CN206190458U - 全向预应力抗疲劳组合钢结构风塔 - Google Patents
全向预应力抗疲劳组合钢结构风塔 Download PDFInfo
- Publication number
- CN206190458U CN206190458U CN201621215162.8U CN201621215162U CN206190458U CN 206190458 U CN206190458 U CN 206190458U CN 201621215162 U CN201621215162 U CN 201621215162U CN 206190458 U CN206190458 U CN 206190458U
- Authority
- CN
- China
- Prior art keywords
- king
- prestressing force
- post
- tower
- steel construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/70—Wind energy
- Y02E10/72—Wind turbines with rotation axis in wind direction
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/70—Wind energy
- Y02E10/728—Onshore wind turbines
Abstract
本实用新型公开了一种全向预应力抗疲劳组合钢结构风塔,所述全向预应力抗疲劳组合钢结构风塔,它包括钢结构塔筒、混凝土过渡段、格构式塔架和基础部,所述钢结构塔筒固定于混凝土过渡段内,所述混凝土过渡段位于格构式塔架顶部,所述格构式塔架安装在基础部上,格构式塔架包括塔柱、预应力双钢绞线、斜杆、横杆、横隔,所述预应力双钢绞线从塔柱底部贯穿至顶部,底端锚固于基础部内,顶端张拉固定于塔柱顶部,所述斜杆交叉固定于塔柱上,所述横杆和横隔间隔固定于塔柱上,结构合理,受力可靠,全面施加预应力,疲劳寿命延长,用料少,施工方便。
Description
技术领域
本实用新型属于风力发电塔技术领域,具体涉及一种全向预应力抗疲劳组合钢结构风塔。
背景技术
随着我国风力发电项目的增多,一些风力资源较好的风场已经逐步被开发完毕,为了更好的利用较高处的风力资源,风力发电塔逐渐向高塔方向发展。理论研究证明,当风力发电塔高度超过100米以上时,格构式塔架与塔筒组合形式的结构优势凸显,这种结构形式可以大幅节约材料、解决运输费用昂贵等问题,进而节约工程造价。然而,由于风力发电塔结构存在疲劳问题,对于焊接结构,疲劳允许应力幅较低,材料的利用率低。
发明内容
为了克服现有技术领域存在的上述技术问题,提高材料的利用率,本实用新型的目的在于,提供一种全向预应力抗疲劳组合钢结构风塔,延长疲劳寿命,施工方便。
本实用新型提供的全向预应力抗疲劳组合钢结构风塔,它包括钢结构塔筒、混凝土过渡段、格构式塔架和基础部,所述钢结构塔筒固定于混凝土过渡段内,所述混凝土过渡段位于格构式塔架顶部,所述格构式塔架安装在基础部上,格构式塔架包括塔柱、预应力双钢绞线、斜杆、横杆、横隔,所述预应力双钢绞线从塔柱底部贯穿至顶部,底端锚固于基础部内,顶端张拉固定于塔柱顶部,所述斜杆交叉固定于塔柱上,所述横杆和横隔间隔固定于塔柱上。
所述塔柱上端焊接有栓钉,所述横隔采用两根钢绞线十字交叉型布置,所述混凝土过渡段设有水平双向钢绞线和预应力锚栓,混凝土过渡段中间设有人孔。
全向预应力抗疲劳组合钢结构风塔的安装方法,具体步骤如下:一、安装基础部:在基础部柱脚底部预埋拉索锚固段,对预应力双钢绞线底端进行锚固;二、安装格构式塔架:安装底层塔柱:将预应力双钢绞线穿过底层塔柱,采用法兰、螺栓连接底层塔柱于基础部,安装该层塔柱段横、斜杆以及横隔,对横隔进行张拉施加预应力;将预应力双钢绞线穿过第二层塔柱,采用法兰、螺栓连接第二层塔柱于底层塔柱,安装该层塔柱段横、斜杆以及横隔,对横隔进行张拉施加预应力;重复步骤的操作,直至各层塔柱安装完毕;三、混凝土过渡段安装:预应力双钢绞线穿过顶层塔柱,预埋预应力锚栓,绑扎钢筋、支模,浇注混凝土,待混凝土氧化完毕,对预应力双钢绞线进行张拉预紧并锚固于混凝土过渡段内,张拉水平双向钢绞线,对混凝土过渡段施加横向预拉力;四、安装钢结构塔筒,并对预应力锚栓进行张拉。
本实用新型提供的全向预应力抗疲劳组合钢结构风塔,其有益效果在于,全面施加预应力,疲劳寿命延长,结构合理,受力可靠,用料少,施工方便;横隔采用两根钢绞线十字交叉型布置,通过对钢绞线张拉来实现斜杆和横杆受压,从而控制工作荷载下斜杆和横杆不出现拉应力;塔柱上端焊接有栓钉,加强塔柱与混凝土过渡段之间的连接;混凝土过渡段中间设有人孔,方便工作人员上下。
附图说明
图1是本实用新型一个实施例的整体结构示意图;
图2是混凝土过渡段连接结构示意图;
