CN211827669U - Distribution network automation simulation training system - Google Patents

Distribution network automation simulation training system Download PDF

Info

Publication number
CN211827669U
CN211827669U CN202020477213.4U CN202020477213U CN211827669U CN 211827669 U CN211827669 U CN 211827669U CN 202020477213 U CN202020477213 U CN 202020477213U CN 211827669 U CN211827669 U CN 211827669U
Authority
CN
China
Prior art keywords
simulation
line
switch
ring main
main unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020477213.4U
Other languages
Chinese (zh)
Inventor
巫耀光
清泉
秋磊
张颖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhuhai Wanlida Electrical Automation Co ltd
Original Assignee
Zhuhai Wanlida Electrical Automation Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhuhai Wanlida Electrical Automation Co ltd filed Critical Zhuhai Wanlida Electrical Automation Co ltd
Priority to CN202020477213.4U priority Critical patent/CN211827669U/en
Application granted granted Critical
Publication of CN211827669U publication Critical patent/CN211827669U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The utility model discloses a distribution network automation emulation training system, it includes the emulation cabinet, the emulation cabinet is including the transformer substation owner that links to each other in proper order becoming the analog box, at least one analog simulation looped netowrk cabinet, analog simulation terminal equipment, alternating current-direct current power supply analog box, transformer substation owner becomes the analog box and is equipped with the A line switch of being qualified for the next round of competitions, the B line switch of being qualified for the next round of competitions, the analog simulation looped netowrk cabinet includes A line analog simulation looped netowrk cabinet and B line analog simulation looped netowrk cabinet, the A line switch of being qualified for the next round of competitions is connected with the A line business turn over line switch of A line analog simulation looped netowrk cabinet, the B line business turn over line switch of B line analog simulation looped netowrk cabinet is connected, each A. The utility model discloses a modularized design has pointed ground to build emulation training system fast, and the operation of distribution network system safety, reliable can further be guaranteed to the net rack structure of the local distribution network of real ground simulation user, various distribution network switches and field failure.

