CN103903496A - 10kV digital power distribution room simulation training system - Google Patents

10kV digital power distribution room simulation training system Download PDF

Info

Publication number
CN103903496A
CN103903496A CN201210554370.0A CN201210554370A CN103903496A CN 103903496 A CN103903496 A CN 103903496A CN 201210554370 A CN201210554370 A CN 201210554370A CN 103903496 A CN103903496 A CN 103903496A
Authority
CN
China
Prior art keywords
simulation
control device
digitizing
training system
switchgear building
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201210554370.0A
Other languages
Chinese (zh)
Inventor
吴琦
陈丁剑
韩彦召
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Wanlong Electric Group Co Ltd
State Grid Corp of China SGCC
Training Center of State Grid Anhui Electric Power Co Ltd
Original Assignee
Suzhou Wanlong Electric Group Co Ltd
State Grid Corp of China SGCC
Training Center of State Grid Anhui Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou Wanlong Electric Group Co Ltd, State Grid Corp of China SGCC, Training Center of State Grid Anhui Electric Power Co Ltd filed Critical Suzhou Wanlong Electric Group Co Ltd
Priority to CN201210554370.0A priority Critical patent/CN103903496A/en
Publication of CN103903496A publication Critical patent/CN103903496A/en
Pending legal-status Critical Current

Links

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention relates to a 10kV digital power distribution room simulation training system. The system comprises a simulation control device, and is characterized in that the simulation control device is connected with a front-located control device through a network communication module, the front-located control device is connected with a filed operation device through a field bus, and the front-located control device is a data acquisition cabinet. At the same time, the data acquisition cabinet is internally provided with a communication manager, the communication manager is provided with a network communication port and a field bus communication port, and the field operating equipment includes a high-voltage cabinet and a low-voltage cabinet. Thus, a software and hardware integration simulation technology and a virtual-sampling-based parameter simulation technology are realized. A trainee is ensured to experience the cutting-edge technology at present when receiving training while the function of simulated training is realized, and the system conforms to the development direction of intelligent power distribution. In addition, simulation and management are promoted simultaneously, cost is saved, and floor space is reduced. Moreover, engineering integration and debugging are more convenient.

