CN103669431A - 一种煤矿采动区输电铁塔倾斜调整装置 - Google Patents

一种煤矿采动区输电铁塔倾斜调整装置 Download PDF

Info

Publication number
CN103669431A
CN103669431A CN201310575494.1A CN201310575494A CN103669431A CN 103669431 A CN103669431 A CN 103669431A CN 201310575494 A CN201310575494 A CN 201310575494A CN 103669431 A CN103669431 A CN 103669431A
Authority
CN
China
Prior art keywords
pylon
base
welded
iron tower
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310575494.1A
Other languages
English (en)
Other versions
CN103669431B (zh
Inventor
袁广林
舒前进
陈志梅
王永安
王慧刚
王强
李庆涛
鲁彩凤
苗生龙
徐支松
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Mining and Technology CUMT
State Grid Corp of China SGCC
State Grid Shanxi Electric Power Co Ltd
Original Assignee
China University of Mining and Technology CUMT
State Grid Corp of China SGCC
State Grid Shanxi Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Mining and Technology CUMT, State Grid Corp of China SGCC, State Grid Shanxi Electric Power Co Ltd filed Critical China University of Mining and Technology CUMT
Priority to CN201310575494.1A priority Critical patent/CN103669431B/zh
Publication of CN103669431A publication Critical patent/CN103669431A/zh
Application granted granted Critical
Publication of CN103669431B publication Critical patent/CN103669431B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

本发明公开了一种煤矿采动区输电铁塔倾斜调整装置,包括地脚螺栓、可顶升塔脚板、铁塔基础和底座;可顶升塔脚板通过地脚螺栓与铁塔基础连接;底座设置于铁塔基础底部外侧,可顶升塔脚板包括底板、焊接在底板上的铁塔主材连接板以及平行焊接于底板上的两个承载槽钢,铁塔主材连接板沿铁塔主材边沿焊接,承载槽钢两端垂直焊接有连接槽钢,连接槽钢位于底座上方;地脚螺栓外露丝扣长度不短于150mm。有益效果是在安装铁塔的同时,预置了可顶升塔脚板,通过该塔脚板上的连接槽钢与用于放置千斤顶的底座相对应设置,能安全、准确、可靠地对倾斜输电铁塔进行纠偏,有效减少铁塔的倾斜。

Description

一种煤矿采动区输电铁塔倾斜调整装置
技术领域
本发明涉及一种纠偏装置,具体是一种煤矿采动区输电铁塔倾斜调整装置。
背景技术
由于煤矿采动区地质结构的变化,建设在采动区的输电铁塔容易发生不同程度的下沉和倾斜,给输电线路的安全运行造成严重威胁。目前解决该问题的做法是当输电铁塔倾斜后,采用对铁塔结构或基础进行改造的方式进行纠偏。采用这种方法,工器具用量大、现场布置较复杂、工作量和工人劳动强度都比较大。
发明内容
针对上述现有技术存在的问题,本发明提供一种煤矿采动区输电铁塔倾斜调整装置,在施工方便、使用工器具少的情况下,对倾斜的输电铁塔进行纠偏,保证输电线路的安全。
为了实现上述目的,本发明采用的技术方案是:一种煤矿采动区输电铁塔倾斜调整装置,包括地脚螺栓和铁塔基础;还包括可顶升塔脚板和底座,底座设置于铁塔基础底部外侧,可顶升塔脚板通过地脚螺栓与铁塔基础连接;所述可顶升塔脚板包括底板、焊接在底板上的铁塔主材连接板以及平行焊接于底板上的两个承载槽钢,铁塔主材连接板沿铁塔主材边沿焊接,承载槽钢两端垂直焊接有连接槽钢,连接槽钢位于底座上方;地脚螺栓外露丝扣长度不短于150mm。
优选地,底板上焊接有加劲板,加劲板与铁塔主材垂直焊接。
优选地,所述地脚螺栓外露丝扣长度为150mm—300mm。
优选地,所述底座采用方木。
本发明的有益效果是:可顶升塔脚板在安装铁塔时,与铁塔同时施工,通过该塔脚板上的连接槽钢与用于放置千斤顶的底座相对应设置,当铁塔发生倾斜时,松开地脚螺栓,将千斤顶放在底座上,采用千斤顶通过顶升可顶升塔脚板中的连接槽钢,就能安全、准确、可靠地对倾斜输电铁塔进行纠偏,有效减少铁塔的倾斜,减少地表变形在输电铁塔上产生的附加应力,使其能够经受煤矿采动的影响,保证输电线路的安全。本发明采用的结构简单,使用的工器具少,施工方便,可靠性高。
附图说明
图1为本发明的结构示意图;
图2为本发明的A-A向剖视图。
图中:1、底座,2、地脚螺栓,3、千斤顶,4、可顶升塔脚板,5、铁塔基础,6、铁塔主材,7、底板,8、铁塔主材连接板,9、加劲板,10、承载槽钢,11、连接槽钢。
具体实施方式
下面结合附图对本发明作进一步说明。
如图1和图2所示:本发明包括地脚螺栓2和铁塔基础5;还包括底座1和可顶升塔脚板4,底座1设置于铁塔基础5底部外侧,可顶升塔脚板4通过地脚螺栓2与铁塔基础5连接;可顶升塔脚板4包括底板7、焊接在底板7上的铁塔主材连接板8以及平行焊接于底板7上的两个承载槽钢10,铁塔主材连接板8沿铁塔主材6边沿焊接;承载槽钢10两端垂直焊接有连接槽钢11,连接槽钢11位于底座1上方;地脚螺栓2外露丝扣长度不短于150mm。
底板7上焊接有加劲板9,加劲板9与铁塔主材6垂直焊接,由于加劲板9的设置,可以有效提高本装置的承载力。
所述地脚螺栓2外露丝扣长度为150mm—300mm,在此长度范围内,方便可顶升塔脚板4的安装和拆卸。
为了节约成本,所述底座1采用方木。
本发明的纠偏装置,在安装铁塔时,同时施工预置可顶升塔脚板4,即将铁塔主材连接板8与铁塔主材6焊接,并与加劲板9、承载槽钢10同时焊接于底板7上;然后将连接槽钢11与承载槽钢10焊接。当铁塔发生倾斜时,松开地脚螺栓2,将千斤顶3放在底座1上,通过千斤顶3顶升塔脚板4中的连接槽钢11,对倾斜输电铁塔进行纠偏,从而有效地减少铁塔的倾斜,减少地表变形在输电铁塔上产生的附加应力,使其能够经受煤矿采动的影响,保证输电线路的安全。

