CN101492967A - Steel column error-correcting method - Google Patents

Steel column error-correcting method Download PDF

Info

Publication number
CN101492967A
CN101492967A CNA2008100328985A CN200810032898A CN101492967A CN 101492967 A CN101492967 A CN 101492967A CN A2008100328985 A CNA2008100328985 A CN A2008100328985A CN 200810032898 A CN200810032898 A CN 200810032898A CN 101492967 A CN101492967 A CN 101492967A
Authority
CN
China
Prior art keywords
steel column
correcting
error
jack
pillar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA2008100328985A
Other languages
Chinese (zh)
Other versions
CN101492967B (en
Inventor
袁金兵
朱宝良
唐兵传
仇宇兵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Baoye Group Corp Ltd
Original Assignee
Shanghai Baoye Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Baoye Construction Co Ltd filed Critical Shanghai Baoye Construction Co Ltd
Priority to CN2008100328985A priority Critical patent/CN101492967B/en
Publication of CN101492967A publication Critical patent/CN101492967A/en
Application granted granted Critical
Publication of CN101492967B publication Critical patent/CN101492967B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention relates to engineering construction, in particular to a method for adjusting steel columns of a factory building. A method for correcting deviation of the steel columns adopts the steel columns, the lower parts of the steel columns are provided with a plurality of anchor bolts, and the method for correcting deviation comprises the following steps: step one, mounting a deviation correcting counterforce device, and setting a transverse jack; step two, jacking pillars, to place the pillars into a plurality of rollers; step three, using a lateral jack to jack and push the pillars to be moved horizontally, so that the steel columns reach deviation correcting horizontal adjusting values; and step four, jacking again to elevating the pillars, extracting the pillars from the rollers, and arranging a backing board at the bottom of the steel column. The method can successfully finish deviation correction of the steel columns, reaches prescribed verticality, and has low construction cost.

Description

Steel column error-correcting method
Technical field
The present invention relates to engineering construction, relate in particular to the steel column adjustment of factory building.
Background technology
For the steel column in the industrial premises, the requirement of itself and ground verticality is very high, must reach the requirement of verticality before grouting.For the workpiece of big L/D ratio, adjust quite difficulty of verticality, there is not good solution.
Summary of the invention
The present invention is intended to address the deficiencies of the prior art, and a kind of steel column error-correcting method is provided.The present invention can finish steel column error-correcting smoothly, reach the verticality of regulation, and construction cost is cheap.
The present invention is achieved in that
A kind of steel column error-correcting method, it comprises steel column, and described steel column bottom is provided with some stone bolt, and described method for correcting error comprises the following steps:
Step 1 is installed the correction counterforce device, sets up horizontal jack;
Step 2, the jacking pillar is put into some cylinders;
Step 3 is utilized the jacking of side direction jack, promotes pillar it is moved horizontally, and makes it to reach the horizontal adjustment value of steel column error-correcting;
Step 4, the jacking pillar is raised pillar once more, extracts cylinder out, and at steel column bottom configuration backing plate.
Described steel column error-correcting method, described correction counterforce device comprise erects the side direction jack base be arranged on steel column one side, and this base is with the connector described stone bolt that is rigidly connected, and described side direction jack bottom is fixed on the base;
The push rod of described side direction jack is resisted against the side of steel column.
Described steel column error-correcting method, described correction counterforce device also comprises a poppet, described poppet is between described side direction jack push rod end and steel column cylinder.
Described steel column error-correcting method, the wall thickness of described cylinder is more than or equal to 12 millimeters.
Described steel column error-correcting method, described vertical jack jacking pillar makes pillar raise 5~10mm.
The present invention utilizes side direction jack, counterforce device to shore steel column, regulates the steel column verticality, and is efficient and convenient, finishes steel column error-correcting smoothly, reach the verticality of regulation, and construction cost is cheap.
Description of drawings
Below, further specify the present invention in conjunction with the accompanying drawings:
Fig. 1 is a schematic diagram of the present invention.
The specific embodiment
A kind of steel column error-correcting method, it comprises steel column 1, and described steel column 1 bottom is provided with some stone bolt 11, and described method for correcting error comprises the following steps:
Step 1 is installed correction counterforce device 3, sets up vertical jack 31;
Step 2, the jacking pillar makes pillar raise 5~10mm, puts into some cylinders 2, and the wall thickness of described cylinder is more than or equal to 12 millimeters;
Step 3 is utilized 31 jackings of side direction jack, promotes pillar it is moved horizontally, and makes it to reach the horizontal adjustment value of steel column error-correcting;
Step 4 is raised pillar, extracts cylinder out, and at steel column 1 bottom configuration backing plate.
Described steel column error-correcting method, described correction counterforce device 3 comprise erects the side direction jack base 32 be arranged on steel column 1 one sides, and this base is with the connector described stone bolt 11 that is rigidly connected, and described side direction jack 31 bottoms are fixed on the base 32; The push rod 33 of described side direction jack 31 is resisted against the side of steel column 1.
Described correction counterforce device 3 also comprises a poppet 4, and described poppet is between described side direction jack push rod 33 ends and steel column 1 cylinder.
After the pillar correction finishes, add the gas pad, tighten stone bolt, welding gas pad carries out back-grouting, and former state is recovered suspension column.

Claims (5)

1. steel column error-correcting method, it comprises steel column, and described steel column bottom is provided with some stone bolt, it is characterized in that, and described method for correcting error comprises the following steps:
Step 1 is installed the correction counterforce device, sets up horizontal jack;
Step 2, the jacking pillar is put into some cylinders;
Step 3 is utilized the jacking of side direction jack, promotes pillar it is moved horizontally, and makes it to reach the horizontal adjustment value of steel column error-correcting;
Step 4, pillar is raised in jacking once more, extracts cylinder out, and at steel column bottom configuration backing plate.
2. steel column error-correcting method according to claim 1, it is characterized in that, described correction counterforce device comprises erects the side direction jack base be arranged on steel column one side, and this base is with the connector described stone bolt that is rigidly connected, and described side direction jack bottom is fixed on the base;
The push rod of described side direction jack is resisted against the side of steel column.
3. steel column error-correcting method according to claim 1 and 2 is characterized in that, described correction counterforce device also comprises a poppet, and described poppet is between described side direction jack push rod end and steel column cylinder.
4. steel column error-correcting method according to claim 1 is characterized in that the wall thickness of described cylinder is more than or equal to 12 millimeters.
5. steel column error-correcting method according to claim 1 is characterized in that, in the described step 2, the jacking pillar makes pillar raise 5~10mm.
CN2008100328985A 2008-01-22 2008-01-22 Steel column error-correcting method Expired - Fee Related CN101492967B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2008100328985A CN101492967B (en) 2008-01-22 2008-01-22 Steel column error-correcting method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2008100328985A CN101492967B (en) 2008-01-22 2008-01-22 Steel column error-correcting method

Publications (2)

Publication Number Publication Date
CN101492967A true CN101492967A (en) 2009-07-29
CN101492967B CN101492967B (en) 2011-01-19

Family

ID=40923748

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2008100328985A Expired - Fee Related CN101492967B (en) 2008-01-22 2008-01-22 Steel column error-correcting method

Country Status (1)

Country Link
CN (1) CN101492967B (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102889002A (en) * 2012-04-12 2013-01-23 中国建筑第四工程局有限公司 Method and structure for rectifying deviation of basic steel column of honeycomb grid column steel frame building
CN103924787A (en) * 2014-05-08 2014-07-16 江苏中南建筑产业集团有限责任公司 Steel column butt joint plane position correction device
CN107013046A (en) * 2017-06-19 2017-08-04 中冶建工集团有限公司 A kind of antidote of heavy in section concrete filled steel tube coupled column
CN109487836A (en) * 2018-09-12 2019-03-19 中建三局集团有限公司 A kind of pipe gallery horizontal displacement is precisely rectified a deviation system and its operating method
CN112878709A (en) * 2021-01-29 2021-06-01 中国五冶集团有限公司 Accurate and rapid fine adjustment device for large steel column installation and fine adjustment method thereof
CN113389232A (en) * 2021-06-22 2021-09-14 浙江风土工程设计有限公司 Stone memorial archway jacking deviation correcting device
CN114293707A (en) * 2021-12-31 2022-04-08 福建磊鑫(集团)有限公司 Dry operation construction method of AAC building block based on anti-seismic steel structure

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1082598C (en) * 1996-05-15 2002-04-10 广州市鲁班建筑防水补强专业公司 Method for jacking and correcting deviation of building broken pillar
CN1078285C (en) * 1997-07-23 2002-01-23 夏强 Controlled construction method and apparatus for rectifying inclined building
CN100519944C (en) * 2003-12-10 2009-07-29 上海市机械施工有限公司 Stress self-balancing and deviation rectification equipment for column system in use for push constructing bridge floor structure

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102889002A (en) * 2012-04-12 2013-01-23 中国建筑第四工程局有限公司 Method and structure for rectifying deviation of basic steel column of honeycomb grid column steel frame building
CN102889002B (en) * 2012-04-12 2016-01-27 中国建筑第四工程局有限公司 The method for correcting error of Cellular Networks lattice column steel framed building basis steel column and structure
CN103924787A (en) * 2014-05-08 2014-07-16 江苏中南建筑产业集团有限责任公司 Steel column butt joint plane position correction device
CN107013046A (en) * 2017-06-19 2017-08-04 中冶建工集团有限公司 A kind of antidote of heavy in section concrete filled steel tube coupled column
CN107013046B (en) * 2017-06-19 2019-04-05 中冶建工集团有限公司 A kind of antidote of big section steel pipe concrete combination column
CN109487836A (en) * 2018-09-12 2019-03-19 中建三局集团有限公司 A kind of pipe gallery horizontal displacement is precisely rectified a deviation system and its operating method
CN112878709A (en) * 2021-01-29 2021-06-01 中国五冶集团有限公司 Accurate and rapid fine adjustment device for large steel column installation and fine adjustment method thereof
CN112878709B (en) * 2021-01-29 2022-08-19 中国五冶集团有限公司 Accurate and rapid fine adjustment device for large steel column installation and fine adjustment method thereof
CN113389232A (en) * 2021-06-22 2021-09-14 浙江风土工程设计有限公司 Stone memorial archway jacking deviation correcting device
CN113389232B (en) * 2021-06-22 2022-06-21 浙江风土工程设计有限公司 Stone memorial archway jacking deviation correcting device
CN114293707A (en) * 2021-12-31 2022-04-08 福建磊鑫(集团)有限公司 Dry operation construction method of AAC building block based on anti-seismic steel structure

Also Published As

Publication number Publication date
CN101492967B (en) 2011-01-19

Similar Documents

Publication Publication Date Title
CN101492967B (en) Steel column error-correcting method
CN203320700U (en) Steel structure column foot connecting structure
CN103437297B (en) Non-bracket closure method for upper cross beam of steel tower and construction system
CN105220769A (en) Large area bolt-ball net frame integral top lifting construction method
CN103912137A (en) Lifting device for lifting construction for buildings
CN205776306U (en) A kind of steel column foot bolt positioning device and steel column foot structure
CN203960919U (en) Colliery minery electric power pylon correction lift-up device
CN104120802B (en) Simple method for mounting and locating seismic isolation support
CN103669431A (en) Device for adjusting inclined steel pylon in mining area of coal mine
CN201184055Y (en) Steel column correcting apparatus
CN204040450U (en) A kind of for angle connector in tools type section steel builder's jack
CN202390753U (en) Fixing structure of bridge table and post cap embedded part
CN104790567A (en) Flexible connecting system, external wall panel and external wall plate installing node
CN203924755U (en) The lifting appliance of building lifting construction
CN204663027U (en) For the bracing or strutting arrangement that rack is installed
CN204571013U (en) Node installed by a kind of Flexible connection system, side fascia and side fascia
CN210031846U (en) Lattice column support system capable of implementing prestress compensation
CN203594264U (en) Clamp special for angle steel iron tower rectification and tool for angle steel iron tower rectification
CN114687567A (en) Ultrahigh heavy embedded part hanging construction tool and method
CN106759557B (en) Mining area power transmission tower horizontal deformation recovery device
CN202658906U (en) Insertion type heel mounting device for steel structure
CN202100018U (en) High-precision positioning fixture for large-scale pre-buried bolts
CN205954674U (en) High accuracy built -in foundation bolt installation device
CN219710298U (en) Novel anchor rod static pressure pile construction structure
CN219387254U (en) Pushing bracket for steel box girder

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: SHANGHAI BAOYE GROUP CORP., LTD.

Free format text: FORMER NAME: BAOYE CONSTRUCTION CO., LTD., SHANGHAI

CP03 Change of name, title or address

Address after: 200941 Fuyuan Road, Shanghai, No. 2457, No.

Patentee after: SHANGHAI BAOYE GROUP Corp.,Ltd.

Address before: 200941 Shanghai City, Baoshan District Road, No. four yuan, 168

Patentee before: SHANGHAI BAOYE GROUP Corp.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110119