CN101750555A - Spare automatic switching comprehensive tester - Google Patents

Spare automatic switching comprehensive tester Download PDF

Info

Publication number
CN101750555A
CN101750555A CN200810243697A CN200810243697A CN101750555A CN 101750555 A CN101750555 A CN 101750555A CN 200810243697 A CN200810243697 A CN 200810243697A CN 200810243697 A CN200810243697 A CN 200810243697A CN 101750555 A CN101750555 A CN 101750555A
Authority
CN
China
Prior art keywords
isolating switch
circuit
activating device
aat
logic
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN200810243697A
Other languages
Chinese (zh)
Inventor
王友
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yangzhou Power Supply Co of Jiangsu Electric Power Co
Original Assignee
Yangzhou Power Supply Co of Jiangsu Electric Power Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yangzhou Power Supply Co of Jiangsu Electric Power Co filed Critical Yangzhou Power Supply Co of Jiangsu Electric Power Co
Priority to CN200810243697A priority Critical patent/CN101750555A/en
Publication of CN101750555A publication Critical patent/CN101750555A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention discloses a spare automatic switching comprehensive tester, and relates to a comprehensive tester of a spare automatic switching device in the field of an electrical power system and a power supply system. The spare automatic switching comprehensive tester can simulate a primary system operation state and a main transformation fault state and implement state detection on a detected spare automatic switching device comprehensively and intuitively on the premise of meeting the requirements of the prior art, and comprises an upper computer, a lower computer, an analogue amplifier, a circuit-breaker analogue circuit and a transformer state simulation circuit. The lower computer is connected with the analogue amplifier through a digital-to-analog converter and is connected with the circuit-breaker analogue circuit and the transformer state simulation circuit; the lower computer and the circuit-breaker analogue circuit are provided with a data interface which exchanges data with the detected spare automatic switching device bidirectionally; the analogue amplifier is provided with a voltage/current output port connected with the detected spare automatic switching device, and output ports P1 and P2 connected with the circuit-breaker analogue circuit; and the transformer state simulation circuit is provided with an interface through which a transformer state signal is transmitted to the detected spare automatic switching device unidirectionally, and output ports B1 and B2 connected with the circuit-breaker analogue circuit.

Description

A kind of prepared auto restart comprehensive tester
Technical field
The present invention relates to power system power supply system field, be particularly suitable for transformer station and responsible consumer dual power supply or the many power supplys backup auto-activating device of the stand-by power supply mode instrument that carries out integration test each other.
Background technology
In electrical production and supply process, for guaranteeing power supply reliability, reduce to greatest extent the user is had a power failure, transformer station and responsible consumer generally adopt dual power supply or many power supplys stand-by power supply mode each other, automatic throw-in equipment of emergency power supply AAT (being called for short " backup auto-activating device ") is an intelligent control device of realizing this function, and its safe and reliable operation is to guarantee that power supply is equipped with the successful key of throwing.
According to statistical data, the power outage that causes because of the tripping of backup auto-activating device own and malfunction still accounts for suitable ratio in the electric system power outage, because adopt the device association complexity of dual power supply or multi-power system power supply, the method of operation is changeable, and the on-the-spot realistic simulation test of backup auto-activating device can't be carried out because of needs change power supply mode or have a power failure.Whole group transmission test link is many, and wiring is complicated and waste time and energy, and makes mistakes easily, therefore judge and can the checking backup auto-activating device regular event, and be a very loaded down with trivial details and difficult job.
According to the requirement of Protection Technology supervision, the new backup auto-activating device of going into operation and the periodic inspection of backup auto-activating device must be qualified through the belt switch transmission test, with the reliability of guaranteeing device and the correctness of external circuit.Thereby guarantee that after working power or equipment disconnect because of failure and other reasons device can correct operation, guarantees power supply.Simultaneously,, before doing the switch transmission test, to carry out simulation test earlier, guarantee that device itself reliably to improve test efficiency, can also reduce the switch motion number of times simultaneously, to help the safe operation of primary equipment according to the convention of reaying protection test.At transformer station's built by separate periods and primary connection not exclusively and the periodic inspection under the back switch normal operating condition of going into operation, contradiction is more outstanding, can't carry out transmission test at all.In actual field, do not have suitable simulation test means and equipment.The logic of backup auto-activating device and the reliability in loop thereof, correctness can't guarantee.
At present domestic have the method for carrying out the automatic throw-in equipment of emergency power supply check comparatively loaded down with trivial details, the test connection complexity, the test very flexible, check is wasted time and energy, and test effect is not ideal enough, can't simulate the various states that actual capabilities occur fully, the mimic-disconnecting switch of use also well mimic-disconnecting switch steal and jump or the tripping state, the dereliction accident hinders analog machine.Feasible state to equipment under test can not comprehensively detect.
Summary of the invention
The present invention is directed to above problem, providing a kind of is satisfying under the prerequisite of prior art, primary system running status and main transformer malfunction can also be simulated, thereby the prepared auto restart comprehensive tester of state-detection can be realized comprehensively, intuitively to tested backup auto-activating device.
Technical scheme of the present invention is: link to each other with tested backup auto-activating device, comprise host computer, slave computer, it also comprises analogue amplifier, isolating switch mimic channel, transformer state artificial circuit, and slave computer links to each other by digital to analog converter with described analogue amplifier; Slave computer links to each other by I/O with described isolating switch mimic channel, transformer state artificial circuit; Slave computer, isolating switch mimic channel are provided with the data-interface with tested backup auto-activating device two-way exchange; Described analogue amplifier is provided with the electric current and voltage delivery outlet that connects tested backup auto-activating device, and the P1, the P2 delivery outlet that connect the isolating switch mimic channel; Described transformer state artificial circuit is provided with the interface that one-way transmission transformer state signal is given tested backup auto-activating device, and the B1, the B2 delivery outlet that connect the isolating switch mimic channel.
Described isolating switch mimic channel comprises interconnective L1, L2 and F isolating switch, and the import of L1 and L2 isolating switch links to each other with P1, the P2 delivery outlet of analogue amplifier respectively; Establish the M1 point between L1 and F, the M1 point connects the B1 delivery outlet; Establish the M2 point between L2 and F, the M2 point connects the B2 delivery outlet; L1, L2 link to each other with tested backup auto-activating device by data line respectively with F isolating switch and M1, M2 point, and L1, L2 link to each other with slave computer by I/O respectively simultaneously with the F isolating switch.
