CN106545472A - 全向预应力抗疲劳组合钢结构风塔及其安装方法 - Google Patents

全向预应力抗疲劳组合钢结构风塔及其安装方法 Download PDF

Info

Publication number
CN106545472A
CN106545472A CN201710021286.5A CN201710021286A CN106545472A CN 106545472 A CN106545472 A CN 106545472A CN 201710021286 A CN201710021286 A CN 201710021286A CN 106545472 A CN106545472 A CN 106545472A
Authority
CN
China
Prior art keywords
king
post
tower
prestressing force
steel construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710021286.5A
Other languages
English (en)
Inventor
王同华
吕兆华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao Zhongtian Stro Technology Co Ltd
Original Assignee
Qingdao Zhongtian Stro Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao Zhongtian Stro Technology Co Ltd filed Critical Qingdao Zhongtian Stro Technology Co Ltd
Publication of CN106545472A publication Critical patent/CN106545472A/zh
Pending legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/72Wind turbines with rotation axis in wind direction
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/728Onshore wind turbines

Abstract

本发明公开了一种全向预应力抗疲劳组合钢结构风塔及其安装方法,它包括钢结构塔筒、过渡段、格构式塔架和基础部,所述钢结构塔筒固定于过渡段内,所述过渡段位于格构式塔架顶部,所述格构式塔架安装在基础部上,格构式塔架包括塔柱、预应力双钢绞线、斜杆、横杆、横膈,所述预应力双钢绞线从塔柱底部贯穿至顶部,底端锚固于基础部内,顶端张拉固定于塔柱顶部,所述斜杆交叉固定于塔柱上,所述横杆和横膈间隔固定于塔柱上,结构合理,受力可靠,全面施加预应力,疲劳寿命延长,用料少,安装方法施工方便。

