CN102926403B - 盖挖法顶板施工方法 - Google Patents
盖挖法顶板施工方法 Download PDFInfo
- Publication number
- CN102926403B CN102926403B CN201210458382.3A CN201210458382A CN102926403B CN 102926403 B CN102926403 B CN 102926403B CN 201210458382 A CN201210458382 A CN 201210458382A CN 102926403 B CN102926403 B CN 102926403B
- Authority
- CN
- China
- Prior art keywords
- excavation
- construction
- cover
- support
- formwork
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
Abstract
本发明公开了一种盖挖法顶板施工方法,包括以下步骤:1)从自然地坪向下开挖土方至施工要求标高;2)平整开挖面,在该开挖面上浇筑混凝土施工垫层;3)待所述混凝土施工垫层满足设计强度后,在该混凝土施工垫层上搭设模板支撑架;4)在该模板支撑架上铺设模板;5)在该模板上浇筑混凝土梁板;6)待该混凝土梁板满足设计强度后,拆除所述模板支撑架与所述模板,破除所述混凝土施工垫层,进行下步土方开挖。本发明结合了盖挖和明挖的施工优势,既利用盖挖节约施工空间,又充分利用明挖支撑架体支模施工优势,加快了盖挖结构顶板的施工效率,提高了下步土方的开挖速度,保证了结构顶板的混凝土观感和施工质量,确保了下步工序的施工安全。
Description
技术领域
本发明关于一种顶板施工方法,尤其是指一种盖挖法顶板施工方法。
背景技术
盖挖法作为一种应用在城市交通繁忙地带施工地下车站、地下广场等地下结构的施工方法,在城市地下空间的建设中得到了广泛的推广应用。随着城市对地下空间深度和广度的拓展,地下结构的使用功能使得结构的梁板截面越来越大。常规盖挖法采用地膜施工结构顶板,土方开挖后往往造成结构顶板混凝土外观较差,地膜垫层和黏附在结构顶板下部的模板的脱落为后续的土方开挖带了施工困难和安全风险。同时,根据施工经验盖挖法土方开挖速度较明挖法施工速度慢,成本高。由于地下结构顶板截面尺寸随着使用功能的拓展要求越来越大,支模体系对下部承载结构的承载力要求就越来越高,尤其在富水软土地区的地下铁道工程中,超厚顶板、超大截面梁施工采用地膜施工难度加大,地膜易发生不均匀沉降,而影响大截面梁板的施工质量。
发明内容
有鉴于上述问题,本发明提供了一种盖挖法顶板施工方法,包括以下步骤:
1)从自然地坪向下开挖土方至施工要求标高;
2)平整开挖面,在该开挖面上浇筑混凝土施工垫层;
3)待所述混凝土施工垫层满足设计强度后,在该混凝土施工垫层上搭设模板支撑架;
4)在该模板支撑架上铺设模板;
5)在该模板上浇筑混凝土梁板;
6)待该混凝土梁板满足设计强度后,拆除所述模板支撑架与所述模板,破除所述混凝土施工垫层,进行下步土方开挖。
进一步的,在所述混凝土施工垫层上搭设所述模板支撑架后,对所述模板支撑架进行加固。
进一步的,在所述模板支撑架上铺设所述模板后,在所述模板上绑扎梁板钢筋,支设梁板侧模。
进一步的,平整所述开挖面后,根据地层含水情况在所述开挖面上留置排水盲沟。
进一步的,在所述开挖面上浇筑所述混凝土施工垫层时,选择强度C15或C20普通硅酸盐混凝土浇筑100mm至200mm厚。
进一步的,待所述混凝土施工垫层的强度达到70%以上后,在开挖的基坑内放出所述混凝土梁板的定位线,根据该定位线搭设所述模板支撑架。
进一步的,所述模板支撑架选择承插型盘扣式脚手架、碗口式钢管脚手架或扣件式钢管脚手架。
本发明的盖挖法顶板施工方法的有益效果是:结合了盖挖和明挖的施工优势,既利用盖挖节约施工空间,又充分利用明挖支撑架体支模施工优势,加快了盖挖结构顶板的施工效率,提高了下步土方的开挖速度,保证了结构顶板的混凝土观感和施工质量,确保了下步工序的施工安全。
附图说明
图1是本发明盖挖法顶板施工方法的流程图。
图2是本发明盖挖法顶板施工方法开挖前结构顶板的结构示意图。
图3是本发明盖挖法顶板施工方法开挖至施工要求标高后的结构示意图。
图4是本发明盖挖法顶板施工方法搭设模板支撑架后的结构示意图。
图5是本发明盖挖法顶板施工方法铺设模板后的结构示意图。
图6是本发明盖挖法顶板施工方法浇筑混凝土梁板后的结构示意图。
具体实施方式
配合参看图1所示,是本发明盖挖法顶板施工方法的流程图,包括以下步骤:
1)结合图2所示,从自然地坪10向下开挖土方至施工要求标高,优选的开挖至结构顶板标高以下3m至5m;
2)结合图3所示,平整开挖面,在该开挖面上浇筑混凝土施工垫层20;进一步的,平整所述开挖面后,根据地层含水情况在所述开挖面上留置排水盲沟21。进一步的,在所述开挖面上浇筑所述混凝土施工垫层20时,选择强度C15或C20普通硅酸盐混凝土浇筑100mm至200mm厚。
3)结合图4所示,待所述混凝土施工垫层20满足设计强度后,在该混凝土施工垫层20上搭设模板支撑架30;进一步的,在所述混凝土施工垫层20上搭设所述模板支撑架30后,对所述模板支撑架30进行加固。进一步的,待所述混凝土施工垫层20的强度达到70%以上后,在开挖的基坑内放出将要浇筑的混凝土梁板的定位线,根据该定位线搭设所述模板支撑架30。进一步的,所述模板支撑架30选择承插型盘扣式脚手架、碗口式钢管脚手架或扣件式钢管脚手架。所述模板支撑架30优先选择承插型盘扣式脚手架。
