CN203960919U - 煤矿采动区输电铁塔纠偏顶升装置 - Google Patents
煤矿采动区输电铁塔纠偏顶升装置 Download PDFInfo
- Publication number
- CN203960919U CN203960919U CN201320726493.8U CN201320726493U CN203960919U CN 203960919 U CN203960919 U CN 203960919U CN 201320726493 U CN201320726493 U CN 201320726493U CN 203960919 U CN203960919 U CN 203960919U
- Authority
- CN
- China
- Prior art keywords
- electric power
- power pylon
- plate
- stone bolt
- main material
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 claims abstract description 40
- 229910052742 iron Inorganic materials 0.000 claims abstract description 20
- 239000004575 stone Substances 0.000 claims abstract description 20
- 239000000463 material Substances 0.000 claims abstract description 19
- 239000003351 stiffener Substances 0.000 claims description 9
- 238000003466 welding Methods 0.000 claims description 4
- 229910000831 Steel Inorganic materials 0.000 description 8
- 239000010959 steel Substances 0.000 description 8
- 238000010276 construction Methods 0.000 description 5
- 230000005540 biological transmission Effects 0.000 description 4
- 230000005611 electricity Effects 0.000 description 4
- 239000003245 coal Substances 0.000 description 2
- 238000009434 installation Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 1
- 230000001131 transforming effect Effects 0.000 description 1
Landscapes
- Electric Cable Installation (AREA)
Abstract
本实用新型公开了一种输电铁塔纠偏装置,尤其涉及一种煤矿采动区输电铁塔纠偏顶升装置,包括混凝土长柱独立基础(1)、地脚螺栓(3)和可顶升塔脚板(4),可顶升塔脚板(4)包括底板(6)和焊接在底板(6)上的铁塔主材连接板(8),铁塔主材连接板(8)与铁塔主材(5)沿边沿焊接;可顶升塔脚板(4)的底板(6)通过地脚螺栓(3)与混凝土长柱独立基础(1)相连;混凝土长柱独立基础(1)上设有用于安放千斤顶(2)的加载孔(7);地脚螺栓(3)外露丝扣长度不短于150mm。本结构体系构造简单,当输电铁塔发生倾斜时,松开地脚螺栓(3),使用千斤顶直接顶升可顶升塔脚板就可以进行纠偏。
Description
技术领域
本实用新型涉及一种输电铁塔纠偏装置,尤其涉及一种煤矿采动区输电铁塔纠偏顶升装置。
背景技术
由于煤矿采动区地质结构的变化,建设在采动区的输电铁塔容易发生不同程度的下沉和倾斜,给输电线路的安全运行造成严重威胁。目前解决该问题的做法是当输电铁塔倾斜后,采用对铁塔结构或基础进行改造的方式进行纠偏。采用这种方法,工器具用量大、现场布置较复杂、工作量和工人劳动强度都比较大。
发明内容
针对上述现有技术存在的问题,本实用新型提供一种煤矿采动区输电铁塔纠偏顶升装置,在施工方便、使用工器具少的情况下,对倾斜的输电铁塔进行纠偏,保证输电线路的安全。
为了实现上述目的,本实用新型采用的技术方案是:一种煤矿采动区输电铁塔纠偏顶升装置,包括混凝土长柱独立基础,地脚螺栓和可顶升塔脚板;可顶升塔脚板包括底板和焊接在底板上的铁塔主材连接板,铁塔主材连接板与铁塔主材沿边沿焊接,可顶升塔脚板的底板通过地脚螺栓与混凝土长柱独立基础相连;混凝土长柱独立基础上设有可安放千斤顶的加载孔;所述的地脚螺栓外露丝扣长度不短于150mm。
优选地,底板上焊接有加劲板,加劲板与铁塔主材连接板垂直焊接。
优选地,加载孔为长方体结构。
优选地,所述加载孔的尺寸宽×长×高不小于150mm×200mm×300mm。
优选地,所述地脚螺栓外露丝扣长度为150mm—300mm。
本实用新型在进行基础施工时,预留可安放千斤顶的加载孔,并且在安装铁塔的同时安装可顶升塔脚板。铁塔发生倾斜时,松开地脚螺栓,将千斤顶放在加载孔内,采用千斤顶顶升塔脚板,便能够安全、准确、可靠地对发生倾斜的输电铁塔进行纠偏;本实用新型在输电铁塔发生倾斜时,松开地脚螺栓,使用千斤顶直接顶升塔脚板就可以进行纠偏,能方便地对倾斜的铁塔进行连续调整,有效地减小铁塔的倾斜角度,施工方便,使用的工器具少,可靠性高;能够显著减少地表变形在输电铁塔上产生的附加应力,使输电铁塔能够经受煤矿采动的影响,进而保证输电线路的安全。
附图说明
图1为本实用新型的结构示意图;
图2为图1的A-A剖面示意图;
图3为混凝土长柱独立基础的俯视图;
图4为混凝土长柱独立基础的左视图。
图中:1、混凝土长柱独立基础,2、千斤顶,3、地脚螺栓,4、可顶升塔脚板,5、铁塔主材,6、底板,7、加载孔,8、铁塔主材连接板,9、加劲板。
具体实施方式
下面结合附图对本实用新型作进一步说明。
如图1至图4所示:本实用新型包括混凝土长柱独立基础1,地脚螺栓3和可顶升塔脚板4;可顶升塔脚板4包括底板6和焊接在底板6上的铁塔主材连接板8,铁塔主材连接板8与铁塔主材5沿边沿焊接,可顶升塔脚板4的底板6通过地脚螺栓3与混凝土长柱独立基础1相连;混凝土长柱独立基础1上设有可安放千斤顶2的预留加载孔7;所述的地脚螺栓3外露丝扣长度不短于150mm。
底板6上焊接有加劲板9,加劲板9与铁塔主材连接板8垂直焊接,由于加劲板9的设置,可以有效提高本装置的承载力。
为了便于容纳千斤顶2,加载孔7为长方体结构。
为了能够容纳千斤顶2,所述加载孔7的尺寸宽×长×高不小于150mm×200mm×300mm。
所述地脚螺栓3外露丝扣长度为150mm—300mm,在此长度范围内,方便可顶升塔脚板4的安装和拆卸。
本实用新型中,通过在混凝土长柱独立基础1上预留可安放千斤顶2的加载孔7,并且在安装铁塔的同时施工可顶升塔脚板4,即铁塔主材连接板8与铁塔主材5焊接,并与加劲板9同时焊接于底板6上。当铁塔发生倾斜时,只需要松开地脚螺栓3,将千斤顶2放在混凝土长柱独立基础1预留的加载孔7内,使用千斤顶2顶升可顶升塔脚板4,就可以对倾斜的输电铁塔进行纠偏,纠偏工作完成后,紧固地脚螺栓3即可。本实用新型在施工方便、工器具少的情况下可以有效地减小铁塔的倾斜角度,并且可以进行连续调整,减少地表变形在输电铁塔上产生的附加应力,使铁塔能够经受煤矿采动的影响,进而保证输电线路的安全。
Claims (5)
1.一种煤矿采动区输电铁塔纠偏顶升装置,包括混凝土长柱独立基础(1)和地脚螺栓(3);其特征在于还包括可顶升塔脚板(4),可顶升塔脚板(4)包括底板(6)和焊接在底板(6)上的铁塔主材连接板(8),铁塔主材连接板(8)与铁塔主材(5)沿边沿焊接;可顶升塔脚板(4)的底板(6)通过地脚螺栓(3)与混凝土长柱独立基础(1)相连;混凝土长柱独立基础(1)上设有用于安放千斤顶(2)的加载孔(7);所述的地脚螺栓(3)外露丝扣长度不短于150mm。
2.根据权利要求1所述的一种煤矿采动区输电铁塔纠偏顶升装置,其特征在于,底板(6)上焊接有加劲板(9),加劲板(9)与铁塔主材连接板(8)垂直焊接。
3.根据权利要求1所述的一种煤矿采动区输电铁塔纠偏顶升装置,其特征在于,所述加载孔(7)为长方体结构。
4.根据权利要求3所述的一种煤矿采动区输电铁塔纠偏顶升装置,其特征在于,所述加载孔(7)的尺寸宽×长×高不小于150mm×200mm×300mm。
5.根据权利要求1所述的一种煤矿采动区输电铁塔纠偏顶升装置,其特征在于,所述地脚螺栓(3)外露丝扣长度为150mm—300mm。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320726493.8U CN203960919U (zh) | 2013-11-18 | 2013-11-18 | 煤矿采动区输电铁塔纠偏顶升装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320726493.8U CN203960919U (zh) | 2013-11-18 | 2013-11-18 | 煤矿采动区输电铁塔纠偏顶升装置 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203960919U true CN203960919U (zh) | 2014-11-26 |
Family
ID=51921521
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201320726493.8U Expired - Lifetime CN203960919U (zh) | 2013-11-18 | 2013-11-18 | 煤矿采动区输电铁塔纠偏顶升装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203960919U (zh) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103669432A (zh) * | 2013-11-18 | 2014-03-26 | 国家电网公司 | 一种煤矿采动区输电铁塔纠偏顶升装置 |
CN106017885A (zh) * | 2016-06-03 | 2016-10-12 | 中国矿业大学 | 一种输电铁塔可顶升塔脚承载性能试验装置 |
CN106703091A (zh) * | 2017-01-22 | 2017-05-24 | 中国矿业大学 | 一种输电铁塔不均匀沉降纠偏装置 |
CN110029695A (zh) * | 2019-04-22 | 2019-07-19 | 中国矿业大学 | 一种组合式高压输电线杆不均匀沉降的纠偏方法 |
CN110747914A (zh) * | 2019-10-15 | 2020-02-04 | 中国化学工程第四建设有限公司 | 大型塔设备倾斜度校正方法 |
CN112502208A (zh) * | 2020-12-31 | 2021-03-16 | 中国电建集团河南省电力勘测设计院有限公司 | 沉降可调节式调车机基础及调节方法 |
-
2013
- 2013-11-18 CN CN201320726493.8U patent/CN203960919U/zh not_active Expired - Lifetime
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103669432A (zh) * | 2013-11-18 | 2014-03-26 | 国家电网公司 | 一种煤矿采动区输电铁塔纠偏顶升装置 |
CN103669432B (zh) * | 2013-11-18 | 2016-11-02 | 国家电网公司 | 一种煤矿采动区输电铁塔纠偏顶升装置 |
CN106017885A (zh) * | 2016-06-03 | 2016-10-12 | 中国矿业大学 | 一种输电铁塔可顶升塔脚承载性能试验装置 |
CN106703091A (zh) * | 2017-01-22 | 2017-05-24 | 中国矿业大学 | 一种输电铁塔不均匀沉降纠偏装置 |
CN106703091B (zh) * | 2017-01-22 | 2018-08-07 | 中国矿业大学 | 一种输电铁塔不均匀沉降纠偏装置 |
CN110029695A (zh) * | 2019-04-22 | 2019-07-19 | 中国矿业大学 | 一种组合式高压输电线杆不均匀沉降的纠偏方法 |
CN110029695B (zh) * | 2019-04-22 | 2020-10-30 | 中国矿业大学 | 一种组合式高压输电线杆不均匀沉降的纠偏方法 |
CN110747914A (zh) * | 2019-10-15 | 2020-02-04 | 中国化学工程第四建设有限公司 | 大型塔设备倾斜度校正方法 |
CN112502208A (zh) * | 2020-12-31 | 2021-03-16 | 中国电建集团河南省电力勘测设计院有限公司 | 沉降可调节式调车机基础及调节方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203960919U (zh) | 煤矿采动区输电铁塔纠偏顶升装置 | |
CN103669432B (zh) | 一种煤矿采动区输电铁塔纠偏顶升装置 | |
CN103669431B (zh) | 一种煤矿采动区输电铁塔倾斜调整装置 | |
CN106436748A (zh) | 一种适用于山地光伏组件的岩锚基础结构及其施工方法 | |
CN103938663A (zh) | 一种单拼角钢主材的倾斜输电铁塔纠偏装置 | |
CN203729330U (zh) | 地铁车站盖挖逆筑法型钢柱的定位架 | |
CN203960920U (zh) | 煤矿采动区输电铁塔倾斜调整装置 | |
CN202164619U (zh) | 一种预应力集成混凝土构件多功能塔机基础 | |
CN203594058U (zh) | 一种单拼角钢主材的倾斜输电铁塔纠偏装置 | |
CN104594317A (zh) | 工作台及单桩基础及海上工作平台及其安装方法 | |
CN201495556U (zh) | 一种大型钢架快速吊装对正钢架底座结构 | |
CN203594263U (zh) | 一种双拼角钢主材的倾斜输电铁塔纠偏装置 | |
CN102817617A (zh) | 新型拉索式盾构始发后靠基座体系 | |
CN203346897U (zh) | 基础筏板埋入式钢柱定位支架 | |
CN203594264U (zh) | 角钢铁塔纠偏专用夹具及角钢铁塔纠偏用具 | |
CN204435337U (zh) | 工作台及单桩基础及海上工作平台 | |
CN204531180U (zh) | 控制大型构件钢筋绑扎精度的劲性骨架 | |
CN205012299U (zh) | 压力钢管安装型钢轨道装置 | |
CN203361170U (zh) | 一种建筑基坑围护用的支撑立柱桩 | |
CN203846494U (zh) | 腰梁土锚杆分段连接结构 | |
CN204529148U (zh) | 水泥电杆排杆装置 | |
CN202467221U (zh) | 发电厂主厂房钢屋架吊装起重装置 | |
CN210152295U (zh) | 一种可周转插销式的逆作法钢管柱调垂导向装置 | |
CN103276889B (zh) | 满堂扣件式钢管脚手架抗侧移方法 | |
CN203322513U (zh) | 一种双支脚式石油管道防护装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
AV01 | Patent right actively abandoned |
Granted publication date: 20141126 Effective date of abandoning: 20161012 |
|
AV01 | Patent right actively abandoned |
Granted publication date: 20141126 Effective date of abandoning: 20161012 |
|
C25 | Abandonment of patent right or utility model to avoid double patenting |