-25 混凝土桩的施工方法

Publications (2)

Publication Number Publication Date
CN102733377A true CN102733377A (zh) 2012-10-17
CN102733377B CN102733377B (zh) 2014-01-29

Family

ID=46989634

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210123043.XA Active CN102733377B (zh) 2012-04-25 2012-04-25 混凝土桩的施工方法

Country Status (1)

Country Link
CN (1) CN102733377B (zh)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104131552A (zh) * 2014-07-03 2014-11-05 王继忠 一种混凝土桩的施工方法
CN104153356A (zh) * 2014-07-30 2014-11-19 王继忠 混凝土桩的施工装置及其施工方法
CN105040692A (zh) * 2015-06-27 2015-11-11 王继忠 一种预制混凝土桩身载体桩的施工方法
CN105821836A (zh) * 2016-02-18 2016-08-03 王继忠 一种载体桩的施工方法
CN105926595A (zh) * 2016-04-21 2016-09-07 化学工业岩土工程有限公司 一种夯扩预应力空心管桩的施工方法
CN106013145A (zh) * 2016-07-15 2016-10-12 朱建新 一种桩的施工方法
CN106013093A (zh) * 2016-06-15 2016-10-12 朱建新 一种桩施工方法
CN106049466A (zh) * 2016-06-30 2016-10-26 朱建新 一种桩的施工方法
CN106049464A (zh) * 2016-06-06 2016-10-26 朱建新 桩的施工方法
CN106049465A (zh) * 2016-06-06 2016-10-26 朱建新 一种桩的施工方法
CN106088085A (zh) * 2016-06-15 2016-11-09 朱建新 桩施工方法
CN111549767A (zh) * 2020-05-27 2020-08-18 刘清洁 一种提高混凝土灌注桩承载力的施工方法

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5826119A (ja) * 1981-08-08 1983-02-16 Kitagawa Tekkosho:Kk 既設杭の引抜き装置
WO1995018892A1 (en) * 1994-01-06 1995-07-13 Roxbury Limited Improvements in or relating to apparatus for use in forming piles
NL1000558C2 (en) * 1994-06-16 1995-12-18 Heiwerken P Van T Wout Waddinx In situ concrete piling method for use in built up areas
CN1354307A (zh) * 2001-12-28 2002-06-19 王继忠 混凝土桩的施工方法
KR100440822B1 (ko) * 2003-07-22 2004-07-21 (주)초석건설 해상 대구경 팩 말뚝 공법 및 해상 대구경 팩 말뚝
CN101220592A (zh) * 2008-02-04 2008-07-16 王继忠 混凝土桩的施工方法
CN101748720A (zh) * 2009-12-17 2010-06-23 王继忠 复合地基的施工方法
CN101768970A (zh) * 2010-01-14 2010-07-07 王继忠 混凝土桩的施工方法

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5826119A (ja) * 1981-08-08 1983-02-16 Kitagawa Tekkosho:Kk 既設杭の引抜き装置
WO1995018892A1 (en) * 1994-01-06 1995-07-13 Roxbury Limited Improvements in or relating to apparatus for use in forming piles
NL1000558C2 (en) * 1994-06-16 1995-12-18 Heiwerken P Van T Wout Waddinx In situ concrete piling method for use in built up areas
CN1354307A (zh) * 2001-12-28 2002-06-19 王继忠 混凝土桩的施工方法
KR100440822B1 (ko) * 2003-07-22 2004-07-21 (주)초석건설 해상 대구경 팩 말뚝 공법 및 해상 대구경 팩 말뚝
CN101220592A (zh) * 2008-02-04 2008-07-16 王继忠 混凝土桩的施工方法
CN101748720A (zh) * 2009-12-17 2010-06-23 王继忠 复合地基的施工方法
CN101768970A (zh) * 2010-01-14 2010-07-07 王继忠 混凝土桩的施工方法