Establish in the slave computer record according to host computer instruction send various running statuses and receive L1, L2 and F isolating switch in tested backup auto-activating device logic feedback, the isolating switch mimic channel the action feedback, will aforementioned each information storer by the program of host computer demonstration.
The present invention adopts host computer (PC) to be parameter typing, display terminal, slave computer (MCU) is a control section, sends needed various analog quantity (voltage and current) and a plurality of digital quantity (I/O) by analogue amplifier, isolating switch mimic channel, transformer state artificial circuit to tested AAT; MCU receives the feedback signal of AAT, in time passes to PC by serial ports, is carried out and by graphic presentation, is reflected the residing state of tested AAT in time by it, and whether analyze tested AAT normal.Can simulate tens of kinds of phenomena of the failure under the available for different connection modes, comprise the various abnormal conditions that the prepared auto restart application places may occur substantially, can make comprehensively and judge accurately and differentiate the reliability of tested AAT.
By the investigation to principle of work, functional configuration and the secondary connection of various model backup auto-activating devices, we think: the difficult point that backup auto-activating device is tested is to simulate the breaker tripping and closing logic that contact and checking backup auto-activating device are left of leaving of actual switch.Core is the switch Design of Simulating Circuits.As long as simulate three~four isolating switchs, just can realize transmission test to tested backup auto-activating device.Isolating switch mimic channel of the present invention has been realized above-mentioned conception, has proposed a kind of isolating switch mimic channel, and has provided two kinds of typical test connections, has successfully solved the backup auto-activating device transmission test, and this perplexs relay protection personnel's a difficult problem for a long time.The invention solves the transmission test problem of backup auto-activating device, guaranteed backup auto-activating device correct, action message when electrical network has an accident.Improve power supply reliability, improved the quality of power supply, increased the indirect economic benefit of enterprise; Also solve the difficult problem of backup auto-activating device field-checking well, filled up the domestic blank of backup auto-activating device tester, also be very easy to equipment debugging personnel's work on the spot.
Description of drawings
Fig. 1 is a circuit configurations block diagram of the present invention
ATT is tested backup auto-activating device among the figure, and PC is a host computer, and MCU is a slave computer, and arrow is signal, electric current, voltage transmission direction,
Fig. 2 is the fundamental diagram of isolating switch mimic channel among the present invention
Embodiment
The present invention links to each other with tested backup auto-activating device as shown in Figure 1, comprises host computer, slave computer, and it also comprises analogue amplifier, isolating switch mimic channel, transformer state artificial circuit, and slave computer links to each other by digital to analog converter with described analogue amplifier; Slave computer links to each other by I/O with described isolating switch mimic channel, transformer state artificial circuit; Slave computer, isolating switch mimic channel are provided with the data-interface with tested backup auto-activating device two-way exchange; Described analogue amplifier is provided with the electric current and voltage delivery outlet that connects tested backup auto-activating device, and the P1, the P2 delivery outlet that connect the isolating switch mimic channel; Described transformer state artificial circuit is provided with the interface that one-way transmission transformer state signal is given tested backup auto-activating device, and the B1, the B2 delivery outlet that connect the isolating switch mimic channel.Described isolating switch mimic channel comprises interconnective L1, L2 and F isolating switch, and the import of L1 and L2 isolating switch links to each other with P1, the P2 delivery outlet of analogue amplifier respectively; Establish the M1 point between L1 and F, the M1 point connects the B1 delivery outlet; Establish the M2 point between L2 and F, the M2 point connects the B2 delivery outlet; L1, L2 link to each other with tested backup auto-activating device by data line respectively with F isolating switch and M1, M2 point, and L1, L2 link to each other with slave computer by I/O respectively simultaneously with the F isolating switch.Establish in the slave computer record according to host computer instruction send various running statuses and receive L1, L2 and F isolating switch in tested backup auto-activating device logic feedback, the isolating switch mimic channel the action feedback, will aforementioned each information storer by the program of host computer demonstration.
Principle of work of the present invention as shown in Figure 2, PC passes to slave computer according to default debugging module and each autoregressive parameter by communication interface; Slave computer is according to the instruction of accepting, parameter separately is transferred to analogue amplifier, isolating switch mimic channel, transformer state artificial circuit and tested backup auto-activating device respectively, establish in the slave computer record according to PC instruction send various running statuses and receive associated actuator part action feedback in the AAT logic feedback, 2, will above-mentioned each information storer by the program of PC demonstration.
In conjunction with Fig. 2 the course of work of the present invention is described now:
One, the AAT under single internal bridge form
Export to the analog quantity of AAT device by analogue amplifier: line current (two groups), line voltage distribution (single-phase two groups), busbar voltage (two groups of three-phases),
