- CN112900480A CN112900480A CN202110200620.XA CN202110200620A CN112900480A CN 112900480 A CN112900480 A CN 112900480A CN 202110200620 A CN202110200620 A CN 202110200620A CN 112900480 A CN112900480 A CN 112900480A
- Authority
- CN
- China
- Prior art keywords
- bottom plate
- prestressed concrete
- rib
- concrete foundation
- roof beam
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/32—Foundations for special purposes
- E02D27/44—Foundations for machines, engines or ordnance
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F03—MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
- F03D—WIND MOTORS
- F03D13/00—Assembly, mounting or commissioning of wind motors; Arrangements specially adapted for transporting wind motor components
- F03D13/20—Arrangements for mounting or supporting wind motors; Masts or towers for wind motors
- F03D13/22—Foundations specially adapted for wind motors
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/70—Wind energy
- Y02E10/72—Wind turbines with rotation axis in wind direction
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/70—Wind energy
- Y02E10/728—Onshore wind turbines
Abstract
Description
Claims (6)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110200620.XA CN112900480A (zh) | 2021-02-23 | 2021-02-23 | 一种用于陆上风电机组的装配式预应力混凝土基础 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110200620.XA CN112900480A (zh) | 2021-02-23 | 2021-02-23 | 一种用于陆上风电机组的装配式预应力混凝土基础 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN112900480A true CN112900480A (zh) | 2021-06-04 |
Family
ID=76124351
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202110200620.XA Pending CN112900480A (zh) | 2021-02-23 | 2021-02-23 | 一种用于陆上风电机组的装配式预应力混凝土基础 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN112900480A (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113482860A (zh) * | 2021-08-27 | 2021-10-08 | 北京银泰建构预应力技术股份有限公司 | 一种用于风电机组的全装配式预应力混凝土塔基 |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201671107U (zh) * | 2010-05-11 | 2010-12-15 | 徐州九鼎建设集团有限公司 | 预应力拼装箱型预制混凝土塔吊基础 |
CN103215967A (zh) * | 2013-05-15 | 2013-07-24 | 北京中水恒信环境科技发展有限公司 | 预应力倒肋板以及预应力倒肋板的制作方法 |
US9096985B1 (en) * | 2006-09-21 | 2015-08-04 | Ahmed Phuly | Foundation with slab, pedestal and ribs for columns and towers |
CN106013207A (zh) * | 2016-06-12 | 2016-10-12 | 武汉市创先专利技术服务有限公司 | 一种连接桩基础的全对称预应力拼装式塔机基础 |
CN106759434A (zh) * | 2016-12-05 | 2017-05-31 | 中国航空规划设计研究总院有限公司 | 一种井字形预制混凝土塔柱基础及其施工方法 |
CN108612124A (zh) * | 2018-05-30 | 2018-10-02 | 沈阳建筑大学 | 风电塔筒系统及其连接方法 |
US20190119875A1 (en) * | 2017-10-25 | 2019-04-25 | Rute Foundation Systems, Inc. | Tower foundation with concrete box girder beams |
CN210031897U (zh) * | 2019-05-22 | 2020-02-07 | 北京天杉高科风电科技有限责任公司 | 风机基础及风力发电机组 |
CN111197319A (zh) * | 2020-02-27 | 2020-05-26 | 同济大学建筑设计研究院(集团)有限公司 | 一种风力发电塔多向预应力预制装配式梁板基础 |
CN210766856U (zh) * | 2019-09-09 | 2020-06-16 | 深圳国金电力新能设计院有限公司 | 预制拼接的中心筒及具有其的塔筒基础 |
-
2021
- 2021-02-23 CN CN202110200620.XA patent/CN112900480A/zh active Pending
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US9096985B1 (en) * | 2006-09-21 | 2015-08-04 | Ahmed Phuly | Foundation with slab, pedestal and ribs for columns and towers |
CN201671107U (zh) * | 2010-05-11 | 2010-12-15 | 徐州九鼎建设集团有限公司 | 预应力拼装箱型预制混凝土塔吊基础 |
CN103215967A (zh) * | 2013-05-15 | 2013-07-24 | 北京中水恒信环境科技发展有限公司 | 预应力倒肋板以及预应力倒肋板的制作方法 |
CN106013207A (zh) * | 2016-06-12 | 2016-10-12 | 武汉市创先专利技术服务有限公司 | 一种连接桩基础的全对称预应力拼装式塔机基础 |
CN106759434A (zh) * | 2016-12-05 | 2017-05-31 | 中国航空规划设计研究总院有限公司 | 一种井字形预制混凝土塔柱基础及其施工方法 |
US20190119875A1 (en) * | 2017-10-25 | 2019-04-25 | Rute Foundation Systems, Inc. | Tower foundation with concrete box girder beams |
CN108612124A (zh) * | 2018-05-30 | 2018-10-02 | 沈阳建筑大学 | 风电塔筒系统及其连接方法 |
CN210031897U (zh) * | 2019-05-22 | 2020-02-07 | 北京天杉高科风电科技有限责任公司 | 风机基础及风力发电机组 |
CN210766856U (zh) * | 2019-09-09 | 2020-06-16 | 深圳国金电力新能设计院有限公司 | 预制拼接的中心筒及具有其的塔筒基础 |
CN111197319A (zh) * | 2020-02-27 | 2020-05-26 | 同济大学建筑设计研究院(集团)有限公司 | 一种风力发电塔多向预应力预制装配式梁板基础 |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113482860A (zh) * | 2021-08-27 | 2021-10-08 | 北京银泰建构预应力技术股份有限公司 | 一种用于风电机组的全装配式预应力混凝土塔基 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN112096573B (zh) | 一种免灌浆干式预应力螺栓拼接分片预制装配式混塔 | |
JP2022509698A (ja) | 風力タービンタワー用の土台 | |
CN208965572U (zh) | 一种超大平面面积部分预应力混凝土沉井基础 | |
CN105179183A (zh) | 一种预应力混凝土风电塔架体系及其施工方法 | |
CN112177036A (zh) | 高度可调的模块化预应力风机基础及其施工方法 | |
CN102535525B (zh) | 一种利用抗浮锚杆支撑地下筏板上排筏板钢筋架的方法 | |
CN109098201A (zh) | 一种超大平面面积部分预应力混凝土沉井基础及其施工方法 | |
CN202194129U (zh) | 复合预应力挡土桩 | |
CN112878354A (zh) | 用于陆上风电机组的梁板装配式预应力混凝土基础 | |
CN201991009U (zh) | 深基坑灌注护坡桩加锚索支护体系 | |
CN112900480A (zh) | 一种用于陆上风电机组的装配式预应力混凝土基础 | |
CN107476316B (zh) | 一种建筑基坑内外支撑结构及施工方法 | |
CN201786045U (zh) | 钢梁与先张法预应力叠合梁相结合的房屋结构体系 | |
CN213392499U (zh) | 一种免灌浆干式预应力螺栓拼接分片预制装配式混塔 | |
CN111335272B (zh) | 一种地锚张弦梁式泥石流格栅坝及其施工方法 | |
CN206190458U (zh) | 全向预应力抗疲劳组合钢结构风塔 | |
CN102587329B (zh) | 一种土石坝拱型组合面板及其施工方法 | |
CN112575789A (zh) | 斜拉式空间桁架基坑内支撑体系 | |
Huang et al. | China Highway Canyon Bridges | |
CN112144548A (zh) | 一种半埋入式多功能框架支护结构及其施工方法 | |
CN208219689U (zh) | 预制构件混凝土塔架风机基础结构 | |
CN109653191A (zh) | 装配式预应力地下连续墙结构及其施工方法 | |
CN215408678U (zh) | 一种拱形隧道复合衬砌结构 | |
CN214574094U (zh) | 一种装配式预应力沉井基础 | |
CN213390202U (zh) | 一种组合式多边形筒状结构风机基础 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information |
Inventor after: Xu Shudong Inventor after: Hong Ming Chi Inventor after: Gao Shun Inventor after: Li Hongyou Inventor after: Liu Jinquan Inventor before: Hao Ertong Inventor before: Hong Ming Chi Inventor before: Gao Shun Inventor before: Li Hongyou Inventor before: Xu Shudong Inventor before: Liu Jinquan |
|