Description

A kind of 10kV digitizing switchgear building simulation training system
Technical field
The present invention relates to a kind of simulation training system, relate in particular to a kind of 10kV digitizing switchgear building simulation training system.
Background technology
Along with the development of intelligent grid, intelligent power distribution, using electricity system have been proposed to higher technical requirement, 10kV digitizing or intelligent power distribution chamber have obtained using widely in the recent period.Traditional 10kV switchgear building does not possess the ability of digitizer and remote real-time monitoring, therefore the operation of traditional switchgear building, maintainer need new digitizing technique to retrain, to adapt to the new digitizing switchgear building operation maintenance demand that intelligent power distribution requires that meets.
Although Current Domestic has some analogue systems for 10kV switchgear building, be all additionally on the basis of High-low voltage switch cabinet to realize with so-called hardware fault simulator and program control load source.The defects such as these methods for designing all exist that security is low, cost is high, validity is poor, very flexible and debugging complexity, and be not also digitizer entirely, do not meet the development trend requirement of intelligent grid.
The emulation of digitizing switchgear building is mainly used to pure software mode abroad, for example, by the database of TDMA Time Division Multiple Access, switchgear building has been carried out to online execution and simulated operation use etc.This method exists and lacks the sense of reality, does not possess the vision problem with operating vivid effect directly perceived.
Therefore, be necessary that for the problems referred to above exploitation has higher in-site modeling degree, operates true to nature, a kind of 10kV digitizing switchgear building simulation training system cheaply, adopt intelligent equipment and digitizing technique, complete on the basis of the aspect courses such as working specification in 10kV switchgear building electrical operation process, fault handling, distribution management at instruction of papil, also will ensure the security in on-the-spot teaching operating process.
Summary of the invention
Object of the present invention is exactly in order to solve the above-mentioned problems in the prior art, and a kind of 10kV digitizing switchgear building simulation training system is provided.
Object of the present invention is achieved through the following technical solutions:
A kind of 10kV digitizing switchgear building simulation training system, include Simulation Control device, wherein: described Simulation Control device connects preposition control device by network communication assembly, described preposition control device is connected with execute-in-place device by fieldbus, described preposition control device is data acquisition cabinet, in described data acquisition cabinet, be provided with communication manager, on described communication manager, be provided with network communication port and field bus communication port, described execute-in-place device includes high-voltage board and low-voltage cabinet.
Further, above-mentioned a kind of 10kV digitizing switchgear building simulation training system, wherein: in described high-voltage board, be provided with fieldbus, on described fieldbus, be provided with communication interface, on described communication interface, be connected with respectively middle pressure and combine guarantor's module and digital instrument module.
Further, above-mentioned a kind of 10kV digitizing switchgear building simulation training system, wherein: in described low-voltage cabinet, be provided with fieldbus, on described fieldbus, be provided with communication interface, on described communication interface, be connected with respectively intelligent framework isolating switch, intelligent moulded case circuit breaker, digital instrument module, Intelligent Reactive Compensating Controller.
Further, above-mentioned a kind of 10kV digitizing switchgear building simulation training system, wherein: described data acquisition cabinet is provided with touching display screen, described touching display screen PORT COM is connected with communication manager.
Further, above-mentioned a kind of 10kV digitizing switchgear building simulation training system, wherein: described Simulation Control device includes emulation training main frame, on described emulation training main frame, be provided with ethernet communication interface and network communication interface, described network communication interface is connected with preposition control device by netting twine, on described netting twine, is connected with switch.
Further, above-mentioned a kind of 10kV digitizing switchgear building simulation training system, wherein: on described emulation training main frame, be connected with liquid crystal display.
Further, above-mentioned a kind of 10kV digitizing switchgear building simulation training system, wherein: on described emulation training main frame, be connected with printer.
Again further, above-mentioned a kind of 10kV digitizing switchgear building simulation training system, wherein: described fieldbus is shield type twisted-pair feeder.
The advantage of technical solution of the present invention is mainly reflected in: 1) software and hardware integration emulation technology and the parameters simulation technology based on virtual sampling: native system has adopted intelligent secondary device and simplation software unity emulation technology, the intelligent secondary device of special customization carries out emulation adjustment with support simulation software to its electrical operation parameter, then by realizing scene simulation to conduction courseware and fault simulation function.Smart machine no longer carries out data sampling from mutual inductor, but receives the virtual sampled data that sends by field bus communication technology of backstage simulation software as measurement parameter, and realization protection, control and the warning function identical with mutual inductor sample.Compare with existing emulation technology, this technology has obvious innovation and advantage: compare with pure software mode, solved the shortage sense of reality, do not possess the vision problem with operating vivid effect directly perceived; Compare with all-real object loading system model, solved again cost high, the problem of security, maintainability, extensibility and bad adaptability.2) in realizing emulation training function; the functions such as selective area interlock protection and requirement protection, transformer economic operation, electric energy quality monitoring, auto-reactive compensation and equipment control maintenance are provided; ensure that student experiences the technology of current forefront in undergoing training, and meets intelligent power distribution developing direction.3) emulation and management develop simultaneously, and system has also been taken into account the training of digitizing switchgear building monitoring management function in realizing electrical operation emulation training, adapt to the demand of new period intelligent power distribution.4) cost-saving, reduce floor area: software and hardware integration emulation technology has abandoned that cost is high, the signal generator of the occupying volume external space and load system, has saved cost, has reduced floor area, make Training Environment more succinct, truly simultaneously.5) engineering is integrated more convenient with debugging: owing to having used totally digitilized scheme, hardware connection, system debug and training courseware development are more fast and convenient, and system has better maintainability.
Brief description of the drawings
Object of the present invention, advantage and disadvantage, by for illustration and explanation the non-limitative illustration by preferred embodiment below.These embodiment are only the prominent examples of application technical solution of the present invention, and all technical schemes of taking to be equal to replacement or equivalent transformation and form, within all dropping on the scope of protection of present invention.
Fig. 1 is the organigram of this 10kV digitizing switchgear building simulation training system.
1 Data acquisition cabinet 2 Communication manager
3 High-voltage board 4 Low-voltage cabinet
5 Fieldbus 6 Intelligent framework isolating switch
7 Intelligent moulded case circuit breaker 8 Digital instrument module
9 Intelligent Reactive Compensating Controller 10 Middle pressure is combined and is protected module
11 Emulation training main frame 12 Ethernet communication interface
13 Network communication interface 14 Netting twine
15 Liquid crystal display 16 Printer
17 Touching display screen 18 Switch
Embodiment
A kind of 10kV digitizing switchgear building simulation training system as shown in Figure 1, include Simulation Control device, its unusual part is: Simulation Control device of the present invention connects preposition control device by network communication assembly, and preposition control device is connected with execute-in-place device by fieldbus 5.Specifically, preposition control device is data acquisition cabinet 1, is provided with communication manager 2 in data acquisition cabinet 1.Meanwhile, for the ease of data communication facility, the simulated data of external other system be can effectively introduce simultaneously, network communication port and fieldbus 5 PORT COM on communication manager 2, are provided with.And, consider the true environment of plan that adapts to practical operation, the execute-in-place device of employing includes high-voltage board 3 and low-voltage cabinet 4.
With regard to preferably embodiment of the present invention one, consider from the teaching convenience degree of overall analogue simulation, in high-voltage board 3, be provided with fieldbus 5, on fieldbus 5, be provided with communication interface, on communication interface, be connected with respectively middle pressure and combine guarantor's module 10 and digital instrument module 8.Correspondence is with it, in the low-voltage cabinet 4 that the present invention adopts, be provided with too fieldbus 5, by being provided with communication interface on fieldbus 5, be connected with respectively intelligent framework isolating switch 6, intelligent moulded case circuit breaker 7, digital instrument module 8, Intelligent Reactive Compensating Controller 9.Thus, can be from realizing to the full extent real work on the spot situation emulation, be beneficial to teaching and realistic simulation operation.
Specifically, for coordinating simulation software to realize Full Featured emulation training, must transform customization to all intelligent secondary device in digitizing switchgear building, main thought is to keep existing device protection, the functions such as control make this equipment no longer carry out data sampling from mutual inductor on constant basis, but use the parameters simulation technology based on virtual sampling, support that simulation software carries out emulation adjustment to its electrical operation parameter, comprising can setting parameter and all electric current, the electric measurement parameters such as voltage, obviously can save signal generator and so-called load system.
Adopt digital instrument module 8, can coordinate simulated running system, and the electric loop operational factor of display simulation directly perceived, can receive the instruction of simulation run software simultaneously, given electric parameter is observably shown, so that student observes and knows from experience.In employing, press computer integrated protection, can receive the instruction of simulation run software, show various electrical operation parameters, protection feature and control function according to instruction simulation, realize fault simulation.Adopt intelligent framework isolating switch 6 and intelligent moulded case circuit breaker 7, can receive the instruction of simulation run software, according to the various electrical operation parameters of command simulation, protection feature and control function, realize fault simulation.Adopt intelligent powerless compensation Comprehensive Control, can receive the instruction of simulation run software, according to the various low-pressure reactive compensation states of command simulation, make student can dynamically get information about principle and the meaning of reactive-load compensation and implement the impact on electrical operation state in reactive-load compensation process.
Further, for the ease of site environment is monitored and rapid configuration in time, data acquisition cabinet 1 is provided with touching display screen 17, and touching display screen 17 PORT COM are connected with communication manager 2.For the ease of wiping sky, can adopt 12 cun of tangible LCDs of industry.
Again further, in order to simulate different working environments, improve the combination of simulated teaching and practical operation, the Simulation Control device of employing includes emulation training main frame 11.Specifically, be provided with ethernet communication interface 12 and network communication interface 13 on this emulation training main frame 11, network communication interface 13 is connected with preposition control device by netting twine 14.On netting twine 14, be connected with switch 18, different data exchange channels is provided simultaneously.Certainly, consider that realizing simulation status timely switches, and is provided with simulation software in main frame.And, in order to know in time the state of current emulation training main frame 11, on emulation training main frame 11, be connected with liquid crystal display 15.And, consider and can think in time that operation information and various configuration information outwards export, be convenient to follow-up teaching, on emulation training main frame 11, be connected with printer 16.
Moreover, consider that preventing unnecessary signal disturbs, improve the authenticity of emulation manipulation, fieldbus 5 is shield type twisted-pair feeder.Thus, carry out best communication by fieldbus 5 and relevant device module, realize that each electric loop service data is uploaded and control command issues.
In conjunction with actual service condition of the present invention, simulation software has adopted the software development technique based on assembly, is made up of on the whole: communication layers, data Layer and application layer three levels.Communication layers comprises data communication component and distributed middleware platform, completes field bus communication and exchanges data with smart machine; Data Layer comprises real-time data base and historical data base, and wherein real-time data base is data storage, processing and the switching centre of whole software systems, and historical data base has used business database (SQL Server 2008); Application layer is the set of all application of simulation software, comprises real-time monitoring, makes out an invoice, checks and rates the assemblies such as management, definite value management and equipment control to conduction courseware, fault simulation, management of power use emulation, operation order simulation.Application layer component is teacher and student's Man Machine Interface.By fault simulation with to conduction courseware assembly, teacher can simulate normal condition and the malfunction of switchgear building electrical operation, instructs the course of the aspects such as student's complete operation code, fault handling, distribution management.
Specifically, in practical operation, can be achieved as follows function:
The function that distribution monitor management realizes, comprise: monitoring in real time: mainly embody with the form of electric primary system figure or cabinet face arrangenent diagram at system monitoring interface, realize the status surveillance to on-the-spot each electric loop, be aided with simultaneously text and button realize corresponding circuit electric parameter monitoring and realize to field apparatus point/combined floodgate straighforward operation.Fault/warning monitors: SOE, state variation warning, manual operation, operating mode are thrown and moved back, condition is reported to the police and variable is reported to the police.Data management: comprise the functions such as real time data dictionary, historical data dictionary, load Analysis, fault analysis, data dump.Report capability: user is the form of report customization (daily sheet, month form, year form) as required, and the various ways such as available form, histogram embody, also can timed print, file and derivation.System management: realize network management and running log.Safety management: comprise user management and relieve management.Data sharing and application integration function: the data of native system are distributed to other application system by modes such as CIS, OPC Server, MODBUS Server, are convenient to and other power automatic system application integration.Equipment control maintenance function: the technical information relevant with digitizing switchgear building is stored in system; Real-time watch device maintenance parameters (for example operating mechanism life-span), in the time of ageing equipment or fault and alarm; Recording unit is safeguarded (change, increase newly or repair) historical information, convenient inquiry.Realize in addition equipment state on-line monitoring: the emphasis faults such as switch contact, busbar tie point, cable connection point, Transformer Winding are easily sent out to position and carry out temperature monitoring, early detection potential faults, circular electrical overhaul personnel in time, to arrange in advance to report for repairment maintenance, stop the generation of accumulation accident.
The function that emulation training is realized, comprise: parameters simulation: in order to support curricula, all secondary devices in system (combining guarantor, instrument, intelligent controller) back-up system software carries out emulation adjustment to its electrical operation parameter, and comprising can setting parameter and the measurement parameter such as all electric currents, voltage.To conduction courseware: need to make variously to conduction courseware according to teaching, adopt graphical discount-window guidance student to complete learning tasks by step.Scene simulation: emulation training software coordinates switch cubicle and the electric components of actual charging operation, can emulation switchgear building electrical operation state, comprises normal operating condition and malfunction.Scene that can emulation comprises: (1) is normally moved, and loads on the running status in the situation such as 0.5,0.8,1.0 times; (2) transformer overload operation (for example loading on 1.1 times, 20s), transformer state change modeling, comprises oil temperature, transformer sound etc.; (3) fault simulation and processing: need to transfer on-site electrical equipment according to teaching and simulate various fault state, then instruction of papil carries out fault handling.Fault type that can emulation includes but not limited to following several: low-pressure line-outgoing switch trip (wink moving, long delay, ground connection), low voltage incoming line switch tripping operation (long delay, short time delay, wink are moving, ground connection), the tripping operation of transformer service entrance switch, high pressure inlet wire or bus connection switch tripping operation etc.(4) dual power supply switches emulation.Automatic voltage reactive-load compensation process simulation: simulate automated capacitive switching in given electric circumstance, and show the changing condition of the every electric parameter in reactive-load compensation process.Transformer economic operation simulation: for thering is the switchgear building of two and above substation transformer.Calculate according to the capacity of transformer, payload, the mode switching transformer of transformer economic operation is pressed in simulation automatically.The operation order simulation of making out an invoice: the simulated operation ticket flow process of making out an invoice, and implement simulated operation according to action by step, in operating process, realize true interactive with on-site electrical equipment.Management of power use emulation: measure and record the power load of wire inlet loop and each transmission line circuit and electric energy service condition (owing to there is no load, therefore data are pressed to set rule emulation), electricity consumption form (daily paper, monthly magazine, annual report) is provided, and applied load curve carrys out the load behaviour in service in the comparison designated period time, be convenient to load Analysis and load prediction.
Student checks and rates management: student's operative skill examination management function is provided.When after input student relevant information, teacher can randomly draw examination question student is checked and rated from test item bank, and to the timing of examination process.After student has checked and rated, teacher scores according to appraisal result, and deposits appraisal result database in, finally prints appraisal result.Support inquiry and printing function to appraisal result.
Can find out by above-mentioned character express, adopt after the present invention, have the following advantages:
1) software and hardware integration emulation technology and the parameters simulation technology based on virtual sampling: native system has adopted intelligent secondary device and simplation software unity emulation technology, the intelligent secondary device of special customization carries out emulation adjustment with support simulation software to its electrical operation parameter, then by realizing scene simulation to conduction courseware and fault simulation function.Smart machine no longer carries out data sampling from mutual inductor, but receives the virtual sampled data that sends by field bus communication technology of backstage simulation software as measurement parameter, and realization protection, control and the warning function identical with mutual inductor sample.Compare with existing emulation technology, this technology has obvious innovation and advantage: compare with pure software mode, solved the shortage sense of reality, do not possess the vision problem with operating vivid effect directly perceived; Compare with all-real object loading system model, solved again cost high, the problem of security, maintainability, extensibility and bad adaptability.
2) in realizing emulation training function; the functions such as selective area interlock protection and requirement protection, transformer economic operation, electric energy quality monitoring, auto-reactive compensation and equipment control maintenance are provided; ensure that student experiences the technology of current forefront in undergoing training, and meets intelligent power distribution developing direction.
3) emulation and management develop simultaneously, and system has also been taken into account the training of digitizing switchgear building monitoring management function in realizing electrical operation emulation training, adapt to the demand of new period intelligent power distribution.
4) cost-saving, reduce floor area: software and hardware integration emulation technology has abandoned that cost is high, the signal generator of the occupying volume external space and load system, has saved cost, has reduced floor area, make Training Environment more succinct, truly simultaneously.
5) engineering is integrated more convenient with debugging: owing to having used totally digitilized scheme, hardware connection, system debug and training courseware development are more fast and convenient, and system has better maintainability.

Claims (8)

1. a 10kV digitizing switchgear building simulation training system, include Simulation Control device, it is characterized in that: described Simulation Control device connects preposition control device by network communication assembly, described preposition control device is connected with execute-in-place device by fieldbus, described preposition control device is data acquisition cabinet, in described data acquisition cabinet, be provided with communication manager, on described communication manager, be provided with network communication port and field bus communication port, described execute-in-place device includes high-voltage board and low-voltage cabinet.
2. a kind of 10kV digitizing switchgear building simulation training system according to claim 1, it is characterized in that: in described high-voltage board, be provided with fieldbus, on described fieldbus, be provided with communication interface, on described communication interface, be connected with respectively middle pressure and combine guarantor's module and digital instrument module.
3. a kind of 10kV digitizing switchgear building simulation training system according to claim 1, it is characterized in that: in described low-voltage cabinet, be provided with fieldbus, on described fieldbus, be provided with communication interface, on described communication interface, be connected with respectively intelligent framework isolating switch, intelligent moulded case circuit breaker, digital instrument module, Intelligent Reactive Compensating Controller.
4. a kind of 10kV digitizing switchgear building simulation training system according to claim 1, is characterized in that: described data acquisition cabinet is provided with touching display screen, and described touching display screen PORT COM is connected with communication manager.
5. a kind of 10kV digitizing switchgear building simulation training system according to claim 1, it is characterized in that: described Simulation Control device includes emulation training main frame, on described emulation training main frame, be provided with ethernet communication interface and network communication interface, described network communication interface is connected with preposition control device by netting twine, on described netting twine, is connected with switch.
6. a kind of 10kV digitizing switchgear building simulation training system according to claim 5, is characterized in that: on described emulation training main frame, be connected with liquid crystal display.
7. a kind of 10kV digitizing switchgear building simulation training system according to claim 5, is characterized in that: on described emulation training main frame, be connected with printer.
8. a kind of 10kV digitizing switchgear building simulation training system according to claim 1, is characterized in that: described fieldbus is shield type twisted-pair feeder.
CN201210554370.0A 2012-12-19 2012-12-19 10kV digital power distribution room simulation training system Pending CN103903496A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210554370.0A CN103903496A (en) 2012-12-19 2012-12-19 10kV digital power distribution room simulation training system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210554370.0A CN103903496A (en) 2012-12-19 2012-12-19 10kV digital power distribution room simulation training system

Publications (1)

Publication Number Publication Date
CN103903496A true CN103903496A (en) 2014-07-02

Family

ID=50994797

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210554370.0A Pending CN103903496A (en) 2012-12-19 2012-12-19 10kV digital power distribution room simulation training system

Country Status (1)

Country Link
CN (1) CN103903496A (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104317636A (en) * 2014-10-16 2015-01-28 国家电网公司 Intelligent power supply and consumption business simulated training system
CN104464429A (en) * 2014-12-11 2015-03-25 国家电网公司 KYN switch cabinet maintenance somatosensory equipment and using method thereof
CN105070136A (en) * 2015-08-27 2015-11-18 临汾电力高级技工学校 Switch cabinet maintenance somatosensory system and method based on wireless data communication
CN105243938A (en) * 2015-11-05 2016-01-13 国网福建省电力有限公司 Switch cabinet test system and test method
CN105654821A (en) * 2014-11-24 2016-06-08 北京北研兴电力仪表有限责任公司 Fault simulation apparatus for electrical control system of transformer equipment
CN105741653A (en) * 2016-04-29 2016-07-06 山东平安电气设备有限公司 Transformation and distribution room simulation controller
CN105810061A (en) * 2016-04-15 2016-07-27 国网江苏省电力公司盐城供电公司 Digital simulation reactive compensation controller
CN109493671A (en) * 2017-12-27 2019-03-19 国网山东省电力公司潍坊供电公司 Multifunction power dispatches remote operation training equipment
CN109559586A (en) * 2017-12-27 2019-04-02 国网山东省电力公司潍坊供电公司 Long-range control power regulation training system
CN110398943A (en) * 2019-07-17 2019-11-01 上海电机学院 A kind of multi-layer three-dimensional experiment platform of control system and its building method
CN112802373A (en) * 2021-02-07 2021-05-14 中国石油化工股份有限公司 Information entertainment teaching integrated simulation teaching system in petrochemical industry

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008244661A (en) * 2007-03-26 2008-10-09 Sumitomo Electric Ind Ltd Power line communication system
CN101739877A (en) * 2010-01-27 2010-06-16 福建电力培训中心 Simulation training system of 10KV typical customer distribution room
CN201570911U (en) * 2009-12-15 2010-09-01 河南省电力公司洛阳供电公司 Remote monitoring information system of 10KV distribution substation
CN202026140U (en) * 2011-04-08 2011-11-02 昆明华奥航星电气有限公司 Distribution type distribution room environment and power distribution comprehensive monitor system
CN202050289U (en) * 2011-04-01 2011-11-23 青岛乾程电子科技有限公司 Network exchange type distribution automatic measurement and control apparatus
CN203013082U (en) * 2012-12-19 2013-06-19 安徽省电力公司培训中心 10kV digital power distribution room simulation training system

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008244661A (en) * 2007-03-26 2008-10-09 Sumitomo Electric Ind Ltd Power line communication system
CN201570911U (en) * 2009-12-15 2010-09-01 河南省电力公司洛阳供电公司 Remote monitoring information system of 10KV distribution substation
CN101739877A (en) * 2010-01-27 2010-06-16 福建电力培训中心 Simulation training system of 10KV typical customer distribution room
CN202050289U (en) * 2011-04-01 2011-11-23 青岛乾程电子科技有限公司 Network exchange type distribution automatic measurement and control apparatus
CN202026140U (en) * 2011-04-08 2011-11-02 昆明华奥航星电气有限公司 Distribution type distribution room environment and power distribution comprehensive monitor system
CN203013082U (en) * 2012-12-19 2013-06-19 安徽省电力公司培训中心 10kV digital power distribution room simulation training system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
吴琦,陈冠华,陈丁剑: "数字化配电室仿真培训系统的研制", 《低压电器》 *

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104317636A (en) * 2014-10-16 2015-01-28 国家电网公司 Intelligent power supply and consumption business simulated training system
CN105654821A (en) * 2014-11-24 2016-06-08 北京北研兴电力仪表有限责任公司 Fault simulation apparatus for electrical control system of transformer equipment
CN104464429A (en) * 2014-12-11 2015-03-25 国家电网公司 KYN switch cabinet maintenance somatosensory equipment and using method thereof
CN105070136A (en) * 2015-08-27 2015-11-18 临汾电力高级技工学校 Switch cabinet maintenance somatosensory system and method based on wireless data communication
CN105243938A (en) * 2015-11-05 2016-01-13 国网福建省电力有限公司 Switch cabinet test system and test method
CN105810061A (en) * 2016-04-15 2016-07-27 国网江苏省电力公司盐城供电公司 Digital simulation reactive compensation controller
CN105741653A (en) * 2016-04-29 2016-07-06 山东平安电气设备有限公司 Transformation and distribution room simulation controller
CN105741653B (en) * 2016-04-29 2018-08-21 山东平安电气设备有限公司 A kind of changed into switchhouse emulation controller
CN109493671A (en) * 2017-12-27 2019-03-19 国网山东省电力公司潍坊供电公司 Multifunction power dispatches remote operation training equipment
CN109559586A (en) * 2017-12-27 2019-04-02 国网山东省电力公司潍坊供电公司 Long-range control power regulation training system
CN109559586B (en) * 2017-12-27 2020-10-20 国网山东省电力公司潍坊供电公司 Remote control electric power regulation and control training system
CN109493671B (en) * 2017-12-27 2020-10-23 国网山东省电力公司潍坊供电公司 Multifunctional remote operation training equipment for power dispatching
CN110398943A (en) * 2019-07-17 2019-11-01 上海电机学院 A kind of multi-layer three-dimensional experiment platform of control system and its building method
CN112802373A (en) * 2021-02-07 2021-05-14 中国石油化工股份有限公司 Information entertainment teaching integrated simulation teaching system in petrochemical industry

Similar Documents

Publication Publication Date Title
CN103903496A (en) 10kV digital power distribution room simulation training system
CN103123758B (en) A kind of dispatching automation numeral physical mixed simulation training system
CN203013082U (en) 10kV digital power distribution room simulation training system
CN102663912B (en) Computer simulation systems for integrated dispatching and monitoring of regional power network
CN105810062A (en) 10kV typical customer transformer substation intelligent simulation training system
CN103440803B (en) The authentic training system of 10kV power distribution equipment real voltage analog current closed loop
CN202134144U (en) High voltage power distribution completely real load control training assessment system
CN104678960B (en) It is a kind of based on scene it is anti-error and intend ticket training off-line type Dispatching system and method
CN103414251A (en) Substation network communication simulation system based on IEC 61850
CN103617760A (en) Power distribution network DTS (Dispatcher Training Simulation) simulation system and simulation method thereof
CN104575200A (en) Low-voltage transformer district simulated practice training system based on rural power grid intelligent low-voltage distribution box
CN103559822A (en) Substation simulation training system
CN104537936A (en) Low-voltage transformer area simulation practical training device for rural network low-voltage distribution box
CN101750555A (en) Spare automatic switching comprehensive tester
CN101635106A (en) Simulation training system of centralized control station
CN111458586A (en) Batch synchronous detection method and system for multi-interval in-situ line protection device of intelligent substation
CN201319052Y (en) Auto-switch-on integrated tester
CN110611312B (en) On-line simulation system and method for panoramic data of substation bay level
CN202362965U (en) Microcomputer protection universal simulation device
CN110021995A (en) A kind of distribution network automated information joint debugging emulation test system
CN204440768U (en) A kind of low-voltage platform area simulation and training system based on rural power grids intelligent type low-voltage panel box
CN103077644B (en) Split-phase breaker hydraulic operation mechanism training device
CN105185207B (en) A kind of intelligent substation training system of layering and zoning structure
CN109754681A (en) A kind of intelligent substation simulation training system
CN204576960U (en) A kind of low pressure management main station system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20140702