CN205024712U - 一种组合式塔吊基础 - Google Patents
一种组合式塔吊基础 Download PDFInfo
- Publication number
- CN205024712U CN205024712U CN201520640129.9U CN201520640129U CN205024712U CN 205024712 U CN205024712 U CN 205024712U CN 201520640129 U CN201520640129 U CN 201520640129U CN 205024712 U CN205024712 U CN 205024712U
- Authority
- CN
- China
- Prior art keywords
- steel pipe
- pipe pile
- tower crane
- pile
- steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 68
- 239000010959 steel Substances 0.000 claims abstract description 68
- 239000011150 reinforced concrete Substances 0.000 claims abstract description 19
- 238000009412 basement excavation Methods 0.000 claims abstract description 13
- 239000002689 soil Substances 0.000 claims abstract description 6
- 239000004567 concrete Substances 0.000 claims description 17
- 230000002787 reinforcement Effects 0.000 claims description 15
- 230000003014 reinforcing effect Effects 0.000 claims description 4
- 230000002093 peripheral effect Effects 0.000 claims description 3
- 238000010276 construction Methods 0.000 abstract description 8
- 239000000463 material Substances 0.000 abstract description 3
- 229910001294 Reinforcing steel Inorganic materials 0.000 abstract 3
- 238000005516 engineering process Methods 0.000 description 2
- 238000009434 installation Methods 0.000 description 2
- 238000004873 anchoring Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
本实用新型涉及一种组合式塔吊基础,由下至上依次包括钢筋混凝土灌注桩、钢管桩以及钢筋混凝土高承台三部分;所述钢管桩伸入钢筋混凝土灌注桩桩头内,在钢管桩的底端部周边焊接有连接钢筋,连接钢筋与钢筋混凝土灌注桩的钢筋笼连接;在钢管桩的顶端部周边也焊接有连接钢筋,连接钢筋锚入到钢筋混凝土高承台内,所述塔吊基础在土方开挖前施工完成,随着土方的开挖对钢管桩进行支撑加固。本实用新型要提供的塔吊基础安全可靠、施工难度小、节省材料、节省工期、且适于软土地基。
Description
技术领域
本实用新型涉及建筑工程领域,尤其涉及一种建筑施工用塔吊的组合式基础。
背景技术
建筑行业中,工地上的各种建筑材料的垂直运输一般是由塔吊完成的,随着建筑产业不断面临的新挑战与绿色技术的发展,施工现场对塔吊的安装与使用提出了新的要求。在大型地下室或多层地下室施工时,由于基坑工程具有平面尺寸大,开挖深度深,垂直运输矛盾突出,施工场地狭小等特点,塔吊常常需放置在基坑内,现有的一般做法是,先挖地下室土方,挖好地下室基坑后再在挖好的基坑上在塔吊的所在位置先打四根桩、桩顶设置柱帽结构形成塔吊基础。上述现有技术存在以下缺陷:一、稳定性差、基础与塔吊的连接结构复杂;二、必须等基坑开挖完成后才能施工塔吊基础,延长了工期;三、对于软土地基场地,土方开挖后,由于土质承载力较差,施工机械无法行驶,无法及时安装塔吊;四、当遇到基坑挖好后,受基坑场地限制不能在挖好的基坑内安装塔吊的情况,或者基坑开挖时必须在基坑位置安装使用塔吊的情况,为施工带来难题。因此有必要提出一种新的塔吊结构。
发明内容
为克服上述现有技术的不足,本实用新型要提供一种安全可靠、施工难度小、节省材料、节省工期、且适于软土地基的组合式塔吊基础。
本实用新型是通过以下技术方案实现的:
一种组合式塔吊基础,由下至上依次包括钢筋混凝土灌注桩、钢管桩以及钢筋混凝土高承台三部分;所述钢管桩伸入钢筋混凝土灌注桩桩头以下至少3米,在钢管桩的底端部周边焊接有连接钢筋,连接钢筋与钢筋混凝土灌注桩的钢筋笼连接;在钢管桩的顶端部周边也焊接有连接钢筋,连接钢筋锚入到钢筋混凝土高承台内。
作为优选,所述钢筋混凝土灌注桩和钢管桩均为四根,且呈方形排列。
作为优选,所述钢管桩顶端焊接有盖板。
作为优选,所述钢筋混凝土高承台内设置有X形交叉暗梁。
作为优选,钢筋混凝土高承台内预埋有塔吊预埋腿。
作为优选,在所述钢管桩之间设置多层支撑钢梁,所述支撑钢梁随着土方的开挖逐层与钢管桩进行焊接。
作为优选,所述支撑钢梁为工厂预制构件。
作为优选,所述钢管桩的下部设置有透气孔。
本实用新型的有益效果:土方开挖前即可进行塔吊基础的施工,缩短了工期;钢管桩与钢筋混凝土灌注桩以及钢管桩与钢筋混凝土高承台的充分连接与锚固,保证了结构安全可靠;钢管桩的下部设置有透气孔,保证了灌注桩混凝土密实;塔吊预埋腿预埋于高承台中,塔吊安装方便;在钢管桩顶端焊接盖板,防止高承台混凝土进入钢管桩内部,既节省材料也方便后期钢管桩的割除;混凝土承台内设置的X形暗梁将四根钢管桩与塔吊预埋腿有效连接在一起,安全可靠。
附图说明
图1是本实用新型的立面示意图。
图2是本实用新型钢管桩与高承台以及灌注桩的连接示意图(图中未显示承台及灌注桩的钢筋)。
图3是本实用新型的平面示意图。
图中,1、钢筋混凝土灌注桩;2、钢管桩;3、钢筋混凝土高承台;4、连接钢筋;5、X形交叉暗梁;6、支撑钢梁;7、透气孔。
具体实施方式
如图1-3所示,一种组合式塔吊基础,由下至上依次包括钢筋混凝土灌注桩1、钢管桩2以及钢筋混凝土高承台3三部分;所述钢管桩伸入钢筋混凝土灌注桩桩头以下至少3米,在钢管桩的底端部周边焊接有连接钢筋4,连接钢筋与钢筋混凝土灌注桩的钢筋笼连接;在钢管桩的顶端部周边也焊接有连接钢筋4,连接钢筋锚入到钢筋混凝土高承台内。
所述钢筋混凝土灌注桩和钢管桩均为四根,且呈方形排列;所述钢管桩顶端焊接有盖板;所述钢筋混凝土高承台内设置有X形交叉暗梁5;钢筋混凝土高承台内预埋有塔吊预埋腿。
在所述钢管桩之间设置多层支撑钢梁6,所述支撑钢梁随着土方的开挖逐层与钢管桩进行焊接;所述支撑钢梁为工厂预制构件。
所述钢管桩的下部设置有透气孔7。
所述塔吊基础在土方开挖前施工完成,随着土方的开挖对钢管桩进行支撑加固。
Claims (6)
1.一种组合式塔吊基础,其特征在于:由下至上依次包括钢筋混凝土灌注桩(1)、钢管桩(2)以及钢筋混凝土高承台(3)三部分;所述钢管桩伸入钢筋混凝土灌注桩桩头以下至少3米,在钢管桩的底端部周边焊接有连接钢筋(4),连接钢筋与钢筋混凝土灌注桩的钢筋笼连接;在钢管桩的顶端部周边也焊接有连接钢筋(4),连接钢筋锚入到钢筋混凝土高承台内。
2.根据权利要求1所述的一种组合式塔吊基础,其特征在于:所述钢筋混凝土灌注桩和钢管桩均为四根,且呈方形排列;所述钢管桩顶端焊接有盖板;所述钢筋混凝土高承台内设置有X形交叉暗梁(5);钢筋混凝土高承台内预埋有塔吊预埋腿。
3.根据权利要求2所述的一种组合式塔吊基础,其特征在于:在所述钢管桩之间设置多层支撑钢梁(6),所述支撑钢梁随着土方的开挖逐层与钢管桩进行焊接。
4.根据权利要求3所述的一种组合式塔吊基础,其特征在于:所述支撑钢梁为工厂预制构件。
5.根据权利要求1所述的一种组合式塔吊基础,其特征在于:所述钢管桩的下部设置有透气孔(7)。
6.根据权利要求1所述的一种组合式塔吊基础,其特征在于:所述塔吊基础在土方开挖前施工完成,随着土方的开挖对钢管桩进行支撑加固。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520640129.9U CN205024712U (zh) | 2015-08-24 | 2015-08-24 | 一种组合式塔吊基础 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520640129.9U CN205024712U (zh) | 2015-08-24 | 2015-08-24 | 一种组合式塔吊基础 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205024712U true CN205024712U (zh) | 2016-02-10 |
Family
ID=55257257
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520640129.9U Expired - Fee Related CN205024712U (zh) | 2015-08-24 | 2015-08-24 | 一种组合式塔吊基础 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205024712U (zh) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110847022A (zh) * | 2019-12-19 | 2020-02-28 | 浙江省交通规划设计研究院有限公司 | 一种带混凝土盖梁的多支座钢管混凝土独柱墩 |
CN111456077A (zh) * | 2020-05-26 | 2020-07-28 | 中国建筑第四工程局有限公司 | 一种大承台悬挑塔吊基础 |
CN114032948A (zh) * | 2021-11-26 | 2022-02-11 | 中铁四局集团有限公司 | 淤泥地层中大跨度现浇梁螺旋管支架基础钢管桩施工方法 |
CN115198787A (zh) * | 2022-07-19 | 2022-10-18 | 中铁建工集团有限公司 | 一种钢管柱式塔吊基础及其施工方法、盖挖逆作施工方法 |
CN115233726A (zh) * | 2022-07-29 | 2022-10-25 | 陕西建工第三建设集团有限公司 | 一种深厚淤泥质土地区塔吊基础施工方法 |
CN115387207A (zh) * | 2022-09-09 | 2022-11-25 | 中铁广州工程局集团有限公司 | 一种浅覆盖层钢混组合桩桥墩结构及施工方法 |
-
2015
- 2015-08-24 CN CN201520640129.9U patent/CN205024712U/zh not_active Expired - Fee Related
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110847022A (zh) * | 2019-12-19 | 2020-02-28 | 浙江省交通规划设计研究院有限公司 | 一种带混凝土盖梁的多支座钢管混凝土独柱墩 |
CN111456077A (zh) * | 2020-05-26 | 2020-07-28 | 中国建筑第四工程局有限公司 | 一种大承台悬挑塔吊基础 |
CN114032948A (zh) * | 2021-11-26 | 2022-02-11 | 中铁四局集团有限公司 | 淤泥地层中大跨度现浇梁螺旋管支架基础钢管桩施工方法 |
CN115198787A (zh) * | 2022-07-19 | 2022-10-18 | 中铁建工集团有限公司 | 一种钢管柱式塔吊基础及其施工方法、盖挖逆作施工方法 |
CN115198787B (zh) * | 2022-07-19 | 2023-10-27 | 中铁建工集团有限公司 | 一种钢管柱式塔吊基础及其施工方法、盖挖逆作施工方法 |
CN115233726A (zh) * | 2022-07-29 | 2022-10-25 | 陕西建工第三建设集团有限公司 | 一种深厚淤泥质土地区塔吊基础施工方法 |
CN115387207A (zh) * | 2022-09-09 | 2022-11-25 | 中铁广州工程局集团有限公司 | 一种浅覆盖层钢混组合桩桥墩结构及施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205024712U (zh) | 一种组合式塔吊基础 | |
CN104453274B (zh) | 利用支护结构和托换结构支撑既有建筑物地下增层方法 | |
CN101775807B (zh) | 软土地基深基坑支护结构 | |
CN100564700C (zh) | 格构式钢柱塔吊基础座的施工方法 | |
CN102162258B (zh) | 一种塔吊钢管混凝土高桩塔基结构及构建方法 | |
CN103938634B (zh) | 一种深基坑支护结构及施工方法 | |
CN109610874A (zh) | 既有厂房内部增建的地下室及其建筑方法 | |
CN102864780A (zh) | 一种基坑支护结构及其支护方法 | |
CN103103988A (zh) | 利用中心岛楼板水平支撑结构的基坑施工方法 | |
CN103114595A (zh) | 支护桩预留核心土双支墩斜内撑基坑支护方法及装置 | |
CN205975658U (zh) | 钢平台塔吊基础 | |
CN104294769A (zh) | 一种补桩与增大台帽组合加固已建桥台结构及施工方法 | |
CN105113514B (zh) | 以地下连续墙作为竖向悬臂支点的基坑围护体系及施工方法 | |
CN209923935U (zh) | 一种上软下硬地层中同位组合桩墙支护结构 | |
CN216041201U (zh) | 一种先撑后挖双层斜向支撑基坑围护体系 | |
CN209585054U (zh) | 一种用于基坑抢险快速应急斜撑 | |
CN113417300B (zh) | 边坡支护系统及其施工方法 | |
CN103215965A (zh) | 层板式高桩承台塔吊基础结构及施工方法 | |
CN204590059U (zh) | 一种复合式塔吊基础结构 | |
CN109577322A (zh) | 一种用于土体内部既有桩基接桩的施工装置 | |
CN203768914U (zh) | 一种用于基坑围护的斜向支撑桩结构 | |
CN204097889U (zh) | 一种补桩与增大台帽组合加固已建桥台结构 | |
CN212052780U (zh) | 一种斜支式深基坑支护结构 | |
CN209211459U (zh) | 一种深埋pba地铁车站围护边桩 | |
CN203625911U (zh) | 一种深基坑内设坑中坑城门洞式出土施工结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160210 Termination date: 20170824 |
|
CF01 | Termination of patent right due to non-payment of annual fee |