CN101705323A - 一种顶燃式硅砖热风炉保温方法 - Google Patents

一种顶燃式硅砖热风炉保温方法 Download PDF

Info

Publication number
CN101705323A
CN101705323A CN200910113569A CN200910113569A CN101705323A CN 101705323 A CN101705323 A CN 101705323A CN 200910113569 A CN200910113569 A CN 200910113569A CN 200910113569 A CN200910113569 A CN 200910113569A CN 101705323 A CN101705323 A CN 101705323A
Authority
CN
China
Prior art keywords
valve
stove
hot
gas
temperature
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN200910113569A
Other languages
English (en)
Inventor
郑拥军
苏艺
张永旺
刘文壮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Baosteel Group Xinjiang Bayi Iron and Steel Co Ltd
Xinjiang Bayi Iron and Steel Co Ltd
Original Assignee
Baosteel Group Xinjiang Bayi Iron and Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Baosteel Group Xinjiang Bayi Iron and Steel Co Ltd filed Critical Baosteel Group Xinjiang Bayi Iron and Steel Co Ltd
Priority to CN200910113569A priority Critical patent/CN101705323A/zh
Publication of CN101705323A publication Critical patent/CN101705323A/zh
Pending legal-status Critical Current

Links

Landscapes

  • Thermal Insulation (AREA)

Abstract

本发明公开了一种顶燃式硅砖热风炉保温方法,该保温方法的每个保温作业程序都包括下列操作步骤:烧炉、闷炉、送风、再次烧炉;每个保温作业程序依次循环进行;当热风炉拱顶温度降至900℃时,开始烧炉,打开助燃空气燃烧阀、煤气切断阀以及空气、煤气调节阀,将煤气量调节至40000-55000m3/h,煤气压力调节至6-10kpa,助燃空气压力4-5kpa,助燃空气流量与煤气量的比值为0.6-0.7;将热风炉上部拱顶温度烧至1350℃后,停止烧炉,进行闷炉操作;当热风炉拱顶温度降至900℃时,开始送风,打开热风炉下部的人孔,以拱顶温度按1℃/min的上升速度为基准,向热风炉内送风,当硅砖温度降至接近900℃时,停止送风,关闭人孔、热风阀以及倒流休风阀即可;再次重复进行烧炉,依次循环。

Description

一种顶燃式硅砖热风炉保温方法
技术领域
本发明涉及一种顶燃式硅砖热风炉保温方法,属于热风炉的保温技术领域。
背景技术
目前,钢铁厂A、B高炉热风炉设计送风能力1250℃,使用寿命30年,热风炉耐材按温度区间依次为低蠕变粘土质砖、粘土质砖、低蠕变粘土质砖、硅质砖。其中硅质砖的性能有耐高温,荷重软化温度高(1500℃)的特点,但其在升温过程中经历晶格转变,在600℃时最为剧烈,同时硅砖抗热震性能差,不能承受急冷急热。因此热风炉投入使用后,如果因检修等原因造成16小时以上长期停止使用的状态下,炉体散热,高温部位的温度逐渐降低,温度低于900℃,晶格发生转变,体积变化在15%,将会造成硅砖耐材脱落现象,损坏热风炉。为了保证热风炉的安全长寿,根据资料介绍硅质格子砖及硅砖温度不能低于900℃,因此要不断进行保温和降低烟道温度工作,提高拱顶温度,从而减缓体积变化。
热风炉上、下部存在较大的温差,热风炉在停止使用的状态下,上部的热量会逐渐向下部转移(上部拱顶设计温度1450℃),上下部的温差逐渐缩小。在热风炉每次烧炉时,烟气在提高热风炉上部温度的同时,也会提高下部的温度,而下部炉蓖子材质决定了,只能承受≤450℃,否则炉蓖子就会损坏。这样,炉蓖子限制了烧炉作业;烧炉不充分,又阻碍了拱顶温度的提高。从而出现上部温度越来越低,下部温度越来越高,最终使整个热风炉报废的严重后果。
发明内容
本发明的目的在于提供一种顶燃式硅砖热风炉保温方法,采用该方法既能使炉蓖子温度≤400℃,又能确保硅砖温度大于900℃,从而有效保持硅砖以及热风炉的正常工作状态。
本发明的目的是这样实现的:一种顶燃式硅砖热风炉保温方法,该保温方法的每个保温作业程序都包括下列操作步骤:烧炉、闷炉、送风、再次烧炉;每个保温作业程序依次循环进行;
其中:
(1)、当热风炉拱顶温度降至900℃时,开始烧炉,其操作步骤如下:依次打开热风炉的废气阀、烟道阀以及位于热风炉拱顶的煤气燃烧阀,关闭煤气放散阀,打开氮气吹扫阀5秒钟后关闭,然后打开助燃空气燃烧阀、煤气切断阀以及空气、煤气调节阀,将煤气量调节至40000-55000m3/h,煤气压力调节至6-10kpa,助燃空气压力4-5kpa,助燃空气流量与煤气量的比值为0.6-0.7;
(2)、将热风炉上部拱顶温度烧至1350℃后,停止烧炉,进行闷炉操作;
(3)、当热风炉拱顶温度降至900℃时,开始送风,其操作步骤如下:依次打开热风炉的均压阀、热风阀以及倒流休风阀,热风炉经过均压后,关闭均压阀,然后打开热风炉下部的人孔,以拱顶温度按1℃/min的上升速度为基准,向热风炉内送风,当硅砖温度降至接近900℃时,停止送风,关闭人孔、热风阀以及倒流休风阀即可;再次重复步骤(1)进行烧炉,依次循环.
采用本发明方法对某钢铁厂的高炉热风炉进行保温操作试验,2008年10月烘炉结束,高炉于2009年2月27日开炉,其间继续沿用本发明热风炉保温方法操作,烧炉、闷炉、送风等每个操作步骤依次循环进行,有效实现了既能使炉蓖子温度≤400℃,又能确保硅砖温度大于900℃,防止硅砖出现晶格转变的目的,从而有效保持硅砖以及热风炉的正常工作状态。采用本发明方法对热风炉进行保温操作,目前热风炉工作正常,没有发生耐材脱落等现象,目前风温1180-1200℃,对高炉采用此种保温方式,可以有效控制硅砖界面温度和烟道温度的要求,证明本发明保温方法适用于硅砖顶燃式热风炉。本发明操作步骤简单易行,易于为本领域技术人员理解掌握。
具体实施方式
一种顶燃式硅砖热风炉保温方法,该保温方法的每个保温作业程序都包括下列操作步骤:烧炉、闷炉、送风、再次烧炉;每个保温作业程序依次循环进行;
其中:
(1)、当热风炉拱顶温度降至900℃时,开始烧炉,单座热风炉烧炉时间控制在120min左右,其操作步骤如下:依次打开热风炉的废气阀、烟道阀以及位于热风炉拱顶的煤气燃烧阀,关闭煤气放散阀,打开氮气吹扫阀5秒钟后关闭,然后打开助燃空气燃烧阀、煤气切断阀以及空气、煤气调节阀,将煤气量调节至50000m3/h,煤气压力调节至8kpa,助燃空气压力5kpa,助燃空气流量与煤气量的比值为0.6;开始烧炉操作。
(2)、将热风炉上部拱顶温度烧至1350℃后,停止烧炉,进行闷炉操作;焖炉操作的步骤按照通常的热风炉自动操作步骤进行即可。
(3)、当热风炉拱顶温度降至900℃时,开始送风,送风时间控制在6-8h左右,其操作步骤如下:依次打开热风炉的均压阀、热风阀以及倒流休风阀,热风炉经过均压后,关闭均压阀,然后打开热风炉下部的人孔,以拱顶温度按1℃/min的上升速度为基准,向热风炉内送风,当硅砖温度降至接近900℃时,停止送风,关闭人孔、热风阀以及倒流休风阀即可;然后再次重复步骤(1)进行烧炉,依次循环。

Claims (1)

1.一种顶燃式硅砖热风炉保温方法,其特征在于:该保温方法的每个保温作业程序都包括下列操作步骤:烧炉、闷炉、送风、再次烧炉;每个保温作业程序依次循环进行;
其中:
(1)、当热风炉拱顶温度降至900℃时,开始烧炉,其操作步骤如下:依次打开热风炉的废气阀、烟道阀以及位于热风炉拱顶的煤气燃烧阀,关闭煤气放散阀,打开氮气吹扫阀5秒钟后关闭,然后打开助燃空气燃烧阀、煤气切断阀以及空气、煤气调节阀,将煤气量调节至40000-55000m3/h,煤气压力调节至6-10kpa,助燃空气压力4-5kpa,助燃空气流量与煤气量的比值为0.6-0.7;
(2)、将热风炉上部拱顶温度烧至1350℃后,停止烧炉,进行闷炉操作;
(3)、当热风炉拱顶温度降至900℃时,开始送风,其操作步骤如下:依次打开热风炉的均压阀、热风阀以及倒流休风阀,热风炉经过均压后,关闭均压阀,然后打开热风炉下部的人孔,以拱顶温度按1℃/min的上升速度为基准,向热风炉内送风,当硅砖温度降至接近900℃时,停止送风,关闭人孔、热风阀以及倒流休风阀即可;再次重复步骤(1)进行烧炉,依次循环。
CN200910113569A 2009-12-11 2009-12-11 一种顶燃式硅砖热风炉保温方法 Pending CN101705323A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200910113569A CN101705323A (zh) 2009-12-11 2009-12-11 一种顶燃式硅砖热风炉保温方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200910113569A CN101705323A (zh) 2009-12-11 2009-12-11 一种顶燃式硅砖热风炉保温方法