Description

全向预应力抗疲劳组合钢结构风塔及其安装方法
技术领域
本发明属于风力发电塔技术领域,具体涉及一种全向预应力抗疲劳组合钢结构风塔及其安装方法。
背景技术
随着我国风力发电项目的增多,一些风力资源较好的风场已经逐步被开发完毕,为了更好的利用较高处的风力资源,风力发电塔逐渐向高塔方向发展。理论研究证明,当风力发电塔高度超过100米以上时,格构式塔架与塔筒组合形式的结构优势凸显,这种结构形式可以大幅节约材料、解决运输费用昂贵等问题,进而节约工程造价。然而,由于风力发电塔结构存在疲劳问题,对于焊接结构,疲劳允许应力幅较低,材料的利用率低。
发明内容
为了克服现有技术领域存在的上述技术问题,提高材料的利用率,本发明的目的在于,提供一种全向预应力抗疲劳组合钢结构风塔及其安装方法,延长疲劳寿命,施工方便。
本发明提供的全向预应力抗疲劳组合钢结构风塔,它包括钢结构塔筒、过渡段、格构式塔架和基础部,所述钢结构塔筒固定于过渡段内,所述过渡段位于格构式塔架顶部,所述格构式塔架安装在基础部上,格构式塔架包括塔柱、预应力双钢绞线、斜杆、横杆、横膈,所述预应力双钢绞线从塔柱底部贯穿至顶部,底端锚固于基础部内,顶端张拉固定于塔柱顶部,所述斜杆交叉固定于塔柱上,所述横杆和横膈间隔固定于塔柱上。
所述横膈采用两根钢绞线十字交叉型布置。
所述过渡段为混凝土过渡段,所述塔柱上端焊接有栓钉,所述混凝土过渡段设有水平双向钢绞线和预应力锚栓,混凝土过渡段中间设有人孔,所述塔柱的柱脚法兰,通过预应力锚栓连接于基础之上。
所述过渡段为钢结构过渡段,所述塔柱的柱脚法兰,通过预应力锚栓连接于基础之上。
全向预应力抗疲劳组合钢结构风塔的安装方法,具体步骤如下:一、安装基础部:在基础部柱脚底部预埋拉索锚固段及预应力锚栓;二、安装格构式塔架:(1)安装底层塔柱:安装底层塔柱于基础部,安装该层塔柱段横、斜杆以及横膈,对横膈进行张拉施加预应力;(2)安装第二层塔柱于底层塔柱,安装该层塔柱段横、斜杆以及横膈;(3)重复步骤(2)的操作,直至各层塔柱安装完毕;三、安装过渡段及钢结构塔筒,张拉塔柱内预应力双钢绞线。
本发明提供的全向预应力抗疲劳组合钢结构风塔及其安装方法,其有益效果在于,全面施加预应力,疲劳寿命延长,结构合理,受力可靠,用料少,施工方便;横膈采用两根钢绞线十字交叉型布置,通过对钢绞线张拉来实现斜杆和横杆受压,从而控制工作荷载下斜杆和横杆不出现拉应力;塔柱上端焊接有栓钉,加强塔柱与混凝土过渡段之间的连接;混凝土过渡段中间设有人孔,方便工作人员上下;塔筒及过渡段控制在不超限的运输范围之内。
附图说明
图1是本发明一个实施例的整体结构示意图;
图2是混凝土过渡段连接结构示意图;
图3是图2的俯视结构示意图;
图4是横膈结构示意图;
图5是本发明一个实施例的结构示意图;
图6是本发明一个实施例的整体结构示意图;
图7是钢结构过渡段连接结构示意图;
图8是基础部结构示意图;
图9是塔柱节点结构示意图;
图10是本发明一个实施例的结构示意图。
图中标注:
1.塔柱;2.预应力双钢绞线;3.斜杆;4.横杆;5.横膈;6.混凝土过渡段;7.钢结构塔筒;8.预应力锚栓;9.基础部;10.栓钉;11.水平双向钢绞线;12.人孔;13.桩;14.拉索锚固段;15.柱脚法兰;16.钢结构过渡段;17.预应力锚栓I。
具体实施方式
下面参照附图,结合实施例,对本发明提供的全向预应力抗疲劳组合钢结构风塔及其安装方法进行详细的说明。
实施例一
参照图1-图4,本实施例的全向预应力抗疲劳组合钢结构风塔,采用混凝土过渡段,风塔包括钢结构塔筒7、混凝土过渡段6、格构式塔架和基础部9,所述钢结构塔筒固定于混凝土过渡段6内,所述混凝土过渡段6位于格构式塔架顶部,所述格构式塔架安装在基础部9上,格构式塔架包括塔柱1、预应力双钢绞线2、斜杆3、横杆4、横膈5,所述预应力双钢绞线2从塔柱1底部贯穿至顶部,底端锚固于基础部9内,顶端张拉固定于塔柱顶部,所述斜杆交叉固定于塔柱上,所述横杆和横膈间隔固定于塔柱上。
所述塔柱上端焊接有栓钉10,所述横膈采用两根钢绞线十字交叉型布置,所述混凝土过渡段设有水平双向钢绞线11和预应力锚栓8,混凝土过渡段6中间设有人孔12。
全向预应力抗疲劳组合钢结构风塔的安装方法,具体步骤如下:一、安装基础部:在基础部柱脚底部预埋拉索锚固段,目的是对预应力双钢绞线底端进行锚固;二、安装格构式塔架:(1)安装底层塔柱:将塔柱采用法兰、螺栓连接底层塔柱于基础部,安装该层塔柱段横、斜杆以及横膈,对横膈进行张拉施加预应力;(2)将预应力双钢绞线穿过第二层塔柱,采用法兰、螺栓连接第二层塔柱于底层塔柱,安装该层塔柱段横、斜杆以及横膈,对横膈进行张拉施加预应力;(3)重复步骤(2)的操作,直至各层塔柱安装完毕;三、混凝土过渡段安装:预应力双钢绞线穿过顶层塔柱,预埋预应力锚栓,绑扎钢筋、支模,浇注混凝土,待混凝土养护完毕,对预应力双钢绞线进行张拉预紧并锚固于混凝土过渡段内,张拉水平双向钢绞线,对混凝土过渡段施加横向预拉力;四、安装钢结构塔筒,并对预应力锚栓进行张拉;五、张拉塔柱内预应力钢绞线。
实施例二
参照图5,作为海上风机基础中的导管架,按照实施例一步骤一至步骤三施工完成后,在塔脚处打桩13。
实施例三
参照图4、图6-图9,本实施例的全向预应力抗疲劳组合钢结构风塔,采用钢结构过渡段,它包括钢结构塔筒7、钢结构过渡段16、格构式塔架和基础部9,所述钢结构塔筒7连接在钢结构过渡段16顶部,所述钢结构过渡段16位于格构式塔架顶部,所述格构式塔架安装在基础部9上,格构式塔架包括塔柱1、预应力双钢绞线2、斜杆3、横杆4、横膈5,所述预应力双钢绞线2从塔柱1底部贯穿至顶部,底端锚固于基础部9的拉索锚固段14内,顶端张拉固定于塔柱1顶部,所述斜杆3交叉固定于塔柱1上,所述横杆4和横膈5间隔固定于塔柱1上。所述横膈5采用两根钢绞线十字交叉型布置;所述塔柱1的柱脚法兰15,通过预应力锚栓I17连接于基础部9之上。
全向预应力抗疲劳组合钢结构风塔的安装方法,具体步骤如下:一、安装基础部:在基础部柱脚底部预埋拉索锚固段14;二、安装格构式塔架:⑴安装底层塔柱:采用法兰、预应力锚栓I17连接底层塔柱于基础部,安装该层塔柱段横、斜杆以及横膈,对横膈进行张拉施加预应力;⑵安装第二层塔柱,采用法兰、螺栓连接第二层塔柱于底层塔柱,安装该层塔柱段横、斜杆以及横膈;⑶重复步骤⑵的操作,直至各层塔柱安装完毕;三、钢结构过渡段安装:待顶部塔架安装完毕后,安装钢结构过渡段及顶部塔筒;四、安装塔柱内双钢绞线,锚固完毕后,在塔架顶部对双钢绞线进行张拉。
实施例四
参照图5、图10,作为海上风机基础中的导管架,按照实施例一步骤一至步骤三施工完成后,在塔脚处打桩13。

