CN101761092A - 大跨度深基坑可移动整体大模板侧墙施工方法 - Google Patents

大跨度深基坑可移动整体大模板侧墙施工方法 Download PDF

Info

Publication number
CN101761092A
CN101761092A CN200910261827A CN200910261827A CN101761092A CN 101761092 A CN101761092 A CN 101761092A CN 200910261827 A CN200910261827 A CN 200910261827A CN 200910261827 A CN200910261827 A CN 200910261827A CN 101761092 A CN101761092 A CN 101761092A
Authority
CN
China
Prior art keywords
side wall
construction
steel
large overall
template
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN200910261827A
Other languages
English (en)
Other versions
CN101761092B (zh
Inventor
李光耀
许盼
王宗勇
刘凯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Second Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd
Original Assignee
Second Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Second Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd filed Critical Second Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd
Priority to CN2009102618277A priority Critical patent/CN101761092B/zh
Publication of CN101761092A publication Critical patent/CN101761092A/zh
Application granted granted Critical
Publication of CN101761092B publication Critical patent/CN101761092B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

本发明涉及地下工程施工领域,具体为一种大跨度深基坑可移动整体大模板侧墙施工方法,解决现有深基坑侧墙施工方法存在工程量大、劳动强度大、施工质量难以保证以及工期长等问题,包括深基坑开挖与钢支撑架设、垫层与底板主体结构施工、钢支撑拆除、侧墙防水与钢筋施工、根据侧墙可拆除支撑空间和主体侧墙高度来设计整体大模板的整体长度和高度、利用移动模架将整体大模板对位、侧墙砼施工、脱模等步骤,脱模后,利用移动模架及时把模板整体向前移动,重复上述步骤进行下一段侧墙施工。该方法具有施工速度快,施工接缝少,工程质量高,施工安全,劳动强度低,无脚手架消耗,总体投资少等优点,适用于地下工程侧墙结构、各种挡墙施工。

Description

大跨度深基坑可移动整体大模板侧墙施工方法
技术领域
本发明涉及地下工程施工领域,具体为一种大跨度深基坑可移动整体大模板侧墙施工方法。
背景技术
随着城市建设的不断发展,各种类型的地下工程、深基坑工程越来越多,高效、经济、节能、环保的深基坑施工方法显得尤为重要。目前,传统的深基坑侧墙施工由于支撑拆除或换撑等原因,侧墙结构一般采用定型小钢模板进行拼接,支撑体系为钢管脚手架加方木或工字钢背肋施工,在实际施工过程中存在以下问题:一是需要不断的搭设和拆除脚手架,工程量较大,工人劳动强度大,而且脚手架周转较慢,大大降低了利用率;二是采用小模板拼接,造成施工缝较多,易发生错台,影响侧墙的施工质量,而且施工周期较长;三是人工搭设脚手架、立模板等均属于高空作业,大大增加了高空作业的施工风险。
发明内容
本发明为了解决现有深基坑侧墙施工方法存在工程量大、劳动强度大、施工质量难以保证以及工期长等问题,提供一种大跨度深基坑可移动整体大模板侧墙施工方法。
本发明是采用如下技术方案实现的:一种大跨度深基坑可移动整体大模板侧墙施工方法,包括以下步骤:A、深基坑开挖与钢支撑架设:基坑采用分层、分段、中间拉槽、两侧放坡的挖机接力开挖,随挖随撑,基底预留30cm人工开挖;B、垫层与底板主体结构施工:基坑开挖至基底设计标高后,施作垫层、防水层并浇筑结构底板,在底板内预埋整体大模板地锚弯钩;C、钢支撑拆除:a、第一次钢支撑拆除:对钢支撑进行受力分析,从受力小的开始从下往上拆除,当长度和高度满足一次整体大模板施工时停止拆除;b、下一段侧墙拆除钢支撑时机:当底板和上一段侧墙砼强度达到85%,方能开始拆除下一段侧墙钢支撑;c、施工顶板时钢支撑:当侧墙砼强度达到100%,方能开始拆除该处顶板钢支撑,进行顶板施工;d、顶板以上钢支撑拆除:当顶板砼强度达到100%,方能开始拆除该处顶板以上钢支撑,进行回填施工;D、侧墙防水与钢筋施工:结构底板养护同时,先作侧墙防水施工,再进行钢筋施工;E、整体大模板结构设计及对位:a、根据侧墙可拆除支撑空间、主体侧墙高度及侧墙混凝土裂缝控制最佳尺寸来设计模板的整体长度和高度;b、结构底板施工完后,安设整体大模板移动行走的轨道;c、将整体大模板安装在移动模架上,启动牵引机,将整体大模板移向钢筋绑扎好的侧墙处,调整整体大模板使其对位;d、整体大模板对位后,利用螺杆将移动模架固定在预埋于底板内的地锚弯钩上;F、侧墙砼施工:利用汽车输送泵多点分层浇砼;G、脱模:侧墙强度达到35%时,开始松动模板进行脱模;H、脱模后,利用移动模架及时把模板整体向前移动,并均匀涂上专用脱模漆,重复上述步骤进行下一段侧墙施工。
所述的移动模架包括三角桁架以及固定在三角桁架下方的主梁,主梁下方安装有与底板上的轨道相互配合的行走轮;三角桁架顶部设有悬臂梁,三角桁架一侧设置模架面板,模架面板背面固定有横梁,三角桁架与横梁之间通过千斤顶丝杠连接;模架面板顶部通过吊耳与沿着悬臂梁前后运动的移动滚轮连接。侧墙施工时,将整体大模板固定在模架面板上,利用行走轮、牵引装置使得模板向侧墙移动,然后再微调千斤顶丝杠进行模板对位。
与现有传统施工方法相比,本发明具有以下优点:
(1)本发明根据侧墙可拆除支撑空间、主体侧墙高度及侧墙混凝土裂缝控制最佳尺寸来设计模板的整体长度和高度,施工时利用底板预埋件固定移动模架及整体大模板,减少了工人搭建脚手架、立模板等高空作业,有效地降低了高空作业施工风险,施工安全;
(2)施工自动化程度高,模板能左右、前后整体移动,操作简单,不用钢管脚手架,降低了劳动强度,施工成本低;
(3)采用传统组合大模板、小模板施工一板需要15天,而采用移动整体大模板整体幅面大,只要5天,采用专用脱模漆,涂一次能连续施工3板侧墙,确保了工期,加快了施工进度;
(4)通用性强,模板可重复利用于别的工程,而且减少了传统施工方法中支撑倒换工序,使侧墙一次到顶,大大减少了错台、施工缝,确保侧墙施工质量;
(5)该工法比其它工法减少脚手架支撑周转,减少量为200T/月,共10个月,阻赁1T脚手架是240元/月,还大大降低劳动强度,节约成本约70万元,脚手架搭设与拆除人工约9000工日,节约成本135万元,直接费用合计节约205万元;在明挖施工中隧道侧墙结构采用整体模板,有效利用了支撑的时间和空间效应,减少了支撑的焊接工作,节约电能约5%;
总之,本发明所述的方法具有施工速度快,施工接缝少,工程质量高,施工安全,劳动强度低,无脚手架消耗,总体投资少等优点,适用于地下工程侧墙结构、各种挡墙施工。
附图说明
图1为本发明的施工工艺流程图;
图2为钢支撑架设的工艺流程图;
图3为整体大模板移动模架结构示意图;