Description

Distribution network automation simulation training system
[ technical field ] A method for producing a semiconductor device
The utility model relates to a distribution automation technical field, it is specific, relate to a distribution network automation simulation training system.
[ background of the invention ]
Along with the increasing expansion of the construction scale of a power distribution network, the requirement on power supply reliability is continuously improved, the power distribution network automation industry is rapid, the problems that the power distribution network automation terminal in the power distribution network is various in types, single in function, difficult in fault analysis and the like are brought, and the operation and maintenance pressure on operators is increased rapidly. At present, no special simulation training system for automatic equipment in a distribution network is available in the market, and related personnel can only know related products by means of actual work, so that the personnel cannot master the products sufficiently, and the field operation proficiency is poor. In addition, in the aspect of detection of related products, a relay protection tester is adopted to perform simulation test on a single distribution network automation device at present to check whether equipment is intact.
In recent years, some enterprises put forward simulation training systems, but all the systems adopt fixed hardware equipment, have poor integration level, cannot be flexibly configured, cannot truly simulate various faults of a distribution network, and simultaneously have larger difference of local network architecture operation modes of users, so that the aims of dynamic simulation testing and simulation training are difficult to achieve due to poor pertinence and practicability.
The following are the disadvantages of the prior art:
1) the local real distribution network structure cannot be truly simulated.
The network frame structures of different areas and different power supply companies are different, the operation and maintenance modes are different, the existing simulation system is solidified at the beginning of design, the equipment configuration, the mutual topological structure and the communication mode are difficult to change, the flexibility is poor, and the actual distribution network structure cannot be simulated according to the local real condition of a user. The technology adopts a modular design, can flexibly configure the number of simulation equipment and the contact mode between the simulation equipment, can verify different distribution network automation strategies, and finally determines one or more distribution network automation schemes suitable for a local area through systematic tests.
2) The problems of incomplete and incomplete test, error setting and the like exist in the power distribution automation terminal test.
In most existing distribution network automation schemes, the action logic of the distribution automation terminal is related to the action conditions of the upper and lower terminals, such as an optical fiber differential protection mode, an intelligent distributed protection mode, a voltage current mode, a voltage time mode, and the like. Especially, when the optical fiber differential protection and the intelligent distributed protection are used for field test by a relay protection tester, the field test is not in place and incomplete due to the difficulty in ensuring the synchronization of the applied voltage and the current, and the situations of error setting and error wiring occur. Because the system simulates the whole power distribution grid structure, the current and voltage during the fault are completely consistent with the actual fault. By adopting the system to carry out network access test or debugging before commissioning of the terminal equipment, the problems of the terminal equipment can be found in time, the error of setting the fixed value is avoided, and the defect is prevented from being brought into actual operation.
3) The training effect is poor.
Distribution network automation equipment combines multiple technologies such as relay protection, automation, communication and direct-current backup power, and distribution network switches, operating mechanisms and automation terminals are multiple in variety and manufacturers, so that operation and maintenance personnel are difficult to be familiar with distribution network automation technology. At present, the training from the organization personnel to the field is mainly adopted, and the training effect is poor because only a single set of equipment on the field can not comprehensively know the action condition of the whole looped network switch equipment. The utility model discloses simulated from transformer substation owner become all switches and the automation equipment that the user distributed the electrical room, can simulate multiple switch and operating device, had multiple distribution network automation mode, the security is high, the training environment is good, adopt utility model to join in marriage net automization relevant planning, design, debugging, operation personnel and carry out the technical training, can play the effect of doing the job a lot doubly.
4) The display is not intuitive.
Present relevant system can only look over each equipment running state through backstage or equipment panel, shows directly perceived inadequately, the utility model discloses an inferior gram force simulation lamp area, size and the flow direction that can analog current and voltage show very directly perceived, simple and convenient.
[ Utility model ] content
In order to overcome prior art's not enough, the utility model aims to provide a distribution network automation emulation training system, this system adopts the modularized design, can be according to the user site conditions, the emulation training system is built fast to pointed ground, simulate user local distribution network rack structure truthfully, various distribution network switch and field fault, restore the on-the-spot actual conditions of distribution network perfectly, help the practitioner to be familiar with distribution network system structure fast, master each link basic operation, strengthen staff's each item operating skill and fault handling ability, promote staff's distribution network automation technological level, guarantee distribution network system safety, reliable operation.
