CN101550697A - 地下桩套管振动冲孔拔除方法 - Google Patents

地下桩套管振动冲孔拔除方法 Download PDF

Info

Publication number
CN101550697A
CN101550697A CNA2008100356735A CN200810035673A CN101550697A CN 101550697 A CN101550697 A CN 101550697A CN A2008100356735 A CNA2008100356735 A CN A2008100356735A CN 200810035673 A CN200810035673 A CN 200810035673A CN 101550697 A CN101550697 A CN 101550697A
Authority
CN
China
Prior art keywords
sleeve
sleeve pipe
vibrating
pulling
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CNA2008100356735A
Other languages
English (en)
Inventor
方四宝
滕善涛
龚锡春
陆国华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Baoye Construction Co Ltd
Original Assignee
Shanghai Baoye Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Baoye Construction Co Ltd filed Critical Shanghai Baoye Construction Co Ltd
Priority to CNA2008100356735A priority Critical patent/CN101550697A/zh
Publication of CN101550697A publication Critical patent/CN101550697A/zh
Pending legal-status Critical Current

Links

Images

Abstract

本发明涉及基础建设,尤其涉及地下桩拔除方法。一种地下桩套管振动冲孔拔除方法,其特征在于,它包括下列步骤:步骤一,套管制作,以一长钢管为套管,其外壁上设置水管和通风管,一端头为锯齿形,且该长钢管内壁上设有钢丝绳;步骤二,确定地下桩的桩头位置并清除回填土;步骤三,振动沉设钢套管,用履带吊车吊住振动锤振动下沉套管,使套管套住地下桩,套管就位后移除振动锤;步骤四,吊拔桩体,当套管完全套住桩体后,用履带式吊机收紧钢丝绳起吊;步骤五,振动拔除钢套管,启动振动锤,使用履带式吊机起吊边振动边拔除钢套管;步骤六,填平桩孔和扰动区处理。本发明能顺利地拔除地下桩,为施工扫除障碍。

Description

地下桩套管振动冲孔拔除方法
技术领域
本发明涉及基础建设,尤其涉及地下桩拔除方法。
背景技术
在基础建设施工中,有时需要开挖一些基坑,如水处理设施旋流沉淀池。根据不同的现场条件,有时会遇到一些影响施工的地下桩需要拔除。由于这些桩往往入土深度达到二、三十米,有的垂直度存在偏差,强行拔除很容易拉断地下桩,剩下的仍然埋在地面以下,无法清除,影响施工。
发明内容
本发明旨在解决现有技术的上述缺陷,提供一种地下桩套管振动冲孔拔除方法。本发明能顺利地拔除地下桩,为施工扫除障碍。
本发明是这样实现的:
一种地下桩套管振动冲孔拔除方法,它包括下列步骤:
步骤一,套管制作,以一长钢管为套管,其外壁上设置水管和通风管,一端头为锯齿形,且该长钢管内壁上设有钢丝绳;
步骤二,确定地下桩的桩头位置并清除回填土;
步骤三,振动沉设钢套管,用履带吊车吊住振动锤振动下沉套管,使套管套住地下桩,套管就位后移除振动锤;
步骤四,吊拔桩体,当套管完全套住桩体后,用履带式吊机收紧钢丝绳起吊;
步骤五,振动拔除钢套管,启动振动锤,使用履带式吊机起吊边振动边拔除钢套管;
步骤六,填平桩孔和扰动区处理。
所述的地下桩套管振动冲孔拔除方法,所述套管上的水管主要包括位于上端的总水管和连通总水管的分水器,所述分水器环绕在套管上且其下方均匀分布有若干出水孔。
所述的地下桩套管振动冲孔拔除方法,所述的水管还包括若干连接于分水器的出水孔的出水管。
所述的地下桩套管振动冲孔拔除方法,所述通风管有两个,它们对称地分布在套管周围,其下端位于分水器下端。
所述的地下桩套管振动冲孔拔除方法,所述套管内壁上圆周设有放置钢丝绳的耳环,所述钢丝绳有上下两个,每个钢丝绳通过一个U形卡绕成圆形以环绕地下桩,一端连接在U形卡上,另一端延伸至套管外的上方。
所述的地下桩套管振动冲孔拔除方法,所述步骤三中,是用150T履带吊车吊住DZ120振动锤振动匀速下沉套管,沉设以高压水冲孔为主,振动为辅,并控制钢套管的垂直度;同时,在钢套管外侧添加膨润土减少土层同套管之间的摩阻力,开启空压机和高压水泵进行套管内桩侧泥土的破碎,及时将套管内的泥浆排走。
所述的地下桩套管振动冲孔拔除方法,所述步骤四中,在钢套管外侧添加膨润土减少土层同套管之间的摩阻力,开启空压机和高压水泵进行套管内桩侧泥土的破碎,及时将套管内的泥浆排走。
所述的地下桩套管振动冲孔拔除方法,所述步骤五中,每节桩上设2个固定点,固定2节桩共有4个固定点,当套管完全套住桩体后,4个固定点同时用150T履带式吊机收紧起吊。
本发明用吊机将钢套管提起,顺着桩基础顶部先打开高压水冲孔再启动振动锤沉管,边沉管边将上返的泥浆排走直到钢套管完全套住桩基础,然后吊机的主钩和副钩拉紧钢丝绳第二节桩和第一接桩上的钢丝绳,将两节桩同时从套管内拔出,之后启动震动锤将套管拔出,桩体顺利被拔出,从而保证了施工进度。
附图说明
下面,结合附图进一步说明本实用新型:
图1为本发明示意图;
图2为本发明中起吊步骤钢丝绳布置示意图;
图3为图2中A-A剖视图;
图4为钢丝绳受力示意图;
图5为本发明一个实施例中的套管示意图;
图6为本发明另一个实施例中套管示意图。
具体实施方式
如图1、图2、图3和图4所示:一种地下桩套管振动冲孔拔除方法,它包括下列步骤:
套管制作:以一长钢管为套管2,其外壁上设置水管3和通风管4,一端头为锯齿形21,且所述套管2内壁上圆周设有放置钢丝绳5的耳环22,所述钢丝绳5有上下两个,每个钢丝绳5通过一个U形卡51绕成圆形以环绕地下桩1,一端连接在U形卡51上,另一端延伸至套管2外的上方;
确定桩头位置:根据测量定位对照新构筑物的设计位置,开挖沟槽并暴露桩头,确定需要拔除的桩位;
清除回填土:为保证沉管的顺利,需要将地层上部的回填土特别是钢渣、石块、钢筋砼之内的东西全部清除掉;
振动沉设钢套管:钢套管水路和气路的刚度须满足要求,用150T履带吊车6吊住DZ120振动锤7振动下沉套管2,沉设以高压水冲孔为主,振动为辅,沉设需匀速进行,控制好套管2的垂直度;下沉就位后移除固定在套管2顶部的振动锤7;
在套管沉入过程中,在套管2外侧添加膨润土减少土层同套管2之间的摩阻力,开启空压机8和高压水泵9进行套管2内桩侧泥土的破碎,及时将套管2内的泥浆排走;
吊拔桩体:钢丝绳5(已预设在套管2内)在每节桩上设二个固定点,固定二节桩共有四个固定点,当套管2完全套住桩体后,四个固定点同时用150T履带式吊车6收紧起吊;
桩孔位回填:桩体拔除后在套管2内进行回填,回填材料采用素填土;
振动拔除套管2:孔位回填后,启动固定在钢套管上的振动锤,使用150T履带式吊车6起吊边振动边拔除套管2;
套管2拔除后填平桩孔。
作为发明的具体实施例:套管2壁厚选用16mm,有较好的刚度,套管2长27m,在现场整根制作,套管上设置水管3、通风管4,详见图5和图6;
所述套管2上的水管3主要包括位于上端的总水管31和连通总水管31的分水器32,所述分水器32环绕在套管2上且其下方均匀分布有若干出水孔;所述通风管4有两个,它们对称地分布在套管2周围,其下端位于分水器32下端(如图6所示)。
作为本发明的另一个实施例;所述的水管3还包括三十个连接于分水器32的出水孔的出水管33(如图5所示)。

Claims (8)

1.一种地下桩套管振动冲孔拔除方法,其特征在于,它包括下列步骤:
步骤一,套管制作,以一长钢管为套管,其外壁上设置水管和通风管,一端头为锯齿形,且该长钢管内壁上设有钢丝绳;
步骤二,确定地下桩的桩头位置并清除回填土;
步骤三,振动沉设钢套管,用履带吊车吊住振动锤振动下沉套管,使套管套住地下桩,套管就位后移除振动锤;
步骤四,吊拔桩体,当套管完全套住桩体后,用履带式吊机收紧钢丝绳起吊;
步骤五,振动拔除钢套管,启动振动锤,使用履带式吊机起吊边振动边拔除钢套管;
步骤六,填平桩孔和扰动区处理。
2.根据权利要求1所述的地下桩套管振动冲孔拔除方法,其特征在于,所述套管上的水管主要包括位于上端的总水管和连通总水管的分水器,所述分水器环绕在套管上且其下方均匀分布有若干出水孔。
3.根据权利要求2所述的地下桩套管振动冲孔拔除方法,其特征在于,所述的水管还包括若干连接于分水器的出水孔的出水管。
4.根据权利要求1、2或3所述的地下桩套管振动冲孔拔除方法,其特征在于,所述通风管有两个,它们对称地分布在套管周围,其下端位于分水器下端。
5.根据权利要求1所述的地下桩套管振动冲孔拔除方法,其特征在于,所述套管内壁上圆周设有放置钢丝绳的耳环,所述钢丝绳有上下两个,每个钢丝绳通过一个U形卡绕成圆形以环绕地下桩,一端连接在U形卡上,另一端延伸至套管外的上方。
6.根据权利要求1所述的地下桩套管振动冲孔拔除方法,其特征在于,所述步骤三中,是用150T履带吊车吊住DZ120振动锤振动匀速下沉套管,沉设以高压水冲孔为主,振动为辅,并控制钢套管的垂直度;同时,在钢套管外侧添加膨润土减少土层同套管之间的摩阻力,开启空压机和高压水泵进行套管内桩侧泥土的破碎,及时将套管内的泥浆排走。
7.根据权利要求1所述的地下桩套管振动冲孔拔除方法,其特征在于,所述步骤四中,在钢套管外侧添加膨润土减少土层同套管之间的摩阻力,开启空压机和高压水泵进行套管内桩侧泥土的破碎,及时将套管内的泥浆排走。
8.根据权利要求1所述的地下桩套管振动冲孔拔除方法,其特征在于,所述步骤五中,每节桩上设二个固定点,固定二节桩共有四个固定点,当套管完全套住桩体后,四个固定点同时用150T履带式吊机收紧起吊。
CNA2008100356735A 2008-04-03 2008-04-03 地下桩套管振动冲孔拔除方法 Pending CN101550697A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNA2008100356735A CN101550697A (zh) 2008-04-03 2008-04-03 地下桩套管振动冲孔拔除方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNA2008100356735A CN101550697A (zh) 2008-04-03 2008-04-03 地下桩套管振动冲孔拔除方法

Publications (1)

Publication Number Publication Date
CN101550697A true CN101550697A (zh) 2009-10-07

Family

ID=41155168

Family Applications (1)

Application Number Title Priority Date Filing Date
CNA2008100356735A Pending CN101550697A (zh) 2008-04-03 2008-04-03 地下桩套管振动冲孔拔除方法

Country Status (1)

Country Link
CN (1) CN101550697A (zh)

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102296610A (zh) * 2011-05-19 2011-12-28 中天建设集团有限公司 一种用于拔除方桩的装置和它的施工方法
CN104110027A (zh) * 2013-12-02 2014-10-22 成都绿迪科技有限公司 工具式抗拔桩
CN104141306A (zh) * 2013-05-07 2014-11-12 上海建工五建集团有限公司 一种振动半套管拔桩装置及其使用方法
CN104196026A (zh) * 2014-05-27 2014-12-10 天津二十冶建设有限公司 水中桥梁临时工程用钢管桩拔除方法
CN104652436A (zh) * 2014-12-24 2015-05-27 福建工程学院 钢套管振动取土或高压注水松土拔桩施工方法
CN104775433A (zh) * 2015-04-11 2015-07-15 葛洲坝集团基础工程有限公司 一种拔桩施工的方法
CN105297730A (zh) * 2015-10-30 2016-02-03 中国建筑第八工程局有限公司 多功能拔桩套管及应用多功能拔桩套管的拔桩施工方法
CN105544544A (zh) * 2015-12-16 2016-05-04 上海市城市建设设计研究总院 低净空条件下快速拔桩的方法
CN105735318A (zh) * 2016-03-25 2016-07-06 上海建工四建集团有限公司 一种振动套管及使用方法
CN106320340A (zh) * 2016-10-12 2017-01-11 中建港务建设有限公司 拔桩用振动套管及高压射水拔桩工艺
CN106758889A (zh) * 2017-04-01 2017-05-31 浙江龙翔建设有限公司 钢栈桥拆卸方法
CN107476774A (zh) * 2017-08-28 2017-12-15 中国葛洲坝集团基础工程有限公司 一种钻孔灌注施工过程中孔内埋钻的处理方法
EP3546654A1 (en) 2014-12-30 2019-10-02 High Five Solutions B.v. Method for removing an anchor or foundation pile out of the ground

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102296610B (zh) * 2011-05-19 2013-05-08 中天建设集团有限公司 一种用于拔除方桩的装置和它的施工方法
CN102296610A (zh) * 2011-05-19 2011-12-28 中天建设集团有限公司 一种用于拔除方桩的装置和它的施工方法
CN104141306A (zh) * 2013-05-07 2014-11-12 上海建工五建集团有限公司 一种振动半套管拔桩装置及其使用方法
CN104110027A (zh) * 2013-12-02 2014-10-22 成都绿迪科技有限公司 工具式抗拔桩
CN104110027B (zh) * 2013-12-02 2016-01-13 华北水利水电大学 工具式抗拔桩
CN104196026A (zh) * 2014-05-27 2014-12-10 天津二十冶建设有限公司 水中桥梁临时工程用钢管桩拔除方法
CN104652436A (zh) * 2014-12-24 2015-05-27 福建工程学院 钢套管振动取土或高压注水松土拔桩施工方法
EP3546654A1 (en) 2014-12-30 2019-10-02 High Five Solutions B.v. Method for removing an anchor or foundation pile out of the ground
CN104775433A (zh) * 2015-04-11 2015-07-15 葛洲坝集团基础工程有限公司 一种拔桩施工的方法
CN105297730A (zh) * 2015-10-30 2016-02-03 中国建筑第八工程局有限公司 多功能拔桩套管及应用多功能拔桩套管的拔桩施工方法
CN105544544A (zh) * 2015-12-16 2016-05-04 上海市城市建设设计研究总院 低净空条件下快速拔桩的方法
CN105735318A (zh) * 2016-03-25 2016-07-06 上海建工四建集团有限公司 一种振动套管及使用方法
CN106320340A (zh) * 2016-10-12 2017-01-11 中建港务建设有限公司 拔桩用振动套管及高压射水拔桩工艺
CN106320340B (zh) * 2016-10-12 2019-11-22 中建港务建设有限公司 拔桩用振动套管及高压射水拔桩工艺
CN106758889A (zh) * 2017-04-01 2017-05-31 浙江龙翔建设有限公司 钢栈桥拆卸方法
CN107476774A (zh) * 2017-08-28 2017-12-15 中国葛洲坝集团基础工程有限公司 一种钻孔灌注施工过程中孔内埋钻的处理方法
CN107476774B (zh) * 2017-08-28 2019-10-25 中国葛洲坝集团市政工程有限公司 一种钻孔灌注施工过程中孔内埋钻的处理方法

Similar Documents

Publication Publication Date Title
CN101550697A (zh) 地下桩套管振动冲孔拔除方法
CN104775433B (zh) 一种拔桩施工的方法
CN102704480B (zh) 前端振动钢护筒处理桩基超厚流沙层施工方法
KR101543209B1 (ko) 지오튜브와 이의 부상방지장치를 사용한 현장타설콘크리트말뚝 및 그 시공 방법
KR20060054711A (ko) 인너튜브와 콘크리트 오름방지장치를 사용한 현장타설콘크리트말뚝 및 이의 시공방법
JP6452299B2 (ja) 仮締切兼用鋼管矢板基礎の施工方法
JP2018091038A (ja) 既設井戸の抜管方法
CN113089654B (zh) 复杂土层挖孔桩施工工艺及施工用钢护筒
CN211037023U (zh) 置于地下连续墙底部的管井降水井
CN108457273B (zh) 一种钢管护坡桩成桩回收方法
JP3776987B2 (ja) マンホール壁兼用筒状体を用いた立坑構築方法
JP3827309B2 (ja) 埋め込み杭工法用補助装置及び埋め込み杭工法
KR101345457B1 (ko) 파일 압입기와 이 파일 압입기를 이용한 파일 압입 시공 방법
CN109930602A (zh) 一种水切割震动沉管拔桩装置
CN113430964B (zh) 长距离跨基坑箱涵原位悬吊保护施工方法
JP2002146789A (ja) 鋼管杭の撤去工法
JPH0468407B2 (zh)
CN113089685B (zh) 一种用于深基坑围护的锚索钻孔桩结构及其围护方法
JP2000352053A (ja) 既設杭の撤去工法
JP2014029076A (ja) アンカー部材及びアンカー部材の切断方法
CN211690366U (zh) 一种能够保护降水管井的基坑支护结构
CN201202119Y (zh) 地下桩拔除用套管
CN103103985A (zh) 一种基于植桩过程的地源热泵管埋置方法
CN1194319A (zh) 沉管挖孔灌注桩的成桩方法
JPS6335767B2 (zh)

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Open date: 20091007