图中:1-地锚弯钩;2-底板;3-轨道;4-三角桁架;5-主梁;6-行走轮;7-悬臂梁;8-模架面板;9-横梁;10-千斤顶丝杠;11-吊耳;12-移动滚轮。
具体实施方式
一种大跨度深基坑可移动整体大模板侧墙施工方法,如图1所示,包括以下步骤:
A、深基坑开挖与钢支撑架设:基坑采用分层、分段、中间拉槽、两侧放坡的挖机接力开挖,随挖随撑,基底预留30cm人工开挖,钢支撑架设流程可按照图2所示进行施工;
B、垫层与底板主体结构施工:基坑开挖至基底设计标高后,放样检查基坑内平面尺寸是否满足结构外围轮廓要求,并及时施作垫层,依次施工防水板、钢筋绑扎、预埋整体大模板地锚弯钩1、浇筑结构底板2,地锚弯钩锚固长度60cm,与移动模架通过φ32螺杆连接,第一排地锚弯钩位于侧墙倒角处,第二排与倒角间距3m;
C、钢支撑拆除:
a、第一次钢支撑拆除:对钢支撑进行受力分析,从受力小的开始从下往上拆除,当长度和高度满足一次整体大模板施工时停止拆除;b、下一段侧墙拆除钢支撑时机:当底板和上一段侧墙砼强度达到85%,方能开始拆除下一段侧墙钢支撑;c、施工顶板时钢支撑:当侧墙砼强度达到100%,方能开始拆除该处顶板钢支撑,进行顶板施工;d、顶板以上钢支撑拆除:当顶板砼强度达到100%,方能开始拆除该处顶板以上钢支撑,进行回填施工;
D、侧墙防水与钢筋施工:结构底板养护同时,先作侧墙防水施工,再进行钢筋施工;
E、整体大模板结构设计及对位:a、根据侧墙可拆除支撑空间、主体侧墙高度及侧墙混凝土裂缝控制最佳尺寸来设计模板的整体长度和高度;b、结构底板施工完后,安设整体大模板移动行走的轨道3;c、将整体大模板安装在移动模架上,启动牵引机,将整体大模板移向钢筋绑扎好的侧墙处,调整整体大模板与三角桁架间的可伸缩千斤顶丝杠,使模板对位;d、整体大模板对位后,利用螺杆将移动模架固定在预埋于底板2内的地锚弯钩1上;上述移动模架包括三角桁架4以及固定在三角桁架下方的主梁5,主梁5下方安装有与底板2上的轨道3相互配合的行走轮6;三角桁架4顶部设有悬臂梁7,三角桁架4一侧设置模架面板8,模架面板8背面固定有横梁9,三角桁架4与横梁9之间通过千斤顶丝杠10连接;模架面板8顶部通过吊耳11与沿着悬臂梁7前后运动的移动滚轮12连接;
F、侧墙砼施工:利用汽车输送泵多点分层浇砼,砼初凝后,立即采用自动喷水养护;侧墙砼施工时刻采用以下措施控制结构裂缝:(1)高温季节施工,尽量选择夜间浇筑,必要时搅拌站采取加冰降温措施,降低混凝土入模温度和最高温峰值;(2)侧墙使用汽车泵直接从底往上浇筑混凝土,以减小混凝土入模后的离析现象。浇筑时必须严格分层进行,严格控制混凝土初凝时间,钢筋密实处尽可能避免浇筑工作经此停歇以及交接,确保混凝土浇筑密实;(3)混凝土振捣采用插入式振捣器,在浇筑预备洞口两侧适当加长振捣时间,以便模板底部混凝土浇筑密实;(4)侧墙混凝土初凝时,在侧墙顶通过养护管进行不断的保湿养护,至少保证混凝土失水基本停止;(5)根据温度变化的规律,控制拆模时间不得短于5天时间,而且拆模应安排在当日温度最高、风力小的时候进行。避免表面温度快速降低或被风吹而混凝土表面快速失水;(6)侧墙一次浇注长度不大于12.5m,高度不大于6m;(7)混凝土浇注应多点分层浇注,浇注点间距不应大于3m。
G、脱模:侧墙强度达到35%时,开始松动模板,做法是调节千斤顶丝杠,使其收缩到最短位置,即可使得模架面板及整体大模板离开侧墙;
H、脱模后,利用移动模架及时把模板整体向前移动,并均匀涂上专用脱模漆,重复上述步骤进行下一段侧墙施工;上述专用脱模漆为现有公知商品,易拆模,拆模后可保持表面光滑平整,棱角完整无损,可极大减少气泡和表面缺陷的产生,并使混凝土外表光洁度高,无杂色,无污染。
为了进一步证明该施工方法的有益效果,申请人列举以下工程实例加以证明:
广深港客运专线广深段狮子洋隧道SD II标明挖暗埋段全长660m,两边侧墙采用本发明所述整体大模板施工,取得了良好的经济和社会效益,根据该侧墙可拆除支撑空间和主体侧墙高度设计移动模架和整体大模板的主要结构尺寸,移动模架长12.5m,高度7m,模架面板高度6m,采用1cm钢板,构成三角桁架的横肋采用为5cm×5cm角钢,间距25cm,纵肋为1.5cm×15cm钢板,间距75cm,纵肋后背双拼20#槽钢,纵向五道,间距1.35m,采用66根φ80丝杠千斤顶连接模架面板与三角桁架,整体大模板采用几块钢模板用槽钢固定成整体,与模架面板固定在一起。
该方法也已成功应用到广深港客运专线深圳段1000m长福田车站地下侧墙施工和广深港客运专线广深段综合I标230m敞开段侧墙施工。

Claims (2)

1.一种大跨度深基坑可移动整体大模板侧墙施工方法,其特征是包括以下步骤:
A、深基坑开挖与钢支撑架设:基坑采用分层、分段、中间拉槽、两侧放坡的挖机接力开挖,随挖随撑,基底预留30cm人工开挖;
B、垫层与底板主体结构施工:基坑开挖至基底设计标高后,施作垫层、防水层并浇筑结构底板(2),在底板内预埋整体大模板地锚弯钩(1);
C、钢支撑拆除:
a、第一次钢支撑拆除:对钢支撑进行受力分析,从受力小的开始从下往上拆除,当长度和高度满足一次整体大模板施工时停止拆除;b、下一段侧墙拆除钢支撑时机:当底板和上一段侧墙砼强度达到85%,方能开始拆除下一段侧墙钢支撑;c、施工顶板时钢支撑:当侧墙砼强度达到100%,方能开始拆除该处顶板钢支撑,进行顶板施工;d、顶板以上钢支撑拆除:当顶板砼强度达到100%,方能开始拆除该处顶板以上钢支撑,进行回填施工;
D、侧墙防水与钢筋施工:结构底板养护同时,先作侧墙防水施工,再进行钢筋施工;
E、整体大模板结构设计及对位:a、根据侧墙可拆除支撑空间、主体侧墙高度及侧墙混凝土裂缝控制最佳尺寸来设计模板的整体长度和高度;b、结构底板施工完后,安设整体大模板移动行走的轨道(3);c、将整体大模板安装在移动模架上,启动牵引机,将整体大模板移向钢筋绑扎好的侧墙处,调整整体大模板使其对位;d、整体大模板对位后,利用螺杆将移动模架固定在预埋于底板(2)内的地锚弯钩(1)上;
F、侧墙砼施工:利用汽车输送泵多点分层浇砼;
G、脱模:侧墙强度达到35%时,开始松动模板进行脱模;
H、脱模后,利用移动模架及时把模板整体向前移动,并均匀涂上专用脱模漆,重复上述步骤进行下一段侧墙施工。
2.根据权利要求1所述的大跨度深基坑可移动整体大模板侧墙施工方法,其特征是所述的移动模架包括三角桁架(4)以及固定在三角桁架下方的主梁(5),主梁(5)下方安装有与底板(2)上的轨道(3)相互配合的行走轮(6);三角桁架(4)顶部设有悬臂梁(7),三角桁架(4)一侧设置模架面板(8),模架面板(8)背面固定有横梁(9),三角桁架(4)与横梁(9)之间通过千斤顶丝杠(10)连接;模架面板(8)顶部通过吊耳(11)与沿着悬臂梁(7)前后运动的移动滚轮(12)连接。
CN2009102618277A 2009-12-30 2009-12-30 大跨度深基坑可移动整体大模板侧墙施工方法 Active CN101761092B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009102618277A CN101761092B (zh) 2009-12-30 2009-12-30 大跨度深基坑可移动整体大模板侧墙施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009102618277A CN101761092B (zh) 2009-12-30 2009-12-30 大跨度深基坑可移动整体大模板侧墙施工方法

Publications (2)

Publication Number Publication Date
CN101761092A true CN101761092A (zh) 2010-06-30
CN101761092B CN101761092B (zh) 2011-09-07

Family

ID=42492462

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009102618277A Active CN101761092B (zh) 2009-12-30 2009-12-30 大跨度深基坑可移动整体大模板侧墙施工方法

Country Status (1)

Country Link
CN (1) CN101761092B (zh)

