CN104142472B - Support the intelligent high-pressure switch interlock logical checking method of IEC61850 stipulations - Google Patents

Support the intelligent high-pressure switch interlock logical checking method of IEC61850 stipulations Download PDF

Info

Publication number
CN104142472B
CN104142472B CN201310456994.3A CN201310456994A CN104142472B CN 104142472 B CN104142472 B CN 104142472B CN 201310456994 A CN201310456994 A CN 201310456994A CN 104142472 B CN104142472 B CN 104142472B
Authority
CN
China
Prior art keywords
interlock
measure
interlock logic
control device
computer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201310456994.3A
Other languages
Chinese (zh)
Other versions
CN104142472A (en
Inventor
孙银山
张军民
尹军华
李惠民
王乐挺
寇新民
李环
张茗
张一茗
毛志宽
陈富国
马东岭
张锦
宋亚凯
樊帅权
陈卓
蒋晓旭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Pinggao Group Co Ltd
Henan Pinggao Electric Co Ltd
Original Assignee
State Grid Corp of China SGCC
Pinggao Group Co Ltd
Henan Pinggao Electric Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Pinggao Group Co Ltd, Henan Pinggao Electric Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201310456994.3A priority Critical patent/CN104142472B/en
Publication of CN104142472A publication Critical patent/CN104142472A/en
Application granted granted Critical
Publication of CN104142472B publication Critical patent/CN104142472B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Driving Mechanisms And Operating Circuits Of Arc-Extinguishing High-Tension Switches (AREA)

Abstract

The present invention relates to a kind of intelligent high-pressure switch interlock logical checking method for supporting IEC61850 stipulations, comprise the following steps:1)Interlock logic formula is inputted in high-voltage switch gear interlock logic examines software function module, computer automatically generates interlock logic verification scheme;2)Computer sends the connectivity port that control signal closes intelligent terminal and interchanger;3)Computer sends high-voltage switch gear position signalling according to described interlock logic verification scheme to measure and control device, there is the location variable of the element of interlock connection in modification measure and control device with disconnecting link to be measured, simulate station level equipment and send instruction control disconnecting link action to be measured to measure and control device, measure and control device sends action or tripping instruction, the computer recording instruction.This method solve manual interlock logic examines when not meeting intelligent high-pressure switch actual motion interlock logic to judge flow, be also easy to produce operational error, the problem of workload is big, Check-Out Time is long, mechanical wear of the reduction to primary equipment.

Description

Support the intelligent high-pressure switch interlock logical checking method of IEC61850 stipulations
Technical field
The present invention relates to a kind of intelligent high-pressure switch interlock logical checking method for supporting IEC61850 stipulations.
Background technology
From the point of view of breaker, the functional characteristics of isolation/grounding switch, when circuit or equipment are normally run(Have voltage, Electric current is present)If carrying out power failure operation can only be according to order as cut-off breaker, point isolation switch, conjunction grounding switch Carry out, this order is referred to as the operation logic of primary equipment.On the contrary, putting equipment in service operation can only according to a point grounding switch, close every Sequentially carried out from as disconnecting link, conjunction breaker.The operation logic that primary equipment puts into operation and had a power failure is also referred to as intelligent high-pressure switch Interlock logic, each isolation/grounding switch has an interlock logic formula, and this logical relation is stored in measure and control device. After measure and control device receives station level equipment for the control instruction of certain isolation/grounding switch, according to being pressed off in transformer station with the height Close associated breaker, current point/"on" position of isolation/grounding switch sends action to the isolation/grounding switch or refused Dynamic instruction.
Intelligent high-pressure switch will test with field adjustable to interlock logic dispatching from the factory, it is ensured that primary equipment will not It is misused.At present, the interlock logic of intelligent high-pressure switch, which is examined, is all manually operated measure and control device completion, it is assumed that when Preceding examined isolation/grounding switch has n associated breakers, isolation/grounding switch, then just have 2n kind interlock logics One by one inspection is needed, is also accomplished by entering to being examined isolation/grounding switch and its associated breaker, isolation/grounding switch Row 2nIt is secondary manually operated.2nIn secondary operation, and if only a kind of logic can make this examined isolation/grounding switch Action, then this be examined isolation/grounding switch interlock logic be it is correct, otherwise mistake.
There is problems with or defect in the manual operation method that the interlock logic of intelligent high-pressure switch is examined:1)In intelligent height Compress switch actual motion when, measure and control device is to meet 61850 stipulations by what the network switch received that station level equipment sends MMS controls message, then carries out interlock logic judgement, this mode is remote control for measure and control device, and existing interlocking is patrolled Collect and examine using on-site manual operation, be closely to control for measure and control device, lack and receive the link that station level controls message, with intelligence Interlock logic during energy high-voltage switch gear actual motion judges that flow is compared and lacks a specific detection, interlock logic detection stream Journey is imperfect;2)Totally the 2 of associated breaker, isolation/grounding switchnThe adjustment of secondary point/closing position is required for manually operated Complete, workload is big, and field operation time is long, and artificial maloperation is produced unavoidably.As long as having a kind of interlock logic because artificial behaviour Make error test errors, whole interlock logic will be made to examine the result for producing mistake;3)Each high-voltage switch gear(Isolation/ground connection Disconnecting link)Interlock logic assay be required for it is artificial judge and manually recorded, only all interlock logic assays are all right, High-voltage switch gear could meet requirement, and artificially judge with manually recorded also unavoidable generation mistake, whole interlock logic can also examined Test the result for producing mistake;4)Associated breaker, the 2 of isolation/grounding switchnSecondary position adjustment can make these primary equipments Action 2nIt is secondary, certain mechanical wear can be produced to these primary equipment bodies.
The content of the invention
It is an object of the invention to provide a kind of intelligent high-pressure switch interlock logical checking method for supporting IEC61850 stipulations, The problem of to solve that existing manual interlock logic method of inspection workload is big, produce mechanical wear to primary equipment body.
To achieve the above object, the solution of the present invention:A kind of intelligent high-pressure switch interlock for supporting IEC61850 stipulations is patrolled The method of inspection is collected, this method includes following operating procedure,
1)To the computer input interlock logic formula equipped with high-voltage switch gear interlock logic checking function module, computer according to Interlock logic formula generate 2n kind interlock logic verification schemes, wherein n be high-voltage switch gear in there is interlock connection with disconnecting link to be measured Number of elements;
2)Computer sends the connectivity port that control signal closes intelligent terminal and interchanger;
3)Computer simulates intelligent terminal to measure and control device transmission high-voltage switch gear according to described interlock logic verification scheme There is the location variable of the element of interlock connection in position state signal, modification measure and control device with disconnecting link to be measured, station level is simulated Equipment sends instruction to measure and control device and controls disconnecting link to be measured to act, and measure and control device refers to according to interlock logic formula, the control received Order and disconnecting link current location to be measured send action or tripping instruction, action described in computer recording or tripping instruction, for sentencing Whether the high-voltage switch gear interlock logic embedded in disconnected measure and control device is correct;
Repeat the 3rd)Step, examines described 2 successivelynPlant interlock logic verification scheme.
The beneficial effects of the invention are as follows:Control instruction is sent to measure and control device using computer simulation station level equipment, is made Interlock logic examines interlock logic when more meeting intelligent high-pressure switch actual motion to judge flow;Filled using computer change observing and controlling Put the position signalling of high-voltage switch, it is to avoid human operational error, reduce workload, shorten Check-Out Time;In detection Computer sends the connectivity port of signal-off intelligent terminal and interchanger before starting, and the frequent divide-shut brake of high-voltage switch gear is avoided with this Operate the mechanical wear caused to primary equipment body.
Brief description of the drawings
Fig. 1 is system architecture and the physics wiring of the present invention;
Fig. 2 is the implementation process of the present invention.
Embodiment
The invention will be further described below in conjunction with the accompanying drawings.
Fig. 1 describes system architecture and the physics wiring of the present invention, and measure and control device, intelligent terminal and computer are passed through Optical fiber connects interchanger, and intelligent terminal is passed through into cable connection intelligent high-pressure Switch main body.
Fig. 2 describes the workflow that the present invention realizes intelligent interlocking logical checking, and the reality of the present invention is exemplified below Existing process.Disconnecting link to be measured is grounding switch QE1, and the element associated with disconnecting link to be measured is respectively QSF1, QSF2, QS3, it is assumed that surveyed Controlling the interlock logic formula stored in device is:QE1=QSF1QSF2QS3.
1)The related equipment of connection shown in Fig. 1 is first according to, the network parameter of all devices is configured:Equipment is connected into by all (Including interchanger)IP address be set to the same network segment, configure interchanger mirror port, the port 1 in Fig. 1 be set to mirror image Port, other ports are set to be mirrored port;High-voltage switch gear parameter is configured, computer reads system SCD texts by application software Configurable parameter is generated after part, GOOSE parameters and the MMS controls of the high-voltage switch gears such as breaker, isolation/grounding switch is then configured Parameter.
2)QE1 interlock logic formula is inputted, input interlocking is patrolled in high-voltage switch gear interlock logic examines software function module The formula of collecting, software automatically generates primary equipment inventory according to the interlock logic formula of input, and user is needed on the right of selection logical formula equal sign Associated primary equipment and its logical relation(AOI), software according to user input with associate setting automatically generate QE1's Interlock logic verification scheme, including 8 kinds(23=8, with disconnecting link QE1 to be measured there is the element of interlock connection to have 3, be respectively QSF1、QSF2、QS3.)The logic examined is needed, as shown in table 1:
Table 1
3)Interlock logic verification scheme according to generation starts interlock logic inspection, and now computer is grasped as follows successively Make:Close intelligent terminal and switch connection port;Simulate intelligent terminal and send high-voltage switch gear location status report to measure and control device Text, according to the interlock logic scheme shown in table 1 set gradually QSF1, QSF2 and QS3 in measure and control device point/closing position;Mould Intend station level equipment to move to the MMS control message commands measure and control device operations QE1 that measure and control device transmission meets IEC61850 stipulations Make, receive measure and control device after order can be judged to issue according to QSF1, QSF2 and QS3 current point/"on" position QE1 action or Tripping is instructed, as shown in table 1, only when QSF1, QSF2 and QS3 are all in open position, and measure and control device just sends the dynamic of QE1 Instruct, other situation measure and control devices all send tripping instruction.
4)Interlock logic assay is checked, as shown in table 1, software can detect the QE1 instructions that measure and control device is sent(Action Or tripping), and the secondary series of table 1 is inserted into the instruction.
After all interlock logic verification schemes are finished, as long as first row and secondary series in user's contrast table 1, it can just obtain To assay:If first row is completely the same with secondary series, the interlock logic for illustrating QE1 be it is correct, if incomplete one Cause, it is wrong to illustrate interlock logic.

Claims (1)

1. a kind of intelligent high-pressure switch interlock logical checking method for supporting the stipulations of IEC 61850, it is characterised in that methods described Including following operating procedure:
1) to the computer input interlock logic formula equipped with high-voltage switch gear interlock logic checking function module, computer is according to interlocking Logical formula generation 2nKind of interlock logic verification scheme, wherein n is the element with disconnecting link to be measured in high-voltage switch gear with interlock connection Quantity;
2) computer sends the connectivity port that control signal closes intelligent terminal and interchanger;
3) computer simulates intelligent terminal to measure and control device transmission high-voltage switch gear position according to described interlock logic verification scheme There is the location variable of the element of interlock connection in status signal, modification measure and control device with disconnecting link to be measured, station level equipment is simulated Send instruction to measure and control device and control disconnecting link to be measured action, measure and control device according to interlock logic formula, the control instruction received with And disconnecting link current location to be measured sends action or tripping instruction, action described in computer recording or tripping instruction, for judging to survey Whether correct control the high-voltage switch gear interlock logic embedded in device;Measure and control device, intelligent terminal and computer are connected by optical fiber Connect interchanger;
4) the 3) step is repeated, described 2 are examined successivelynPlant interlock logic verification scheme.
CN201310456994.3A 2013-09-29 2013-09-29 Support the intelligent high-pressure switch interlock logical checking method of IEC61850 stipulations Expired - Fee Related CN104142472B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310456994.3A CN104142472B (en) 2013-09-29 2013-09-29 Support the intelligent high-pressure switch interlock logical checking method of IEC61850 stipulations

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310456994.3A CN104142472B (en) 2013-09-29 2013-09-29 Support the intelligent high-pressure switch interlock logical checking method of IEC61850 stipulations

Publications (2)

Publication Number Publication Date
CN104142472A CN104142472A (en) 2014-11-12
CN104142472B true CN104142472B (en) 2017-09-26

Family

ID=51851704

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310456994.3A Expired - Fee Related CN104142472B (en) 2013-09-29 2013-09-29 Support the intelligent high-pressure switch interlock logical checking method of IEC61850 stipulations

Country Status (1)

Country Link
CN (1) CN104142472B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108880858B (en) * 2018-05-23 2021-06-11 许继集团有限公司 Protocol communication system for high-voltage direct-current transmission
CN110867331B (en) * 2019-12-03 2021-08-24 常熟开关制造有限公司(原常熟开关厂) Automatic transfer switch interlocking test method and automatic transfer switch
CN113641122A (en) * 2021-08-06 2021-11-12 广西电网有限责任公司电力科学研究院 Interlocking logic visualization method and device for intelligent high-voltage switch
CN114089174A (en) * 2021-10-20 2022-02-25 平高集团有限公司 High-voltage switch mechanical characteristic monitoring device and GIS circuit breaker

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101836122B (en) * 2007-10-25 2014-12-24 Abb研究有限公司 Operating a substation automation system
EP2088444A1 (en) * 2008-02-11 2009-08-12 ABB Research Ltd. System level testing for substation automation systems
CN101813928B (en) * 2010-04-27 2012-07-04 北京首钢自动化信息技术有限公司 Automated one-machine multiple-station intelligent five-defense system of energy system transformer substation
CN102157983B (en) * 2011-04-01 2014-04-23 南京南瑞继保电气有限公司 GOOSE (generic object oriented substation event)-based five-prevention locking method of measuring and controlling device
CN102141950A (en) * 2011-04-18 2011-08-03 国电南瑞科技股份有限公司 Method for checking interlock logics of intelligent substation measuring and controlling device
CN102539968B (en) * 2011-12-30 2014-06-04 长园深瑞继保自动化有限公司 Locking control testing system of intelligent transformer substation
CN102638105A (en) * 2012-04-25 2012-08-15 广东电网公司珠海供电局 Online anti-maloperation sequential control method

Also Published As

Publication number Publication date
CN104142472A (en) 2014-11-12

Similar Documents

Publication Publication Date Title
CN105978152B (en) A kind of intelligent substation telemechanical apparatus and the method for regulating and controlling main website automated closed-loop joint debugging
CN105070157B (en) A kind of feeder automation simulation training system
CN103123758B (en) A kind of dispatching automation numeral physical mixed simulation training system
CN111694288B (en) On-site feeder automation function closed-loop automatic test platform
CN108983006B (en) On-site type feeder automation switch terminal field uninterrupted full-automatic test method
CN106527181B (en) A kind of electrical power distribution automatization system emulation test method based on communication network
CN105548742B (en) System is tested in a distant place for relay protection
CN105527521B (en) A kind of protective relaying device verification ancillary equipment and monitoring system
CN106444709A (en) Automatic testing method and device of distribution intelligent function of power distribution terminal
CN104483568B (en) A kind of device for detecting stand-by power supply automatic switching
CN104142472B (en) Support the intelligent high-pressure switch interlock logical checking method of IEC61850 stipulations
CN105094120B (en) Simulate the test device of primary equipment action behavior
CN205139272U (en) Join in marriage power -grid switch analog switch unit for equipment
CN106329720A (en) Detecting and debugging method for reconstruction and extension project secondary system for intelligent substation
CN109613906B (en) Third-generation intelligent substation measurement and control submachine test system and application method thereof
CN108957160A (en) Active power distribution network feed line automatization system test method
CN111551809A (en) Synchronous whole-group automatic testing method and system for secondary system of intelligent substation
CN108270092A (en) A kind of subway contact net visualizes earthed system
CN105847076B (en) Signal testing system, method and device for substation control level equipment of transformer substation
CN104269090A (en) Simulation system and method for electricity consumption information acquisition terminal round control switch
CN107491569A (en) Transformer substation system On-line Fault emulation mode based on IEC61850 standard GOOSE, SV technologies
CN105319466B (en) A kind of middle pressure electric equipment simulation live testing test method
CN110718132B (en) Distribution network terminal inspection fault simulation method and system
CN102375105A (en) Simulation test system of substation equipment relay protection system
CN102903286B (en) Distant place fault setting and monitoring system of practical training substation

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170926

CF01 Termination of patent right due to non-payment of annual fee