Cited By (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104131552A (zh) * 2014-07-03 2014-11-05 王继忠 一种混凝土桩的施工方法
CN104153356A (zh) * 2014-07-30 2014-11-19 王继忠 混凝土桩的施工装置及其施工方法
CN104153356B (zh) * 2014-07-30 2016-08-31 王继忠 混凝土桩的施工装置及其施工方法
CN105040692A (zh) * 2015-06-27 2015-11-11 王继忠 一种预制混凝土桩身载体桩的施工方法
CN105040692B (zh) * 2015-06-27 2018-01-19 王继忠 一种预制混凝土桩身载体桩的施工方法
CN105821836B (zh) * 2016-02-18 2017-08-04 王继忠 一种载体桩的施工方法
CN105821836A (zh) * 2016-02-18 2016-08-03 王继忠 一种载体桩的施工方法
CN105926595A (zh) * 2016-04-21 2016-09-07 化学工业岩土工程有限公司 一种夯扩预应力空心管桩的施工方法
CN106049464A (zh) * 2016-06-06 2016-10-26 朱建新 桩的施工方法
CN106049465A (zh) * 2016-06-06 2016-10-26 朱建新 一种桩的施工方法
CN106049464B (zh) * 2016-06-06 2018-07-03 朱建新 桩的施工方法
CN106049465B (zh) * 2016-06-06 2018-07-06 朱建新 一种桩的施工方法
CN106088085A (zh) * 2016-06-15 2016-11-09 朱建新 桩施工方法
CN106013093A (zh) * 2016-06-15 2016-10-12 朱建新 一种桩施工方法
CN106088085B (zh) * 2016-06-15 2018-07-06 朱建新 桩施工方法
CN106049466A (zh) * 2016-06-30 2016-10-26 朱建新 一种桩的施工方法
CN106013145A (zh) * 2016-07-15 2016-10-12 朱建新 一种桩的施工方法
CN111549767A (zh) * 2020-05-27 2020-08-18 刘清洁 一种提高混凝土灌注桩承载力的施工方法
WO2021237766A1 (zh) * 2020-05-27 2021-12-02 刘清洁 一种提高混凝土灌注桩承载力的施工方法

Also Published As

Publication number Publication date
CN102733377B (zh) 2014-01-29

Similar Documents

Publication Publication Date Title
CN102733377B (zh) 混凝土桩的施工方法
CN101768970B (zh) 混凝土桩的施工方法
CN102733378B (zh) 混凝土桩的施工方法
CN104074186B (zh) 一种建筑地基中成孔的护筒装置及其施工方法
CN103821139B (zh) 一种夯扩载体劲芯多元复合桩及软土地基加固施工方法
CN104294818B (zh) 混凝土桩的施工方法
CN101220592A (zh) 混凝土桩的施工方法
CN106192999A (zh) 抗拔桩的施工方法
CN104314078A (zh) 混凝土桩的施工设备及其施工方法
CN100375820C (zh) 混凝土桩的施工方法
CN104929125A (zh) 一种载体桩的施工设备及其施工方法
CN1052284C (zh) 混凝土桩的施工方法
CN104099925A (zh) 混凝土桩的施工装置及其施工方法
CN102635110B (zh) 混凝土桩的施工方法
CN102733379B (zh) 混凝土桩的施工方法
CN101748720B (zh) 复合地基的施工方法
CN106013093B (zh) 一种桩施工方法
CN112240022A (zh) 一种静压沉管桩的施工方法及施工设备
CN105064332A (zh) 一种方形桩身载体桩的施工方法
WO2017133373A1 (zh) 一种用于桩基的小直径桩簇及其施工方法
CN105926621A (zh) 一种静压载体桩的施工方法
CN106088085B (zh) 桩施工方法
CN203741824U (zh) 一种夯扩载体劲芯多元复合桩
CN100387789C (zh) 混凝土桩的施工方法
CN104153356A (zh) 混凝土桩的施工装置及其施工方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: BEIJING PUISSANT GEOTECHNICAL ENGINEERING CO., LTD

Free format text: FORMER OWNER: WANG JIZHONG

Effective date: 20140715

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20140715

Address after: 102218, Beijing, Changping District East small town Taiping homes, building 31

Patentee after: BEIJING PUISSANT GEOTECHNICAL ENGINEERING CO., LTD.

Address before: 102218 Beijing city Changping District East Town Taiping home building No. 31 Beijing possente Geotechnical Engineering Co. Ltd.

Patentee before: Wang Jizhong