In order to achieve the main purpose, the utility model adopts the following technical scheme:
a distribution network automation simulation training system comprises a simulation cabinet, wherein the simulation cabinet comprises a transformer substation main transformer simulation box, at least one simulation ring main network cabinet, simulation terminal equipment and an alternating current/direct current power supply simulation box for providing alternating current and direct current power supply for the simulation cabinet which are sequentially connected, the simulation ring main network cabinet is used for simulating the secondary principle wiring of a real ring main network cabinet unit, the transformer substation main transformer simulation box is provided with an A-line outgoing switch and a B-line outgoing switch, the simulation ring main network cabinet comprises an A-line simulation ring main network cabinet and a B-line simulation ring main network cabinet, the A-line outgoing switch is connected with at least one A-line incoming and outgoing switch of the A-line simulation ring main network cabinet and forms an A line with the simulation terminal equipment, and the B-line outgoing switch is connected with at least one B-line incoming and outgoing switch of the B-line simulation ring main network cabinet, and form the B circuit with the said analog simulation terminal installation; the A line in-out switch of the first A line simulation ring main unit is connected with the A line in-out switch of the second A line simulation ring main unit, the B line in-out switch of the first B line simulation ring main unit is connected with the B line in-out switch of the second B line simulation ring main unit, and each A line simulation ring main unit is provided with at least two A line in-out switches which are sequentially connected; each of the A-line analog simulation ring main unit and the B-line analog simulation ring main unit is provided with a communication network box, and the communication network boxes are used for collecting related information and simulating communication states among the devices; the simulation terminal equipment is composed of an A-line simulation ring main unit and a user simulation power distribution room, the A-line simulation ring main unit of the simulation terminal equipment comprises 3A-line in-out switches, a first A-line in-out switch of the simulation terminal equipment is connected with an A-line in-out switch of the last A-line simulation ring main unit on the A line, a second A-line in-out switch of the simulation terminal equipment is connected with a B-line in-out switch of the last B-line simulation ring main unit on the B line, a third A-line in-out switch of the simulation terminal equipment is connected with the user simulation power distribution room, and the third A-line in-out switch of the simulation terminal equipment is a feeder switch.
The transformer substation main transformer simulation box is provided with a simulation transformer and a first relay module, the first relay module is used for simulating the state of an outgoing line switch of the transformer substation main transformer, and the simulation transformer and the first relay module are respectively connected with the alternating current/direct current power supply simulation box, wherein the simulation transformer is a three-phase dry-type transformer.
According to a further scheme, the alternating current-direct current power supply simulation box comprises a power input end, a power supply transformer and a switch power supply, wherein the power input end is connected with a wire inlet end of the power supply transformer, a wire outlet end of the power supply transformer is respectively connected with an input end of the switch power supply and a wire inlet end of the simulation transformer, and an output end of the switch power supply is connected with an input end of the relay module.
In a further aspect, an industrial ethernet switch is installed in the communication network box.
In a further scheme, an analog switch composed of a second relay module and a load resistor and a control terminal for controlling the second relay module to be switched on and off and switching the load resistor are installed in the A-line analog simulation ring main unit and the B-line analog simulation ring main unit.
The further scheme is that a distribution automation terminal, a remote/local simulation control switch, a control state display lamp, a simulation on-off indicator lamp, a local simulation on-off button and a load switch mechanism are arranged on a control panel of the simulation ring main unit and used for simulating secondary principle wiring of a real ring main unit.
According to a further scheme, the power distribution automation terminal comprises a data acquisition module and a central processing unit, and the data acquisition module sends acquired analog switch signals and current signals to the central processing unit for processing.
In a further scheme, the central processing unit comprises a data processing module and a main control module; the data processing module and the main control module adopt low-power consumption dual-core application processors.
The further scheme is that the A-line outgoing switch, the B-line outgoing switch, the A-line incoming and outgoing switch and the B-line incoming and outgoing switch adopt air switches with electric operating mechanisms, communication interfaces and one-time reclosing functions.
In a further scheme, a primary simulation graphic board is arranged on a control panel of the transformer substation main transformer simulation box, the simulation ring main unit and the simulation terminal equipment.
Compared with the prior art, the beneficial effects of the utility model reside in that:
1. the utility model discloses design according to the equipment and the parameter of actual electric wire netting, contain from the transformer substation become all key equipment of user's distribution room, provide the environment the same with the scene and carry out distribution network automation test, emulation and training.
2. The modular combination mode is adopted, the configuration and the transformation can be flexibly carried out according to the requirements of different grid structures of users, and the requirements of different grid structures in different regions are ensured to be met.
