CN101492967A - 钢柱纠偏方法 - Google Patents

钢柱纠偏方法 Download PDF

Info

Publication number
CN101492967A
CN101492967A CNA2008100328985A CN200810032898A CN101492967A CN 101492967 A CN101492967 A CN 101492967A CN A2008100328985 A CNA2008100328985 A CN A2008100328985A CN 200810032898 A CN200810032898 A CN 200810032898A CN 101492967 A CN101492967 A CN 101492967A
Authority
CN
China
Prior art keywords
steel column
correcting
error
jack
pillar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA2008100328985A
Other languages
English (en)
Other versions
CN101492967B (zh
Inventor
袁金兵
朱宝良
唐兵传
仇宇兵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Baoye Group Corp Ltd
Original Assignee
Shanghai Baoye Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Baoye Construction Co Ltd filed Critical Shanghai Baoye Construction Co Ltd
Priority to CN2008100328985A priority Critical patent/CN101492967B/zh
Publication of CN101492967A publication Critical patent/CN101492967A/zh
Application granted granted Critical
Publication of CN101492967B publication Critical patent/CN101492967B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

本发明涉及工程建筑,尤其涉及厂房的钢柱调整方法。一种钢柱纠偏方法,它包括钢柱,所述钢柱下部设有若干地脚螺栓,所述纠偏方法包括下列步骤:步骤一,安装纠偏反力装置,架设横向千斤顶;步骤二,顶升柱子,放入若干滚筒;步骤三,利用侧向千斤顶顶升,推动柱子使其水平移动,使之达到钢柱纠偏的水平调整值;步骤四,再次顶升将柱子抬高,抽出滚筒,并在钢柱底部配置垫板。本发明能顺利完成钢柱纠偏,达到规定的垂直度,且施工成本低廉。

Description

钢柱纠偏方法
技术领域
本发明涉及工程建筑,尤其涉及厂房的钢柱调整。
背景技术
对于工业厂房中的钢柱来说,其和地面垂直度的要求很高,必须在灌浆之前达到垂直度的要求。对于大长径比的工件来说,调整垂直度相当困难,没有很好的解决方案。
发明内容
本发明旨在解决现有技术的缺陷,提供一种钢柱纠偏方法。本发明能顺利完成钢柱纠偏,达到规定的垂直度,且施工成本低廉。
本发明是这样实现的:
一种钢柱纠偏方法,它包括钢柱,所述钢柱下部设有若干地脚螺栓,所述纠偏方法包括下列步骤:
步骤一,安装纠偏反力装置,架设横向千斤顶;
步骤二,顶升柱子,放入若干滚筒;
步骤三,利用侧向千斤顶顶升,推动柱子使其水平移动,使之达到钢柱纠偏的水平调整值;
步骤四,再次顶升柱子,将柱子抬高,抽出滚筒,并在钢柱底部配置垫板。
所述的钢柱纠偏方法,所述纠偏反力装置包括竖立设置在钢柱一侧的侧向千斤顶底座,该底座以连接件刚性连接所述的地脚螺栓,所述的侧向千斤顶底部固定在底座上;
所述侧向千斤顶的顶杆抵靠在钢柱的侧面。
所述的钢柱纠偏方法,所述纠偏反力装置还包括一个垫架,所述垫架位于所述侧向千斤顶顶杆端和钢柱柱体之间。
所述的钢柱纠偏方法,所述滚筒的壁厚大于或等于12毫米。
所述的钢柱纠偏方法,所述竖向千斤顶顶升柱子使柱子抬高5~10mm。
本发明利用侧向千斤顶、反力装置来顶撑钢柱,调节钢柱垂直度,快捷方便,顺利完成钢柱纠偏,达到规定的垂直度,且施工成本低廉。
附图说明
下面,结合附图进一步说明本发明:
图1为本发明示意图。
具体实施方式
一种钢柱纠偏方法,它包括钢柱1,所述钢柱1下部设有若干地脚螺栓11,所述纠偏方法包括下列步骤:
步骤一,安装纠偏反力装置3,架设竖向千斤顶31;
步骤二,顶升柱子,使柱子抬高5~10mm,放入若干滚筒2,所述滚筒的壁厚大于或等于12毫米;
步骤三,利用侧向千斤顶31顶升,推动柱子使其水平移动,使之达到钢柱纠偏的水平调整值;
步骤四,将柱子抬高,抽出滚筒,并在钢柱1底部配置垫板。
所述的钢柱纠偏方法,所述纠偏反力装置3包括竖立设置在钢柱1一侧的侧向千斤顶底座32,该底座以连接件刚性连接所述的地脚螺栓11,所述的侧向千斤顶31底部固定在底座32上;所述侧向千斤顶31的顶杆33抵靠在钢柱1的侧面。
所述纠偏反力装置3还包括一个垫架4,所述垫架位于所述侧向千斤顶顶杆33端和钢柱1柱体之间。
柱子纠偏结束后,加瓦斯垫,拧紧地脚螺栓,焊接瓦斯垫,进行二次灌浆,原样恢复柱脚。

Claims (5)

1.一种钢柱纠偏方法,它包括钢柱,所述钢柱下部设有若干地脚螺栓,其特征在于,所述纠偏方法包括下列步骤:
步骤一,安装纠偏反力装置,架设横向千斤顶;
步骤二,顶升柱子,放入若干滚筒;
步骤三,利用侧向千斤顶顶升,推动柱子使其水平移动,使之达到钢柱纠偏的水平调整值;
步骤四,再次顶升将柱子抬高,抽出滚筒,并在钢柱底部配置垫板。
2.根据权利要求1所述的钢柱纠偏方法,其特征在于,所述纠偏反力装置包括竖立设置在钢柱一侧的侧向千斤顶底座,该底座以连接件刚性连接所述的地脚螺栓,所述的侧向千斤顶底部固定在底座上;
所述侧向千斤顶的顶杆抵靠在钢柱的侧面。
3.根据权利要求1或2所述的钢柱纠偏方法,其特征在于,所述纠偏反力装置还包括一个垫架,所述垫架位于所述侧向千斤顶顶杆端和钢柱柱体之间。
4.根据权利要求1所述的钢柱纠偏方法,其特征在于,所述滚筒的壁厚大于或等于12毫米。
5.根据权利要求1所述的钢柱纠偏方法,其特征在于,所述步骤二中,顶升柱子使柱子抬高5~10mm。
CN2008100328985A 2008-01-22 2008-01-22 钢柱纠偏方法 Expired - Fee Related CN101492967B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2008100328985A CN101492967B (zh) 2008-01-22 2008-01-22 钢柱纠偏方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2008100328985A CN101492967B (zh) 2008-01-22 2008-01-22 钢柱纠偏方法

Publications (2)

Publication Number Publication Date
CN101492967A true CN101492967A (zh) 2009-07-29
CN101492967B CN101492967B (zh) 2011-01-19

Family

ID=40923748

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2008100328985A Expired - Fee Related CN101492967B (zh) 2008-01-22 2008-01-22 钢柱纠偏方法

Country Status (1)

Country Link
CN (1) CN101492967B (zh)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102889002A (zh) * 2012-04-12 2013-01-23 中国建筑第四工程局有限公司 蜂窝网格柱钢框架建筑基础钢柱的纠偏方法及结构
CN103924787A (zh) * 2014-05-08 2014-07-16 江苏中南建筑产业集团有限责任公司 钢柱对接平面位置校正装置
CN107013046A (zh) * 2017-06-19 2017-08-04 中冶建工集团有限公司 一种大截面钢管混凝土组合柱的矫正方法
CN109487836A (zh) * 2018-09-12 2019-03-19 中建三局集团有限公司 一种综合管廊水平位移精准纠偏体系及其操作方法
CN112878709A (zh) * 2021-01-29 2021-06-01 中国五冶集团有限公司 大型钢柱安装精准快速微调装置及其微调方法
CN113389232A (zh) * 2021-06-22 2021-09-14 浙江风土工程设计有限公司 石牌坊顶升纠偏装置
CN114293707A (zh) * 2021-12-31 2022-04-08 福建磊鑫(集团)有限公司 Aac砌块基于抗震钢结构的干作业施工方法

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1082598C (zh) * 1996-05-15 2002-04-10 广州市鲁班建筑防水补强专业公司 一种建筑物断柱顶升纠偏方法
CN1078285C (zh) * 1997-07-23 2002-01-23 夏强 倾斜建筑物可控纠偏施工方法及装置
CN100519944C (zh) * 2003-12-10 2009-07-29 上海市机械施工有限公司 桥面结构顶推施工中立柱的受力自平衡装置和纠偏方法

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102889002A (zh) * 2012-04-12 2013-01-23 中国建筑第四工程局有限公司 蜂窝网格柱钢框架建筑基础钢柱的纠偏方法及结构
CN102889002B (zh) * 2012-04-12 2016-01-27 中国建筑第四工程局有限公司 蜂窝网格柱钢框架建筑基础钢柱的纠偏方法及结构
CN103924787A (zh) * 2014-05-08 2014-07-16 江苏中南建筑产业集团有限责任公司 钢柱对接平面位置校正装置
CN107013046A (zh) * 2017-06-19 2017-08-04 中冶建工集团有限公司 一种大截面钢管混凝土组合柱的矫正方法
CN107013046B (zh) * 2017-06-19 2019-04-05 中冶建工集团有限公司 一种大截面钢管混凝土组合柱的矫正方法
CN109487836A (zh) * 2018-09-12 2019-03-19 中建三局集团有限公司 一种综合管廊水平位移精准纠偏体系及其操作方法
CN112878709A (zh) * 2021-01-29 2021-06-01 中国五冶集团有限公司 大型钢柱安装精准快速微调装置及其微调方法
CN112878709B (zh) * 2021-01-29 2022-08-19 中国五冶集团有限公司 大型钢柱安装精准快速微调装置及其微调方法
CN113389232A (zh) * 2021-06-22 2021-09-14 浙江风土工程设计有限公司 石牌坊顶升纠偏装置
CN113389232B (zh) * 2021-06-22 2022-06-21 浙江风土工程设计有限公司 石牌坊顶升纠偏装置
CN114293707A (zh) * 2021-12-31 2022-04-08 福建磊鑫(集团)有限公司 Aac砌块基于抗震钢结构的干作业施工方法

Also Published As

Publication number Publication date
CN101492967B (zh) 2011-01-19

Similar Documents

Publication Publication Date Title
CN101492967B (zh) 钢柱纠偏方法
CN203320700U (zh) 一种钢结构柱脚连接结构
CN103437297B (zh) 钢塔上横梁无支架合龙方法及施工系统
CN105220769A (zh) 大面积螺栓球网架整体顶升施工方法
CN205776306U (zh) 一种钢柱柱脚螺栓定位装置以及钢柱柱脚结构
CN104120802B (zh) 一种隔震支座安装定位简易方法
CN103912137A (zh) 建筑物抬升施工的提升装置
CN103669431A (zh) 一种煤矿采动区输电铁塔倾斜调整装置
CN104790567A (zh) 一种柔性连接系统、外墙板及外墙板安装节点
CN202174130U (zh) 预埋件校正器
CN201184055Y (zh) 钢柱纠偏装置
CN204040450U (zh) 一种用于工具式型钢悬挑脚手架的内角连接件
CN202390753U (zh) 桥台和柱帽预埋件的固定结构
CN203924755U (zh) 建筑物抬升施工的提升装置
CN106759557B (zh) 一种采动区输电铁塔水平变形恢复装置
CN204663027U (zh) 用于网架安装的支撑装置
CN202100018U (zh) 大型预埋螺栓用高精度定位夹具
CN204571013U (zh) 一种柔性连接系统、外墙板及外墙板安装节点
CN210031846U (zh) 可实施预应力补偿的格构柱支撑体系
CN203594264U (zh) 角钢铁塔纠偏专用夹具及角钢铁塔纠偏用具
CN114687567A (zh) 一种超高重型预埋件吊挂施工工装及方法
CN209799419U (zh) 一种结构柱的定位、调垂装置
CN202658906U (zh) 钢结构插入式柱脚安装装置
CN205954674U (zh) 高精度预埋地脚螺栓安装装置
CN219710298U (zh) 新型锚杆静压桩施工结构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: SHANGHAI BAOYE GROUP CORP., LTD.

Free format text: FORMER NAME: BAOYE CONSTRUCTION CO., LTD., SHANGHAI

CP03 Change of name, title or address

Address after: 200941 Fuyuan Road, Shanghai, No. 2457, No.

Patentee after: SHANGHAI BAOYE GROUP Corp.,Ltd.

Address before: 200941 Shanghai City, Baoshan District Road, No. four yuan, 168

Patentee before: SHANGHAI BAOYE GROUP Corp.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110119