4)结合图5所示,在该模板支撑架30上铺设模板40与模板支撑的龙骨;进一步的,在所述模板支撑架30上铺设所述模板40后,在所述模板40上绑扎梁板钢筋,支设梁板侧模。
5)结合图6所示,在该模板40上浇筑混凝土梁板50;
6)待该混凝土梁板50满足设计强度后,拆除所述模板支撑架30与所述模板40,破除所述混凝土施工垫层20,即可进行下步土方开挖。
以上所述仅是本发明的较佳实施例而已,并非对本发明做任何形式上的限制,虽然本发明已以较佳实施例揭露如上,然而并非用以限定本发明,任何熟悉本专业的技术人员,在不脱离本发明技术方案的范围内,当可利用上述揭示的技术内容作出些许更动或修饰为等同变化的等效实施例,但凡是未脱离本发明技术方案的内容,依据本发明的技术实质对以上实施例所作的任何简单修改、等同变化与修饰,均仍属于本发明技术方案的范围内。
Claims (7)
1.一种盖挖法顶板施工方法,其特征在于包括以下步骤:
1)从自然地坪向下开挖土方以形成一用于搭设模板支撑架的空间;
2)平整所述用于搭设模板支撑架的空间的开挖面,在该开挖面上浇筑混凝土施工垫层;
3)待所述混凝土施工垫层满足设计强度后,在该混凝土施工垫层上搭设模板支撑架;
4)在该模板支撑架上铺设模板;
5)在该模板上浇筑混凝土梁板;
6)待该混凝土梁板满足设计强度后,拆除所述模板支撑架与所述模板,破除所述混凝土施工垫层,进行下部土方开挖。
2.如权利要求1所述的盖挖法顶板施工方法,其特征在于在所述混凝土施工垫层上搭设所述模板支撑架后,对所述模板支撑架进行加固。
3.如权利要求1或2所述的盖挖法顶板施工方法,其特征在于在所述模板支撑架上铺设所述模板后,在所述模板上绑扎梁板钢筋,支设梁板侧模。
4.如权利要求3所述的盖挖法顶板施工方法,其特征在于平整所述开挖面后,根据地层含水情况在所述开挖面上留置排水盲沟。
5.如权利要求4所述的盖挖法顶板施工方法,其特征在于在所述开挖面上浇筑所述混凝土施工垫层时,选择强度C15或C20普通硅酸盐混凝土浇筑100mm至200mm厚。
6.如权利要求5所述的盖挖法顶板施工方法,其特征在于待所述混凝土施工垫层的强度达到70%以上后,在开挖的基坑内放出所述混凝土梁板的定位线,根据该定位线搭设所述模板支撑架。
7.如权利要求6所述的盖挖法顶板施工方法,其特征在于所述模板支撑架选择承插型盘扣式脚手架、碗口式钢管脚手架或扣件式钢管脚手架。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210458382.3A CN102926403B (zh) | 2012-11-15 | 2012-11-15 | 盖挖法顶板施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210458382.3A CN102926403B (zh) | 2012-11-15 | 2012-11-15 | 盖挖法顶板施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102926403A CN102926403A (zh) | 2013-02-13 |
CN102926403B true CN102926403B (zh) | 2015-07-08 |
Family
ID=47641320
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210458382.3A Active CN102926403B (zh) | 2012-11-15 | 2012-11-15 | 盖挖法顶板施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102926403B (zh) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103741714B (zh) * | 2013-12-09 | 2016-09-14 | 中国建筑第二工程局有限公司 | 地下工程全盖挖逆作法施工方法 |
CN108149922B (zh) * | 2017-12-29 | 2023-06-16 | 上海市机械施工集团有限公司 | 一种适用于逆作法施工结构顶板的无排模板施工方法 |
CN112663619A (zh) * | 2020-11-18 | 2021-04-16 | 中铁二局集团有限公司 | 一种基坑盖板及支护体系施工方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4008577A (en) * | 1974-10-31 | 1977-02-22 | Bingham Sidney H | Cut and cover construction of subway with utility chamber and air conditioning with minimum street traffic disturbance |
CN1687536A (zh) * | 2005-06-07 | 2005-10-26 | 上海市城市建设设计研究院 | 利用既有地下室顶板作为天然盖板的暗挖加层施工方法 |