3. An intuitive one-step simulation drawing board is manufactured by adopting a high-grade acrylic board and is subjected to silk printing, and a multi-color luminous lamp belt is embedded to simulate the electrified condition of a cable and a ring main unit. The high-grade aluminum profiles are adopted as frameworks around the simulation drawing board, so that the simulation drawing board is attractive in appearance, firm, durable and convenient to disassemble and assemble.
Therefore, the utility model provides an environment completely consistent with the distribution network site, which simulates the whole grid structure from the transformer substation main transformer to the transformer substation outgoing switch, the cable and the distribution network switch to the user distribution room; the system can be used as a training platform in various aspects such as verification of a distribution network automation strategy, test of a distribution network automation terminal, test of FA functions of a distribution network main station, distribution network operation, a distribution network automation technology, distribution network automation operation and maintenance and the like.
[ description of the drawings ]
Fig. 1 is a schematic diagram of an embodiment of the distribution network automation simulation training system of the present invention.
Fig. 2 is the utility model relates to a distribution network automation emulation training system embodiment in the transformer substation become the schematic structure of simulation box.
Fig. 3 is the utility model relates to a distribution network automation emulation training system embodiment in the structural schematic diagram of analog simulation looped netowrk cabinet.
Fig. 4 is a schematic structural diagram of an analog simulation terminal device in an embodiment of the distribution network automation simulation training system of the present invention.
Fig. 5 is a schematic diagram of an ac/dc power supply simulation box in an embodiment of a distribution network automation simulation training system.
Fig. 6 is a schematic circuit diagram of a KZQ intelligent distributed device in an embodiment of a distribution network automation simulation training system.
Fig. 7 is a schematic circuit diagram of a fault control terminal in an embodiment of a distribution network automation simulation training system.
Fig. 8 is a schematic diagram of a circuit related to a load resistor in an embodiment of the distribution automation simulation training system of the present invention.
Fig. 9 is a schematic diagram of the KZQ intelligent distributed device connected to the fault control terminal in the embodiment of the distribution network automation simulation training system.
[ detailed description ] embodiments
In order to make the objects, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative of the invention and are not limiting of the invention.
Referring to fig. 1 to 4, the utility model discloses a distribution automation simulation training system, which comprises a simulation cabinet, the simulation cabinet comprises a transformer substation main transformer simulation box 10, at least one simulation ring main network cabinet 20, a simulation terminal device 30, an ac/dc power simulation box 50 for providing ac and dc power for the simulation cabinet, the simulation ring main transformer cabinet 20 is used for simulating the wiring of the secondary principle of a real ring main network cabinet unit, the transformer substation main transformer simulation box 10 is used for controlling the above devices and the circuit connection and disconnection, the transformer substation main transformer simulation box 10 is provided with an a-line outgoing switch 100 and a B-line outgoing switch, the simulation ring main network cabinet 20 comprises an a-line simulation ring main network cabinet 21 and a B-line simulation ring main network cabinet 22, the a-line outgoing switch is connected with an a-line incoming and outgoing switch of at least one a-line simulation ring main network cabinet 21 and forms an a-line with the simulation terminal device 30, the B-wire outgoing switch is connected with at least one B-wire incoming and outgoing switch of the B-wire analog simulation ring main unit 22, and forms a B-wire with the analog simulation terminal device 30. In this embodiment, the number of the analog ring main units 20 is 3.
The a-line in-out switch of the first a-line analog simulation ring main unit 21 is connected with the a-line in-out switch of the second a-line analog simulation ring main unit 21, the B-line in-out switch of the first B-line analog simulation ring main unit 22 is connected with the B-line in-out switch of the second B-line analog simulation ring main unit 22, wherein each a-line analog simulation ring main unit 21 is provided with at least two a-line in-out switches which are sequentially connected.
Each of the a-line analog simulation ring main unit 21 and the B-line analog simulation ring main unit 22 is provided with a communication network box 40, and the communication network box 40 is used for collecting related information and simulating communication states among the devices.
In this embodiment, the analog simulation terminal device 30 is composed of an a-line analog simulation ring main unit 21 and a user simulation power distribution room 31, the a-line analog simulation ring main unit 21 of the analog simulation terminal device 30 includes 3 a-line in/out switches, a first a-line in/out switch of the analog simulation terminal device 30 is connected to an a-line in/out switch of the last a-line analog simulation ring main unit 21 on the a-line, a second a-line in/out switch of the analog simulation terminal device 30 is connected to a B-line in/out switch of the last B-line analog simulation ring main unit 22 on the B-line, a third a-line in/out switch of the analog simulation terminal device 30 is connected to the user simulation power distribution room, wherein the third a-line in/out switch of the analog simulation terminal device 30 is a feeder switch.
Referring to fig. 5, the transformer substation main transformer simulation box 10 is provided with a simulation transformer T2 and a first relay module, the first relay module is used for simulating the outgoing switch state of the transformer substation main transformer, the simulation transformer T2 and the first relay module are respectively connected with the ac/dc power supply simulation box 50, and the simulation transformer T2 is a three-phase dry-type transformer.
