CN101736913B - 保留外墙托换方法 - Google Patents
保留外墙托换方法 Download PDFInfo
- Publication number
- CN101736913B CN101736913B CN2009101983358A CN200910198335A CN101736913B CN 101736913 B CN101736913 B CN 101736913B CN 2009101983358 A CN2009101983358 A CN 2009101983358A CN 200910198335 A CN200910198335 A CN 200910198335A CN 101736913 B CN101736913 B CN 101736913B
- Authority
- CN
- China
- Prior art keywords
- shoulder pole
- external wall
- pole girder
- reserved
- reserved external
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Working Measures On Existing Buildindgs (AREA)
Abstract
本发明公开了一种保留外墙托换方法,包括如下步骤:在保留外墙上间隔一定距离设置扁担梁,通过开孔机开排孔后绑扎钢筋并制模浇筑混凝土;每个扁担梁在达到设计强度后再开设旁边的扁担梁,当所有扁担梁完成后,在保留外墙外侧部分再将扁担梁预留钢筋锚入新筑基础梁,基础梁达到设计强度后打设静压锚杆桩并封桩孔。本发明通过采用在保留外墙上间隔设置扁担梁,再通过扁担梁与框架梁或基础梁连接,最后传至锚杆工程桩的方法,有效的解决了保留外墙竖向力的传递途径,该方法节省了施工时间、施工费用同时也避免了老墙托换过程引起的结构不稳定危险。本发明具有施工方便、操作简单且费用较低等优点。
Description
技术领域
本发明涉及一种建筑施工方法,具体公开了一种保护建筑基础及上部结构托换工程技术,特别是一种保留外墙托换施工方法。
背景技术
在保护建筑改造过程中,当需要对建筑物外墙进行不拆除保留情况下,同时又要满足改造后的功能和墙体受力后整体稳定性及抗震要求,故需对保留原外墙进行托换和抗震加固。目前的常用的托换方法是:在原墙体两侧用静力压桩机打工程桩,在新桩上浇筑卸荷支座,在卸荷支座上放置千斤顶,这样启动千斤顶,千斤顶便通过千斤顶着力架、横梁、纵梁、钢夹板顶升房屋立柱,使立柱所受房屋重力转移至卸荷支座上,再把旧承台、立柱与卸荷支座的钢筋焊接,新筑混凝土。这种方法需把原基础进行整体拆除、整体浇筑混凝土,所需置换时间较长、费用较高、技术要求亦很高,而且不适用上部结构外墙托换。
因此,提供一种可以同时满足保护建筑基础及上部结构托换的托换施工方法,成为本领域技术人员迫切需要解决的技术难题。
发明内容
本发明所要解决的技术问题是提供一种即可节约施工时间、节省费用,又可以实现保留外墙托换的安全性与稳定性需要的的保留外墙托换施工方法,以克服现有技术存在的上述缺陷。
本发明解决技术问题的技术方案如下:
一种保留外墙托换方法,其特征在于,包括如下步骤:
(一)、在保留外墙上间隔一定距离设置扁担梁,通过开孔机开排孔后绑扎 钢筋并制模浇筑混凝土;
(二)、每个扁担梁在达到设计强度后再开设旁边的扁担梁;
(三)当所有扁担梁完成后,在保留外墙外侧部分再将扁担梁预留钢筋锚入新筑基础梁,新筑基础梁内预留静压锚杆桩孔洞及爪肢锚杆,
(四)、新筑基础梁或结构梁及筏板基础一起浇捣完成新基础,基础梁达到设计强度后打设静压锚杆桩并封桩孔。
由以上公开的技术方案可知,本发明通过采用在保留外墙上间隔设置扁担梁,再通过扁担梁与框架梁或基础梁连接,最后传至锚杆工程桩的方法,有效的解决了保留外墙竖向力的传递途径,该方法节省了施工时间、施工费用同时也避免了老墙托换过程引起的结构不稳定危险。本发明具有施工方便、操作简单且费用较低等优点。
附图说明
图1为保留外墙扁担梁开洞示意图;
图2为在保留外墙设置基础扁担梁的结构示意图。
图3为图2中A-A断面结构图。
图4为在保留外墙上部设置扁担梁的结构示意图。
图5为图4中B-B断面结构图。
附图标记如下:
1、保留外墙 2、墙洞 3、原基础
4、基础梁 5、扁担梁 6、新浇混凝土梁
7、待拆除外墙 8、保留外墙加固层
具体实施方式
下面结合附图和实施例对本发明进行进一步描述。
如图2~5所示,本发明保留外墙托换方法,包括如下步骤:在保留外墙1 上间隔一定距离设置扁担梁5,通过开孔机开排孔后绑扎钢筋并制模浇筑混凝土;每个扁担梁5在达到设计强度后再开设旁边的扁担梁,当所有扁担梁5完成后,在保留外墙1外侧部分再将扁担梁与基础梁4或结构梁一起浇捣形成基础梁4或新浇混凝土梁6,新筑基础梁4内预留静压锚杆桩孔洞及爪肢锚杆,新筑基础梁4或结构梁及筏板基础一起浇捣完成新基础,新筑基础梁4达到设计强度后打设静压锚杆桩并封桩孔。待新浇混凝土梁达到设计强度后再拆除待拆除外墙7,如图4所示。
所述扁担梁5间隔设置在保留外墙1原基础上即可实现保留外墙基础托换,如果所述扁担梁5间隔设置在保留外墙1每层楼面上,则可实现上部结构的外墙托换。
所述扁担梁5的间隔间距为2.5m~3m。所述扁担梁5的的断面宽度范围为250mm~350mm,高度范围为650mm~800mm。
在保留外墙1上设置扁担梁5的施工步骤如下:
a、在保留外墙1上把扁担梁的外边线放出来;
b、使用钻孔切割机打设直径为100mm的排孔切割出墙洞2,要求20m范围内禁止同时开洞,具体可参见图1所示;
c、切割出一个墙洞后即进行钢筋绑扎;
d、支设模板;
f、先行浇捣扁担梁,预留出与基础梁或结构梁相接的钢筋,采用微膨胀混凝土,标号同基础梁4或结构梁,继续重复步骤a~e,进行其它扁担梁的施工。
Claims (7)
1.一种保留外墙托换方法,其特征在于,包括如下步骤:
(一)、在保留外墙(1)上间隔一定距离设置扁担梁(5),通过开孔机开排孔后绑扎钢筋并制模浇筑混凝土;
(二)、每个扁担梁(5)在达到设计强度后再开设旁边的扁担梁;
(三)当所有扁担梁(5)完成后,在保留外墙(1)外侧部分再将扁担梁预留钢筋锚入新筑基础梁(4),新筑基础梁(4)内预留静压锚杆桩孔洞及爪肢锚杆,
(四)、新筑基础梁(4)及筏板基础一起浇捣完成新基础,基础梁达到设计强度后打设静压锚杆桩并封桩孔。
2.根据权利要求1所述的保留外墙托换方法,其特征在于,所述扁担梁(5)间隔设置在保留外墙(1)原基础上。
3.根据权利要求1所述的保留外墙托换方法,其特征在于,所述扁担梁(5)间隔设置在保留外墙(1)每层楼面上。
4.根据权利要求1所述的保留外墙托换方法,其特征在于,在保留外墙上设置扁担梁(5)的施工步骤如下:
a、在保留外墙(1)上把扁担梁的外边线放出来;
b、使用钻孔切割机打设直径为100mm的排孔切割出墙洞(2);
c、切割出一个墙洞后即进行钢筋绑扎;
d、支设模板;
e、先行浇捣扁担梁,预留出与基础梁或结构梁相接的钢筋,采用微膨胀混凝土,标号同基础梁或结构梁,继续重复步骤a~e,进行其它扁担梁的施工。
5.根据权利要求1所述的保留外墙托换方法,其特征在于,所述扁担梁(5)的间隔间距为2.5m~3m。
6.根据权利要求1所述的保留外墙托换方法,其特征在于,所述扁担梁(5)的断面宽度范围为250mm~350mm,高度范围为650mm~800mm。
7.根据权利要求4所述的保留外墙托换方法,其特征在于,所说的步骤b中切割墙洞(2)时要求20m范围内禁止同时开洞。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009101983358A CN101736913B (zh) | 2009-11-05 | 2009-11-05 | 保留外墙托换方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009101983358A CN101736913B (zh) | 2009-11-05 | 2009-11-05 | 保留外墙托换方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101736913A CN101736913A (zh) | 2010-06-16 |
CN101736913B true CN101736913B (zh) | 2011-07-20 |
Family
ID=42460892
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2009101983358A Active CN101736913B (zh) | 2009-11-05 | 2009-11-05 | 保留外墙托换方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101736913B (zh) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107299652A (zh) * | 2017-07-11 | 2017-10-27 | 上海岩土工程勘察设计研究院有限公司 | 一种砖墙大放脚基础单侧托换加固方法及加固结构 |
CN108035716B (zh) * | 2017-10-18 | 2019-11-29 | 广州地铁设计研究院股份有限公司 | 一种侧墙开洞的施工方法 |
-
2009
- 2009-11-05 CN CN2009101983358A patent/CN101736913B/zh active Active
Also Published As
Publication number | Publication date |
---|---|
CN101736913A (zh) | 2010-06-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203514336U (zh) | 一种叠合墙板嵌入式基础 | |
CN202925555U (zh) | 一种基坑斜撑支护结构 | |
CN104878835A (zh) | 条形基础房屋后增地下室结构 | |
CN109403654B (zh) | 一种既有建筑物结构的托换加固方法 | |
CN214245383U (zh) | 用于盖梁施工的组合模具系统 | |
CN203200745U (zh) | 一种逆作法施工中地下连续墙的加固支撑 | |
CN101736913B (zh) | 保留外墙托换方法 | |
KR101086643B1 (ko) | 다수개의 강선을 인장부의 전단면에 배치한 프리스트레스트콘크리트거더 | |
CN101492918B (zh) | 一种用于逆作法基坑工程的梁柱节点 | |
CN111270678A (zh) | 一种支撑系统及其施工方法 | |
CN211113683U (zh) | 高边坡免拆轻型钢模网自密实混凝土框架护坡结构 | |
JP2005105531A (ja) | 建物の基礎構造とその構築方法 | |
CN210562287U (zh) | 一种复合装配式地下结构 | |
CN204059940U (zh) | 一种混凝土楼板铝合金模板 | |
CN213062030U (zh) | 一种组合钢管混凝土腰梁结构、预制件及连接节点 | |
CN211898547U (zh) | 用于地铁车站的组合式格构柱托换装置 | |
CN107816132B (zh) | 高位塔吊无楼板单排框架附着结构及其施工方法 | |
CN211395698U (zh) | 一种劲芯帷幕桩与护壁桩锚联合支护结构 | |
KR101131631B1 (ko) | 다수개의 강선을 인장부의 전단면에 배치한 프리스트레스트콘크리트거더를 이용한 조립식교량시공방법 | |
CN112682048A (zh) | 一种新建隧道小净距上跨既有隧道的置换加固施工方法 | |
JP4560557B2 (ja) | 橋梁の耐震補強工法 | |
CN103485365A (zh) | 排桩围护的地下混凝土墙模板的安装方法 | |
KR101131629B1 (ko) | 다수개의 강선을 인장부의 전단면에 배치한 프리스트레스트콘크리트거더의 제작방법 | |
CN214940197U (zh) | 预应力组合桩和预应力钢板桩墙 | |
CN205100433U (zh) | 一种用于支撑后浇带的格构柱 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C56 | Change in the name or address of the patentee |
Owner name: SHANGHAI CONSTRUCTION NO.1 GROUP CO., LTD. Free format text: FORMER NAME: NO.1 BUILDING CO., LTD., SHANGHAI |
|
CP01 | Change in the name or title of a patent holder |
Address after: 200120 Shanghai city Pudong New Area Fushan Road No. 33 Patentee after: Shanghai Construction No.1 (Group) Co., Ltd. Address before: 200120 Shanghai city Pudong New Area Fushan Road No. 33 Patentee before: Shanghai First Construction Co., Ltd. |