Claims (5)

1.一种煤矿采动区输电铁塔倾斜调整装置,包括地脚螺栓(2)和铁塔基础(5);其特征在于:还包括底座(1)和可顶升塔脚板(4),底座(1)设置于铁塔基础(5)底部外侧,可顶升塔脚板(4)通过地脚螺栓(2)与铁塔基础(5)连接所述可顶升塔脚板(4)包括底板(7)、焊接在底板(7)上的铁塔主材连接板(8)以及平行焊接于底板(7)上的两个承载槽钢(10),铁塔主材连接板(8)沿铁塔主材(6)边沿焊接,承载槽钢(10)两端垂直焊接有连接槽钢(11),连接槽钢(11)位于底座(1)上方;地脚螺栓(2)外露丝扣长度不短于150mm。
2.根据权利要求1所述的一种煤矿采动区输电铁塔倾斜调整装置,其特征在于,底板(7)上焊接有加劲板(9)。
3.根据权利要求2所述的一种煤矿采动区输电铁塔倾斜调整装置,其特征在于,加劲板(9)与铁塔主材(6)垂直焊接。
4.根据权利要求1所述的一种煤矿采动区输电铁塔倾斜调整装置,其特征在于,所述地脚螺栓(2)外露丝扣长度为150mm—300mm。
5.根据权利要求1所述的一种煤矿采动区输电铁塔倾斜调整装置,其特征在于,所述底座(1)采用方木。
CN201310575494.1A 2013-11-18 2013-11-18 一种煤矿采动区输电铁塔倾斜调整装置 Expired - Fee Related CN103669431B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310575494.1A CN103669431B (zh) 2013-11-18 2013-11-18 一种煤矿采动区输电铁塔倾斜调整装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310575494.1A CN103669431B (zh) 2013-11-18 2013-11-18 一种煤矿采动区输电铁塔倾斜调整装置

Publications (2)

Publication Number Publication Date
CN103669431A true CN103669431A (zh) 2014-03-26
CN103669431B CN103669431B (zh) 2016-06-01

Family

ID=50308145

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310575494.1A Expired - Fee Related CN103669431B (zh) 2013-11-18 2013-11-18 一种煤矿采动区输电铁塔倾斜调整装置

Country Status (1)

Country Link
CN (1) CN103669431B (zh)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104763005A (zh) * 2015-03-18 2015-07-08 山东省水利科学研究院 大型钢制球罐纠倾方法
CN110616733A (zh) * 2019-10-25 2019-12-27 中国电建集团贵州电力设计研究院有限公司 一种输电铁塔基础及构件的整体加固装置及方法
CN112431190A (zh) * 2020-12-10 2021-03-02 施秀华 一种输电铁塔纠偏系统
CN113187305A (zh) * 2021-05-26 2021-07-30 新余学院 一种电子信息工程通信塔连接装置
CN114278141A (zh) * 2021-11-26 2022-04-05 内蒙古电力(集团)有限责任公司鄂尔多斯电业局 一种可纠偏输电塔及其使用方法
CN114278139A (zh) * 2021-11-26 2022-04-05 内蒙古电力(集团)有限责任公司鄂尔多斯电业局 一种采纠协同的输电塔维护方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10280427A (ja) * 1997-03-31 1998-10-20 Fujio Itagaki 建築物の沈下を修正する修正装置及び修正工法
CN102080382A (zh) * 2010-11-30 2011-06-01 济南大学 适应采空区地基变形的建筑基础
CN102864795A (zh) * 2012-10-19 2013-01-09 重庆大学 一种适应填土地基沉降的轻钢厂房柱基础及施工方法
CN203284791U (zh) * 2013-06-06 2013-11-13 中鼎国际工程有限责任公司 可以进行顶升纠偏的柱下独立柱基础
CN203960920U (zh) * 2013-11-18 2014-11-26 国家电网公司 煤矿采动区输电铁塔倾斜调整装置

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10280427A (ja) * 1997-03-31 1998-10-20 Fujio Itagaki 建築物の沈下を修正する修正装置及び修正工法
CN102080382A (zh) * 2010-11-30 2011-06-01 济南大学 适应采空区地基变形的建筑基础
CN102864795A (zh) * 2012-10-19 2013-01-09 重庆大学 一种适应填土地基沉降的轻钢厂房柱基础及施工方法
CN203284791U (zh) * 2013-06-06 2013-11-13 中鼎国际工程有限责任公司 可以进行顶升纠偏的柱下独立柱基础
CN203960920U (zh) * 2013-11-18 2014-11-26 国家电网公司 煤矿采动区输电铁塔倾斜调整装置

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104763005A (zh) * 2015-03-18 2015-07-08 山东省水利科学研究院 大型钢制球罐纠倾方法
CN110616733A (zh) * 2019-10-25 2019-12-27 中国电建集团贵州电力设计研究院有限公司 一种输电铁塔基础及构件的整体加固装置及方法
CN112431190A (zh) * 2020-12-10 2021-03-02 施秀华 一种输电铁塔纠偏系统
CN113187305A (zh) * 2021-05-26 2021-07-30 新余学院 一种电子信息工程通信塔连接装置
CN114278141A (zh) * 2021-11-26 2022-04-05 内蒙古电力(集团)有限责任公司鄂尔多斯电业局 一种可纠偏输电塔及其使用方法
CN114278139A (zh) * 2021-11-26 2022-04-05 内蒙古电力(集团)有限责任公司鄂尔多斯电业局 一种采纠协同的输电塔维护方法

Also Published As

Publication number Publication date
CN103669431B (zh) 2016-06-01

Similar Documents

Publication Publication Date Title
CN103669431A (zh) 一种煤矿采动区输电铁塔倾斜调整装置
CN203960919U (zh) 煤矿采动区输电铁塔纠偏顶升装置
CN103669432B (zh) 一种煤矿采动区输电铁塔纠偏顶升装置
CN105863362A (zh) 一种用于倾斜输电铁塔的纠偏装置
CN103938663A (zh) 一种单拼角钢主材的倾斜输电铁塔纠偏装置
CN204983171U (zh) 一种预制柱连接装置
CN106760903A (zh) 一种输电铁塔不均匀沉降调节装置
CN203729330U (zh) 地铁车站盖挖逆筑法型钢柱的定位架
CN206233276U (zh) 一种预试桩静压施加装置
CN203960920U (zh) 煤矿采动区输电铁塔倾斜调整装置
CN203499559U (zh) 一种方便移动型巷道用液压锚固钻机
CN202767612U (zh) 一种煤矿沉陷区倾斜输电铁塔扶正装置
CN203594058U (zh) 一种单拼角钢主材的倾斜输电铁塔纠偏装置
CN203594263U (zh) 一种双拼角钢主材的倾斜输电铁塔纠偏装置
CN203145036U (zh) 一种抗采动大变形钢柱脚
CN215858944U (zh) 一种钢结构施工作业用的平台结构
CN203594264U (zh) 角钢铁塔纠偏专用夹具及角钢铁塔纠偏用具
CN212359211U (zh) 一种塌陷区输电铁塔倾斜纠偏装置
CN203821939U (zh) 一种±800kV特高压直流线路用圆形塔脚板
CN206591903U (zh) 输电铁塔不均匀沉降调节装置
CN203846494U (zh) 腰梁土锚杆分段连接结构
CN203361170U (zh) 一种建筑基坑围护用的支撑立柱桩
CN204174980U (zh) 一种磨机检修平台
CN203322513U (zh) 一种双支脚式石油管道防护装置
CN203768940U (zh) 一种架空输电线路角钢塔基础

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160601

Termination date: 20211118

CF01 Termination of patent right due to non-payment of annual fee