CN203729330U - 地铁车站盖挖逆筑法型钢柱的定位架 - Google Patents

地铁车站盖挖逆筑法型钢柱的定位架 Download PDF

Info

Publication number
CN203729330U
CN203729330U CN201320865471.XU CN201320865471U CN203729330U CN 203729330 U CN203729330 U CN 203729330U CN 201320865471 U CN201320865471 U CN 201320865471U CN 203729330 U CN203729330 U CN 203729330U
Authority
CN
China
Prior art keywords
steel column
section steel
locating rack
positioning frame
chassis
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201320865471.XU
Other languages
English (en)
Inventor
曾伟
杨铭
胡勇
应雄
第五亚东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fifth Engineering Co Ltd of CTCE Group
Original Assignee
Fifth Engineering Co Ltd of CTCE Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fifth Engineering Co Ltd of CTCE Group filed Critical Fifth Engineering Co Ltd of CTCE Group
Priority to CN201320865471.XU priority Critical patent/CN203729330U/zh
Application granted granted Critical
Publication of CN203729330U publication Critical patent/CN203729330U/zh
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

一种地铁车站盖挖逆筑法型钢柱的定位架,包括四个调节千斤顶,调节千斤顶上安装底盘调整平台,所述千斤顶和底盘调整平台之间通过焊接或螺栓连成整体;在所述底盘调整平台上通过螺栓连接定位架,定位架的顶、底面中间留设型钢柱下放孔洞;定位架顶面上设置槽钢横担梁,和型钢柱通过螺栓连接并固定型钢柱,型钢柱下面设有接长节;定位架的顶、底面各设有四个调节螺杆,调整定位架孔洞尺寸大小,保证孔洞尺寸和型钢柱尺寸相吻合并且保证二者中心线重合。从而改善传统结构立柱定位和安装施工设备复杂、定位技术要求高的难题,并且具有施工时间短,无危险、成本低的优点。

