CN203594264U - 角钢铁塔纠偏专用夹具及角钢铁塔纠偏用具 - Google Patents
角钢铁塔纠偏专用夹具及角钢铁塔纠偏用具 Download PDFInfo
- Publication number
- CN203594264U CN203594264U CN201320788990.0U CN201320788990U CN203594264U CN 203594264 U CN203594264 U CN 203594264U CN 201320788990 U CN201320788990 U CN 201320788990U CN 203594264 U CN203594264 U CN 203594264U
- Authority
- CN
- China
- Prior art keywords
- angle steel
- steel tower
- iron tower
- steel iron
- hole
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 229910000831 Steel Inorganic materials 0.000 title abstract description 67
- 239000010959 steel Substances 0.000 title abstract description 67
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 title abstract description 22
- 229910052742 iron Inorganic materials 0.000 title abstract description 11
- 238000005457 optimization Methods 0.000 description 3
- 230000005540 biological transmission Effects 0.000 description 2
- 230000005611 electricity Effects 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 239000003245 coal Substances 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000005259 measurement Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000005065 mining Methods 0.000 description 1
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
本实用新型涉及一种角钢铁塔纠偏专用夹具及角钢铁塔纠偏用具。现有技术缺少角钢铁塔纠偏扶正设备。为此,本角钢铁塔纠偏专用夹具包括内夹板和外夹板,二者截面均呈“L”形,二者分别处于待纠偏角钢铁塔的底脚角钢的两侧,其两侧超出待纠偏角钢铁塔的底脚角钢的部分均开有通孔,且每个通孔内分别设有紧固螺栓,外夹板上还焊有一横杆。本实用新型具有使用方便、安全可靠的优点,适合对各种角钢铁塔进行纠偏校正。
Description
技术领域
本实用新型涉及一种角钢铁塔纠偏专用夹具及角钢铁塔纠偏用具。
背景技术
煤矿供电多数为35KV-110KV输电线路,近年来为了提高线路的运行年限,普遍采用角钢铁塔。线路走廊在设计时多数没有考虑远离采煤塌陷区,而且煤矿投产5到10年左右,输电线路部分铁塔所在地区,都会出现塌陷区。
铁塔倾斜,严重时,直接影响煤矿生产安全。如果对线路搬迁,投资费用较大,施工周期较长。
实用新型内容
本实用新型要解决的技术问题是如何克服现有技术的上述缺陷,提供一种角钢铁塔纠偏专用夹具及角钢铁塔纠偏用具。
为解决上述技术问题,本角钢铁塔纠偏专用夹具包括内夹板和外夹板,二者截面均呈“L”形,二者分别处于待纠偏角钢铁塔的底脚角钢的两侧,其两侧超出待纠偏角钢铁塔的底脚角钢的部分均开有通孔,且每个通孔内分别设有紧固螺栓,外夹板上还焊有一横杆。如此设计,使用时,根据角钢铁塔倾斜状况,在角钢铁塔的相应两个或三个底脚角钢上分别安装上本角钢铁塔纠偏专用夹具,每个角钢铁塔纠偏专用夹具的横杆下分别安装一个千斤顶,然后松开角钢铁塔的基础螺栓,根据角钢铁塔倾斜度,用千斤顶将角钢铁塔扶正,然后在角钢铁塔的四角分别垫上合适厚度的垫块,最后重新将基础螺栓拧紧,即完成了角钢铁塔的扶正作业。
作为优化,所述横杆由槽钢制成,其槽口向外。如此设计,横杆与外夹板的固定面大,更加牢固。
作为优化,每个紧固螺栓穿过的通孔中至少有一个通孔是长槽形通孔。如此设计,便于安装夹紧。
本角钢铁塔纠偏用具包括多个垫铁,还包括至少三个角钢夹具、三个千斤顶,所述角钢夹具为前述角钢铁塔纠偏专用夹具。
作为优化,其还包括经纬仪和扳手。
本实用新型具有使用方便、安全可靠的优点,适合对各种角钢铁塔进行纠偏扶正。
附图说明
下面结合附图对本角钢铁塔纠偏专用夹具及角钢铁塔纠偏用具作进一步说明:
图1是本角钢铁塔纠偏专用夹具使用状态结构示意图。
图中:1为内夹板、2为外夹板、3为底脚角钢、4为通孔、5为紧固螺栓、6为横杆。
具体实施方式
实施方式一:如图1所示,本角钢铁塔纠偏专用夹具包括内夹板1和外夹板2,二者截面均呈“L”形,二者分别处于待纠偏角钢铁塔的底脚角钢3的两侧,其两侧超出待纠偏角钢铁塔的底脚角钢3的部分均开有通孔4,且每个通孔4内分别设有紧固螺栓5,外夹板2上还焊有一横杆6。所述横杆6由槽钢制成,其槽口向外。
每个紧固螺栓5穿过的通孔中至少有一个通孔4是长槽形通孔4。
实施方式二:本角钢铁塔纠偏用具包括多个垫铁、至少三个角钢夹具和三个千斤顶,所述角钢夹具为实施方式一所述角钢铁塔纠偏专用夹具。本角钢铁塔纠偏用具还包括经纬仪和扳手,图略。
角钢铁塔纠偏扶正方法,包括下述步骤:
1.用经纬仪对倾斜的角钢铁塔进行测量,测量正面及侧面的倾斜度数。
2.计算出找正铁塔倾斜,铁塔铁鞋所垫的高度。
3.根据铁塔铁鞋所垫高度,测量基础螺栓的长度是否满足铁塔铁鞋所垫的高度需要。如果不满足要对基础螺栓提前焊接加高。
4.线路停电后,拆除混凝土基础螺帽,在需要垫高的铁塔铁鞋侧面的角钢上安装实施方式一所述角钢铁塔纠偏专用夹具,下部安装千斤顶(千斤顶根据铁塔重量进行选择)。
5.准备就绪后,开始用千斤顶慢慢顶起,随松螺栓、随顶、随安装垫铁。顶起的速度与随松螺栓速度之间的距离保持在10mm之内。防止速度过快,对角钢铁塔上部的导线产生不利影响。与此同时用两台经纬仪测量垂直度,控制在铁塔高度差变化在千分之五以内。
6.满足规程要求以后,千斤顶停止上顶,用垫铁塞实,拆除千斤顶。把基础螺栓上紧,拆除所述角钢铁塔纠偏专用夹具。
7.用细石混凝土塞实垫铁之间的缝隙,把基础保护帽做好。
Claims (5)
1.一种角钢铁塔纠偏专用夹具,其特征在于:包括内夹板和外夹板,二者截面均呈“L”形,二者分别处于待纠偏角钢铁塔的底脚角钢的两侧,其两侧超出待纠偏角钢铁塔的底脚角钢的部分均开有通孔,且每个通孔内分别设有紧固螺栓,外夹板上还焊有一横杆。
2.如权利要求1所述的角钢铁塔纠偏专用夹具,其特征在于:所述横杆由槽钢制成,其槽口向外。
3.如权利要求1或2所述的角钢铁塔纠偏专用夹具,其特征在于:每个紧固螺栓穿过的通孔中至少有一个通孔是长槽形通孔。
4.一种角钢铁塔纠偏用具,包括多个垫铁,其特征在于:其包括至少三个角钢夹具、三个千斤顶,所述角钢夹具为权利要求1至3任一所述的角钢铁塔纠偏专用夹具。
5.如权利要求4所述的角钢铁塔纠偏用具,其特征在于:其还包括经纬仪和扳手。
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201320788990.0U CN203594264U (zh) | 2013-12-03 | 2013-12-03 | 角钢铁塔纠偏专用夹具及角钢铁塔纠偏用具 |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201320788990.0U CN203594264U (zh) | 2013-12-03 | 2013-12-03 | 角钢铁塔纠偏专用夹具及角钢铁塔纠偏用具 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN203594264U true CN203594264U (zh) | 2014-05-14 |
Family
ID=50675159
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201320788990.0U Expired - Fee Related CN203594264U (zh) | 2013-12-03 | 2013-12-03 | 角钢铁塔纠偏专用夹具及角钢铁塔纠偏用具 |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN203594264U (zh) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105162030A (zh) * | 2015-07-23 | 2015-12-16 | 国家电网公司 | 更换铁塔底部支撑角钢的装置 |
| CN111530988A (zh) * | 2020-05-16 | 2020-08-14 | 合肥浩凌机械设计制造有限公司 | 一种金属板材冲压成型工艺 |
| CN117260580A (zh) * | 2023-10-25 | 2023-12-22 | 广州增立钢管结构股份有限公司 | 铁塔角钢主材纠偏夹具 |
-
2013
- 2013-12-03 CN CN201320788990.0U patent/CN203594264U/zh not_active Expired - Fee Related
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105162030A (zh) * | 2015-07-23 | 2015-12-16 | 国家电网公司 | 更换铁塔底部支撑角钢的装置 |
| CN111530988A (zh) * | 2020-05-16 | 2020-08-14 | 合肥浩凌机械设计制造有限公司 | 一种金属板材冲压成型工艺 |
| CN117260580A (zh) * | 2023-10-25 | 2023-12-22 | 广州增立钢管结构股份有限公司 | 铁塔角钢主材纠偏夹具 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN203320700U (zh) | 一种钢结构柱脚连接结构 | |
| CN203222729U (zh) | 一种新型减隔震支座 | |
| CN203783165U (zh) | 预埋件多方位精确调节装置 | |
| CN101858148A (zh) | 钢柱对接三维调校方法 | |
| CN103982045A (zh) | 一种屋面网壳结构无支架悬挑安装施工方法 | |
| CN203594264U (zh) | 角钢铁塔纠偏专用夹具及角钢铁塔纠偏用具 | |
| CN103938663A (zh) | 一种单拼角钢主材的倾斜输电铁塔纠偏装置 | |
| CN207227968U (zh) | T梁梁底钢板调坡装置 | |
| CN103774841A (zh) | 轨道式滑模装置 | |
| CN101492967A (zh) | 钢柱纠偏方法 | |
| CN204252023U (zh) | 一种支座辅助安装模具 | |
| CN202926849U (zh) | 一种回转台地角螺栓用球铰垫圈 | |
| CN212359211U (zh) | 一种塌陷区输电铁塔倾斜纠偏装置 | |
| CN203099228U (zh) | 一种地脚螺栓调平结构 | |
| CN201495556U (zh) | 一种大型钢架快速吊装对正钢架底座结构 | |
| CN205954497U (zh) | 大跨度连续梁深水桥墩墩顶托架预压施工结构 | |
| CN203792305U (zh) | 一种快速调平t型槽地轨装置 | |
| CN202302573U (zh) | 一种倾斜座浆用垫板 | |
| CN204919565U (zh) | 基坑支撑拆除使用的钢平台 | |
| CN206109965U (zh) | 一种水电工地的钢栈道 | |
| CN204662489U (zh) | 一种输送线路支架底座预埋装置 | |
| CN204571013U (zh) | 一种柔性连接系统、外墙板及外墙板安装节点 | |
| CN209799419U (zh) | 一种结构柱的定位、调垂装置 | |
| CN204019070U (zh) | 井架组装用组合钢架 | |
| CN206316579U (zh) | 一种铁路接触网h型钢支柱底板焊接平台 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20140514 Termination date: 20141203 |
|
| EXPY | Termination of patent right or utility model |