CN101660355B - 钢制筒体结构内锥体倒装法 - Google Patents

钢制筒体结构内锥体倒装法 Download PDF

Info

Publication number
CN101660355B
CN101660355B CN2009101729554A CN200910172955A CN101660355B CN 101660355 B CN101660355 B CN 101660355B CN 2009101729554 A CN2009101729554 A CN 2009101729554A CN 200910172955 A CN200910172955 A CN 200910172955A CN 101660355 B CN101660355 B CN 101660355B
Authority
CN
China
Prior art keywords
inner cone
cylinder body
outer cylinder
epimere
cone
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN2009101729554A
Other languages
English (en)
Other versions
CN101660355A (zh
Inventor
刘昌岑
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC Jingtang Construction Co Ltd
Original Assignee
MCC Jingtang Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC Jingtang Construction Co Ltd filed Critical MCC Jingtang Construction Co Ltd
Priority to CN2009101729554A priority Critical patent/CN101660355B/zh
Publication of CN101660355A publication Critical patent/CN101660355A/zh
Application granted granted Critical
Publication of CN101660355B publication Critical patent/CN101660355B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

一种钢制筒体结构内锥体倒装法。它按照以下步骤进行安装:a、制作内锥体;b、内锥体下段拼装和放置;c、固定内锥体最上段;d、安装内锥体下段。与现有技术相比,本发明将外筒体和内锥体分离安装,将内锥体分体倒装,不仅能够保证安装过程中定位的简单化,也实现了内锥体精确安装和完美连接,有效地减轻结构的吊装重量,使用低成本的吊装机械完成内锥体的安装,减少资金投入,提高吊装过程的工作效率。

Description

钢制筒体结构内锥体倒装法
技术领域
本发明涉及一种建筑工程中内锥体安装的方法,特别是一种钢制筒体结构内锥体倒装法。
背景技术
在传统的结构施工过程中,内锥体的安装难度较大,一般是在地面工作区将内锥体与外筒体拼装成整体或内锥体单独拼装成整体,然后再进行正置法吊装;采用与外筒体拼装成整体吊装的方法,其结构整体重量较大,对施工现场的吊装机械的起重性能要求较高,如果结构安装高度也较大时,采用高性能吊装机械的费用投入将加大;而采用内锥体单独拼装并正置安装的方法,在结构重量上相对减轻了,但由于内锥体上口直径与外筒体内径相同,在其安装过程中受结构椭圆度偏差的影响,内锥体在外筒体内向下安装就位时将无法进行,并且其安装位置精度也无法保证,也严重影响工作效率。
发明内容
本发明是针对现有内锥体吊装过程中存在的不足,提供一种将外筒体和内锥体分离,使内锥体实现分体倒装的钢制筒体结构内锥体倒装法。
实现上述目的采用的技术方案是:一种钢制筒体结构内锥体倒装法,包括外筒体和设置在外筒体内部的内锥体,其特征在于,它按照以下步骤进行安装:
a、制作内锥体:将内锥体沿纵向分成若干段,且各段锥体根据其设计直径大小分成若干块体;
b、内锥体下段拼装和放置:在地面按照设计尺寸将下部各段锥体的若干块体拼装成整圈,并吊至外筒体内放置固定;
c、固定内锥体最上段:根据内锥体在外筒体内的安装位置,沿外筒体内壁周圈均匀固接多个定位板,然后逐块将内锥体最上段各块体安装完成,并将各块体顶端与外筒体固接成一体;
d、安装内锥体下段:待内锥体最上段固定完成后,将放置在外筒体内的内锥体下段逐一吊装提升,将其依次拼装固接为一体。
与现有技术相比,本发明将外筒体和内锥体分离安装,将内锥体分体倒装,不仅能够保证安装过程中定位的简单化,也实现了内锥体精确安装和完美连接,有效地减轻结构的吊装重量,使用低成本的吊装机械完成内锥体的安装,减少资金投入,提高吊装过程的工作效率。
附图说明
图1为本发明整体结构示意图。
图2为内锥体下段在外筒体内位置示意图。
图3为内锥体上段和焊接带位置示意图。
图4为定位板与内椎体上段安装位置示意图。
图5为内锥体上、下段吊装位置示意图。
图中:外筒体1,内锥体上段2,内锥体下段3,安装带4,定位板5。
具体实施方式
下面结合附图和实施例详述本发明。
参见附图1-5,本实施例中,这种钢制筒体结构内锥体倒装法,包括用于安装的外筒体1和内锥体,该内椎体的最上端直径较大,需要将最上段分成若干瓦块,它按照以下步骤进行安装:
a、制作内锥体:将内锥体沿纵向分成若干段,且各段锥体根据其设计直径大小分成若干块体,这种块体是将锥体纵向切割而成,且呈圆弧状的瓦状结构。本实施例是将整个内锥体分成两段来吊装,其内锥体上段2的垂直长度为500mm。
b、内锥体下段拼装和放置:在地面按照设计尺寸将组成内锥体下段3的若干块体拼装成整圈,并吊至外筒体1内放置固定。
c、固定内锥体最上段:根据内锥体上段2在外筒体1内的安装位置,在外筒体1内壁上确定安装带4,在该安装带4的范围内,沿外筒体1内壁周圈均匀焊接多个定位板5,该定位板5的数量不少于三个,然后逐块将组成内锥体上段2的各块体安装完成,并将各块体顶端与外筒体1焊接成一体。
d、安装内锥体下段:待内锥体上段2固定完成后,将放置在外筒体1内的内锥体下段3沿附图3中的方向进行吊装提升,将其与内锥体上段2拼装焊接为一体。
定位板5为楔形结构,其斜面的倾斜角度与内锥体上段2的倾斜角度相同,且该定位板的斜面长度小于内锥体上段2的长度,其长度差一般为100mm,以保证内锥体下段3与上段的对口。
另外,若外筒体1和内锥体的直径尺寸都较小,可以将其上段直接与外筒体1焊接成一体进行吊装,不需要将其分割成若干块体结构再进行组装。

Claims (3)

1.一种钢制筒体结构内锥体倒装法,包括外筒体和设置在外筒体内部的内锥体,其特征在于,它按照以下步骤进行安装:
a、制作内锥体:将内锥体沿纵向分成若干段,且各段锥体根据其设计直径大小分成若干块体;
b、内锥体下段拼装和放置:在地面按照设计尺寸将下部各段锥体的若干块体拼装成整圈,并吊至外筒体内放置固定;
c、固定内锥体最上段:根据内锥体在外筒体内的安装位置,沿外筒体内壁周圈均匀固接多个定位板,然后逐块将内锥体最上段各块体安装完成,并将各块体顶端与外筒体固接成一体;
d、安装内锥体下段:待内锥体最上段固定完成后,将放置在外筒体内的内锥体下段逐一吊装提升,将其依次拼装固接为一体。
2.根据权利要求1所述的筒体结构内锥体倒装法,其特征在于,c、固定内锥体最上段:根据内锥体在外筒体内的安装位置,沿外筒体内壁周圈均匀固接多个定位板,然后逐块将内锥体最上段各块体安装完成,并将各块体顶端与外筒体固接成一体;
替换为:c、固定内锥体最上段:根据内锥体在外筒体内的安装位置,沿外筒体内壁周圈均匀固接多个定位板,根据内锥体尺寸的大小,将内锥体的最上段整体与外筒体固接在一起。
3.根据权利要求1所述的筒体结构内锥体倒装法,其特征在于,所述定位板为楔形结构,其斜面的倾斜角度与内锥体最上段倾斜角度相同,且该定位板斜面长度小于内锥体最上段长度。
CN2009101729554A 2009-09-11 2009-09-11 钢制筒体结构内锥体倒装法 Active CN101660355B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009101729554A CN101660355B (zh) 2009-09-11 2009-09-11 钢制筒体结构内锥体倒装法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009101729554A CN101660355B (zh) 2009-09-11 2009-09-11 钢制筒体结构内锥体倒装法

Publications (2)

Publication Number Publication Date
CN101660355A CN101660355A (zh) 2010-03-03
CN101660355B true CN101660355B (zh) 2011-01-05

Family

ID=41788597

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009101729554A Active CN101660355B (zh) 2009-09-11 2009-09-11 钢制筒体结构内锥体倒装法

Country Status (1)

Country Link
CN (1) CN101660355B (zh)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1405359A (en) * 1973-05-31 1975-09-10 Inst Elektroswarki Patona Resistance butt-welding apparatus
US4020606A (en) * 1975-10-29 1977-05-03 John William Pratt Street lighting columns
CN101481961A (zh) * 2009-01-06 2009-07-15 二十三冶建设集团有限公司 带支架的锥底钢制槽罐地面倒装施工方法
CN201292682Y (zh) * 2008-11-21 2009-08-19 新疆石油工程建设有限责任公司 大型储罐倒装法施工抗风装置
CN201301581Y (zh) * 2008-10-23 2009-09-02 中冶天工建设有限公司 吸收塔塔壁倒装法施工装置

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1405359A (en) * 1973-05-31 1975-09-10 Inst Elektroswarki Patona Resistance butt-welding apparatus
US4020606A (en) * 1975-10-29 1977-05-03 John William Pratt Street lighting columns
CN201301581Y (zh) * 2008-10-23 2009-09-02 中冶天工建设有限公司 吸收塔塔壁倒装法施工装置
CN201292682Y (zh) * 2008-11-21 2009-08-19 新疆石油工程建设有限责任公司 大型储罐倒装法施工抗风装置
CN101481961A (zh) * 2009-01-06 2009-07-15 二十三冶建设集团有限公司 带支架的锥底钢制槽罐地面倒装施工方法

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
汪公河等.240m烟囱钢内筒气压顶升倒装施工法.《电力建设》.2009,第30卷(第9期), *

Also Published As

Publication number Publication date
CN101660355A (zh) 2010-03-03

Similar Documents

Publication Publication Date Title
CN201933417U (zh) 一种适用于高铁预制箱梁的钢筋整体绑扎胎具
CN109236012B (zh) 一种输电线路干字型拉线塔吊装方法
CN102756019A (zh) 压力钢管圆度调整及支撑装置
CN103341531A (zh) 一种用于压力钢管制造的内支撑装置
CN205295950U (zh) 现浇薄壁高墩钢筋笼安装劲性定位骨架体系
CN201494590U (zh) 集装箱船横壁分段上的导轨架安装工作车
CN109702387B (zh) 一种斜拉桥塔柱内衬钢结构制作方法
CN106425334A (zh) 一种天圆地方钢结构的制造方法
CN101660355B (zh) 钢制筒体结构内锥体倒装法
CN103341706B (zh) 一种300英尺自升式钻井平台桩腿结构专用胎架
CN208501732U (zh) 一种管廊现浇施工整体移动式模架
CN103924986B (zh) 一种超大盾构始发洞门密封钢环整体安装装置
CN101780916B (zh) 大型容器及内部重型设备异步整合吊装方法及一种定位支架
CN107881914B (zh) 一种分丝管式索鞍后场装配式定位装置及装配方法
CN207210977U (zh) 一种系杆拱桥吊杆更换用的固定、调平装置
CN103639947B (zh) 高精度实面反射面装配工装及其装配方法
CN206494660U (zh) 地铁明挖车站可调跨度梁门式起重机
CN211776201U (zh) 一种异形构筑物施工结构
CN204185742U (zh) 路基边坡拱形骨架加固结构
CN110469130A (zh) 管桁架梁和管桁架柱法兰盘安装模具及安装方法
KR101068891B1 (ko) 우물통 지지장치
CN210418929U (zh) 管柱约束吊装连接板
CN203049569U (zh) 一种大直径灌注桩钢筋笼的加固结构
CN218263872U (zh) 一种多功能基坑盖件
CN215926717U (zh) 一种双曲线雨棚及双曲线弧形墙钢模支撑加固结构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant