CN101654930B - 一种组合式房屋的梁架结构及其安装方法 - Google Patents
一种组合式房屋的梁架结构及其安装方法 Download PDFInfo
- Publication number
- CN101654930B CN101654930B CN200810041838XA CN200810041838A CN101654930B CN 101654930 B CN101654930 B CN 101654930B CN 200810041838X A CN200810041838X A CN 200810041838XA CN 200810041838 A CN200810041838 A CN 200810041838A CN 101654930 B CN101654930 B CN 101654930B
- Authority
- CN
- China
- Prior art keywords
- joist
- wall
- beam frame
- frame structure
- nib
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/24—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/24—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
- E04B2001/2481—Details of wall panels
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/24—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
- E04B2001/2484—Details of floor panels or slabs
Abstract
Description
Claims (16)
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN200810041838XA CN101654930B (zh) | 2008-08-19 | 2008-08-19 | 一种组合式房屋的梁架结构及其安装方法 |
PCT/CN2009/000926 WO2010020111A1 (zh) | 2008-08-19 | 2009-08-13 | 一种组合式房屋的梁架结构及其安装方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN200810041838XA CN101654930B (zh) | 2008-08-19 | 2008-08-19 | 一种组合式房屋的梁架结构及其安装方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101654930A CN101654930A (zh) | 2010-02-24 |
CN101654930B true CN101654930B (zh) | 2011-06-08 |
Family
ID=41706832
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN200810041838XA Active CN101654930B (zh) | 2008-08-19 | 2008-08-19 | 一种组合式房屋的梁架结构及其安装方法 |
Country Status (2)
Country | Link |
---|---|
CN (1) | CN101654930B (zh) |
WO (1) | WO2010020111A1 (zh) |
Families Citing this family (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
ES2391014B1 (es) * | 2010-12-28 | 2013-09-20 | Elea Innova Sl | Estructura ligera para construcción industrializada de viviendas |
CN103031891B (zh) * | 2011-10-08 | 2015-07-15 | 江苏久信医用净化工程有限公司 | 搭建模块化洁净手术室用的龙骨连接件 |
GB2519996B (en) * | 2013-11-05 | 2016-10-19 | Paw (Holdings) Ltd | Assembly of wall frames. |
CN103938721A (zh) * | 2014-04-23 | 2014-07-23 | 浙江元森态家具有限公司 | 木塑屋组装结构 |
CN108019026B (zh) * | 2017-12-19 | 2023-08-11 | 广东象博生态科技有限公司 | 一种拼接房屋用可拆装地板 |
CN108118917A (zh) * | 2018-02-07 | 2018-06-05 | 缤果可为(北京)科技有限公司 | 模块化组装无人值守便利店及其组装方法 |
CN108675131A (zh) * | 2018-05-07 | 2018-10-19 | 上海海事大学 | 一种用于起重机薄板的加筋方式 |
CN109162385A (zh) * | 2018-09-20 | 2019-01-08 | 中冶天工集团有限公司 | 一种钢结构模块建筑隔墙安装结构形式及安装方法 |
CN111593816B (zh) * | 2020-06-09 | 2021-11-30 | 上海沪江建筑工程有限公司 | 一种钢结构建筑物连接拐角部加固结构 |
CN112064513A (zh) * | 2020-09-11 | 2020-12-11 | 合肥清雅装饰工程有限公司 | 一种民用小型快速拼接的桥梁设备 |
CN113482162B (zh) * | 2021-06-29 | 2022-11-29 | 云南建筑产业化研发中心有限公司 | 一种快速拆装式方舱的总成架构 |
CN113530340B (zh) * | 2021-08-31 | 2022-11-08 | 石河子大学 | 一种钢与生土混合抗震结构 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4633634A (en) * | 1985-08-30 | 1987-01-06 | Nemmer Albert E | Building side wall construction and panel therefor |
CN1055787A (zh) * | 1990-02-02 | 1991-10-30 | 杰克斯·威保 | 多层建筑框架及其所构成的建筑物 |
US5155962A (en) * | 1986-04-07 | 1992-10-20 | Lowell E. Burkstrand | Ceiling runner |
CN2612743Y (zh) * | 2003-04-24 | 2004-04-21 | 朴海天 | 组合式钢骨架系统 |
CN2918638Y (zh) * | 2006-04-12 | 2007-07-04 | 王庆云 | 方便节能房 |
CN201276758Y (zh) * | 2008-08-19 | 2009-07-22 | 茂地(上海)建筑工程咨询有限公司 | 一种组合式房屋的梁架结构 |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4224776A (en) * | 1978-02-01 | 1980-09-30 | Easy Up Shelving, Inc. | Mezzanine support beam for multi-story hook-in type shelving |
US4408434A (en) * | 1979-06-19 | 1983-10-11 | Collins Leonard D | Multi-storey building and a prefabricated panel for such a building |
US4850169A (en) * | 1986-04-07 | 1989-07-25 | Lowell E. Burkstrand | Ceiling runner |
JP3787348B2 (ja) * | 2004-11-25 | 2006-06-21 | 新日本製鐵株式会社 | スチールハウスのパネル構造およびパネル構築方法 |
KR200426512Y1 (ko) * | 2006-06-20 | 2006-09-19 | 성우기술개발(주) | 조립식 패널 지지체 |
CN201276756Y (zh) * | 2008-08-19 | 2009-07-22 | 茂地(上海)建筑工程咨询有限公司 | 一种多层组合式房屋 |
-
2008
- 2008-08-19 CN CN200810041838XA patent/CN101654930B/zh active Active
-
2009
- 2009-08-13 WO PCT/CN2009/000926 patent/WO2010020111A1/zh active Application Filing
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4633634A (en) * | 1985-08-30 | 1987-01-06 | Nemmer Albert E | Building side wall construction and panel therefor |
US5155962A (en) * | 1986-04-07 | 1992-10-20 | Lowell E. Burkstrand | Ceiling runner |
CN1055787A (zh) * | 1990-02-02 | 1991-10-30 | 杰克斯·威保 | 多层建筑框架及其所构成的建筑物 |
CN2612743Y (zh) * | 2003-04-24 | 2004-04-21 | 朴海天 | 组合式钢骨架系统 |
CN2918638Y (zh) * | 2006-04-12 | 2007-07-04 | 王庆云 | 方便节能房 |
CN201276758Y (zh) * | 2008-08-19 | 2009-07-22 | 茂地(上海)建筑工程咨询有限公司 | 一种组合式房屋的梁架结构 |
Also Published As
Publication number | Publication date |
---|---|
CN101654930A (zh) | 2010-02-24 |
WO2010020111A1 (zh) | 2010-02-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101654930B (zh) | 一种组合式房屋的梁架结构及其安装方法 | |
CN101654929B (zh) | 一种组合式房屋及其组装方法 | |
EP1992750A1 (en) | Prefabricated reinforced-concrete single-family dwelling and method for erecting said dwelling | |
US20160319534A1 (en) | Reversible module co-ordination system for buildings | |
US20130305628A1 (en) | Dual-side unfoldable building modules | |
WO2010020108A1 (zh) | 一种组合式房屋的主体结构及其组装方法 | |
ES2333636B1 (es) | Modulo semirresistente prefabricado para construccion y procedimientode montaje en obra del mismo. | |
CN102635248B (zh) | 模块化快速组装房屋 | |
CN103821229A (zh) | 一种快速装配式集成化房屋及安装方法 | |
CN103249898A (zh) | 由互补建筑物模块形成的建筑物及其建造方法 | |
CN203769069U (zh) | 一种快速装配式集成化房屋 | |
CN205444984U (zh) | 拼装式环卫室 | |
CN103343574A (zh) | 一种装配式集成房屋 | |
CN101654928B (zh) | 一种多层组合式房屋的结构及其组装方法 | |
CN201276757Y (zh) | 一种组合式房屋 | |
CN201276758Y (zh) | 一种组合式房屋的梁架结构 | |
CN201276756Y (zh) | 一种多层组合式房屋 | |
CN106759853B (zh) | 一种结构保温一体化的装配式盒式结构体系及其施工方法 | |
CN201738446U (zh) | 单元模块化房屋 | |
KR100694702B1 (ko) | 모듈러 주택용 바닥 시스템 | |
CN215717548U (zh) | 一种简易混凝土预制装配房 | |
CN212836243U (zh) | 一种外挂式预制含外窗附框墙板模块、外墙板及房屋建筑 | |
CN211257313U (zh) | 一种装配式轻钢结构房屋 | |
CN214941333U (zh) | 一种外挂墙板的墙角连接节点及装配式建筑外墙 | |
CN217517797U (zh) | 全装配式多层排架建筑 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
ASS | Succession or assignment of patent right |
Owner name: MAODI (SHANGHAI) HOUSE BUILDING TECHNOLOGY CONSULT Free format text: FORMER OWNER: MAODI (SHANGHAI) BUILDING ENGINEERING CONSULTATION CO., LTD. Effective date: 20120221 |
|
C41 | Transfer of patent application or patent right or utility model | ||
COR | Change of bibliographic data |
Free format text: CORRECT: ADDRESS; FROM: 200042 JING AN, SHANGHAI TO: 201201 PUDONG NEW AREA, SHANGHAI |
|
TR01 | Transfer of patent right |
Effective date of registration: 20120221 Address after: 201201, B, building 814, building 977, 1 Feng Feng Road, Shanghai, Pudong New Area Patentee after: Mao Mao (Shanghai) Housing Construction Technology Consulting Co., Ltd. Address before: 200042, No. 318, South Wuning Road, Shanghai, Jingan District, No. 7 Patentee before: Maodi (Shanghai) Construction Engineering Consulting Co., Ltd. |
|
ASS | Succession or assignment of patent right |
Owner name: MEIJIAN BUILDING SYSTEMS (CHINA) CO., LTD. Free format text: FORMER OWNER: MAODI (SHANGHAI) BUILDING CONSTRUCTION TECHNOLOGY CONSULTING CO., LTD. Effective date: 20141021 |
|
C41 | Transfer of patent application or patent right or utility model | ||
COR | Change of bibliographic data |
Free format text: CORRECT: ADDRESS; FROM: 201201 PUDONG NEW AREA, SHANGHAI TO: 201801 JIADING, SHANGHAI |
|
TR01 | Transfer of patent right |
Effective date of registration: 20141021 Address after: 201801 No. 2676, Baoan Road, Shanghai, Jiading District Patentee after: ABC Building Systems (China) Co., Ltd. Address before: 201201, B, building 814, building 977, 1 Feng Feng Road, Shanghai, Pudong New Area Patentee before: Mao Mao (Shanghai) Housing Construction Technology Consulting Co., Ltd. |