CN105094120B - Simulate the test device of primary equipment action behavior - Google Patents

Simulate the test device of primary equipment action behavior Download PDF

Info

Publication number
CN105094120B
CN105094120B CN201510575176.4A CN201510575176A CN105094120B CN 105094120 B CN105094120 B CN 105094120B CN 201510575176 A CN201510575176 A CN 201510575176A CN 105094120 B CN105094120 B CN 105094120B
Authority
CN
China
Prior art keywords
full model
parsing module
module
simulation
scd parsing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201510575176.4A
Other languages
Chinese (zh)
Other versions
CN105094120A (en
Inventor
曹海欧
杨毅
刘韶俊
高翔
高磊
袁宇波
管益斌
徐宁
吴奕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI YIHAO AUTOMATION CO Ltd
State Grid Corp of China SGCC
State Grid Jiangsu Electric Power Co Ltd
Electric Power Research Institute of State Grid Jiangsu Electric Power Co Ltd
Original Assignee
SHANGHAI YIHAO AUTOMATION CO Ltd
State Grid Corp of China SGCC
State Grid Jiangsu Electric Power Co Ltd
Electric Power Research Institute of State Grid Jiangsu Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI YIHAO AUTOMATION CO Ltd, State Grid Corp of China SGCC, State Grid Jiangsu Electric Power Co Ltd, Electric Power Research Institute of State Grid Jiangsu Electric Power Co Ltd filed Critical SHANGHAI YIHAO AUTOMATION CO Ltd
Priority to CN201510575176.4A priority Critical patent/CN105094120B/en
Publication of CN105094120A publication Critical patent/CN105094120A/en
Application granted granted Critical
Publication of CN105094120B publication Critical patent/CN105094120B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B23/00Testing or monitoring of control systems or parts thereof
    • G05B23/02Electric testing or monitoring
    • G05B23/0205Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults
    • G05B23/0208Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults characterized by the configuration of the monitoring system
    • G05B23/0213Modular or universal configuration of the monitoring system, e.g. monitoring system having modules that may be combined to build monitoring program; monitoring system that can be applied to legacy systems; adaptable monitoring system; using different communication protocols

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Automation & Control Theory (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
  • Debugging And Monitoring (AREA)

Abstract

The invention discloses a kind of test devices for simulating primary equipment action behavior, including intelligent processing module, full model SCD parsing module and simulation primary equipment module;Intelligent processing module, which is connected with full model SCD parsing module and passes through MMS message, receives and transmits control command and status information, full model SCD parsing module is connected with simulation primary equipment module constructs the model corresponding relationship of simulation one next state and SCD, realizes the consistency function of test simulation system and running equipment;Simulate the behavior state that primary equipment module completes mimic-disconnecting switch, disconnecting link, transformer on-load voltage regulating.Complete the test of monitoring software correctness;Solves the problems, such as existing intelligent substation monitoring software on-the-spot test, so that for the upgrading for realizing monitoring software, the test after upgrading creates necessary condition.

Description

Simulate the test device of primary equipment action behavior
Technical field
It is specifically a kind of for monitoring system the present invention relates to a kind of test device for simulating primary equipment action behavior Primary equipment control loop simulating test device, belongs to technical field of power systems.
Background technique
The circuit that substation carries out operation control to electrical primary equipment is an important component of Substation control. Monitoring programme change requires to take primary equipment is not out of service respectively to be tested after substation puts into operation, general at this stage All over the intelligent substation of application, because of no corresponding test device, therefore it is not able to satisfy above-mentioned test request.
Summary of the invention
Purpose: in order to overcome the deficiencies in the prior art, the present invention provides a kind of simulation primary equipment action behavior Test device be embedded in simulation primary equipment action behavior in test device for the test of intelligent substation monitoring system Functional unit passes through parsing full model SCD file, generates simulation system, simulates the state of primary equipment, tests in monitoring system When with monitoring system closed loop, by control mimic-disconnecting switch, disconnecting link, transformer on-load voltage regulating state, complete monitoring software just True property test.Solves the problems, such as existing intelligent substation monitoring software on-the-spot test, to rise for the upgrading for realizing monitoring software Test after grade creates necessary condition.
Technical solution: in order to solve the above technical problems, the technical solution adopted by the present invention are as follows:
A kind of test device for simulating primary equipment action behavior characterized by comprising intelligent processing module, Quan Mo Type SCD parsing module and simulation primary equipment module;
Wherein: intelligent processing module, which is connected with full model SCD parsing module and passes through MMS message, receives and transmits control Order and status information, full model SCD parsing module is connected with simulation primary equipment module constructs one next state of simulation and SCD Model corresponding relationship, realize test simulation system and running equipment consistency function;It simulates primary equipment module and completes mould Intend the behavior state of breaker, disconnecting link, transformer on-load voltage regulating.
The intelligent processing module includes: MMS Network Interface Unit and logic function unit, in which: MMS network interface list Member receives the MMS message of external monitoring host computer, and logic function unit completes operation logic processing, by differentiate MMS message and from The relevant information of full model SCD parsing module completes corresponding function.
The full model SCD parsing module includes: that detection starts logic unit and testing result automatic discrimination logic unit, Wherein: detection starting logic unit receives the MMS Message Service of external monitoring systems, to realize detection start command and connect simultaneously External artificial detection start command is received, starting result is will test after logic discrimination and is directly connect with transmission monitoring modular.
The simulation primary equipment module includes: mimic-disconnecting switch unit, simulation disconnecting link unit and simulation on-load voltage regulation shelves Bit location;
Wherein: mimic-disconnecting switch unit by full model SCD parsing module receive operating breaker breaker tripping and closing order after, Its RS software toggle is inverted, and RS software toggle current state is exported by full model SCD parsing module;
Disconnecting link unit is simulated after receiving operation switch operation order by full model SCD parsing module, makes its RS software Trigger reversion, and RS software toggle current state is exported by full model SCD parsing module;
On-load voltage regulation gear unit is simulated after receiving gear shifting operation order by full model SCD parsing module, keeps its soft The variation of part counter, and pass through full model SCD parsing module output software counter current value.
The working method of the test device of above-mentioned simulation primary equipment action behavior, comprising the following steps:
1) precondition of monitoring system host test differentiates: according to test needs, being first directed to full model SCD parsing mould Block is then turned off the connecting line of tested monitoring host computer Yu MMS interchanger to test device, is connected secondly with test device by cable It connects;
2) intelligent processing module can receive tripping, the switch operation signal that tested monitoring host computer is sent by MMS message; If receiving signal in test, signal, which exports, gives full model SCD parsing module;
3) full model SCD parsing module parses MMS message, and intelligent processing module and simulation primary equipment module pass through full mould Type SCD parsing module logical connection;
It 3a) tests breaker control circuit: after receiving operating breaker breaker tripping and closing order, keeping its RS software toggle anti- Turn, and RS software toggle current state is exported by full model SCD parsing module;
It 3b) tests disconnecting link control loop: after receiving operation switch operation order, inverting its RS software toggle, and RS software toggle current state is exported by full model SCD parsing module;
It 3c) tests control loop of transferring the files: after receiving gear shifting operation order, changing its software counter, and by complete Model SCD parsing module output software counter current value.
The utility model has the advantages that the test device of simulation primary equipment action behavior provided by the invention is led to compared with prior art It crosses and analog simulation is carried out to the breaker circuit, disconnecting link circuit, on-load voltage regulation circuit etc. of intelligence, it can be with practical primary equipment solution Coupling is tested, and testing procedure is rationally effective, fully meets the requirement of electric substation automation system test.
Detailed description of the invention
Fig. 1 is the structural diagram of the present invention.
Specific embodiment
The present invention will be further explained combined with specific embodiments below.
As shown in Figure 1, a kind of test device for simulating primary equipment action behavior, comprising: intelligent processing module, full model SCD parsing module and simulation primary equipment module;
Wherein: intelligent processing module, which is connected with full model SCD parsing module and passes through MMS message, receives and transmits control Order and status information, full model SCD parsing module is connected with simulation primary equipment module constructs one next state of simulation and SCD Model corresponding relationship, realize test simulation system and running equipment consistency function;It simulates primary equipment module and completes mould Intend the behavior state of breaker, disconnecting link, transformer on-load voltage regulating.
The intelligent processing module includes: MMS Network Interface Unit and logic function unit, in which: MMS network interface list Member receives the MMS message of external monitoring host computer, and logic function unit completes operation logic processing, by differentiate MMS message and from The relevant information of full model SCD parsing module completes corresponding function.
The full model SCD parsing module includes: that detection starts logic unit and testing result automatic discrimination logic unit, Wherein: detection starting logic unit receives the MMS Message Service of external monitoring systems, to realize detection start command and connect simultaneously External artificial detection start command is received, starting result is will test after software logic differentiates and is directly connect with transmission monitoring modular.
The simulation primary equipment module includes: mimic-disconnecting switch unit, simulation disconnecting link unit and simulation on-load voltage regulation shelves Bit location;
Wherein: mimic-disconnecting switch unit by full model SCD parsing module receive operating breaker breaker tripping and closing order after, Its RS software toggle is inverted, and RS software toggle current state is exported by full model SCD parsing module;
Disconnecting link unit is simulated after receiving operation switch operation order by full model SCD parsing module, makes its RS software Trigger reversion, and RS software toggle current state is exported by full model SCD parsing module;
On-load voltage regulation gear unit is simulated after receiving gear shifting operation order by full model SCD parsing module, keeps its soft The variation of part counter, and pass through full model SCD parsing module output software counter current value.
The working method of the test device of above-mentioned simulation primary equipment action behavior, comprising the following steps:
1) precondition of monitoring system host test differentiates: according to test needs, being first directed to full model SCD parsing mould Block is then turned off company of the tested monitoring host computer (substation can be with a job, a test) with MMS interchanger to test device Wiring is connected secondly with test device by cable;
2) intelligent processing module can receive tripping, the switch operation signal that tested monitoring host computer is sent by MMS message; If receiving signal in test, signal, which exports, gives full model SCD parsing module;
3) full model SCD parsing module parses MMS message, and intelligent processing module and simulation primary equipment module pass through full mould Type SCD parsing module logical connection;
It 3a) tests breaker control circuit: after receiving operating breaker breaker tripping and closing order, keeping its RS software toggle anti- Turn, and RS software toggle current state is exported by full model SCD parsing module;
It 3b) tests disconnecting link control loop: after receiving operation switch operation order, inverting its RS software toggle, and RS software toggle current state is exported by full model SCD parsing module;
It 3c) tests control loop of transferring the files: after receiving gear shifting operation order, changing its software counter, and by complete Model SCD parsing module output software counter current value.
It is completed.
So far, the Overall Steps of the control loop test an of intelligent apparatus are completed.
The implementation case compared with prior art, when primary equipment is not out of service, can exit a monitoring host computer Simulation test is carried out, solves the control loop test problem of intelligent substation monitoring host computer software upgrading, thus to realize intelligence Energy monitoring system of electric substation upgrading mode creates necessary condition.
The above is only a preferred embodiment of the present invention, it should be pointed out that: for the ordinary skill people of the art For member, various improvements and modifications may be made without departing from the principle of the present invention, these improvements and modifications are also answered It is considered as protection scope of the present invention.

Claims (4)

1. a kind of test device for simulating primary equipment action behavior characterized by comprising intelligent processing module, full model SCD parsing module and simulation primary equipment module;
Wherein: intelligent processing module, which is connected with full model SCD parsing module and passes through MMS message, receives and transmits control command And status information, full model SCD parsing module is connected with simulation primary equipment module constructs the mould of simulation one next state and SCD Type corresponding relationship realizes the consistency function of test simulation system and running equipment;It simulates primary equipment module and completes to simulate and break Road device, disconnecting link, transformer on-load voltage regulating behavior state;
The full model SCD parsing module includes: that detection starts logic unit and testing result automatic discrimination logic unit, In: detection starting logic unit receives the MMS Message Service of external monitoring systems, to realize detection start command and receive simultaneously External artificial detection start command will test starting result after logic discrimination and directly connect with transmission monitoring modular.
2. the test device of simulation primary equipment action behavior according to claim 1, it is characterised in that: at the intelligence Managing module includes: MMS Network Interface Unit and logic function unit, in which: MMS Network Interface Unit receives external monitoring host computer MMS message, logic function unit completes operation logic processing, by differentiating MMS message and from full model SCD parsing module Relevant information completes corresponding function.
3. the test device of simulation primary equipment action behavior according to claim 1, it is characterised in that: the simulation one Secondary device module includes: mimic-disconnecting switch unit, simulation disconnecting link unit and simulation on-load voltage regulation gear unit;
Wherein: mimic-disconnecting switch unit makes it after receiving operating breaker breaker tripping and closing order by full model SCD parsing module The reversion of RS software toggle, and RS software toggle current state is exported by full model SCD parsing module;
Disconnecting link unit is simulated after receiving operation switch operation order by full model SCD parsing module, triggers its RS software Device reversion, and RS software toggle current state is exported by full model SCD parsing module;
On-load voltage regulation gear unit is simulated after receiving gear shifting operation order by full model SCD parsing module, makes its software meter Number device variation, and pass through full model SCD parsing module output software counter current value.
4. the working method of the test device of simulation primary equipment action behavior according to claim 1-3, packet Include following steps:
1) precondition of monitoring system host test differentiates: according to test needs, being first directed to full model SCD parsing module and arrives Test device is then turned off the connecting line of tested monitoring host computer Yu MMS interchanger, is connected secondly with test device by cable;
2) intelligent processing module can receive tripping, the switch operation signal that tested monitoring host computer is sent by MMS message;If Signal is received in test, signal, which exports, gives full model SCD parsing module;
3) full model SCD parsing module parses MMS message, and intelligent processing module and simulation primary equipment module pass through full model SCD parsing module logical connection;
It 3a) tests breaker control circuit: after receiving operating breaker breaker tripping and closing order, inverting its RS software toggle, and And RS software toggle current state is exported by full model SCD parsing module;
It 3b) tests disconnecting link control loop: after receiving operation switch operation order, inverting its RS software toggle, and pass through Full model SCD parsing module exports RS software toggle current state;
It 3c) tests control loop of transferring the files: after receiving gear shifting operation order, changing its software counter, and pass through full model SCD parsing module output software counter current value.
CN201510575176.4A 2015-09-11 2015-09-11 Simulate the test device of primary equipment action behavior Expired - Fee Related CN105094120B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510575176.4A CN105094120B (en) 2015-09-11 2015-09-11 Simulate the test device of primary equipment action behavior

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510575176.4A CN105094120B (en) 2015-09-11 2015-09-11 Simulate the test device of primary equipment action behavior

Publications (2)

Publication Number Publication Date
CN105094120A CN105094120A (en) 2015-11-25
CN105094120B true CN105094120B (en) 2019-01-15

Family

ID=54574797

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510575176.4A Expired - Fee Related CN105094120B (en) 2015-09-11 2015-09-11 Simulate the test device of primary equipment action behavior

Country Status (1)

Country Link
CN (1) CN105094120B (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105548746B (en) * 2015-12-04 2018-12-14 国家电网公司华东分部 Simulate the device and method of protective device action behavior
CN108694514B (en) * 2018-06-05 2021-08-31 国网江苏省电力有限公司苏州供电分公司 Full-digital simulation verification system and verification method adopted by same
CN108694291B (en) * 2018-06-05 2021-04-16 国网江苏省电力有限公司苏州供电分公司 Simulation verification system for background machine of transformer substation
CN108649698A (en) * 2018-06-05 2018-10-12 国网江苏省电力有限公司苏州供电分公司 Conventional substation telemechanical simulation checking system
CN110750437B (en) * 2018-07-23 2023-12-22 阿里巴巴集团控股有限公司 Equipment debugging method, device, equipment and system
CN116132343B (en) * 2023-02-13 2024-06-04 国网四川省电力公司电力科学研究院 Online monitoring terminal simulation test system and method for primary equipment of intelligent substation

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102291277A (en) * 2011-08-09 2011-12-21 上海思源弘瑞自动化有限公司 Automatic test system and method for intelligent substation spacing apparatus
CN103364663A (en) * 2013-07-16 2013-10-23 上海毅昊自动化有限公司 Intelligent device for simulating transformer substation primary equipment behavior
CN103439612A (en) * 2013-09-02 2013-12-11 上海毅昊自动化有限公司 Intelligent transformer substation automatic testing system based on SCD
CN104090194A (en) * 2014-07-31 2014-10-08 上海毅昊自动化有限公司 Intelligent substation relay protection noninvasive test system and method
CN104868599A (en) * 2015-05-29 2015-08-26 国网河南省电力公司电力科学研究院 Intelligent substation message simulation test and association analysis system, and simulation method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102291277A (en) * 2011-08-09 2011-12-21 上海思源弘瑞自动化有限公司 Automatic test system and method for intelligent substation spacing apparatus
CN103364663A (en) * 2013-07-16 2013-10-23 上海毅昊自动化有限公司 Intelligent device for simulating transformer substation primary equipment behavior
CN103439612A (en) * 2013-09-02 2013-12-11 上海毅昊自动化有限公司 Intelligent transformer substation automatic testing system based on SCD
CN104090194A (en) * 2014-07-31 2014-10-08 上海毅昊自动化有限公司 Intelligent substation relay protection noninvasive test system and method
CN104868599A (en) * 2015-05-29 2015-08-26 国网河南省电力公司电力科学研究院 Intelligent substation message simulation test and association analysis system, and simulation method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
智能变电站SCD在线应用探索;罗皎虹;《供用电》;20150305(第期);第47-51页

Also Published As

Publication number Publication date
CN105094120A (en) 2015-11-25

Similar Documents

Publication Publication Date Title
CN105094120B (en) Simulate the test device of primary equipment action behavior
CN108983006B (en) On-site type feeder automation switch terminal field uninterrupted full-automatic test method
CN106527181B (en) A kind of electrical power distribution automatization system emulation test method based on communication network
CN103713214A (en) Intelligent transformer station relay protection closed loop test system
CN202218067U (en) Automated intelligent information pointing system of electric power system
CN107167680B (en) RTDS-based power distribution network distributed test system
CN103364663B (en) Intelligent device for simulating transformer substation primary equipment behavior
CN103076520A (en) Dynamic analogue simulation detection platform and analogue simulation method for secondary system of intelligent substation
CN109613906B (en) Third-generation intelligent substation measurement and control submachine test system and application method thereof
CN106329720A (en) Detecting and debugging method for reconstruction and extension project secondary system for intelligent substation
CN104483568B (en) A kind of device for detecting stand-by power supply automatic switching
CN101750555A (en) Spare automatic switching comprehensive tester
CN105334417A (en) Portable spare power automatic switching check device
CN104076805A (en) Test system for automatic control equipment of power distribution network
CN104638761B (en) Packet sensing and packet simulation verification based GOOSE (generic object oriented substation event) virtual terminal connection method
CN203191816U (en) Test system for automatic control equipment of power distribution network
CN104142472B (en) Support the intelligent high-pressure switch interlock logical checking method of IEC61850 stipulations
CN201230204Y (en) Logic test device for microcomputer type protection monitoring module in power supply and distribution system
CN102375105A (en) Simulation test system of substation equipment relay protection system
CN202353314U (en) Modularized intelligent switch controller
CN201725016U (en) Protection device full-interface testing device based on simulated field and wave recording
CN103077644B (en) Split-phase breaker hydraulic operation mechanism training device
CN105006891A (en) On-line visual remote control terminal and method used for transformer station background upgrading
CN113629879B (en) Portable SV/GOOSE common-network maintenance isolation device and method
CN210722065U (en) Fault simulation display device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Cao Haiou

Inventor after: Yang Yi

Inventor after: Liu Shaojun

Inventor after: Gao Xiang

Inventor after: Gao Lei

Inventor after: Yuan Yubo

Inventor after: Guan Yibin

Inventor after: Xu Ning

Inventor after: Wu Yi

Inventor before: Cao Haiou

Inventor before: Yang Yi

Inventor before: Liu Shaojun

Inventor before: Gao Xiang

Inventor before: Gao Lei

Inventor before: Yuan Yubo

Inventor before: Guan Yibin

Inventor before: Xu Ning

Inventor before: Wu Yi

GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190115

Termination date: 20190911