Publications (1)

Publication Number Publication Date
CN101705323A true CN101705323A (zh) 2010-05-12

Family

ID=42375575

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200910113569A Pending CN101705323A (zh) 2009-12-11 2009-12-11 一种顶燃式硅砖热风炉保温方法

Country Status (1)

Country Link
CN (1) CN101705323A (zh)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102399927A (zh) * 2011-05-27 2012-04-04 林庆霖 高炉热风炉高压烧炉法
CN103352095A (zh) * 2013-07-16 2013-10-16 莱芜钢铁集团有限公司 一种延长热风炉焖炉时间的装置和方法
CN104232825A (zh) * 2014-09-02 2014-12-24 莱芜钢铁集团有限公司 一种硅砖热风炉保温方法
CN104630403A (zh) * 2013-11-08 2015-05-20 山东省冶金设计院股份有限公司 一种顶燃式热风炉的烧炉控制方法及烧炉控制系统
CN105886687A (zh) * 2015-01-26 2016-08-24 鞍钢股份有限公司 一种热风炉换炉燃烧控制方法
CN111647702A (zh) * 2020-06-16 2020-09-11 山东莱钢永锋钢铁有限公司 一种热风炉焖炉保温方法
CN111850211A (zh) * 2020-07-29 2020-10-30 广东韶钢松山股份有限公司 一种热风炉的离线烘炉方法
CN112239797A (zh) * 2020-10-21 2021-01-19 宝钢湛江钢铁有限公司 一种大型高炉顶燃式热风炉拱顶温度控制技术

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102399927A (zh) * 2011-05-27 2012-04-04 林庆霖 高炉热风炉高压烧炉法
CN103352095A (zh) * 2013-07-16 2013-10-16 莱芜钢铁集团有限公司 一种延长热风炉焖炉时间的装置和方法
CN104630403A (zh) * 2013-11-08 2015-05-20 山东省冶金设计院股份有限公司 一种顶燃式热风炉的烧炉控制方法及烧炉控制系统
CN104630403B (zh) * 2013-11-08 2016-08-31 山东省冶金设计院股份有限公司 一种顶燃式热风炉的烧炉控制方法及烧炉控制系统
CN104232825A (zh) * 2014-09-02 2014-12-24 莱芜钢铁集团有限公司 一种硅砖热风炉保温方法
CN105886687A (zh) * 2015-01-26 2016-08-24 鞍钢股份有限公司 一种热风炉换炉燃烧控制方法
CN111647702A (zh) * 2020-06-16 2020-09-11 山东莱钢永锋钢铁有限公司 一种热风炉焖炉保温方法
CN111850211A (zh) * 2020-07-29 2020-10-30 广东韶钢松山股份有限公司 一种热风炉的离线烘炉方法
CN112239797A (zh) * 2020-10-21 2021-01-19 宝钢湛江钢铁有限公司 一种大型高炉顶燃式热风炉拱顶温度控制技术

Similar Documents

Publication Publication Date Title
CN101705323A (zh) 一种顶燃式硅砖热风炉保温方法
JP6683685B2 (ja) 改善されたコークス運転用燃焼プロファイル
CN112342332B (zh) 一种用于热风炉点火保温及逆送风集成系统和运行方法
CN112430697A (zh) 高炉热风炉的煤气管道供气装置
CN101353579B (zh) 一种7.63米焦炉负压炉内烘炉方法
CN101280955B (zh) 外燃式热风炉加热保温方法
CN114350877B (zh) 热风炉烘炉方法
CN103740380B (zh) 一种焦炉烘炉工艺
CN101993967B (zh) 自身预热式热风炉的保温方法
CN101929736A (zh) 一种基于蓄热式烧嘴的加热炉温度控制方法
CN104232825A (zh) 一种硅砖热风炉保温方法
CN104019665B (zh) 均热炉小修烘炉方法
JPS5940882B2 (ja) 熱風スト−ブ
JP7115995B2 (ja) 連続式加熱炉の炉圧制御方法、炉圧制御装置及び連続式加熱炉
CN103664008B (zh) 一种环形套筒窑烘炉低温控制工艺
CN202808850U (zh) 能够实现控温的热风炉
JP3952529B2 (ja) 二重円筒型間接加熱炉及びその運転方法
CN204779642U (zh) 一种热风炉
CN101760211B (zh) 一种采用风冷斜道技术的干熄炉
CN111876543A (zh) 一种改进型顶燃式热风炉快速烘炉优化方法
CN204630380U (zh) 烧结点火炉用烘炉系统
CN106190185B (zh) 焦炉部分燃烧室置换煤气加热的方法
CN111088411B (zh) 一种高炉热风炉的空气对流保温方法
CN219772158U (zh) 一种使用纯高炉煤气烘热风炉系统
JP4839921B2 (ja) 熱風炉の冷却方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20100512