CN112878354A - 用于陆上风电机组的梁板装配式预应力混凝土基础 - Google Patents
用于陆上风电机组的梁板装配式预应力混凝土基础 Download PDFInfo
- Publication number
- CN112878354A CN112878354A CN202110201005.0A CN202110201005A CN112878354A CN 112878354 A CN112878354 A CN 112878354A CN 202110201005 A CN202110201005 A CN 202110201005A CN 112878354 A CN112878354 A CN 112878354A
- Authority
- CN
- China
- Prior art keywords
- bottom plate
- octagonal
- prefab
- hollow
- tensioning
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/32—Foundations for special purposes
- E02D27/42—Foundations for poles, masts or chimneys
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/32—Foundations for special purposes
- E02D27/44—Foundations for machines, engines or ordnance
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F03—MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
- F03D—WIND MOTORS
- F03D13/00—Assembly, mounting or commissioning of wind motors; Arrangements specially adapted for transporting wind motor components
- F03D13/20—Arrangements for mounting or supporting wind motors; Masts or towers for wind motors
- F03D13/22—Foundations specially adapted for wind motors
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/70—Wind energy
- Y02E10/72—Wind turbines with rotation axis in wind direction
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/70—Wind energy
- Y02E10/728—Onshore wind turbines
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Structural Engineering (AREA)
- Sustainable Development (AREA)
- Sustainable Energy (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Mechanical Engineering (AREA)
- Wind Motors (AREA)
Abstract
Description
Claims (5)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110201005.0A CN112878354A (zh) | 2021-02-23 | 2021-02-23 | 用于陆上风电机组的梁板装配式预应力混凝土基础 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110201005.0A CN112878354A (zh) | 2021-02-23 | 2021-02-23 | 用于陆上风电机组的梁板装配式预应力混凝土基础 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN112878354A true CN112878354A (zh) | 2021-06-01 |
Family
ID=76053758
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202110201005.0A Pending CN112878354A (zh) | 2021-02-23 | 2021-02-23 | 用于陆上风电机组的梁板装配式预应力混凝土基础 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN112878354A (zh) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114408764A (zh) * | 2022-04-02 | 2022-04-29 | 中国电建集团华东勘测设计研究院有限公司 | 一种风电混凝土塔筒体外钢绞线提升装置及提升方法 |
CN115305946A (zh) * | 2022-04-27 | 2022-11-08 | 四川电力设计咨询有限责任公司 | 山区架空肋梁风机基础 |
CN115897649A (zh) * | 2022-11-25 | 2023-04-04 | 国网福建省电力有限公司经济技术研究院 | 底盘及卡盘一体化电杆用抗倾覆装配式基础及施工方法 |
CN118390563A (zh) * | 2024-06-28 | 2024-07-26 | 浙江华东新能科技有限公司 | 梁板式桩基础结构及其施工方法 |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201671107U (zh) * | 2010-05-11 | 2010-12-15 | 徐州九鼎建设集团有限公司 | 预应力拼装箱型预制混凝土塔吊基础 |
CN103374924A (zh) * | 2012-04-18 | 2013-10-30 | 彭宝安 | 一种全对称预应力拼装式塔机基础 |
CN103899499A (zh) * | 2014-04-25 | 2014-07-02 | 湖南大学 | 一种风力发电机塔架 |
US9096985B1 (en) * | 2006-09-21 | 2015-08-04 | Ahmed Phuly | Foundation with slab, pedestal and ribs for columns and towers |
CN105544593A (zh) * | 2016-01-29 | 2016-05-04 | 惠宏工程技术(北京)有限公司 | 基础预制预应力梁板式风力发电塔基础 |
CN106013207A (zh) * | 2016-06-12 | 2016-10-12 | 武汉市创先专利技术服务有限公司 | 一种连接桩基础的全对称预应力拼装式塔机基础 |
CN106759434A (zh) * | 2016-12-05 | 2017-05-31 | 中国航空规划设计研究总院有限公司 | 一种井字形预制混凝土塔柱基础及其施工方法 |
CN108612124A (zh) * | 2018-05-30 | 2018-10-02 | 沈阳建筑大学 | 风电塔筒系统及其连接方法 |
EP3417115A1 (en) * | 2016-02-18 | 2018-12-26 | Holcim Technology Ltd. | Foundation for a wind mill |
CN210766856U (zh) * | 2019-09-09 | 2020-06-16 | 深圳国金电力新能设计院有限公司 | 预制拼接的中心筒及具有其的塔筒基础 |
-
2021
- 2021-02-23 CN CN202110201005.0A patent/CN112878354A/zh active Pending
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US9096985B1 (en) * | 2006-09-21 | 2015-08-04 | Ahmed Phuly | Foundation with slab, pedestal and ribs for columns and towers |
CN201671107U (zh) * | 2010-05-11 | 2010-12-15 | 徐州九鼎建设集团有限公司 | 预应力拼装箱型预制混凝土塔吊基础 |
CN103374924A (zh) * | 2012-04-18 | 2013-10-30 | 彭宝安 | 一种全对称预应力拼装式塔机基础 |
CN103899499A (zh) * | 2014-04-25 | 2014-07-02 | 湖南大学 | 一种风力发电机塔架 |
CN105544593A (zh) * | 2016-01-29 | 2016-05-04 | 惠宏工程技术(北京)有限公司 | 基础预制预应力梁板式风力发电塔基础 |
EP3417115A1 (en) * | 2016-02-18 | 2018-12-26 | Holcim Technology Ltd. | Foundation for a wind mill |
CN106013207A (zh) * | 2016-06-12 | 2016-10-12 | 武汉市创先专利技术服务有限公司 | 一种连接桩基础的全对称预应力拼装式塔机基础 |
CN106759434A (zh) * | 2016-12-05 | 2017-05-31 | 中国航空规划设计研究总院有限公司 | 一种井字形预制混凝土塔柱基础及其施工方法 |
CN108612124A (zh) * | 2018-05-30 | 2018-10-02 | 沈阳建筑大学 | 风电塔筒系统及其连接方法 |
CN210766856U (zh) * | 2019-09-09 | 2020-06-16 | 深圳国金电力新能设计院有限公司 | 预制拼接的中心筒及具有其的塔筒基础 |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114408764A (zh) * | 2022-04-02 | 2022-04-29 | 中国电建集团华东勘测设计研究院有限公司 | 一种风电混凝土塔筒体外钢绞线提升装置及提升方法 |
CN114408764B (zh) * | 2022-04-02 | 2022-07-12 | 中国电建集团华东勘测设计研究院有限公司 | 一种风电混凝土塔筒体外钢绞线提升装置及提升方法 |
CN115305946A (zh) * | 2022-04-27 | 2022-11-08 | 四川电力设计咨询有限责任公司 | 山区架空肋梁风机基础 |
CN115897649A (zh) * | 2022-11-25 | 2023-04-04 | 国网福建省电力有限公司经济技术研究院 | 底盘及卡盘一体化电杆用抗倾覆装配式基础及施工方法 |
CN118390563A (zh) * | 2024-06-28 | 2024-07-26 | 浙江华东新能科技有限公司 | 梁板式桩基础结构及其施工方法 |
CN118390563B (zh) * | 2024-06-28 | 2024-10-11 | 浙江华东新能科技有限公司 | 梁板式桩基础结构及其施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN112878354A (zh) | 用于陆上风电机组的梁板装配式预应力混凝土基础 | |
US10947747B2 (en) | Foundation with pedestal and ribs for towers | |
US20240018736A1 (en) | Foundation with pedestal and ribs for towers | |
US9938685B2 (en) | Beam and pile anchor foundation for towers | |
US9937635B2 (en) | Method of constructing a wind tower foundation | |
US8661752B2 (en) | Foundation with slab, pedestal and ribs for columns and towers | |
US20110061321A1 (en) | Fatigue reistant foundation system | |
CN205647362U (zh) | 大跨度预应力拉索光伏支架 | |
CN210031842U (zh) | 基于排桩、连系梁和对拉锚索的相临深基坑联合支护体系 | |
CN108265618B (zh) | 一种高架桥柱墩基础地下逆向增层施工方法 | |
CN112575789A (zh) | 斜拉式空间桁架基坑内支撑体系 | |
CN107476316B (zh) | 一种建筑基坑内外支撑结构及施工方法 | |
CN111335272B (zh) | 一种地锚张弦梁式泥石流格栅坝及其施工方法 | |
CN113417300A (zh) | 边坡支护系统及其施工方法 | |
CN112144548A (zh) | 一种半埋入式多功能框架支护结构及其施工方法 | |
CN112900480A (zh) | 一种用于陆上风电机组的装配式预应力混凝土基础 | |
WO2017011681A1 (en) | Beam and pile anchor foundation for towers | |
CN112031495A (zh) | 预制舱变电站拼装式钢结构基础及其施工拼接方法 | |
CN206655064U (zh) | 用于空中轨道系统的型钢支撑立柱及空中轨道系统 | |
CN111244825A (zh) | 一种跨路电缆铺设结构及其施工方法 | |
CN220225353U (zh) | 一种桩锚联合基坑支护结构 | |
CN221855584U (zh) | 一种输电水泥杆基础 | |
CN220868201U (zh) | 一种现浇式重力地牛结构 | |
CN113309145B (zh) | 一种用于大型建筑施工的穿楼板塔吊拆除方法 | |
CN210887283U (zh) | 平原低风速高混塔风机基础结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information |
Inventor after: Xu Shudong Inventor after: Hong Ming Chi Inventor after: Gao Shun Inventor after: Li Hongyou Inventor after: Liu Jinquan Inventor before: Hao Ertong Inventor before: Hong Ming Chi Inventor before: Gao Shun Inventor before: Li Hongyou Inventor before: Xu Shudong Inventor before: Liu Jinquan |
|
CB03 | Change of inventor or designer information | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20210601 |
|
RJ01 | Rejection of invention patent application after publication |