Cited By (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102505709A (zh) * 2011-11-03 2012-06-20 浙江天力建设集团有限公司 基础预制混凝土模板施工方法
CN102535493A (zh) * 2012-01-12 2012-07-04 江苏省淮海建设集团有限公司 一种倒置式基础梁的施工方法
CN102747735A (zh) * 2012-07-06 2012-10-24 中国十七冶集团有限公司 一种深基坑混凝土支护排桩异常变形的处理方法
CN102817372A (zh) * 2011-06-09 2012-12-12 五冶集团上海有限公司 地下深基础混凝土反模施工方法
CN102926403A (zh) * 2012-11-15 2013-02-13 中国建筑第八工程局有限公司 盖挖法顶板施工方法
CN103266623A (zh) * 2013-05-30 2013-08-28 上海绿地建设(集团)有限公司 长条型等截面混凝土结构的整体水平移动式模板施工装置
CN103321246A (zh) * 2013-06-14 2013-09-25 孔志坚 采用地下连续墙的基坑施工方法
CN103572763A (zh) * 2013-11-18 2014-02-12 中建二局第三建筑工程有限公司 大跨度钢支撑基坑支护拆除施工方法
CN104141310A (zh) * 2013-05-07 2014-11-12 上海市政工程设计研究总院(集团)有限公司 一种装配式预应力鱼腹梁内支撑系统的施工方法
CN106917415A (zh) * 2017-04-10 2017-07-04 金陵科技学院 一种预制装配式地下结构及其施工方法
CN106988319A (zh) * 2017-04-10 2017-07-28 中铁隧道集团有限公司 一种大型深基坑主体结构侧墙的快速施工方法
CN109537623A (zh) * 2017-12-28 2019-03-29 中建科技有限公司深圳分公司 管廊安装方法
CN110144824A (zh) * 2019-05-12 2019-08-20 中铁二十二局哈尔滨铁路建设集团有限责任公司 贝雷片单侧支模法
CN111549821A (zh) * 2020-05-30 2020-08-18 深圳市建工集团股份有限公司 与地下室顶土方回填同步施工的落地式脚手架搭设方法
CN111705747A (zh) * 2020-06-05 2020-09-25 江苏省水利建设工程有限公司 一种河道挡墙用滑动模板组件
CN113529647A (zh) * 2021-07-09 2021-10-22 上海景铭建设发展有限公司 一种混凝土堤顶的施工系统及施工方法
CN114351675A (zh) * 2022-01-14 2022-04-15 江苏盐城水利建设有限公司 一种整体组合式大钢模船闸闸室墙保温施工方法
CN115125997A (zh) * 2022-08-01 2022-09-30 上海建工一建集团有限公司 一种组合式多腔体综合管廊的施工设备及施工方法
CN115324067A (zh) * 2022-07-23 2022-11-11 北京城乡建设集团有限责任公司 一种半盖挖精准定位安装钢支撑的装置

Cited By (30)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102817372A (zh) * 2011-06-09 2012-12-12 五冶集团上海有限公司 地下深基础混凝土反模施工方法
CN102505709A (zh) * 2011-11-03 2012-06-20 浙江天力建设集团有限公司 基础预制混凝土模板施工方法
CN102535493A (zh) * 2012-01-12 2012-07-04 江苏省淮海建设集团有限公司 一种倒置式基础梁的施工方法
CN102535493B (zh) * 2012-01-12 2012-12-05 江苏省淮海建设集团有限公司 一种倒置式基础梁的施工方法
CN102747735A (zh) * 2012-07-06 2012-10-24 中国十七冶集团有限公司 一种深基坑混凝土支护排桩异常变形的处理方法
CN102926403B (zh) * 2012-11-15 2015-07-08 中国建筑第八工程局有限公司 盖挖法顶板施工方法
CN102926403A (zh) * 2012-11-15 2013-02-13 中国建筑第八工程局有限公司 盖挖法顶板施工方法
CN104141310B (zh) * 2013-05-07 2017-04-26 上海市政工程设计研究总院(集团)有限公司 一种装配式预应力鱼腹梁内支撑系统的施工方法
CN104141310A (zh) * 2013-05-07 2014-11-12 上海市政工程设计研究总院(集团)有限公司 一种装配式预应力鱼腹梁内支撑系统的施工方法
CN103266623A (zh) * 2013-05-30 2013-08-28 上海绿地建设(集团)有限公司 长条型等截面混凝土结构的整体水平移动式模板施工装置
CN103266623B (zh) * 2013-05-30 2014-12-03 上海绿地建设(集团)有限公司 长条型等截面混凝土结构的整体水平移动式模板施工装置
CN103321246A (zh) * 2013-06-14 2013-09-25 孔志坚 采用地下连续墙的基坑施工方法
CN103321246B (zh) * 2013-06-14 2015-07-15 孔志坚 采用地下连续墙的基坑施工方法
CN103572763B (zh) * 2013-11-18 2015-08-26 中建二局第三建筑工程有限公司 大跨度钢支撑基坑支护拆除施工方法
CN103572763A (zh) * 2013-11-18 2014-02-12 中建二局第三建筑工程有限公司 大跨度钢支撑基坑支护拆除施工方法
CN106917415B (zh) * 2017-04-10 2024-01-19 金陵科技学院 一种预制装配式地下结构及其施工方法
CN106917415A (zh) * 2017-04-10 2017-07-04 金陵科技学院 一种预制装配式地下结构及其施工方法
CN106988319A (zh) * 2017-04-10 2017-07-28 中铁隧道集团有限公司 一种大型深基坑主体结构侧墙的快速施工方法
CN109537623A (zh) * 2017-12-28 2019-03-29 中建科技有限公司深圳分公司 管廊安装方法
CN109537623B (zh) * 2017-12-28 2021-03-02 中建科技有限公司深圳分公司 管廊安装方法
CN110144824A (zh) * 2019-05-12 2019-08-20 中铁二十二局哈尔滨铁路建设集团有限责任公司 贝雷片单侧支模法
CN111549821A (zh) * 2020-05-30 2020-08-18 深圳市建工集团股份有限公司 与地下室顶土方回填同步施工的落地式脚手架搭设方法
CN111549821B (zh) * 2020-05-30 2021-08-24 深圳市建工集团股份有限公司 与地下室顶土方回填同步施工的落地式脚手架搭设方法
CN111705747A (zh) * 2020-06-05 2020-09-25 江苏省水利建设工程有限公司 一种河道挡墙用滑动模板组件
CN113529647A (zh) * 2021-07-09 2021-10-22 上海景铭建设发展有限公司 一种混凝土堤顶的施工系统及施工方法
CN114351675A (zh) * 2022-01-14 2022-04-15 江苏盐城水利建设有限公司 一种整体组合式大钢模船闸闸室墙保温施工方法
CN115324067A (zh) * 2022-07-23 2022-11-11 北京城乡建设集团有限责任公司 一种半盖挖精准定位安装钢支撑的装置
CN115324067B (zh) * 2022-07-23 2023-08-18 北京城乡建设集团有限责任公司 一种半盖挖精准定位安装钢支撑的装置
CN115125997A (zh) * 2022-08-01 2022-09-30 上海建工一建集团有限公司 一种组合式多腔体综合管廊的施工设备及施工方法
CN115125997B (zh) * 2022-08-01 2024-05-07 上海建工一建集团有限公司 一种组合式多腔体综合管廊的施工设备及施工方法

