CN101358454A - 220kv耐张原杆位更换角钢塔基础的施工方法 - Google Patents

220kv耐张原杆位更换角钢塔基础的施工方法 Download PDF

Info

Publication number
CN101358454A
CN101358454A CNA200810139313XA CN200810139313A CN101358454A CN 101358454 A CN101358454 A CN 101358454A CN A200810139313X A CNA200810139313X A CN A200810139313XA CN 200810139313 A CN200810139313 A CN 200810139313A CN 101358454 A CN101358454 A CN 101358454A
Authority
CN
China
Prior art keywords
foundation
tower
steel tower
new
cement pole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA200810139313XA
Other languages
English (en)
Other versions
CN101358454B (zh
Inventor
孙学锋
赵延华
颜炳辉
韩进新
周勇
钱冰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Zibo Power Supply Co of State Grid Shandong Electric Power Co Ltd
Original Assignee
ZIBO POWER SUPPLY Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZIBO POWER SUPPLY Co filed Critical ZIBO POWER SUPPLY Co
Priority to CN200810139313XA priority Critical patent/CN101358454B/zh
Publication of CN101358454A publication Critical patent/CN101358454A/zh
Application granted granted Critical
Publication of CN101358454B publication Critical patent/CN101358454B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Foundations (AREA)

Abstract

本发明220KV耐张原杆位更换角钢塔基础的施工方法,包括如下步骤:(1)根据耐张水泥杆位置,运用中心桩辅助线延伸原理在原有线路杆位不变的情况下,确定新塔的中心桩辅助线,根据使用的塔型确定新角钢塔4个塔的基础位置和中心;(2)在耐张水泥杆地面打临时平衡拉线桩,采用临时拉线加固耐张水泥杆;(3)根据确定的新角钢塔4个塔的基础位置开挖和浇筑新塔基础。本发明简单、易操作、容易掌握;施工方法安全、基础开挖可靠,将采取原有线路杆位不变,确保原水泥杆的基础稳定性不变,确保线路的供电可靠性,最大限度的减少因更换钢塔,基础施工和现浇的混凝土养护期长而带来的线路长时间停电改造的问题。

