CN102953554A - 一种大跨度蜂窝形双层网壳结构的安装方法 - Google Patents

一种大跨度蜂窝形双层网壳结构的安装方法 Download PDF

Info

Publication number
CN102953554A
CN102953554A CN2012104603850A CN201210460385A CN102953554A CN 102953554 A CN102953554 A CN 102953554A CN 2012104603850 A CN2012104603850 A CN 2012104603850A CN 201210460385 A CN201210460385 A CN 201210460385A CN 102953554 A CN102953554 A CN 102953554A
Authority
CN
China
Prior art keywords
jack
district
jacking
hydraulic jack
straight section
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012104603850A
Other languages
English (en)
Inventor
郭俊梅
林会明
兰小龙
刘法新
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC Tiangong Group Corp Ltd
Original Assignee
MCC Tiangong Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC Tiangong Group Corp Ltd filed Critical MCC Tiangong Group Corp Ltd
Priority to CN2012104603850A priority Critical patent/CN102953554A/zh
Publication of CN102953554A publication Critical patent/CN102953554A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

一种大跨度蜂窝形双层网壳结构的安装方法,包括如下步骤:①根据结构平面和立面形状,将结构分成近似直段区和中间区;②将近似直段区先进行竖向分条,将每条网壳结构坐标旋转至水平,在平台上完成拼装,用吊车逐条吊装就位,焊接成片;③将中间区在地面从中心向外扩展拼装,扩展过程采用千斤顶多点顶升,顶升至一定区间,曲率变大,常规千斤顶行程不能满足要求时,采用多点穿芯式液压千斤顶同步提升,逐步扩拼完成后,采用多点穿芯式液压千斤顶同步提升到安装高度,与直段连成片。本发明提高了结构拼装精度、提高了结构安装安全度,最终保证了结构安装质量和安装工期。

Description

一种大跨度蜂窝形双层网壳结构的安装方法
技术领域:
本发明属于一种钢结构建筑的安装技术,特别涉及一种大跨度蜂窝形双层网壳结构的安装方法。
背景技术:
网壳结构的常用安装方法有:高空散装法、分块或分条安装法、滑移法、整体吊装法、整体提升法、整体顶升法等,对于大跨度网壳结构可根据工程三维形状和网格构造不同,选用不同的安装方法。对于网格复杂、水平和立面形状不规则的大跨度工程,由于结构支撑点少,结构分块分条困难、平面形状不规则,不具备采用分块分条安装法和滑移法的条件,蜂窝形网格安全裕度低,不能采用整体吊装法、整体提升法、整体顶升法。
最常用的安装方法是高空散装法,这种安装方法是用脚手架搭设拼装支架和平台,平台标高低于结构下弦节点标高,逐点测量定位,构件吊装到高空进行拼装。由于大跨度建筑通常净高较高,采用这种方法,脚手架搭设时间长、费用高,节点定位准确性差,施工速度慢。
发明内容:
本发明的目的就在于克服上述现有技术中存在的不足,而提供一种大跨度蜂窝形双层网壳结构的安装方法,该方法提高了结构拼装精度、提高了结构安装安全度,最终保证了结构安装质量和安装工期。
如上构思,本发明的技术方案是:一种大跨度蜂窝形双层网壳结构的安装方法,其特征在于:包括如下步骤:
①根据结构平面和立面形状,将结构进行分区,靠近边缘基本直立的部位分成一个区,称近似直段区,中间曲率较小高度变化平缓的部位分成一个区,称中间区;
②近似直段区下部均为支座点,先进行竖向分条,将每条网壳结构坐标旋转至水平,在平台上完成拼装,用吊车逐条吊装就位,焊接成片;
③中间区在地面从中心向外扩展拼装,扩展过程采用千斤顶多点顶升,顶升至一定区间,曲率变大,常规千斤顶行程不能满足要求时,采用多点穿芯式液压千斤顶同步提升,逐步扩拼完成后,采用多点穿芯式液压千斤顶同步提升到安装高度,与直段连成片。
上述一种大跨度蜂窝形双层网壳结构的安装的方法,其特征在于:具体施工步骤如下:
①计算确定近似直立区和中间区的分区位置;
②将近似直立段进行计算分块,保证每块可吊装,并将分块下弦节点最内侧三点取一个平面,所有块上节点按所取面为XY面,与该面垂直为Z轴的坐标系进行坐标旋转转换,并在平台上拼装,用吊车安装;
③中心区网壳结构安装场地地面用外扩法拼装,从中心开始,边拼边顶,设置顶升支架,以两个为一组,用螺旋顶升千斤顶相互交替顶升,直到顶升用千斤顶行程在利用简单支架也无法满足顶升要求时,安装临时支柱,改用穿芯式液压千斤顶提升,逐步扩展至拼完全部中心区网壳;用穿芯式液压千斤顶提升,一次提升到位;
④补齐近似直段区与是中心区连接处的杆析;
⑤分步拆除穿芯式液压千斤顶处的临时支柱。
本发明通过将网壳结构分区,避免了直段区繁重的搭设脚手架工作;将高空作业移到地面,提高了结构拼装精度;采用多点同步提升,大大提高了结构安装安全度,最终保证了结构安装质量和安装工期。
附图说明:
图1是不规则网壳平面示意图;
图2是网壳断面示意图;
图3是中心区网壳外扩法拼装示意图;
图4是近似直立段分块示意图。
具体实施方式:
本发明一种大跨度蜂窝形双层网壳结构的安装方法的发明思路是:
1、根据结构平面和立面形状,将结构进行分区,靠近边缘基本直立的部位分成一个区,称近似直段区1,中间曲率较小高度变化平缓的部位分成一个区,称中间区2。(图1、图2)
2、大跨度网壳结构通常为周边支承,也即在边界处,上、下弦球均为结构支座点。
近似直段区下部均为支座点,先进行竖向分条,将每条网壳结构坐标旋转至水平,在平台上完成拼装,用吊车逐条吊装就位,焊接成片。(如图4所示)
3、中间区在地面从中心向外扩展拼装,扩展过程采用千斤顶多点顶升,顶升至一定区间,曲率变大,常规千斤顶行程不能满足要求时,采用多点穿芯式液压千斤顶同步提升,逐步扩拼完成后,采用多点穿芯式液压千斤顶同步提升到安装高度,与直段连成片。(如图2、3所示)附图3中箭头方向为焊接顺序。
本发明的实施条件:
1、结构为双层网壳。
2、结构近似直段区能满足结构站立情况下,杆件无超应力情况。
3、结构中间区网格为静定或超静定结构。当网格约束不足,为不稳定结构体系时,可进行局部加强并经设计人员同意。
本发明的具体实施步骤:
第一步,计算确定近似直立区和中间区的分区位置;(如图2所示)
第二步,将近似直立段进行计算分块,保证每块可吊装,并将分块下弦节点最内侧三点取一个平面,所有块上节点按所取面为XY面,与该面垂直为Z轴的坐标系进行坐标旋转转换,并在平台上拼装,用吊车安装;(如图4所示)
第三步,中心区网壳结构安装场地地面用外扩法拼装,从中心开始,边拼边顶,设置顶升支架,以两个为一组,用螺旋顶升千斤顶相互交替顶升,直到顶升用千斤顶行程在利用简单支架也无法满足顶升要求时,安装临时支柱,改用穿芯式液压千斤顶提升,逐步扩展至拼完全部中心区网壳。用穿芯式液压千斤顶提升,一次提升到位;
第四步,补齐近似直段区与是中心区连接处的杆析;
第五部,分步拆除穿芯式液压千斤顶处的临时支柱。

Claims (2)

1.一种大跨度蜂窝形双层网壳结构的安装方法,其特征在于:包括如下步骤:
①根据结构平面和立面形状,将结构进行分区,靠近边缘基本直立的部位分成一个区,称近似直段区,中间曲率较小高度变化平缓的部位分成一个区,称中间区;
②近似直段区下部均为支座点,先进行竖向分条,将每条网壳结构坐标旋转至水平,在平台上完成拼装,用吊车逐条吊装就位,焊接成片;
③中间区在地面从中心向外扩展拼装,扩展过程采用千斤顶多点顶升,顶升至一定区间,曲率变大,常规千斤顶行程不能满足要求时,采用多点穿芯式液压千斤顶同步提升,逐步扩拼完成后,采用多点穿芯式液压千斤顶同步提升到安装高度,与直段连成片。
2.根据权利要求1所述的一种大跨度蜂窝形双层网壳结构的安装方法,其特征在于:具体施工步骤如下:
①计算确定近似直立区和中间区的分区位置;
②将近似直立段进行计算分块,保证每块可吊装,并将分块下弦节点最内侧三点取一个平面,所有块上节点按所取面为XY面,与该面垂直为Z轴的坐标系进行坐标旋转转换,并在平台上拼装,用吊车安装;
③中心区网壳结构安装场地地面用外扩法拼装,从中心开始,边拼边顶,设置顶升支架,以两个为一组,用螺旋顶升千斤顶相互交替顶升,直到顶升用千斤顶行程在利用简单支架也无法满足顶升要求时,安装临时支柱,改用穿芯式液压千斤顶提升,逐步扩展至拼完全部中心区网壳;用穿芯式液压千斤顶提升,一次提升到位;
④补齐近似直段区与是中心区连接处的杆析;
⑤分步拆除穿芯式液压千斤顶处的临时支柱。
CN2012104603850A 2012-11-14 2012-11-14 一种大跨度蜂窝形双层网壳结构的安装方法 Pending CN102953554A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012104603850A CN102953554A (zh) 2012-11-14 2012-11-14 一种大跨度蜂窝形双层网壳结构的安装方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012104603850A CN102953554A (zh) 2012-11-14 2012-11-14 一种大跨度蜂窝形双层网壳结构的安装方法

Publications (1)

Publication Number Publication Date
CN102953554A true CN102953554A (zh) 2013-03-06

Family

ID=47762890

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012104603850A Pending CN102953554A (zh) 2012-11-14 2012-11-14 一种大跨度蜂窝形双层网壳结构的安装方法

Country Status (1)

Country Link
CN (1) CN102953554A (zh)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103449318A (zh) * 2013-09-26 2013-12-18 中联重科股份有限公司 顶升机构、顶升方法、及具有该顶升机构的塔式起重机
CN103603501A (zh) * 2013-10-21 2014-02-26 中建钢构有限公司北京分公司 大跨度空间结构建筑施工的卸载方法
CN103982045A (zh) * 2014-04-08 2014-08-13 浙江国盛钢结构有限公司 一种屋面网壳结构无支架悬挑安装施工方法
CN108532767A (zh) * 2018-05-09 2018-09-14 中建七局安装工程有限公司 空间球面网架逐环扩大先顶后提升施工方法
CN108678180A (zh) * 2018-05-09 2018-10-19 中建七局安装工程有限公司 空间球面网架阶梯提升施工方法
CN111625877A (zh) * 2020-04-15 2020-09-04 浙江仁欣环科院有限责任公司 一种基于cad等高线提高大气污染预测准确性的方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05311882A (ja) * 1992-05-13 1993-11-22 Kajima Corp 大スパン構造物のプッシュアップ工法及び装置
CN101718115A (zh) * 2009-11-20 2010-06-02 徐玉平 大跨度柱面网壳安装方法
CN101839068A (zh) * 2010-04-08 2010-09-22 宝厦建设(集团)股份有限公司 安装大跨度双层网壳结构的预应力方法
CN102071814A (zh) * 2010-12-16 2011-05-25 中建二局第三建筑工程有限公司 高层大跨度门式桁架整体提升装置及其施工方法
CN102425260A (zh) * 2011-11-25 2012-04-25 安徽鲁班建设投资集团有限公司 一种大跨度半球形屋顶钢构网架环形单点安装方法

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05311882A (ja) * 1992-05-13 1993-11-22 Kajima Corp 大スパン構造物のプッシュアップ工法及び装置
CN101718115A (zh) * 2009-11-20 2010-06-02 徐玉平 大跨度柱面网壳安装方法
CN101839068A (zh) * 2010-04-08 2010-09-22 宝厦建设(集团)股份有限公司 安装大跨度双层网壳结构的预应力方法
CN102071814A (zh) * 2010-12-16 2011-05-25 中建二局第三建筑工程有限公司 高层大跨度门式桁架整体提升装置及其施工方法
CN102425260A (zh) * 2011-11-25 2012-04-25 安徽鲁班建设投资集团有限公司 一种大跨度半球形屋顶钢构网架环形单点安装方法

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103449318A (zh) * 2013-09-26 2013-12-18 中联重科股份有限公司 顶升机构、顶升方法、及具有该顶升机构的塔式起重机
CN103449318B (zh) * 2013-09-26 2015-11-04 中联重科股份有限公司 顶升机构、顶升方法、及具有该顶升机构的塔式起重机
CN103603501A (zh) * 2013-10-21 2014-02-26 中建钢构有限公司北京分公司 大跨度空间结构建筑施工的卸载方法
CN103603501B (zh) * 2013-10-21 2016-06-08 中建钢构有限公司 大跨度空间结构建筑施工的卸载方法
CN103982045A (zh) * 2014-04-08 2014-08-13 浙江国盛钢结构有限公司 一种屋面网壳结构无支架悬挑安装施工方法
CN103982045B (zh) * 2014-04-08 2016-08-24 浙江国盛钢结构有限公司 一种屋面网壳结构无支架悬挑安装施工方法
CN108532767A (zh) * 2018-05-09 2018-09-14 中建七局安装工程有限公司 空间球面网架逐环扩大先顶后提升施工方法
CN108678180A (zh) * 2018-05-09 2018-10-19 中建七局安装工程有限公司 空间球面网架阶梯提升施工方法
CN111625877A (zh) * 2020-04-15 2020-09-04 浙江仁欣环科院有限责任公司 一种基于cad等高线提高大气污染预测准确性的方法
CN111625877B (zh) * 2020-04-15 2023-05-23 浙江仁欣环科院有限责任公司 一种基于cad等高线提高大气污染预测准确性的方法

Similar Documents

Publication Publication Date Title
CN102953554A (zh) 一种大跨度蜂窝形双层网壳结构的安装方法
CN208702197U (zh) 一种大位移整体顶升水平限位装置
CN111395532B (zh) 大跨度半开口椭圆球面网壳安装施工方法
CN101936536A (zh) 一种船舶烟囱分段的建造方法
CN104594201B (zh) 一种利用单侧墩旁托架架设墩顶钢梁的方法
CN102888894B (zh) 内筒外框式回形钢框架建筑的结构及施工方法
CN104196165B (zh) 一种超大型多腔钢结构巨柱及其制作方法
CN102877412A (zh) 钢塔整体竖立式预拼装方法
CN103061514A (zh) 大跨度钢结构连廊施工方法
CN201362952Y (zh) 一种电梯井筒结构施工型钢平台
CN203213019U (zh) 长悬臂盖梁现浇施工支架体系
CN103276909B (zh) 弧形网架拼装方法及其使用的网架拼装胎架
CN204310646U (zh) 一种新型电梯井道
CN104060838B (zh) 一种通廊分组空中组对安装法
CN207526141U (zh) 一种小截面塔型钢结构拼装式操作平台
CN202831628U (zh) 浇筑大跨度混凝土梁用组合式贝雷架承重排架
CN116163534A (zh) 大直径铝合金网壳结构现场低空散拼方法
CN101774516B (zh) 更换耙式吊车桥架的顶升装置及施工方法
CN205276472U (zh) 一种大跨度钢桁架结构
CN202055412U (zh) 一种圆形十字柱脚
CN204199691U (zh) 一种螺旋楼梯的扶手浇筑模板结构
CN203429888U (zh) 一种大型目字型厚板组合箱形柱
CN203201127U (zh) 钢桁架临时支撑体系
CN202388183U (zh) H型钢数控切割机举升设备
CN103510658B (zh) 一种大型目字型厚板组合箱形柱及其制作方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20130306