In this embodiment, the ac/dc power supply simulation box 50 includes a power input terminal, a power supply transformer T1 and a switching power supply 41, the power input terminal is connected to the incoming line terminal of the power supply transformer T1, the outgoing line terminal of the power supply transformer T1 is connected to the input terminal of the switching power supply and the incoming line terminal of the simulation transformer T2, respectively, and the output terminal of the switching power supply 41 is connected to the input terminal of the relay module. It can be seen that the power supply transformer T1 and the switching power supply 41 are provided inside, and provide ac and dc power for the whole system, and are used for power supply and power supply transformation, supplying power for the devices of the whole set of analog system and for the transmission of protection voltage, and generally 1 to 3 devices are configured according to the actual primary main line mode.
The power input end of the transformer substation main transformer simulation box 10 comprises bus voltage (Uab, Ubc, 3U0), current (Ia, Ib, Ic, 3I0) and incoming line voltage Uab, and calculation of active power, reactive power and power factor is achieved; the protection, safety automation and feeder automation logic functions are realized.
An industrial ethernet switch is installed in the communication network box 40. It can be seen that the communication network box 40 is used for realizing communication among the control terminal, the distribution automation terminal 101, the dispatching automation system, the real-time monitoring system and the remote maintenance system. An Ethernet switch is arranged in the box body, and an intelligent communication management unit is arranged on a panel of the box body. Generally, 2 to 10 units are arranged in an actual primary main wiring manner.
Referring to fig. 6 to 8, the analog switches composed of the second relay module and the load resistor and the control terminals for controlling the second relay module to switch on and off and switching the load resistor are installed in the a-line analog simulation ring main unit 21 and the B-line analog simulation ring main unit 22. Therefore, the analog switch is used for simulating various switches and cables of the outgoing line switch and the distribution network of the transformer substation, the main transformer analog box 10 of the transformer substation, the analog simulation ring main unit 20 and the analog simulation terminal device 30 are connected through the aviation plug, and the assembly and disassembly are very convenient. The cabinet body is internally provided with a terminal for controlling the switching on and off of the relay and switching over the load resistor, the functions of simulating a switch, controlling various input and output interfaces and automating are realized by controlling the switching on and off of the output relay, and the fault current is simulated by switching over the load resistor.
Specifically, a KZQ intelligent distributed device, a fault control terminal and a plurality of load resistors are installed in the A line analog simulation ring main unit and the B line analog simulation ring main unit, wherein the KZQ intelligent distributed device is used for collecting bus voltage, line voltage, phase current and zero sequence current output by an analog switch of a transformer substation, and is also used for collecting switch on-off positions and other switch input quantities of the fault control terminal, and can protect and remotely control switch-off signals to be input to the fault control terminal, and the functions of the power distribution terminal are protection, safety automatic control, voltage current type feeder automation, voltage time type feeder automation and intelligent distributed feeder automation integrated, such as a KZQ-5990 switch cabinet intelligent control device.
The second relay module of this embodiment is integrated in fault control terminal, can simulate circuit breaker separating brake coil, closing coil, circuit breaker auxiliary contact, control relay. The function of the device is to switch load resistance to simulate fault current; simulating the opening and closing of the circuit breaker, and outputting a dry contact signal to the intelligent distributed device; and outputting a 5V signal to control the color of the lamp strip. The fault control terminal receives electric signals of ABC0G 5 buttons, the automatic control relay switches the load resistor to simulate fault current, when AB is pressed, the AB phase is short-circuited, A0 is pressed, A phase is grounded, and AG is pressed, A phase is overloaded.
In fig. 1 to 9, the resistor R1, the resistor R2, the resistor R3, the resistor R4, the resistor Ra, the resistor Rb, and the resistor Rc are all load resistors, wherein the resistor Ra, the resistor Rb, and the resistor Rc are metal resistors; x is a high-current terminal, DY1-DY2 is a power module, T2 is a three-phase dry-type transformer, T1 is an isolation transformer, CK is a change-over switch, and 6 pairs of contact change-over switches are arranged in total; HC8 is HF-8 core aviation plug, HC9 is HF-9 core aviation plug, HC10 is HF-10 core aviation plug; KZB is an expansion board; K1-K6 is a control switch; LP1, LP2 and LP3 are connecting sheets; KSH is distant place, change over switch on the spot, KK is for closing and separating brake change over switch, HD is combined floodgate pilot lamp, LD is separating brake pilot lamp, 1ZK is the ship type switch, MP is fault control terminal, and KZQ is intelligent distributed device.
In this embodiment, the control panel of the analog simulation ring main unit 20 is provided with a distribution automation terminal, a remote/local simulation control switch, a control status display lamp, a switch-on/off simulation indicator lamp, a local switch-on/off simulation button, and a load switch mechanism, and is used for simulating the secondary principle wiring of the real ring main unit. Therefore, different types of distribution automation terminals (such as a DTU and an FTU) are installed on a panel of the box body, each distribution terminal realizes various automation functions according to detected states and currents of the analog switch, and 15 to 35 distribution automation terminals are generally configured according to an actual primary main wiring mode.
The power distribution automation terminal comprises a data acquisition module and a central processing unit, wherein the data acquisition module sends acquired analog switch signals and current signals to the central processing unit for processing.
The central processing unit comprises a data processing module and a main control module; the data processing module and the main control module adopt low-power consumption dual-core application processors.
Preferably, the a-line outgoing switch, the B-line outgoing switch, the a-line incoming and outgoing switch, and the B-line incoming and outgoing switch are air switches having an electric operation mechanism, a communication interface, and a primary reclosing function.
Preferably, the transformer substation main transformer simulation box 10, the simulation ring main unit 20 and the simulation terminal device 30 are all formed by stainless steel mounting brackets, and are used for mounting the various simulation boxes and the primary simulation drawing board according to a primary main wiring manner.
In this embodiment, the primary simulation panels are disposed on the control panels of the transformer substation main transformer simulation box 10, the simulation ring main unit 20, and the simulation terminal device 30. It can be seen that the primary simulation chart board is mounted on a stainless steel support and is provided with a lamp strip for simulating a power transmission cable, when the lamp strip is green, no voltage is present on the cable, and when the lamp strip is red, voltage is present on the cable. The system can be used for visually displaying the name of each station and displaying the electrified condition of the corresponding switch and cable through the colored lamp strip, and various control buttons of the system are arranged on the system.
In practical application, the utility model discloses a main wiring scheme of once need be according to the configuration of user's on-the-spot net actual conditions to the basic grid structure of most power supply networks configures into the example, constitutes the main ring by two circuit hand-in-hand looped netowrk wiring, and any circuit breaks down and all can come the power supply that falls through another circuit. In addition, a ring main unit is selected to configure a branch line and a user power distribution room 31. The specific scheme is as follows:
a power supply point: the power supply point consists of two substation outlet switches, namely a 10KV training A line 1# substation F1 outlet switch and a 10KV training B line 2# substation F2 outlet switch. The 10KV training A line F1 outgoing line is provided with a 10KV training A line 1# ring main unit, a 10KV training A line 2# ring main unit, a 10KV training A line 3# ring main unit load and a 10KV training A line 4# ring main unit load. The 10KV training B wire F2 outgoing line is provided with a 10KV training B wire 1# ring main unit, a 10KV training B wire 2# ring main unit and a 10KV training B wire 3# ring main unit.
A main ring: the main ring is composed of 7 ring main unit hand-pulls to form a ring network power supply, and each line is divided into four sections by the ring main unit.
Ring opening point: and setting a ring opening point when the 10KV training A line 4# ring main unit 602 normally operates.
Branching: the branch line comprises a 10KV training A line 4# ring main unit 603 switch and a user power distribution room 31.
Compared with the prior art, the beneficial effects of the utility model reside in that:
1. the utility model discloses design according to the equipment and the parameter of actual electric wire netting, contain from the transformer substation become the user and join in marriage the all key equipment in electrical room 31, provide the environment the same with the scene and carry out distribution network automation test, emulation and training.
2. The modular combination mode is adopted, the configuration and the transformation can be flexibly carried out according to the requirements of different grid structures of users, and the requirements of different grid structures in different regions are ensured to be met.
3. An intuitive one-step simulation drawing board is manufactured by adopting a high-grade acrylic board and is subjected to silk printing, and a multi-color luminous lamp belt is embedded to simulate the electrified condition of a cable and a ring main unit. The high-grade aluminum profiles are adopted as frameworks around the simulation drawing board, so that the simulation drawing board is attractive in appearance, firm, durable and convenient to disassemble and assemble.
Therefore, the utility model provides an environment completely consistent with the distribution network site, which simulates the whole grid structure from the transformer substation main transformer to the transformer substation outgoing switch, the cable, the distribution network switch and to the user distribution room 31; the system can be used as a training platform in various aspects such as verification of a distribution network automation strategy, test of a distribution network automation terminal, test of FA functions of a distribution network main station, distribution network operation, a distribution network automation technology, distribution network automation operation and maintenance and the like.
The simulation main transformer takes the load of a distribution line of a single outgoing line of a transformer substation as a prototype, reduces rated voltage, capacity, current, impedance and short-circuit current according to different scales, and realizes simulation by boosting a low-voltage distribution system. The rated voltage of the distribution line system is 800V, and the main transformer capacity and the actual load condition of the distribution system are fully considered.
It should be noted that the above is only the preferred embodiment of the present invention, but the design concept of the present invention is not limited thereto, and all the insubstantial modifications made by using the design concept of the present invention also fall within the protection scope of the present invention.

Claims (10)

1. The utility model provides a distribution network automation simulation training system, includes emulation cabinet, its characterized in that:
the simulation cabinet comprises a transformer substation main transformer simulation box, at least one simulation ring main unit, simulation terminal equipment and an alternating current/direct current power supply simulation box for providing alternating current and direct current power supply for the simulation cabinet which are connected in sequence, the simulation ring main unit is used for simulating the secondary principle wiring of a real ring main unit, the transformer substation main transformer simulation box is provided with an A-line outgoing switch and a B-line outgoing switch, the analog simulation ring main unit comprises an A-line analog simulation ring main unit and a B-line analog simulation ring main unit, the A-line outgoing switch is connected with at least one A-line incoming and outgoing switch of the A-line analog simulation ring main unit, the B-wire outlet switch is connected with at least one B-wire inlet/outlet switch of the B-wire analog simulation ring main unit and forms a B-wire with the analog simulation terminal equipment;
the A line in-out switch of the first A line simulation ring main unit is connected with the A line in-out switch of the second A line simulation ring main unit, the B line in-out switch of the first B line simulation ring main unit is connected with the B line in-out switch of the second B line simulation ring main unit, and each A line simulation ring main unit is provided with at least two A line in-out switches which are sequentially connected;
each of the A-line analog simulation ring main unit and the B-line analog simulation ring main unit is provided with a communication network box, and the communication network boxes are used for collecting related information and simulating communication states among the devices;
the simulation terminal equipment is composed of an A-line simulation ring main unit and a user simulation power distribution room, the A-line simulation ring main unit of the simulation terminal equipment comprises 3A-line in-out switches, a first A-line in-out switch of the simulation terminal equipment is connected with an A-line in-out switch of the last A-line simulation ring main unit on the A line, a second A-line in-out switch of the simulation terminal equipment is connected with a B-line in-out switch of the last B-line simulation ring main unit on the B line, a third A-line in-out switch of the simulation terminal equipment is connected with the user simulation power distribution room, and the third A-line in-out switch of the simulation terminal equipment is a feeder switch.
2. The simulated training system of claim 1, wherein:
the transformer substation main transformer simulation box is provided with a simulation transformer and a first relay module, the first relay module is used for simulating the state of an outgoing line switch of the transformer substation main transformer, the simulation transformer and the first relay module are respectively connected with the alternating current-direct current power supply simulation box, and the simulation transformer is a three-phase dry-type transformer.
3. The simulated training system of claim 2, wherein:
the alternating current and direct current power supply simulation box comprises a power input end, a power supply transformer and a switch power supply, wherein the power input end is connected with the wire inlet end of the power supply transformer, the wire outlet end of the power supply transformer is respectively connected with the input end of the switch power supply and the wire inlet end of the simulation transformer, and the output end of the switch power supply is connected with the input end of the relay module.
4. The simulated training system of claim 1, wherein:
and an industrial Ethernet switch is installed in the communication network box.
5. The simulated training system as claimed in any one of claims 1 to 4, wherein:
and the A-line analog simulation ring main unit and the B-line analog simulation ring main unit are internally provided with analog switches consisting of a second relay module and a load resistor, and control terminals for controlling the second relay module to be switched on and off and switching the load resistor.
6. The simulated training system of claim 5, wherein:
the control panel of the simulation ring main unit is provided with a power distribution automation terminal, a simulation remote/local control switch, a control state display lamp, a simulation switching-on/off indicator lamp, a simulation local switching-on/off button and a load switch mechanism, and the simulation ring main unit is used for simulating secondary principle wiring of a real ring main unit.
7. The simulated training system of claim 6, wherein:
the distribution automation terminal comprises a data acquisition module and a central processing unit, wherein the data acquisition module is used for acquiring analog switch signals and current signals of the analog switch and sending the analog switch signals and the current signals to the central processing unit for processing.
8. The simulated training system of claim 7, wherein:
the central processor comprises a data processing module and a main control module; the data processing module and the main control module adopt low-power consumption dual-core application processors.
9. The simulated training system as claimed in any one of claims 1 to 4, wherein:
the A-line outgoing switch, the B-line outgoing switch, the A-line incoming and outgoing switch and the B-line incoming and outgoing switch adopt air switches with electric operating mechanisms, communication interfaces and one-time reclosing functions.
10. The simulated training system as claimed in any one of claims 1 to 4, wherein:
and a primary simulation graphic board is arranged on a control panel of the transformer substation main transformer simulation box, the simulation ring main unit and the simulation terminal equipment.
CN202020477213.4U 2020-04-03 2020-04-03 Distribution network automation simulation training system Active CN211827669U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020477213.4U CN211827669U (en) 2020-04-03 2020-04-03 Distribution network automation simulation training system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020477213.4U CN211827669U (en) 2020-04-03 2020-04-03 Distribution network automation simulation training system

Publications (1)

Publication Number Publication Date
CN211827669U true CN211827669U (en) 2020-10-30

Family

ID=73143345

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020477213.4U Active CN211827669U (en) 2020-04-03 2020-04-03 Distribution network automation simulation training system

Country Status (1)

Country Link
CN (1) CN211827669U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112331007A (en) * 2020-11-03 2021-02-05 国网江苏省电力有限公司南通供电分公司 Distribution transformer intelligent terminal optimization stationing skill training system and training method
CN113053199A (en) * 2021-03-11 2021-06-29 国网河北省电力有限公司培训中心 Distributed regional communication power supply simulation training system
CN114299799A (en) * 2021-12-10 2022-04-08 上海金智晟东电力科技有限公司 Simulation system, electronic device and readable storage medium suitable for distribution automation training

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112331007A (en) * 2020-11-03 2021-02-05 国网江苏省电力有限公司南通供电分公司 Distribution transformer intelligent terminal optimization stationing skill training system and training method
CN112331007B (en) * 2020-11-03 2022-06-07 国网江苏省电力有限公司南通供电分公司 Distribution transformer intelligent terminal optimization stationing skill training system and training method
CN113053199A (en) * 2021-03-11 2021-06-29 国网河北省电力有限公司培训中心 Distributed regional communication power supply simulation training system
CN114299799A (en) * 2021-12-10 2022-04-08 上海金智晟东电力科技有限公司 Simulation system, electronic device and readable storage medium suitable for distribution automation training
CN114299799B (en) * 2021-12-10 2024-02-27 上海金智晟东电力科技有限公司 Simulation system, electronic device and readable storage medium suitable for distribution automation training

Similar Documents

Publication Publication Date Title
CN211827669U (en) Distribution network automation simulation training system
CN105070157B (en) A kind of feeder automation simulation training system
CN101515014B (en) Analog device of control cabinet matched with detection switch apparatus
CN202736379U (en) Transformer station comprehensive automation skill training system
CN110299041B (en) Intelligent power distribution terminal and communication operation and maintenance integrated training system and method
CN101750555A (en) Spare automatic switching comprehensive tester
CN111724661A (en) Distribution network automation simulation system and distribution network fault simulation method
Chan et al. The implementation and evolution of a SCADA system for a large distribution network
CN110224491A (en) Monitoring device, monitoring method and the monitoring system of Distributed power net automatic switch
CN201319052Y (en) Auto-switch-on integrated tester
CN115313653A (en) Simulation platform area training system with intelligent fusion terminal as core
CN110718132B (en) Distribution network terminal inspection fault simulation method and system
CN210142411U (en) Universal power supply station practical training operating system and anti-electricity-stealing practical training circuit thereof
CN112213592A (en) Distributed terminal double-loop network self-healing transfer detection system and method thereof
CN210780231U (en) Intelligent distributed comprehensive test platform
CN210466822U (en) All-round comprehensive training system
CN209947134U (en) Simulation training platform for secondary control loop of medium-voltage switch cabinet
CN109950883A (en) Protection supervisory equipment and protection investigating method for distribution network automated switch
CN208636396U (en) Feeder switch operating condition adaptive modeling device
CN205910922U (en) Small -size power supply circuit hauls oneself willingly into experimental facilities fully
CN209608335U (en) A kind of protection supervisory equipment for distribution network automated switch
CN110009959B (en) Practical training operation system of all-round power supply station and anti-electricity-stealing practical training circuit thereof
CN108811415A (en) A kind of control cabinet for street lamp
CN203673691U (en) Substation training device based on PLC control
CN113972621A (en) Protection measurement and control system of alternating current filter bank of high-voltage direct current converter station

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CB03 Change of inventor or designer information

Inventor after: Wu Yaoguang

Inventor after: Zhou Qingquan

Inventor after: Qiu Lei

Inventor after: Zhang Ying

Inventor before: Wu Yaoguang

Inventor before: Qingquan

Inventor before: Qiu Lei

Inventor before: Zhang Ying

CB03 Change of inventor or designer information