Description

220KV耐张原杆位更换角钢塔基础的施工方法
技术领域
本发明属于电力工程输电线路大修、改造,采用原线路杆塔位置和走径杆塔基础施工各种直线、耐张角钢塔型基础施工的方法。
背景技术
现有的电网杆塔由于线路杆塔强度和承担导线截面的机械力和各种对地、交叉跨越等技术要求的变化,随着所在地国民经济的发展和城乡建设的不断发展,以及社会经济的发展,杆塔的各项性能已经不能适应安全、经济和正常的运行要求。电网作为国民经济的基础行业,首先电力要发展。电网中主要设备是由输电线路组成的,线路又主要是由杆塔组成的。不同的杆塔,担负着不同作用。每当线路杆塔的位置,与环境、交叉跨越及电量需求增加发生变化时,需要更换导线界面扩容;城乡规划统一建设要求需要改造线路时,经常要对线路改造杆塔进行改造;经常发生因线路走径、通道困难,又需要杆塔满足《输电线路运行规程》的各种距离的技术要求。在电网的改造中,经常发生要在一条线路原杆塔中心桩不变的情况下,改造杆塔位置,杆塔要满足机械强度和高度等要对原杆塔进行改造。基础作为杆塔的关键技术核心。在原杆塔中心桩不变的情况下,需要将原水泥杆更改为角钢塔基础。
原杆塔中心桩不变首先要满足原水泥杆的基础受力不变,确保原水泥杆的基础稳定性不变。同时新角钢塔在原杆塔中心桩的位置不变,才能保证新的尺寸符合设计要求,保证满足新塔的开挖基础,图纸要求的尺寸,满足施工图规定的铁塔基础,尤其是转角杆塔,要确保受拉基础和受压基础的不同要求。
原杆塔改造技术按照常规方式,杆塔需要占用新的土地,旧的杆塔进行拆除,施工过程也要占用土地,同时拆除的杆塔也要造成建筑垃圾,原位置土地无法修复,加上施工过程需要占用临时性场地,因此,需要增加改造工程中的成本。
发明内容
本发明所要解决的技术问题是提供一种220KV耐张原杆位更换角钢塔基础的施工方法,不改变原有线路的通道,在线路运行带电的情况下,浇筑角钢塔基础,最大限度的减少因更换角钢塔,基础施工和现浇的混凝土养护期长,带来线路长时间停电改造的问题。
本发明220KV耐张原杆位更换角钢塔基础的施工方法,其特征在于包括如下步骤:
(1)根据耐张水泥杆位置,运用中心桩辅助线延伸原理在原有线路杆位不变的情况下,确定新塔的中心桩辅助线,根据使用的塔型确定新角钢塔4个塔的基础位置和中心;
(2)在耐张水泥杆地面打临时平衡拉线桩,采用临时拉线加固耐张水泥杆;
(3)根据确定的新角钢塔4个塔的基础位置开挖和浇筑新塔基础。
本发明的方法是采取原有线路杆位不变,确保原水泥杆的基础稳定性不变。施工方法简单可靠,作为步骤(1),根据本行业的标准设计以及常规知识,根据线路的走向便确定了线路的转角,从而确定了采用的塔型。塔型的确定,也就确定了新塔基础的位置以及基础的开挖尺寸和浇筑要求。步骤(2)为防止新基础开挖时造成原水泥杆的基础回填层塌落改变水泥杆的挠度和弯矩力,根据受力平衡原则,采用水泥杆上导、地线拉线反向、垂直平衡技术加临时拉线。步骤(3)所述的基础开挖和浇筑基础,均按照常规方法和要求进行。基础浇筑好后,然后更换线路。
本发明的优点:
(1)不改变原有线路的通道,解决了征地困难和理赔费用高,特殊困难位置无法基础施工的问题。
(2)简单、易操作、容易掌握;施工方法安全、基础开挖可靠,将采取原有线路杆位不变,确保原水泥杆的基础稳定性不变。
(3)解决了因计划停电和施工期矛盾,基础施工由于现浇混凝土养护期长,而带来的计划不周问题,可以提前介入基础施工。
(4)原位置施工,机械、人员、材料、管理、标准化建设,利于施工管理和安全管理。
(5)不改变运行线路的杆塔的运行机械状况,确保线路的供电可靠性,最大限度的减少因更换钢塔,基础施工和现浇的混凝土养护期长,带来线路长时间停电改造。
附图说明
图1为本发明的工作原理平面示意图;
图2为新角钢塔基础位置示意图。
图中:1耐张水泥杆塔中心桩位置 2耐张水泥杆位置 3新角钢塔基础 4上风拉线 5反向拉线 6八字拉线 7导线
具体实施方式
如图2,以此为例说明新角钢塔基础的有关标注尺寸。图2中A、B分别为基础的间距,L为对角线距离,θ/ζ为线路实际转角。
如图1,本发明220KV耐张原杆位更换角钢塔基础的施工方法,包括如下步骤:
(1)根据耐张水泥杆位置2,运用中心桩辅助线延伸原理在原有线路杆位不变的情况下,确定新角钢塔的中心桩辅助线,按照行业标准设计,根据导线7的走向,确定导线的转角(θ/ζ),从而确定使用的塔型,根据使用的塔型确定新角钢塔4个塔的基础3的位置和中心。
(2)在耐张水泥杆地面打临时平衡拉线桩,采用临时拉线加固耐张水泥杆。临时拉线是在导线7以及上风拉线4的反方向上,包括反向拉线5和八字拉线6,使各导线以及地线的受力平衡。
(3)根据确定的新角钢塔4个塔的基础位置按照常规方式和技术要求开挖和浇筑新塔基础。根据导线的转角不同,四个角钢塔基础可以分为受拉基础和受压基础,图1左侧的两个基础为受拉基础,右侧的两个基础为受压基础。

Claims (1)

1、一种220KV耐张原杆位更换角钢塔基础的施工方法,其特征在于包括如下步骤:
(1)根据耐张水泥杆位置,运用中心桩辅助线延伸原理在原有线路杆位不变的情况下,确定新塔的中心桩辅助线,根据使用的塔型确定新角钢塔4个塔的基础位置和中心;
(2)在耐张水泥杆地面打临时平衡拉线桩,采用临时拉线加固耐张水泥杆;
(3)根据确定的新角钢塔4个塔的基础位置开挖和浇筑新塔基础。
CN200810139313XA 2008-08-25 2008-08-25 220kv耐张原杆位更换角钢塔基础的施工方法 Active CN101358454B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200810139313XA CN101358454B (zh) 2008-08-25 2008-08-25 220kv耐张原杆位更换角钢塔基础的施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200810139313XA CN101358454B (zh) 2008-08-25 2008-08-25 220kv耐张原杆位更换角钢塔基础的施工方法

Publications (2)

Publication Number Publication Date
CN101358454A true CN101358454A (zh) 2009-02-04
CN101358454B CN101358454B (zh) 2010-11-17

Family

ID=40331035

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200810139313XA Active CN101358454B (zh) 2008-08-25 2008-08-25 220kv耐张原杆位更换角钢塔基础的施工方法

Country Status (1)

Country Link
CN (1) CN101358454B (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102021917A (zh) * 2010-11-03 2011-04-20 河南省电力公司洛阳供电公司 一种送电线路π型杆基础施工的方法
CN103452128A (zh) * 2013-08-06 2013-12-18 安徽华电工程咨询设计有限公司 一种采用钢管接腿输电线路杆塔基面抬升方法
CN108643216A (zh) * 2018-04-27 2018-10-12 国家电网公司 更换老旧隔离开关时基础不停电施工方法

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102021917A (zh) * 2010-11-03 2011-04-20 河南省电力公司洛阳供电公司 一种送电线路π型杆基础施工的方法
CN102021917B (zh) * 2010-11-03 2017-01-25 河南省电力公司洛阳供电公司 一种送电线路π型杆基础施工的方法
CN103452128A (zh) * 2013-08-06 2013-12-18 安徽华电工程咨询设计有限公司 一种采用钢管接腿输电线路杆塔基面抬升方法
CN108643216A (zh) * 2018-04-27 2018-10-12 国家电网公司 更换老旧隔离开关时基础不停电施工方法

Also Published As

Publication number Publication date
CN101358454B (zh) 2010-11-17

Similar Documents

Publication Publication Date Title
CN109235499B (zh) 一种明挖地下建筑结构装配式施工方法
CN104294753B (zh) 一种桥梁预制空心墩柱连接结构及施工工法
CN202559384U (zh) 一种预制装配式顶管工作井
CN105256812B (zh) 基坑预制装配式混凝土支撑结构及其施工方法
CN104695715A (zh) 一种屋面张弦梁结构施工方法
CN105863042A (zh) 一种全钢结构建筑及其施工方法
CN202031108U (zh) 后浇带型装配式顶管工作井
CN106049679A (zh) 一种超高层型钢混凝土框架核心筒结构体系及施工方法
CN106351258A (zh) 一种全预制拼装钢混凝土组合地下综合管廊
CN101358454B (zh) 220kv耐张原杆位更换角钢塔基础的施工方法
EP4079970A1 (en) Concrete foundation for a wind turbine tower and method for installing same
CN206070724U (zh) 采用y型柱与抗拔桩结合设计大跨度深埋地铁车站的结构
CN104727339A (zh) 电力设备基础两步式施工方法
CN112878354A (zh) 用于陆上风电机组的梁板装配式预应力混凝土基础
CN112575789A (zh) 斜拉式空间桁架基坑内支撑体系
CN203782738U (zh) 预制式通信基站基础
CN207934054U (zh) 一种预制装配式筏板基础
CN112575771B (zh) 逆作地下工程钢砼以桩兼柱竖向支承体系的绿色建造方法
CN205046569U (zh) 基于双波纹钢筒成型的环形风电基础结构
CN112343074A (zh) 一种拼接预制根键式掏挖类基础
CN203007973U (zh) 组合式塔吊基础
CN219973273U (zh) 一种可预制装配的带肋梁式风机扩展基础
CN102493495B (zh) 高压输电铁塔加固方法和结构
CN202164622U (zh) 串接式塔机基础
CN101824823B (zh) 具有超短地下墙的围护结构施工方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: STATE ELECTRIC NET CROP.

Free format text: FORMER OWNER: ZIBO POWER SUPPLY COMPANY OF SHANDONG ELECTRIC POWER CORPORATION

Effective date: 20130718

Owner name: ZIBO POWER SUPPLY COMPANY OF SHANDONG ELECTRIC POW

Effective date: 20130718

C41 Transfer of patent application or patent right or utility model
C56 Change in the name or address of the patentee

Owner name: ZIBO POWER SUPPLY COMPANY OF SHANDONG ELECTRIC POW

Free format text: FORMER NAME: ZIBO POWER SUPPLY COMPANY

COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 255032 ZIBO, SHANDONG PROVINCE TO: 100031 XICHENG, BEIJING

CP01 Change in the name or title of a patent holder

Address after: 100031 Xicheng District, Chang'an Avenue, No. 86,

Patentee after: State Grid Corporation of China

Patentee after: STATE GRID ZIBO POWER SUPPLY COMPANY OF SHANDONG PROVINCE

Address before: 100031 Xicheng District, Chang'an Avenue, No. 86,

Patentee before: State Grid Corporation of China

Patentee before: Zibo Power Supply Company of Shandong Electric Power Corp.

Address after: 255032 No. 61 West Village Road, Zhangdian District, Shandong, Zibo

Patentee after: Zibo Power Supply Company of Shandong Electric Power Corp.

Address before: 255032 No. 61 West Village Road, Zhangdian District, Shandong, Zibo

Patentee before: Zibo Power Supply Co.,Ltd.

TR01 Transfer of patent right

Effective date of registration: 20130718

Address after: 100031 Xicheng District, Chang'an Avenue, No. 86,

Patentee after: State Grid Corporation of China

Patentee after: Zibo Power Supply Company of Shandong Electric Power Corp.

Address before: 255032 No. 61 West Village Road, Zhangdian District, Shandong, Zibo

Patentee before: Zibo Power Supply Company of Shandong Electric Power Corp.