There is the output of pressure: U>Uset*1.03 that stream output: I>Iset*1.03 is arranged
Do not have the output of pressure: U<Uset*0.97 and do not have stream output: I<Iset*0.97
The switching value of being exported to the AAT device by isolating switch mimic channel, transformer state artificial circuit, MCU has: main transformer malfunction (2), the position of the switch (making war or close point for 3), the mimic-disconnecting switch that is provided by the isolating switch mimic channel is 3.
One, L1 standby (P1, P2, M1, M2 all have pressure, and L2 has stream, and L1 divides the position, and L2, F close the position)
1.1.0 original state: P1, P2, M1, M2 all have pressure, and L2 has stream, and L1 divides the position, and L2, F1 close the position, the AAT logic: charging;
1.1.1 simulation L2 does not have stream, AAT logic: no change;
1.1.2 simulation P1 decompression, the AAT logic: alarm, the time-delay discharge is also posted a letter;
1.1.3 simulation M1 decompression, AAT logic: only alarm;
1.1.4 simulation M2 decompression, AAT logic: only alarm;
1.1.5 simulation M1, M2 decompression, AAT logic: only alarm;
1.1.6 simulation M1 decompression, L2 does not have stream, the AAT logic: only alarm;
1.1.7 simulation M2 decompression, L2 does not have stream: the AAT logic: only alarm;
1.1.8 simulation M1, M2 decompression, L2 does not have stream, the AAT logic: jump L2 and close L1, recharge (normal logic);
Simulate L2 and refuse branch, the AAT logic this moment: jump F and close L1, do not recharge concurrent letter;
Simulate L1 refuse to close the AAT logic this moment: jump that to close L1 behind the L2 unsuccessful, discharge and post a letter;
1.2.1 simulation B1 fault, F tripping (AAT has input signal), AAT logic: discharge and post a letter;
1.2.2 simulation B2 fault, F, L2 tripping, AAT logic: close behind the L1 discharge and post a letter;
F tripping this moment, L2 refuse branchs, the AAT logic: close and discharge behind the L1 and post a letter;
This moment, F refused branch, L2 tripping, the AAT logic: discharge and post a letter;
Two, L2 standby (P1, P2, M1, M2 all have pressure, and L1 has stream, and L2 divides the position, and L1, F close the position)
1.1.0 original state: P1, P2, M1, M2 all have pressure, and L1 has stream, and L2 divides the position, and L1, F close the position, the AAT logic: charging;
1.1.1 simulation L1 does not have stream, AAT logic: no change;
1.1.2 simulation P2 decompression, the AAT logic: alarm, the time-delay discharge is also posted a letter;
1.1.3 simulation M1 decompression, AAT logic: only alarm;
1.1.4 simulation M2 decompression, AAT logic: only alarm;
1.1.5 simulation M1, M2 decompression, AAT logic: only alarm;
1.1.6 simulation M1 decompression, L1 does not have stream, the AAT logic: only alarm;
1.1.7 simulation M2 decompression, L1 does not have stream: the AAT logic: only alarm;
1.1.8 simulation M1, M2 decompression, L1 does not have stream, the AAT logic: jump L2 and close L1, recharge (normal logic);
Simulate L1 and refuse branch, the AAT logic this moment: jump F and close L2, do not recharge concurrent letter;
Simulate L2 refuse to close the AAT logic this moment: jump that to close L2 behind the L1 unsuccessful, discharge and post a letter;
1.2.1 simulation B2 fault, F tripping (AAT open into), AAT logic: discharge and post a letter;
1.2.2 simulation B1 fault, F, L1 tripping, AAT logic: close behind the L2 discharge and post a letter;
F tripping this moment, L1 refuse branchs, the AAT logic: close and discharge behind the L2 and post a letter;
This moment, F refused branch, L1 tripping, the AAT logic: discharge and post a letter;
Three, F standby (P1, P2, M1, M2 all have pressure, and L1, L2 all have stream, and F divides the position, and L1, L2 close the position)
1.1.0 original state: P1, P2, M1, M2 all have pressure, and L1, L2 all have stream, and F divides the position, and L1, L2 close the position, the AAT logic: charging;
1.1.1 simulation L1 does not have stream, AAT logic: no change;
Simulation L2 does not have stream, AAT logic: no change;
1.1.2 simulation P1, M1 be decompression simultaneously, the AAT logic: alarm, the time-delay discharge is also posted a letter;
Simulation P2, M2 be decompression simultaneously, the AAT logic: alarm, and the time-delay discharge is also posted a letter;
1.1.3 simulation M1 decompression, AAT logic: only alarm;
1.1.4 simulation M2 decompression, AAT logic: only alarm;
1.1.5 simulation M1, M2 decompression, AAT logic: only alarm;
1.1.6 simulation M1 decompression, L1 does not have stream, the AAT logic: jump L1 and close F, recharge (normal logic);
Simulate L1 refuse branch, the AAT logic this moment: discharge and post a letter;
Simulate F refuse to close the AAT logic this moment: jump and close F behind the L1 and do not become, discharge and post a letter;
1.1.7 simulation M2 decompression, L2 does not have stream: the AAT logic: jump L2 and close F, recharge (normal logic);
Simulate L2 refuse branch, the AAT logic this moment: discharge and post a letter;
Simulate F refuse to close the AAT logic this moment: jump and close F behind the L2 and do not become, discharge and post a letter;
1.2.1 simulation B1 fault, L1 tripping (AAT open into), AAT logic: discharge and post a letter;
1.2.2 simulation B2 fault, L2 tripping (AAT open into), AAT logic: discharge and post a letter;
In sum, the present invention can Simulation Substation and the various methods of operation of electric power system under primary connection, can intuitively show and provide the circuit under the variety of way and the electric and position signalling of switch to backup auto-activating device, the abnormal conditions of simulation under the various methods of operation, as: the circuit dead electricity, bus loss of pressure, the main transformer fault, switch is stolen and is jumped, tripping or the like, automatically monitor and write down the course of action and the related data of backup auto-activating device simultaneously, automatically handle experimental data, draw conclusion (of pressure testing), whether correct with the action of checking backup auto-activating device, and the formation laboratory report, for device long-time running maintenance management produces factual evidence.
The present invention can simulate the state and the relation of various logic each other of six above switches and three transformers, exceed cited mode of this device and project as the consumer networks primary connection, as enlarge interior bridge, particular forms such as sectionalized single busbar connection can be made amendment and can satisfy software according to customer requirements.After equipment comes into operation, make the debugging of backup auto-activating device more convenient, intuitive display as a result can reduce commissioning staff 2/3 debugging work load; Need not to carry out again primary equipment power failure simulation simultaneously, need not primary system fortune side and adjust, improve power supply reliability, avoid the terminal user to have a power failure.
Carry the three-phase test power supply in the machine, made things convenient for field adjustable.This device detects by national inspection center.Product meets " relay protection microcomputer type test unit technical conditions " (DL/T624-1997) standard.
Under the condition that need not the primary equipment full cut-off, finish all checks of automatic throw-in equipment of emergency power supply, and the warranty test mode needs with operation consistent; Device can be simulated the various methods of operation of electric system, be not only applicable to single internal bridge, be applicable to the expansion internal bridge simultaneously, can simulate any following any isolating switch in fortune side of leading and jump, refuse branch steathily, refuse to close and any main transformer failure condition, with the various performances of check automatic throw-in equipment of emergency power supply.Can simulate tens of kinds of phenomena of the failure under the available for different connection modes, comprise the various abnormal conditions that the prepared auto restart application places may occur substantially, can make comprehensively and judge accurately and differentiate the reliability of backup auto-activating device.
Tester of the present invention, easy to operate performance is directly perceived: the integrated demonstration of menu and figure, simple to operate, course of action is intuitively transparent.I/O mode is flexible: input and output contact has idle contact and two kinds of forms of current potential.Multiple logical course: have the antilogical function, the logic of some backup auto-activating device is anti-, and promptly when junction closure, internal logic is 0, and when contact separated, internal logic was 1.The user only need can realize by menu setting.Wide application: the prepared auto restart system works situation of tens of kinds of abnormality under the multiple method of operation of energy survey formula.Friendly background interface: have microcomputer interface, all operations can carry out on microcomputer, and test result is stored and printout.Easy-to-connect: panel jack output is all adopted in all input and output, arranges by transformer station and electric power system main wiring diagram, comes into plain view, and greatly facilitates the wiring operation, avoids wiring error.Adaptive faculty is strong: adapt to multiple import and homemade protection and backup auto-activating device.The graphical operation interface, multiple primary system main electrical scheme is simulated in the control of MCU processor, and extendible main electrical scheme type; Various dead electricity and main transformer fault that the different fortune sides of simulation electric system primary connection may occur down, the action behavior and the duty of test backup auto-activating device correspondence are so that the commissioning staff makes comprehensively, assesses exactly prepared auto restart; Large-sized solor LCD, but the variation of visual display system main wiring diagram, primary system trend and each make and break contact state; Complete Chinese operation display interface and test findings, clear course of action, the result who intuitively intactly tests, writes down and show whole backup auto-activating device supports multiple modes of operation, and be convenient and swift; Parameters, experimental result are preserved automatically, and power down is not lost.
It is responsible for the concrete work of function interface, algorithm, analysis PC, and transmits various parameters to MCU.MCU handles after receiving corresponding data, and data are separately delivered on the corresponding port, receive the feedback signal of equipment under test simultaneously, these signals are delivered to PC, be responsible at last handling corresponding signal by PC, and on the interface, reflect timely.PC adopts the WINDOWS system, has good interactive function software, and is short and sweet.The MCU plate adopts the system of signal processor formation simple and high-efficient data acquisition and processing (DAP) fast, and reliability and the antijamming capability that mounting process has improved system greatly pasted in unique design and advanced showing; Hardware has house dog and guarantee that system can in time reset when unusual; Perfect software and hardware self check can also make system guarantee that when operation various parameters are excellent; Serial D/the A with 8 passages is adopted in digital-to-analog conversion, and conversion accuracy is 12, switching time about 10 μ s, 1 passage is used for the analog to digital conversion to outside input quantity; MCU is by RS232 mouth and host computer swap data.

Claims (3)

1. prepared auto restart comprehensive tester, link to each other with tested backup auto-activating device, comprise host computer, slave computer, it is characterized in that, it also comprises analogue amplifier, isolating switch mimic channel, transformer state artificial circuit, and slave computer links to each other by digital to analog converter with described analogue amplifier; Slave computer links to each other by I/O with described isolating switch mimic channel, transformer state artificial circuit; Slave computer, isolating switch mimic channel are provided with the data-interface with tested backup auto-activating device two-way exchange; Described analogue amplifier is provided with the electric current and voltage delivery outlet that connects tested backup auto-activating device, and the P1, the P2 delivery outlet that connect the isolating switch mimic channel; Described transformer state artificial circuit is provided with the interface that one-way transmission transformer state signal is given tested backup auto-activating device, and the B1, the B2 delivery outlet that connect the isolating switch mimic channel.
2. a kind of prepared auto restart comprehensive tester according to claim 1 is characterized in that described isolating switch mimic channel comprises interconnective L1, L2 and F isolating switch, and the import of L1 and L2 isolating switch links to each other with P1, the P2 delivery outlet of analogue amplifier respectively; Establish the M1 point between L1 and F, the M1 point connects the B1 delivery outlet; Establish the M2 point between L2 and F, the M2 point connects the B2 delivery outlet; L1, L2 link to each other with tested backup auto-activating device by data line respectively with F isolating switch and M1, M2 point, and L1, L2 link to each other with slave computer by I/O respectively simultaneously with the F isolating switch.
3. a kind of prepared auto restart comprehensive tester according to claim 1, it is characterized in that, establish in the slave computer record according to host computer instruction send various running statuses and receive L1, L2 and F isolating switch in tested backup auto-activating device logic feedback, the isolating switch mimic channel the action feedback, will aforementioned each information storer by the program of host computer demonstration.
CN200810243697A 2008-12-12 2008-12-12 Spare automatic switching comprehensive tester Pending CN101750555A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200810243697A CN101750555A (en) 2008-12-12 2008-12-12 Spare automatic switching comprehensive tester

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200810243697A CN101750555A (en) 2008-12-12 2008-12-12 Spare automatic switching comprehensive tester

Publications (1)

Publication Number Publication Date
CN101750555A true CN101750555A (en) 2010-06-23

Family

ID=42477835

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200810243697A Pending CN101750555A (en) 2008-12-12 2008-12-12 Spare automatic switching comprehensive tester

Country Status (1)

Country Link
CN (1) CN101750555A (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102200559A (en) * 2011-03-23 2011-09-28 广东电网公司佛山供电局 Regional remote spare power source automatic transfer test method and related equipment
CN102879663A (en) * 2012-05-15 2013-01-16 许继集团有限公司 Relay protection device automatic testing system and testing tool special for same
CN103308797A (en) * 2013-05-22 2013-09-18 江苏省电力公司常州供电公司 Intelligent automatic standby power supply switching device calibration system
WO2014187133A1 (en) * 2013-05-22 2014-11-27 江苏省电力公司常州供电公司 Intelligent checking system for backup power supply automatic switching apparatus
CN104360181A (en) * 2014-10-08 2015-02-18 成都交大许继电气有限责任公司 Method for quick fault diagnosis when spare power automatic switching of traction substation fails
CN105527521A (en) * 2016-01-13 2016-04-27 云南电网有限责任公司西双版纳供电局 Relay protection device verification auxiliary equipment and monitoring system
CN107861004A (en) * 2017-11-08 2018-03-30 许昌许继软件技术有限公司 A kind of prepared auto restart Auto-Test System
CN107942228A (en) * 2017-11-20 2018-04-20 国网山东省电力公司泗水县供电公司 Backup auto-activating device laboratory apparatus and experimental method based on mimic-disconnecting switch
CN108153281A (en) * 2017-12-23 2018-06-12 国网宁夏电力有限公司检修公司 It is a kind of that tester of the dual power supply for throwing system is exchanged based on the output of high voltage constant pressure source power amplifier
CN108631313A (en) * 2018-06-21 2018-10-09 国网江苏省电力有限公司南通供电分公司 Network prepared auto restart control strategy automatic test approach
CN113533889A (en) * 2021-07-26 2021-10-22 南方电网数字电网研究院有限公司 Spare power automatic switching uninterrupted visual test method and device based on digital analog circuit breaker

Cited By (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102200559A (en) * 2011-03-23 2011-09-28 广东电网公司佛山供电局 Regional remote spare power source automatic transfer test method and related equipment
CN102200559B (en) * 2011-03-23 2013-05-29 广东电网公司佛山供电局 Regional remote spare power source automatic transfer test method and related equipment
CN102879663A (en) * 2012-05-15 2013-01-16 许继集团有限公司 Relay protection device automatic testing system and testing tool special for same
CN104897984A (en) * 2013-05-22 2015-09-09 江苏省电力公司常州供电公司 Backup power automatic switching device intelligent calibration system with convenient operation
CN103308797B (en) * 2013-05-22 2015-06-03 江苏省电力公司常州供电公司 Intelligent automatic standby power supply switching device calibration system
CN104897986A (en) * 2013-05-22 2015-09-09 江苏省电力公司常州供电公司 Backup power automatic switching device intelligent calibration system with good detection effect
CN103308797A (en) * 2013-05-22 2013-09-18 江苏省电力公司常州供电公司 Intelligent automatic standby power supply switching device calibration system
CN104898047A (en) * 2013-05-22 2015-09-09 江苏省电力公司常州供电公司 Backup power automatic switching device intelligent calibration system with convenient wire connection
WO2014187133A1 (en) * 2013-05-22 2014-11-27 江苏省电力公司常州供电公司 Intelligent checking system for backup power supply automatic switching apparatus
US9606185B2 (en) 2013-05-22 2017-03-28 Chang Zhou Current Supply Company Of Jiangsu Electric Power Company Intelligent calibration system for backup-power automatic switching device
CN104360181B (en) * 2014-10-08 2017-12-01 成都交大许继电气有限责任公司 Fault Quick Diagnosis method when traction substation prepared auto restart fails
CN104360181A (en) * 2014-10-08 2015-02-18 成都交大许继电气有限责任公司 Method for quick fault diagnosis when spare power automatic switching of traction substation fails
CN105527521A (en) * 2016-01-13 2016-04-27 云南电网有限责任公司西双版纳供电局 Relay protection device verification auxiliary equipment and monitoring system
CN107861004A (en) * 2017-11-08 2018-03-30 许昌许继软件技术有限公司 A kind of prepared auto restart Auto-Test System
CN107942228A (en) * 2017-11-20 2018-04-20 国网山东省电力公司泗水县供电公司 Backup auto-activating device laboratory apparatus and experimental method based on mimic-disconnecting switch
CN108153281A (en) * 2017-12-23 2018-06-12 国网宁夏电力有限公司检修公司 It is a kind of that tester of the dual power supply for throwing system is exchanged based on the output of high voltage constant pressure source power amplifier
CN108153281B (en) * 2017-12-23 2019-07-19 国网宁夏电力有限公司检修公司 It is a kind of that dual power supply is exchanged for the tester of throwing system based on the output of high voltage constant pressure source power amplifier
CN108631313A (en) * 2018-06-21 2018-10-09 国网江苏省电力有限公司南通供电分公司 Network prepared auto restart control strategy automatic test approach
CN113533889A (en) * 2021-07-26 2021-10-22 南方电网数字电网研究院有限公司 Spare power automatic switching uninterrupted visual test method and device based on digital analog circuit breaker

Similar Documents

Publication Publication Date Title
CN101750555A (en) Spare automatic switching comprehensive tester
CN201319052Y (en) Auto-switch-on integrated tester
CN101504449B (en) Experiment tester for spare power automatic switching apparatus
CN103713214A (en) Intelligent transformer station relay protection closed loop test system
CN201893058U (en) Safe simulation training system for distribution room
CN201466500U (en) Multifunctional intelligent power distribution box
CN103903496A (en) 10kV digital power distribution room simulation training system
CN102355048A (en) Intelligent dual-power automatic transfer switch and running method
CN103545917A (en) Scheduling-automation sub-station simulation system
CN109274182A (en) The long-range integrated monitoring platform of DC power supply
CN203013082U (en) 10kV digital power distribution room simulation training system
CN211827669U (en) Distribution network automation simulation training system
CN101557102A (en) General-purpose simulation device for microcomputer protection
CN105094120B (en) Simulate the test device of primary equipment action behavior
CN105810062A (en) 10kV typical customer transformer substation intelligent simulation training system
CN201392392Y (en) Experiment tester of pare power automatic switching device
CN111458586A (en) Batch synchronous detection method and system for multi-interval in-situ line protection device of intelligent substation
CN209070028U (en) A kind of exploitation of direct-current charging post and test macro
CN202102060U (en) Direct current distribution intelligent detection unit
CN204884390U (en) Trouble sets up system based on PROFIBUS bus
CN204065322U (en) For the failure diagnosis apparatus of ring main unit distribution terminal
CN201230204Y (en) Logic test device for microcomputer type protection monitoring module in power supply and distribution system
CN112216174A (en) AC/DC power supply fault simulation system
CN102255382A (en) Intelligent monitor of switch cabinet
CN218825293U (en) Detection device applied to special transformer control extension module

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20100623