Also Published As

Publication number Publication date
CN101761092B (zh) 2011-09-07

Similar Documents

Publication Publication Date Title
CN101761092B (zh) 大跨度深基坑可移动整体大模板侧墙施工方法
CN101864959B (zh) 一种地下车站主体结构的暗挖施工方法
CN104631512B (zh) 吊模法后浇带梁板施工方法
CN101906768B (zh) 混凝土面板堆石坝的面板施工方法
CN107059920B (zh) 黄土层管廊施工工艺
CN104060629B (zh) 盖挖逆作地铁车站叠合墙施工方法及移动式侧墙模板台车
CN110318776B (zh) 基于仰拱与仰拱填充层替代钢混组合结构的隧道施工方法
CN105256812B (zh) 基坑预制装配式混凝土支撑结构及其施工方法
CN101418571B (zh) 宽大基坑逆作法施工的中板施工方法
CN105178244A (zh) 一种现浇防浪墙快速立模施工方法
CN104533456A (zh) 一种超大断面硐室钢筋混凝土模筑施工的方法
CN110205921A (zh) 通过钢筋插入波纹管连接的预制拼装墩柱构造及施工方法
CN203924116U (zh) 移动式侧墙模板台车
CN111794254A (zh) 一种铁路边坡预制拼装后浇式骨架护坡结构及其施工方法
CN108035379B (zh) 一种综合管廊及其施工方法
CN107386246B (zh) 一种船闸闸室墙移动模架施工方法
CN210263131U (zh) 装配式自止水地下管廊构造
CN109594581A (zh) 跨河段管道结构及其安装方法
CN213143117U (zh) 一种装配式键槽基础挡土墙结构
CN102767378B (zh) 排架施工隧道双柱式洞门方法
CN101929245A (zh) 薄腹梁立式施工方法
CN107542065A (zh) 一种高陡泄槽小钢模翻升施工方法
CN204059973U (zh) 工具式墙体单侧模板支撑型钢桁架
CN106193120A (zh) 地下室悬挑底板逆作结构及施工方法
CN206888997U (zh) 隧道素混凝土衬砌施工用辅助设施

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant