CN101718115A - 大跨度柱面网壳安装方法 - Google Patents

大跨度柱面网壳安装方法 Download PDF

Info

Publication number
CN101718115A
CN101718115A CN200910223971A CN200910223971A CN101718115A CN 101718115 A CN101718115 A CN 101718115A CN 200910223971 A CN200910223971 A CN 200910223971A CN 200910223971 A CN200910223971 A CN 200910223971A CN 101718115 A CN101718115 A CN 101718115A
Authority
CN
China
Prior art keywords
arch
installation
mother
joint
ball
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN200910223971A
Other languages
English (en)
Other versions
CN101718115B (zh
Inventor
孙兴亮
韩洪亮
徐玉平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Hongyue Steel Space Frame Structure Co., Ltd.
Original Assignee
徐玉平
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 徐玉平 filed Critical 徐玉平
Priority to CN2009102239711A priority Critical patent/CN101718115B/zh
Publication of CN101718115A publication Critical patent/CN101718115A/zh
Priority to PCT/CN2010/076514 priority patent/WO2011060659A1/zh
Application granted granted Critical
Publication of CN101718115B publication Critical patent/CN101718115B/zh
Priority to US13/475,499 priority patent/US20120227353A1/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/32Arched structures; Vaulted structures; Folded structures
    • E04B1/3205Structures with a longitudinal horizontal axis, e.g. cylindrical or prismatic structures
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/19Three-dimensional framework structures
    • E04B1/1903Connecting nodes specially adapted therefor
    • E04B1/1906Connecting nodes specially adapted therefor with central spherical, semispherical or polyhedral connecting element
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/19Three-dimensional framework structures
    • E04B2001/1924Struts specially adapted therefor
    • E04B2001/1927Struts specially adapted therefor of essentially circular cross section
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/19Three-dimensional framework structures
    • E04B2001/1957Details of connections between nodes and struts
    • E04B2001/196Screw connections with axis parallel to the main axis of the strut
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/32Arched structures; Vaulted structures; Folded structures
    • E04B2001/3217Auxiliary supporting devices used during erection of the arched structures
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/32Arched structures; Vaulted structures; Folded structures
    • E04B2001/3235Arched structures; Vaulted structures; Folded structures having a grid frame

Abstract

本发明涉及一种大跨度柱面网壳结构的施工安装方法,具体地说是一种大跨度柱面网壳安装方法。该工艺首先在地面采用散装法安装一母拱,安装的时候从母拱的一侧逐渐向另一侧推进,配合举升装备提升母拱的延展末端,使延展末端的高度始终适合地面安装施工的要求。母拱安装完成以后,采用高空悬挑法施工,沿着母拱轴向伸展推进,依次安装与之邻近的其他网拱,直到完成整个大跨度柱面网壳的安装。该安装工艺无需搭建脚手架,利用吊车等举升装备做辅助工具,简单实用,可靠性高,成本低,工期短。

Description

大跨度柱面网壳安装方法
技术领域
本发明涉及一种大跨度柱面网壳结构的施工安装方法,具体地说是一种大跨度柱面网壳安装方法。
背景技术
热电厂干煤棚因倒煤机工艺需要静跨度通常要达到76米以上,有的甚至超过110米,其净高度一般在28米以上。这种大跨度大高度的封闭罩棚其科学经济合理的方案是采用柱面网壳结构,这已经经过了数学、力学理论计算的验证。但其安装工艺一直在不断变换与探讨中。采用不同的安装工艺将产生不同的费用和工期,效果不同。传统的施工工艺分为整体脚手架施工法和局部脚手架施工法,整体脚手架施工法需要在整个柱面网壳覆盖的区域内搭建脚手架,施工周期长、成本高;局部脚手架施工法首先搭建脚手架安装一个环面,然后以这个环面为基础,采用高空悬挑施工法将环面向两侧延长。局部脚手架施工法由于只需要搭建部分脚手架,有利于缩短施工周期、降低施工成本;例如,中国专利申请“一种筒壳型螺栓球节点网架高空悬挑施工方法”,专利申请号200810231497.2,该专利申请就公开了这样一种局部脚手架施工法。但即使是局部脚手架施工法也要搭建高度相当于柱面网壳最高处的脚手架,对于特大、超高的柱面网壳,施工成本和施工的难度依然比较大。
发明内容
本发明提供一种大跨度柱面网壳安装方法,无需搭建脚手架,利用吊车做辅助工具,简单实用,可靠性高,成本低,工期短。
为实现上述目的,本发明采用以下技术方案:
本发明所述的大跨度柱面网壳安装方法,其特征在于包括如下步骤:
A)结合支承情况将所述大跨度柱面网壳划分成多榀沿轴向排列的网拱,所述每一网拱至少包括对称设置在两侧的四个支座以及安装在所述四个支座上相互连接成网架状的球节和拉杆;首先安装一榀网拱,称为母拱,在母拱任一侧的支座上各安装一个的活动球节,然后以这个活动球节为起点依次安装该母拱上的其他球节和拉杆;安装所述球节和拉杆的时候,将本应竖向高空延展安装的母拱横向延展安装,在母拱横向延展的过程中,利用举升装备提升母拱的延展末端,使延展末端的高度始终适合地面安装施工的要求;
B)在上述母拱的所有球节和拉杆都连接完成以后,将与活动球节对称位置的球节固定安装在相应位置的支座上,至此整个母拱安装完成;母拱安装完成以后,采用高空悬挑法施工,沿着母拱轴向伸展推进,依次安装与之邻近的其他网拱,直到完成整个大跨度柱面网壳的安装。
在安装母拱的过程中,活动球节以可旋转、球心位置不可移动的方式安装在支座上,在网拱安装完成以后,整个大跨度柱面网壳安装完成之前,将活动球节与支座固定连接。
由于采用了上述技术方案,该安装工艺无需搭建脚手架,利用吊车等举升装备做辅助工具,简单实用,可靠性高,成本低,工期短。
附图说明
图1为本发明一种实施例的安装施工立面图;
图2为母拱安装到一半时的安装施工立面图;
图3为母拱安装到最后阶段的施工立面图;
图4为母拱安装完成以后的立面图。
具体实施方式
如附图所示,本发明所述的大跨度柱面网壳安装方法,其特征在于包括如下步骤:
A)结合支承情况将所述大跨度柱面网壳划分成多榀沿轴向排列的网拱,每一网拱带至少包括对称设置在两侧的四个支座1以及安装在所述四个支座1上相互连接成网架状的球节和拉杆;首先安装一榀网拱,这个最先安装的网拱我们称之为母拱,本实施例中的母拱的两侧各有两个支座1,在母拱任一侧的支座1上各安装一个的活动球节2。活动球节2以可旋转、球心位置不可移动的方式安装在支座1上。具体结构可以采用链条或者钢丝绳将活动球节2捆绑在支座1上,也可以直接在支座1的顶端设置较深的球窝,将活动球节2安装在球窝中;上述两种方法都可以使活动球节2安装在支座1的顶端,可以旋转但是不会从支座1上脱落。
安装好活动球节2以后,以活动球节2为起点依次安装该母拱上的其他球节和拉杆;安装所述球节和拉杆的时候,将本应竖直向上向空中延展安装的母拱横向延展安装,这样可以直接在地面上安装施工,无需搭建脚手架;当然,由于母拱带有一定的弧度,随着安装进度的发展和母拱横向延展的过程中,地面或者施工平台就会阻碍球节和拉杆的安装。此时,利用举升装备3适当提升母拱的延展末端,使延展末端的高度始终适合地面安装施工的要求,随着延展末端提升,活动球节2逐渐旋转到设计角度。举升装备3可以采用各种吊车、行吊、液压千斤顶、手拉葫芦等各种能够提升高度的设备。举升时吊挂的母拱上的位置要根据受力原理,选择在受力最合理、产生变形最小的位置。
B)在上述母拱的所有球节和拉杆都连接完成以后,将与活动球节2对称位置的球节固定安装在相应位置的支座上,至此整个母拱安装完成;在母拱安装完成以后,就可以将活动球节2与支座1固定连接,通常采用焊接的方法即可。母拱安装完成以后,采用高空悬挑法施工,沿着基础网架带轴向伸展推进,依次安装与之邻近的其他网拱,直到完成整个大跨度柱面网壳的安装。
高空悬挑法施工是本领域常用的施工方法,在此不再详细叙述。

Claims (2)

1.大跨度柱面网壳安装方法,其特征在于包括如下步骤:
A)结合支承情况将所述大跨度柱面网壳划分成多榀沿轴向排列的网拱,所述每一网拱至少包括对称设置在两侧的四个支座(1)以及安装在所述四个支座(1)上相互连接成网架状的球节和拉杆;首先安装一榀网拱,称为母拱,在母拱任一侧的支座(1)上各安装一个的活动球节(2),然后以这个活动球节(2)为起点依次安装该母拱上的其他球节和拉杆;安装所述球节和拉杆的时候,将本应竖向高空延展安装的母拱横向延展安装,在母拱横向延展的过程中,利用举升装备(3)提升母拱的延展末端,使延展末端的高度始终适合地面安装施工的要求;
B)在上述母拱的所有球节和拉杆都连接完成以后,将与活动球节(2)对称位置的球节固定安装在相应位置的支座上,至此整个母拱安装完成;母拱安装完成以后,采用高空悬挑法施工,沿着母拱轴向伸展推进,依次安装与之邻近的其他网拱,直到完成整个大跨度柱面网壳的安装。
2.根据权利要求1所述的大跨度柱面网壳安装方法,其特征在于:在安装母拱的过程中,活动球节(2)以可旋转、球心位置不可移动的方式安装在支座(1)上,在网拱安装完成以后,整个大跨度柱面网壳安装完成之前,将活动球节(2)与支座(1)固定连接。
CN2009102239711A 2009-11-20 2009-11-20 大跨度柱面网壳安装方法 Expired - Fee Related CN101718115B (zh)

Priority Applications (3)

Application Number Priority Date Filing Date Title
CN2009102239711A CN101718115B (zh) 2009-11-20 2009-11-20 大跨度柱面网壳安装方法
PCT/CN2010/076514 WO2011060659A1 (zh) 2009-11-20 2010-08-31 大跨度柱面网壳安装方法
US13/475,499 US20120227353A1 (en) 2009-11-20 2012-05-18 Method for installing a large-span cylindrical reticulated shell

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009102239711A CN101718115B (zh) 2009-11-20 2009-11-20 大跨度柱面网壳安装方法

Publications (2)

Publication Number Publication Date
CN101718115A true CN101718115A (zh) 2010-06-02
CN101718115B CN101718115B (zh) 2011-06-22

Family

ID=42432747

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009102239711A Expired - Fee Related CN101718115B (zh) 2009-11-20 2009-11-20 大跨度柱面网壳安装方法

Country Status (3)

Country Link
US (1) US20120227353A1 (zh)
CN (1) CN101718115B (zh)
WO (1) WO2011060659A1 (zh)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102003078A (zh) * 2010-12-24 2011-04-06 青建集团股份公司 一种网架拼装方法
WO2011060659A1 (zh) * 2009-11-20 2011-05-26 Xu Yuping 大跨度柱面网壳安装方法
CN102953554A (zh) * 2012-11-14 2013-03-06 中冶天工集团有限公司 一种大跨度蜂窝形双层网壳结构的安装方法
CN103233582A (zh) * 2013-04-25 2013-08-07 东北林业大学 用长度可调压杆实现预应力柱面索杆网壳结构成形的方法
CN104097914A (zh) * 2014-07-24 2014-10-15 中交一航局第五工程有限公司 一种码头堆场封闭大棚网架跨越皮带机的安装方法
CN104295141A (zh) * 2014-08-22 2015-01-21 环球汇能(北京)科技有限公司 一种模块式仓储棚的分级建造方法
CN104878913A (zh) * 2013-07-25 2015-09-02 中冶天工集团有限公司 基于正交满堂脚手架搭设方法
CN110185188A (zh) * 2019-06-04 2019-08-30 中国十九冶集团有限公司 大跨度网壳安装方法
CN111042541A (zh) * 2019-12-18 2020-04-21 徐州中煤(宁夏)钢结构建设有限公司 大跨度焊接球柱面网壳顶升施工方法
CN114277938A (zh) * 2022-01-04 2022-04-05 浙江东南网架股份有限公司 基于空间四杆机构的装配式空间网壳结构及其制备方法

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103243806B (zh) * 2013-05-31 2015-02-25 周丰峻 基于球形多面体的网架结构
EP2921600B1 (en) 2014-03-19 2016-05-18 Airbus Operations GmbH Rotary joint, framework construction kit and method for constructing a framework
CN105951994B (zh) * 2016-06-29 2018-08-07 中国铁路设计集团有限公司 一种柱面网壳封闭罩棚的拓展安装方法
CN112380602B (zh) * 2020-11-13 2023-05-30 上海二十冶建设有限公司 受限环境下空间曲面网壳高精度建造方法
CN113502923A (zh) * 2021-06-30 2021-10-15 中国二十二冶集团有限公司 辅助网壳结构在伸缩缝处免二次起步的施工方法
CN115199038B (zh) * 2022-08-15 2023-07-21 中国建筑第八工程局有限公司 多向多曲率大跨度曲面网壳系统

Family Cites Families (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB191228685A (en) * 1912-12-12 1913-11-13 Heinrich Holland Improvements in the Construction of Trusses for Halls, Air-ship Hangars and like Buildings.
GB191228840A (en) * 1912-12-14 1913-10-30 Heinrich Holland Improvements in or relating to the Construction of Halls, Airship Hangars and other Structures.
US4276733A (en) * 1979-07-25 1981-07-07 Liftech Consultants, Inc. Method of constructing and erecting a dome-shaped structure
JPH0788696B2 (ja) * 1989-07-26 1995-09-27 株式会社巴コーポレーション 大スパン架構体におけるプレストレス導入装置
JP2000517015A (ja) * 1996-09-20 2000-12-19 テムコア 二重網状組織ドーム構造
CN1393607A (zh) * 2001-07-03 2003-01-29 浙江大学 柱面网壳“机构→结构”整体提升或顶升施工方法
US7143550B1 (en) * 2002-09-19 2006-12-05 Conservatek Industries, Inc. Double network reticulated frame structure
CN1188575C (zh) * 2003-05-23 2005-02-09 浙江大学 柱面网壳支座水平滑移结构整体成形施工方法
CN100427690C (zh) * 2004-03-18 2008-10-22 上海市机械施工有限公司 大跨度大纵深空间钢结构的矩阵式顶推安装法
CN100545365C (zh) * 2004-08-11 2009-09-30 中国机械工业建设总公司 建筑物桁架整体提升方法及其设备
CN100480481C (zh) * 2007-10-30 2009-04-22 浙江大学 四角锥球面网壳无脚手架施工型钢托撑式吊装机具
CN101435224A (zh) * 2008-12-24 2009-05-20 河南中美铝业有限公司 筒壳型螺栓球节点网架高空悬挑散装施工方法
CN101718115B (zh) * 2009-11-20 2011-06-22 山东宏跃网架钢结构有限公司 大跨度柱面网壳安装方法

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2011060659A1 (zh) * 2009-11-20 2011-05-26 Xu Yuping 大跨度柱面网壳安装方法
CN102003078A (zh) * 2010-12-24 2011-04-06 青建集团股份公司 一种网架拼装方法
CN102953554A (zh) * 2012-11-14 2013-03-06 中冶天工集团有限公司 一种大跨度蜂窝形双层网壳结构的安装方法
CN103233582B (zh) * 2013-04-25 2015-02-11 东北林业大学 用长度可调压杆实现预应力柱面索杆网壳结构成形的方法
CN103233582A (zh) * 2013-04-25 2013-08-07 东北林业大学 用长度可调压杆实现预应力柱面索杆网壳结构成形的方法
CN104878913A (zh) * 2013-07-25 2015-09-02 中冶天工集团有限公司 基于正交满堂脚手架搭设方法
CN104878913B (zh) * 2013-07-25 2017-03-15 中冶天工集团有限公司 基于正交满堂脚手架搭设方法
CN104097914A (zh) * 2014-07-24 2014-10-15 中交一航局第五工程有限公司 一种码头堆场封闭大棚网架跨越皮带机的安装方法
CN104295141A (zh) * 2014-08-22 2015-01-21 环球汇能(北京)科技有限公司 一种模块式仓储棚的分级建造方法
CN104295141B (zh) * 2014-08-22 2017-02-01 环球汇能(北京)科技有限公司 一种模块式仓储棚及分级建造方法
CN110185188A (zh) * 2019-06-04 2019-08-30 中国十九冶集团有限公司 大跨度网壳安装方法
CN111042541A (zh) * 2019-12-18 2020-04-21 徐州中煤(宁夏)钢结构建设有限公司 大跨度焊接球柱面网壳顶升施工方法
CN114277938A (zh) * 2022-01-04 2022-04-05 浙江东南网架股份有限公司 基于空间四杆机构的装配式空间网壳结构及其制备方法

Also Published As

Publication number Publication date
US20120227353A1 (en) 2012-09-13
WO2011060659A1 (zh) 2011-05-26
CN101718115B (zh) 2011-06-22

Similar Documents

Publication Publication Date Title
CN101718115B (zh) 大跨度柱面网壳安装方法
US8584429B2 (en) Tower erection system and method
US9316208B2 (en) Method and apparatus for handling wind turbine components during transport and assembly
AU2009244469B2 (en) Erection method for solar receiver and support tower
CN106481060B (zh) 用于塔筒的操作平台及吊装方法
CN204899238U (zh) 一种单元式幕墙板块吊装装置
CN104234200A (zh) 一种弦支穹顶索杆系逐环提升安装方法
CN203128000U (zh) 用于直驱式风力发电机组的吊装设备
CN103276908A (zh) 一种用于组装钢网架筒壳结构干煤棚的施工方法
CN202544468U (zh) 拉杆型电力钢管杆
CN103896165B (zh) 一种悬挂式外爬塔吊支承系统及其周转使用方法
CN201334306Y (zh) 立柱构件吊装机具
CN103043543A (zh) 沿海区域塔吊加固装置
CN107476560B (zh) 风电塔施工平台及方法
CN105016220B (zh) 一种抱杆加节装置
CN103334628B (zh) 一种便携式升降式通信塔
CN103343641B (zh) 一种便携式升降信号塔
CN202899720U (zh) 一种带脚踏板的高压输电线路铁塔用钢杆
CN202467221U (zh) 发电厂主厂房钢屋架吊装起重装置
CN206457187U (zh) 一种安装钢烟囱的抱杆
CN102040174B (zh) 一种大型设备与构件的整体吊装装置和方法
CN109779382A (zh) 一种用于钢管杆施工的可伸缩独脚抱杆组件
CN220790542U (zh) 一种钢管杆用可拆卸施工作业平台
CN108729644A (zh) 一种新型悬吊梁支架及其安装使用方法
CN104110155B (zh) 一种薄壁钢管杆塔及其加工与施工方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: SHANDONG HONGYUE STEEL SPACE FRAME STRUCTURE CO.,

Free format text: FORMER OWNER: XU YUPING

Effective date: 20110427

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 261000 HONGYUE COMPANY, JIEXING 2ND STREET, NORTH SECTION, DONGFANG ROAD, HIGH-TECH. DEVELOPMENT ZONE, WEIFANG CITY, SHANDONG PROVINCE TO: 261041 NO. 80, YUQUAN NORTH LANE, HIGH-TECH. DEVELOPMENT ZONE, WEIFANG CITY, SHANDONG PROVINCE

TA01 Transfer of patent application right

Effective date of registration: 20110427

Address after: 261041 Shandong city of Weifang province Jade Spring High-tech Development Zone No. 80 North Lane

Applicant after: Shandong Hongyue Steel Space Frame Structure Co., Ltd.

Address before: 261000, Shandong Province, Weifang high tech Development Zone, North East Road, Jie Xing, two street, Hong Yue company

Applicant before: Xu Yuping

C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: XU YUPING

Free format text: FORMER OWNER: SHANDONG HONGYUE STEEL SPACE FRAME STRUCTURE CO., LTD.

Effective date: 20140714

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20140714

Address after: Weifang City, Shandong province 261041 g street Kuiwei District No. 5, building 7, unit 2, No. 102

Patentee after: Xu Yuping

Address before: 261041 Shandong city of Weifang province Jade Spring High-tech Development Zone No. 80 North Lane

Patentee before: Shandong Hongyue Steel Space Frame Structure Co., Ltd.

ASS Succession or assignment of patent right

Owner name: SHANDONG HONGYUE STEEL SPACE FRAME STRUCTURE CO.,

Free format text: FORMER OWNER: XU YUPING

Effective date: 20140917

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 261041 WEIFANG, SHANDONG PROVINCE TO: 261000 WEIFANG, SHANDONG PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20140917

Address after: 261000 Shandong city of Weifang province Jade Spring High-tech Development Zone No. 80 North Lane

Patentee after: Shandong Hongyue Steel Space Frame Structure Co., Ltd.

Address before: Weifang City, Shandong province 261041 g street Kuiwei District No. 5, building 7, unit 2, No. 102

Patentee before: Xu Yuping

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110622

Termination date: 20161120

CF01 Termination of patent right due to non-payment of annual fee