Description

地铁车站盖挖逆筑法型钢柱的定位架
技术领域
本实用新型涉及地铁车站盖挖逆筑法型钢柱的定位架。
背景技术
随着我国城市地铁工程的快速发展及建设,地铁车站采用盖挖逆筑法以其不影响地面交通、安全可靠的特点应用越来越广泛。而盖挖逆筑法要求将结构立柱的预先插打,在基坑开挖之前施工完,结构立柱一般有钢管柱和型钢柱两种。施工期间,结构立柱必须严格按设计位置垂直插入,规范要求平面位置允许误差±25mm,垂直度3‰,精度要求高。否则无法满足立柱平面位置要求,无法保证和车站纵梁连接,其平面位置和倾斜度控制是施工的关键技术。
目前的结构立柱定位和安装一般采用人工挖孔桩或钢护筒跟进到桩底,然后人工在桩底设置定位针(锥),并在地面设置定位架,利用桩底的定位针(锥)和地面的定位架双重装置来定位安装钢管柱或型钢柱。施工设备复杂,技术要求高,人工挖孔施工时间长,危险性较大,钢护筒不能重复利用,成本费用高。
实用新型内容
 本实用新型是为避免上述现有技术所存在的不足之处,提供一种地铁车站盖挖逆筑法型钢柱的定位架,以改善传统结构立柱定位和安装施工设备复杂、定位技术要求高、施工时间长、危险性较大、成本费用高的问题。
本实用新型为了实现上述目的而采取的技术方案,本装置包括四个调节千斤顶,调节千斤顶上安装底盘调整平台,所述千斤顶和底盘调整平台之间通过焊接或螺栓连成整体;在所述底盘调整平台上通过螺栓连接定位架,定位架的顶、底面中间留设型钢柱下放孔洞;定位架顶面上设置槽钢横担梁,和型钢柱通过螺栓连接并固定型钢柱,型钢柱下面设有接长节;定位架的顶、底面各设有四个调节螺杆,调整定位架孔洞尺寸大小,保证孔洞尺寸和型钢柱尺寸相吻合并且保证二者中心线重合。
与已有技术相比,本实用新型有益效果体现在:
1、本实用新型利用制作定位架,有效避免了传统结构立柱定位和安装施工设备复杂、定位技术要求高、施工时间长、危险性较大、成本费用高的问题,并且具有良好的结构稳定性,定位准确,定位精度满足要求,定位架可重复利用,周转方便,减少了一次投入,经济效益明显;
2、本实用新型结构设计及周转定位简单方便,所用材料均为施工现场易得的钢板、型钢和螺杆,多模具组合成整体,定位准确,施工速度快,能有效的缩短施工周期,时间效益显著。
附图说明
图1为本实用新型结构示意图;
图2为本实用新型俯视结构示意图。
图中标号:1千斤顶;2底盘调整平台;3定位架;4槽钢横担梁;5调节螺杆;6型钢柱
具体实施方式
实施例,如图1所示,包括四个调节千斤顶1,调节千斤顶1上安装底盘调整平台2,所述千斤顶1和底盘调整平台之间通过焊接或螺栓连成整体;在所述底盘调整平台2上通过螺栓连接定位架3,定位架3的顶、底面中间留设型钢柱下放孔洞;定位架3顶面上设置槽钢横担梁4,和型钢柱6通过螺栓连接并固定型钢柱6,型钢柱6下面设有接长节6a;定位架3的顶、底面各设有四个调节螺杆5,调整定位架3孔洞尺寸大小,保证孔洞尺寸和型钢柱6尺寸相吻合并且保证二者中心线重合,沿四个调节螺杆5形成的空间下放入钻孔桩孔内,实现地铁车站盖挖逆筑法型钢柱6的自动定位下放功能,型钢柱6吊装下放采用吊车配合实现。
参见图1,本实施例地铁车站盖挖逆筑法型钢柱定位架定位方法按如下过程施工:
a、制作型钢柱定位架
根据型钢柱钻孔桩径大小设计定位架尺寸,将四台千斤顶1和底盘调整平台2连接或焊接成整体,然后将中间开孔的定位架3搁置在底盘调整平台2上,并二者中心对齐,采用螺栓连接牢固。定位架由四根立柱和四面连接钢板及上、下面钢板焊接成箱体形状,其上、下面中间开孔,孔洞尺寸大于型钢柱尺寸。调节千斤顶1可实现定位架3的水平。定位架底、顶板处的十字中心线上各安装四个调节螺杆5,与定位架焊接固定,调节螺杆端头为钢板,作用是导向型钢柱6下放。
在定位架3上设置两根槽钢横担梁4,每根梁上钻4个φ20孔,对应型钢柱6位置同样也钻四个φ20孔,通过φ20螺栓将槽钢横担梁4和型钢柱6连接,将型钢柱6临时搁置在定位架3上。
b、型钢柱基础钻孔和定位架安装就位
根据设计图纸施工型钢柱钻孔桩基础,浇灌基础砼后,立即测量出定位架底部四个千斤顶1的位置,吊装千斤顶1、底盘调整平台2和定位架3就位,通过千斤顶1和设计位置中心重合保证定位架3中心和型钢柱6中心重合,通过调整千斤顶1高低保证定位架3水平满足设计和规范要求。
C、吊放型钢柱
用吊车将加工成型的型钢柱分段吊放入孔:伸缩调整定位架3上、下面的八个调节螺杆5,使其十字中心和型钢柱6中心对准,同时孔洞尺寸比型钢柱6略大1cm,保证型钢柱6顺沿着四个调节螺杆5形成的空间下放。
型钢柱6接长时在定位架3上设置两根槽钢横担梁4,通过φ20螺栓将槽钢横担梁4和型钢柱6连接,将型钢柱6临时搁置在定位架3上,用吊车将另一根型钢柱6吊装连接成整体后,再松开槽钢横担梁4将型钢柱6继续下放,反复接长,直至型钢柱6下放满足设计要求。完毕后用吊车整体吊起千斤顶1、底盘调整平台2和定位架3至安全地带,下一次使用。
具体实施中,千斤顶1采用四台10t液压式手动千斤顶,底盘调整平台2采用[20槽钢和10mm钢板焊接成型,定位架3采用四根200×200方钢立柱和钢板组合焊接成箱形,槽钢横担梁4采用20槽钢,调节螺杆5采用φ48螺杆,型钢柱6为钢板组合十字形柱。

Claims (1)

1.一种地铁车站盖挖逆筑法型钢柱的定位架,其特征在于,包括四个调节千斤顶(1),调节千斤顶(1)上安装底盘调整平台(2),所述千斤顶(1)和底盘调整平台之间通过焊接或螺栓连成整体;在所述底盘调整平台(2)上通过螺栓连接定位架(3),定位架(3)的顶、底面中间留设型钢柱下放孔洞;定位架(3)顶面上设置槽钢横担梁(4),和型钢柱(6)通过螺栓连接并固定型钢柱(6),型钢柱(6)下面设有接长节(6a);定位架(3)的顶、底面各设有四个调节螺杆(5),调整定位架(3)孔洞尺寸大小,保证孔洞尺寸和型钢柱(6)尺寸相吻合并且保证二者中心线重合。
CN201320865471.XU 2013-12-26 2013-12-26 地铁车站盖挖逆筑法型钢柱的定位架 Expired - Lifetime CN203729330U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320865471.XU CN203729330U (zh) 2013-12-26 2013-12-26 地铁车站盖挖逆筑法型钢柱的定位架

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320865471.XU CN203729330U (zh) 2013-12-26 2013-12-26 地铁车站盖挖逆筑法型钢柱的定位架

Publications (1)

Publication Number Publication Date
CN203729330U true CN203729330U (zh) 2014-07-23

Family

ID=51199415

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320865471.XU Expired - Lifetime CN203729330U (zh) 2013-12-26 2013-12-26 地铁车站盖挖逆筑法型钢柱的定位架

Country Status (1)

Country Link
CN (1) CN203729330U (zh)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104328799A (zh) * 2014-11-17 2015-02-04 中建交通建设集团有限公司 一种盖挖逆作法地铁车站钢管柱精确定位方法
CN105297731A (zh) * 2015-10-09 2016-02-03 中铁二局集团有限公司 一种逆作法钢立柱定位装置以及定位方法
CN110984612A (zh) * 2019-12-04 2020-04-10 中建二局第一建筑工程有限公司 钢柱校正及固定结构
CN113247751A (zh) * 2021-06-10 2021-08-13 上海宝冶集团有限公司 一种盖挖法施工中的钢构件吊装方法及吊装装置
CN113279428A (zh) * 2021-06-09 2021-08-20 中铁四局集团第五工程有限公司 盖挖逆作条件下半悬挂预应力混凝土墙行车道的施工方法
CN113585271A (zh) * 2021-07-26 2021-11-02 中铁一局集团(广州)建设工程有限公司 一种盖挖地排架逆作法格构砼柱安装结构及其施工方法
CN114658003A (zh) * 2022-04-08 2022-06-24 中铁第五勘察设计院集团有限公司 铁路高低错台加固系统及施工方法

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104328799A (zh) * 2014-11-17 2015-02-04 中建交通建设集团有限公司 一种盖挖逆作法地铁车站钢管柱精确定位方法
CN104328799B (zh) * 2014-11-17 2016-04-27 中建交通建设集团有限公司 一种盖挖逆作法地铁车站钢管柱精确定位方法
CN105297731A (zh) * 2015-10-09 2016-02-03 中铁二局集团有限公司 一种逆作法钢立柱定位装置以及定位方法
CN105297731B (zh) * 2015-10-09 2017-04-12 中铁二局集团有限公司 一种逆作法钢立柱定位装置以及定位方法
CN110984612A (zh) * 2019-12-04 2020-04-10 中建二局第一建筑工程有限公司 钢柱校正及固定结构
CN113279428A (zh) * 2021-06-09 2021-08-20 中铁四局集团第五工程有限公司 盖挖逆作条件下半悬挂预应力混凝土墙行车道的施工方法
CN113247751A (zh) * 2021-06-10 2021-08-13 上海宝冶集团有限公司 一种盖挖法施工中的钢构件吊装方法及吊装装置
CN113585271A (zh) * 2021-07-26 2021-11-02 中铁一局集团(广州)建设工程有限公司 一种盖挖地排架逆作法格构砼柱安装结构及其施工方法
CN114658003A (zh) * 2022-04-08 2022-06-24 中铁第五勘察设计院集团有限公司 铁路高低错台加固系统及施工方法
CN114658003B (zh) * 2022-04-08 2023-07-21 中铁第五勘察设计院集团有限公司 铁路高低错台加固系统及施工方法

Similar Documents

Publication Publication Date Title
CN203729330U (zh) 地铁车站盖挖逆筑法型钢柱的定位架
WO2019128155A1 (zh) 沉井施工结构及其施工方法
CN109487822B (zh) 逆作法施工钢管柱安装调整方法及控制装置
CN204040035U (zh) 一种钢护筒的定位导向结构
CN203583497U (zh) 一种逆作钢管柱垂直度校正装置
CN205712137U (zh) 基坑支护结构
CN106759350A (zh) 一种深基坑围护竖向格构柱定位转向控制系统及使用方法
CN203546728U (zh) 一种改进后逆作钢管柱的安装固定装置
CN105569054A (zh) 控制低于地面格构柱方向与标高的装置及方法
CN111456009A (zh) 一种打桩施工中的工程桩导向装置及其使用方法
CN103669432A (zh) 一种煤矿采动区输电铁塔纠偏顶升装置
CN205917601U (zh) 一种桥梁拱肋的整体提升装置
CN206637189U (zh) 一种大型塔式起重机基础预埋螺栓固定装置
CN211646406U (zh) 钢管柱插入精确定位结构
CN105297731A (zh) 一种逆作法钢立柱定位装置以及定位方法
CN204298830U (zh) 基于地下基坑内格构柱平面及高程调控装置
CN206346199U (zh) 一种深井筒内安放格构柱的导向支架
CN106403996A (zh) 用于精密工程测量的强制归心观测标桩的制作方法
CN202450544U (zh) 一种深基坑内无承台塔吊基础
CN203583501U (zh) 一种抵抗岩体滑动的深层抗剪装置
CN203531010U (zh) 热力管沟跨越预留地铁车站的承托平台
CN206591451U (zh) 一种用于竖向钢筋安装的定位装置
CN214116620U (zh) 一种用于永久双钢管柱精确定位的可调节支架
CN205228789U (zh) 一种模拟黄土隧道锁脚锚管端头受力的加载装置
CN210827478U (zh) 深基坑地下结构逆作法钢管柱定位装置

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20140723