CN101235649A (zh) * | 2008-02-22 | 2008-08-06 | 上海市政工程设计研究总院 | 一种盖挖基坑系统 |
CN101761092A (zh) * | 2009-12-30 | 2010-06-30 | 中铁十二局集团第二工程有限公司 | 大跨度深基坑可移动整体大模板侧墙施工方法 |
CN102477745A (zh) * | 2010-11-28 | 2012-05-30 | 中建七局第四建筑有限公司 | 一种梁板结构分体施工方法 |
-
2012
- 2012-11-15 CN CN201210458382.3A patent/CN102926403B/zh active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4008577A (en) * | 1974-10-31 | 1977-02-22 | Bingham Sidney H | Cut and cover construction of subway with utility chamber and air conditioning with minimum street traffic disturbance |
CN1687536A (zh) * | 2005-06-07 | 2005-10-26 | 上海市城市建设设计研究院 | 利用既有地下室顶板作为天然盖板的暗挖加层施工方法 |
CN101235649A (zh) * | 2008-02-22 | 2008-08-06 | 上海市政工程设计研究总院 | 一种盖挖基坑系统 |
CN101761092A (zh) * | 2009-12-30 | 2010-06-30 | 中铁十二局集团第二工程有限公司 | 大跨度深基坑可移动整体大模板侧墙施工方法 |
CN102477745A (zh) * | 2010-11-28 | 2012-05-30 | 中建七局第四建筑有限公司 | 一种梁板结构分体施工方法 |
Non-Patent Citations (2)
Title |
---|
某工程超高、大跨度梁板模板支撑架体设计与施工技术;荣际泉;《建筑安全》;20071130(第11期);参见期刊第47-49页第1节、第3-4节及图1-4 * |
深圳地铁岗厦站某路段盖挖半逆作法施工技术;李良生;《西部探矿工程》;20040731(第7期);参见期刊第114-115页第2.2-2.7节 * |
Also Published As
Publication number | Publication date |
---|---|
CN102926403A (zh) | 2013-02-13 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106907159B (zh) | 一种浅埋暗挖地铁车站分离开敞式结构及其施工方法 | |
CN101914925B (zh) | 利用优化复合预制拱墙作外墙的地下室 | |
CN204662499U (zh) | 地下室混凝土外墙、防水、肥槽一体化施工构造 | |
CN104452809A (zh) | 一种超浅埋隧道盖挖施工方法 | |
CN101418569B (zh) | 预制拱片、支护与主体结构结合的优化复合拱墙 | |
CN102644466A (zh) | 岩质地层中修建超浅埋大跨度暗挖地铁车站的托梁拱盖法 | |
CN105839946B (zh) | 砖混结构建筑物提升增层方法 | |
CN102966114A (zh) | 塔机基础结构及其施工方法 | |
CN204343339U (zh) | 一种临时支撑柱防水底板 | |
CN108589737A (zh) | 一种城市主干道下地下快速路与轨交区间合建的施工方法 | |
CN208933989U (zh) | 一种塔吊基础结构 | |
CN103103988A (zh) | 利用中心岛楼板水平支撑结构的基坑施工方法 | |
CN110004991A (zh) | 基于外凸式翼脚板的地下结构抗浮体系及构建方法 | |
CN109750571A (zh) | 一种道路塌方应急与永久支挡一体化结构及施工方法 | |
CN109183848B (zh) | 一种隧道设计和建设方法 | |
CN106088115A (zh) | 增加土质高边坡稳定性的方法 | |
CN203066104U (zh) | H型素砼砌块及其所砌成的小型生态挡土墙 | |
CN102926403B (zh) | 盖挖法顶板施工方法 | |
CN206752667U (zh) | 一种地下室挡墙结构 | |
CN104652495A (zh) | 基坑内支撑立柱与底板节点防水施工工艺 | |
CN202100263U (zh) | 高烈度膨胀土地区高回填隧道明洞衬砌构造 | |
CN204825923U (zh) | 一种接力式基坑支护结构 | |
CN204282399U (zh) | 一种地铁围护结构 | |
CN203247838U (zh) | 全埋式地下室侧墙后浇带超前止水模板 | |
CN109898556A (zh) | 一种地下综合管廊结构及下沉式施工方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |