CN203846494U - 腰梁土锚杆分段连接结构 - Google Patents

腰梁土锚杆分段连接结构 Download PDF

Info

Publication number
CN203846494U
CN203846494U CN201420236586.7U CN201420236586U CN203846494U CN 203846494 U CN203846494 U CN 203846494U CN 201420236586 U CN201420236586 U CN 201420236586U CN 203846494 U CN203846494 U CN 203846494U
Authority
CN
China
Prior art keywords
soil anchor
anchor rod
breast beam
anchor bolt
fender post
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420236586.7U
Other languages
English (en)
Inventor
陈春来
毛林富
郭伟坚
梁旭
汤金良
吴立军
陈燕洁
余剑英
蒋吉清
朱萍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hangzhou Xing Yao Construction Group Co Ltd
ZHEJIANG XINDONGYANG CONSTRUCTION GROUP CO Ltd
Zhejiang University City College ZUCC
Original Assignee
Hangzhou Xing Yao Construction Group Co Ltd
ZHEJIANG XINDONGYANG CONSTRUCTION GROUP CO Ltd
Zhejiang University City College ZUCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hangzhou Xing Yao Construction Group Co Ltd, ZHEJIANG XINDONGYANG CONSTRUCTION GROUP CO Ltd, Zhejiang University City College ZUCC filed Critical Hangzhou Xing Yao Construction Group Co Ltd
Priority to CN201420236586.7U priority Critical patent/CN203846494U/zh
Application granted granted Critical
Publication of CN203846494U publication Critical patent/CN203846494U/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

本实用新型涉及一种建筑工程结构,尤其是涉及一种腰梁土锚杆分段连接结构。腰梁土锚杆分段连接结构由围护桩、腰梁和土锚杆构成,腰梁由槽钢焊接而成,且紧贴在围护桩的侧壁,土锚杆分有两段,第一段土锚杆水平穿过腰梁,第二段土锚杆斜穿入围护桩中,槽钢上穿有固定螺母,固定螺母下端连接压板,压板分别上下夹持第一段土锚杆,第二段土锚杆内设置有三股钢绞线,三股钢绞线的一端延伸至围护桩外与腰梁固定。本实用新型具有设计较合理,施工成本较低,抗拔承载力较足,型钢腰梁可再次回收等特点。

Description

腰梁土锚杆分段连接结构
技术领域
本实用新型涉及一种建筑工程结构,尤其是涉及一种腰梁土锚杆分段连接结构。
背景技术
随着深基坑和边坡支护建设工程与建筑施工新技术的发展,深基坑和边坡支护工程中新型支护技术不断涌现。当深基坑挖深较深且基坑平面面积很大应用内支撑的造价较高时,或土质边坡的高度较大时,需要利用基坑及边坡中合适的土层,在安全适用、方便施工的前提下,研发出新型深基坑或边坡的施工结构。传统的桩墙内支撑支护系统,基坑平面面积较大时,围护桩的上部土层得不到较好支护,围护桩所承受的侧向载荷无法较好的传递到周围稳定的土层中去。
发明内容
本实用新型主要是针对现有技术所存在的结构复杂,施工成本较高,抗拔承载力不足,型钢腰梁无法再次回收等的技术问题,提供一种结构简单,施工成本较低,抗拔承载力较足,型钢腰梁可再次回收的腰梁土锚杆分段连接结构。
本实用新型的上述技术问题主要是通过下述技术方案得以解决的:腰梁土锚杆分段连接结构由围护桩、腰梁和土锚杆构成,腰梁由槽钢焊接而成,且紧贴在围护桩的侧壁,土锚杆分有两段,第一段土锚杆水平穿过腰梁,第二段土锚杆斜穿入围护桩中,槽钢上穿有固定螺母,固定螺母下端连接压板,压板分别上下夹持第一段土锚杆,第二段土锚杆内设置有三股钢绞线,三股钢绞线的一端延伸至围护桩外与腰梁固定。钢绞线可增加土锚杆的承载力。
因此,本实用新型具有设计较合理,施工成本较低,抗拔承载力较足,型钢腰梁可再次回收等特点。
附图说明
附图1是本实用新型的整体结构示意图。
具体实施方式
下面通过实施例,并结合附图,对本实用新型的技术方案作进一步具体的说明。
实施例1:腰梁土锚杆分段连接结构由围护桩、腰梁和土锚杆构成,腰梁1由槽钢焊接而成,且紧贴在围护桩2的侧壁,土锚杆3分有两段,第一段土锚杆31水平穿过腰梁1,第二段土锚杆32斜穿入围护桩2中,槽钢上穿有固定螺母5,固定螺母5下端连接压板6,压板6分别上下夹持第一段土锚杆31,第二段土锚杆32内设置有三股钢绞线4,三股钢绞线4的一端延伸至围护桩2外与腰梁1固定(如图1所示)。

Claims (1)

1.一种腰梁土锚杆分段连接结构,由围护桩、腰梁和土锚杆构成,其特征在于所述腰梁(1)由槽钢焊接而成,且紧贴在围护桩(2)的侧壁,土锚杆(3)分有两段,第一段土锚杆(31)水平穿过腰梁(1),第二段土锚杆(32)斜穿入围护桩(2)中,槽钢上穿有固定螺母(5),固定螺母(5)下端连接压板(6),压板(6)分别上下夹持第一段土锚杆(31),第二段土锚杆(32)内设置有三股钢绞线(4),三股钢绞线(4)的一端延伸至围护桩(2)外与腰梁(1)固定。
CN201420236586.7U 2014-04-25 2014-04-25 腰梁土锚杆分段连接结构 Expired - Fee Related CN203846494U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420236586.7U CN203846494U (zh) 2014-04-25 2014-04-25 腰梁土锚杆分段连接结构

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420236586.7U CN203846494U (zh) 2014-04-25 2014-04-25 腰梁土锚杆分段连接结构

Publications (1)

Publication Number Publication Date
CN203846494U true CN203846494U (zh) 2014-09-24

Family

ID=51559531

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420236586.7U Expired - Fee Related CN203846494U (zh) 2014-04-25 2014-04-25 腰梁土锚杆分段连接结构

Country Status (1)

Country Link
CN (1) CN203846494U (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107190743A (zh) * 2017-07-26 2017-09-22 山东省城乡建设勘察设计研究院 一种复合杆体自钻式锚杆及其施工方法
CN110130336A (zh) * 2019-06-12 2019-08-16 山东建勘集团有限公司 锚杆内置锁定结构

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107190743A (zh) * 2017-07-26 2017-09-22 山东省城乡建设勘察设计研究院 一种复合杆体自钻式锚杆及其施工方法
CN110130336A (zh) * 2019-06-12 2019-08-16 山东建勘集团有限公司 锚杆内置锁定结构

Similar Documents

Publication Publication Date Title
CN203145038U (zh) 格构柱式塔吊基础
CN103437567A (zh) 利用原有桩基础支撑既有建筑地下增层的方法
CN201722776U (zh) 适用于方钢管柱的梁柱节点
CN201896318U (zh) 塔吊基础节与钢格构柱的连接结构
CN205024712U (zh) 一种组合式塔吊基础
CN101851923B (zh) 一种支撑柱施工安装方法
CN203846494U (zh) 腰梁土锚杆分段连接结构
CN210917440U (zh) 一种建筑工地用的桩基加固装置
CN203559432U (zh) 一种地下厂房拱顶
CN204311457U (zh) 一种地铁车站基坑开挖施工用组合式支护体系
CN203159027U (zh) 一种预制装配式铁塔基础吊具
CN202866002U (zh) 型钢混凝土非埋入式柱脚
CN204174737U (zh) 一种小型活动房屋的钢构架
CN204062152U (zh) 高压泵管固定装置
CN106120880A (zh) 一种海上风电单桩基础抗压承载力试验装置
CN203213140U (zh) 层板式高桩承台塔吊基础结构
CN203755781U (zh) 一种分段式中心立柱
CN203129169U (zh) 基坑内独立柱支撑电梯基础结构
CN203377226U (zh) 配重式太阳能架
CN105804293A (zh) 预制钢管混凝土构造柱夯土墙
CN201433356Y (zh) 大跨径预应力混凝土桥梁悬臂浇筑施工用的抱箍
CN206015740U (zh) 一种海上风电单桩基础抗压承载力试验装置
CN202247830U (zh) 新型水中钢平台
CN201896319U (zh) 塔吊基础节与钢格构柱连接的转换平台
CN206158010U (zh) 高强钢‑高强灌浆料超强组合柱结构

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140924

Termination date: 20210425