图3是图2的俯视结构示意图;
图4是横隔结构示意图;
图5是本实用新型一个实施例的结构示意图。
图中标注:
1.塔柱;2.预应力双钢绞线;3.斜杆;4.横杆;5.横隔;6.混凝土过渡段;7.钢结构塔筒;8.预应力锚栓;9.基础部;10.栓钉;11.水平双向钢绞线;12.人孔;13.桩。
具体实施方式
下面参照附图,结合实施例,对本实用新型提供的全向预应力抗疲劳组合钢结构风塔进行详细的说明。
实施例一
参照图1-图4,本实施例的全向预应力抗疲劳组合钢结构风塔,它包括钢结构塔筒7、混凝土过渡段6、格构式塔架和基础部9,所述钢结构塔筒固定于混凝土过渡段6内,所述混凝土过渡段6位于格构式塔架顶部,所述格构式塔架安装在基础部9上,格构式塔架包括塔柱1、预应力双钢绞线2、斜杆3、横杆4、横隔5,所述预应力双钢绞线2从塔柱1底部贯穿至顶部,底端锚固于基础部9内,顶端张拉固定于塔柱顶部,所述斜杆交叉固定于塔柱上,所述横杆和横隔间隔固定于塔柱上。
所述塔柱上端焊接有栓钉10,所述横隔采用两根钢绞线十字交叉型布置,所述混凝土过渡段设有水平双向钢绞线11和预应力锚栓8,混凝土过渡段6中间设有人孔12。
全向预应力抗疲劳组合钢结构风塔的安装方法,具体步骤如下:一、安装基础部:在基础部柱脚底部预埋拉索锚固段,对预应力双钢绞线底端进行锚固;二、安装格构式塔架:安装底层塔柱:将预应力双钢绞线穿过底层塔柱,采用法兰、螺栓连接底层塔柱于基础部,安装该层塔柱段横、斜杆以及横隔,对横隔进行张拉施加预应力;将预应力双钢绞线穿过第二层塔柱,采用法兰、螺栓连接第二层塔柱于底层塔柱,安装该层塔柱段横、斜杆以及横隔,对横隔进行张拉施加预应力;重复步骤的操作,直至各层塔柱安装完毕;三、混凝土过渡段安装:预应力双钢绞线穿过顶层塔柱,预埋预应力锚栓,绑扎钢筋、支模,浇注混凝土,待混凝土氧化完毕,对预应力双钢绞线进行张拉预紧并锚固于混凝土过渡段内,张拉水平双向钢绞线,对混凝土过渡段施加横向预拉力;四、安装钢结构塔筒,并对预应力锚栓进行张拉。
实施例二
参照图5,作为海上风机基础中的导管架,按照实施例一步骤一至步骤三施工完成后,在塔脚处打桩13。
Claims (4)
1.一种全向预应力抗疲劳组合钢结构风塔,其特征在于:它包括钢结构塔筒、混凝土过渡段、格构式塔架和基础部,所述钢结构塔筒固定于混凝土过渡段内,所述混凝土过渡段位于格构式塔架顶部,所述格构式塔架安装在基础部上,格构式塔架包括塔柱、预应力双钢绞线、斜杆、横杆、横隔,所述预应力双钢绞线从塔柱底部贯穿至顶部,底端锚固于基础部内,顶端张拉固定于塔柱顶部,所述斜杆交叉固定于塔柱上,所述横杆和横隔间隔固定于塔柱上。
2.根据权利要求1所述的全向预应力抗疲劳组合钢结构风塔,其特征在于:所述塔柱上端焊接有栓钉。
3.根据权利要求1所述的全向预应力抗疲劳组合钢结构风塔,其特征在于:所述横隔采用两根钢绞线十字交叉型布置。
4.根据权利要求1所述的全向预应力抗疲劳组合钢结构风塔,其特征在于:所述混凝土过渡段设有水平双向钢绞线和预应力锚栓,混凝土过渡段中间设有人孔。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621215162.8U CN206190458U (zh) | 2016-11-11 | 2016-11-11 | 全向预应力抗疲劳组合钢结构风塔 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621215162.8U CN206190458U (zh) | 2016-11-11 | 2016-11-11 | 全向预应力抗疲劳组合钢结构风塔 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206190458U true CN206190458U (zh) | 2017-05-24 |
Family
ID=58733752
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621215162.8U Active CN206190458U (zh) | 2016-11-11 | 2016-11-11 | 全向预应力抗疲劳组合钢结构风塔 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206190458U (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106545472A (zh) * | 2016-11-11 | 2017-03-29 | 青岛中天斯壮科技有限公司 | 全向预应力抗疲劳组合钢结构风塔及其安装方法 |
CN108397355A (zh) * | 2018-02-27 | 2018-08-14 | 新疆金风科技股份有限公司 | 塔架和风力发电机组 |
CN112922018A (zh) * | 2021-03-08 | 2021-06-08 | 中国长江三峡集团有限公司 | 海上风电胶结碎石桩强化软土地基的重力基础的施工方法 |
-
2016
- 2016-11-11 CN CN201621215162.8U patent/CN206190458U/zh active Active
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106545472A (zh) * | 2016-11-11 | 2017-03-29 | 青岛中天斯壮科技有限公司 | 全向预应力抗疲劳组合钢结构风塔及其安装方法 |
CN108397355A (zh) * | 2018-02-27 | 2018-08-14 | 新疆金风科技股份有限公司 | 塔架和风力发电机组 |
CN112922018A (zh) * | 2021-03-08 | 2021-06-08 | 中国长江三峡集团有限公司 | 海上风电胶结碎石桩强化软土地基的重力基础的施工方法 |
CN112922018B (zh) * | 2021-03-08 | 2022-07-12 | 中国长江三峡集团有限公司 | 海上风电胶结碎石桩强化软土地基的重力基础的施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206917805U (zh) | 全向预应力抗疲劳组合钢结构风塔 | |
CN106321367B (zh) | 斜拉预应力钢与混凝土组合式风机塔架 | |
CN101446065B (zh) | 组合式索塔 | |
CN203755778U (zh) | 装配式体外预应力活性粉末混凝土风电塔架 | |
CN206190458U (zh) | 全向预应力抗疲劳组合钢结构风塔 | |
US20150143765A1 (en) | Connection between a wind turbine tower and its foundation | |
CN101798874B (zh) | 环形封闭钢管内平行钢绞线组装索的预应力施工方法 | |
CN205725582U (zh) | 一种预应力拉索结构和刚架结构相结合的光伏支架 | |
CN201762717U (zh) | 预应力管桩与承台的连接结构 | |
CN105179183A (zh) | 一种预应力混凝土风电塔架体系及其施工方法 | |
CN202990170U (zh) | 一种配置交叉斜向体内预应力的剪力墙结构 | |
CN203080400U (zh) | 一种单叶双曲面空间索网主缆的特大跨径悬索桥 | |
CN206190456U (zh) | 斜拉预应力钢与混凝土组合式风机塔架 | |
CN103867019A (zh) | 装配式体外预应力活性粉末混凝土风电塔架 | |
CN109898415A (zh) | 带有抛物线拱形塔帽的空间混合索网悬索桥的筒中筒桥塔 | |
CN112412707A (zh) | 一种装配式风电机组圆截面混凝土支撑结构 | |
CN207047885U (zh) | 一种体外预应力混凝土风机塔架空心基础 | |
CN108506169A (zh) | 一种风电机组预应力拉线式塔架增高方法和结构 | |
CN202596242U (zh) | 一种混凝土塔架 | |
CN105756077B (zh) | 基础环岩石锚杆基础 | |
CN106704107A (zh) | 一种全向预应力抗疲劳组合钢结构风塔及其施工方法 | |
CN208763818U (zh) | 一种风电机组预应力拉线式塔架增高结构 | |
CN206707932U (zh) | 预应力抗疲劳组合结构风塔 | |
CN208252281U (zh) | 一种风力发电机组钢混塔架 | |
CN205046925U (zh) | 抗疲劳预应力钢管柱结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20210402 Address after: No.8, Zhejiang Road, Beiguan Industrial Park, Jiaobei sub district office, Jiaozhou City, Qingdao City, Shandong Province 266000 Patentee after: QINGDAO HUASIZHUANG ENERGY TECHNOLOGY Co.,Ltd. Address before: 266300, Qingdao, Shandong City, Jiaozhou Province North Industrial Park Patentee before: QINGDAO ZHONGTIAN STRONG SCIENCE AND TECHNOLOGY Co.,Ltd. |