Claims (7)

1.一种全向预应力抗疲劳组合钢结构风塔,其特征在于:它包括钢结构塔筒、过渡段、格构式塔架和基础部,所述钢结构塔筒固定于过渡段内,所述过渡段位于格构式塔架顶部,所述格构式塔架安装在基础部上,格构式塔架包括塔柱、预应力双钢绞线、斜杆、横杆、横膈,所述预应力双钢绞线从塔柱底部贯穿至顶部,底端锚固于基础部内,顶端张拉固定于塔柱顶部,所述斜杆交叉固定于塔柱上,所述横杆和横膈间隔固定于塔柱上。
2.根据权利要求1所述的全向预应力抗疲劳组合钢结构风塔,其特征在于:所述横膈采用两根钢绞线十字交叉型布置。
3.根据权利要求1所述的全向预应力抗疲劳组合钢结构风塔,其特征在于:所述过渡段为混凝土过渡段。
4.根据权利要求3所述的全向预应力抗疲劳组合钢结构风塔,其特征在于:所述塔柱上端焊接有栓钉。
5.根据权利要求3所述的全向预应力抗疲劳组合钢结构风塔,其特征在于:所述混凝土过渡段设有水平双向钢绞线和预应力锚栓,混凝土过渡段中间设有人孔。
6.根据权利要求1所述的全向预应力抗疲劳组合钢结构风塔,其特征在于:所述过渡段为钢结构过渡段,所述塔柱的柱脚法兰,通过预应力锚栓连接于基础之上。
7.一种如权利要求1所述的全向预应力抗疲劳组合钢结构风塔的安装方法,其特征在于:具体步骤如下:一、安装基础部: 在基础部柱脚底部预埋拉索锚固段及预应力锚栓;二、安装格构式塔架:(1)安装底层塔柱:安装底层塔柱于基础部,安装该层塔柱段横、斜杆以及横膈,对横膈进行张拉施加预应力;(2)安装第二层塔柱于底层塔柱,安装该层塔柱段横、斜杆以及横膈;(3)重复步骤(2)的操作,直至各层塔柱安装完毕;三、安装过渡段及钢结构塔筒,张拉塔柱内预应力双钢绞线。
CN201710021286.5A 2016-11-11 2017-01-12 全向预应力抗疲劳组合钢结构风塔及其安装方法 Pending CN106545472A (zh)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN2016109926902 2016-11-11
CN201610992690 2016-11-11

Publications (1)

Publication Number Publication Date
CN106545472A true CN106545472A (zh) 2017-03-29

Family

ID=58396513

Family Applications (2)

Application Number Title Priority Date Filing Date
CN201710021286.5A Pending CN106545472A (zh) 2016-11-11 2017-01-12 全向预应力抗疲劳组合钢结构风塔及其安装方法
CN201720034863.XU Active CN206917805U (zh) 2016-11-11 2017-01-12 全向预应力抗疲劳组合钢结构风塔

Family Applications After (1)

Application Number Title Priority Date Filing Date
CN201720034863.XU Active CN206917805U (zh) 2016-11-11 2017-01-12 全向预应力抗疲劳组合钢结构风塔

Country Status (1)

Country Link
CN (2) CN106545472A (zh)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106836937A (zh) * 2017-04-01 2017-06-13 青岛中天斯壮科技有限公司 一种带有塔顶直接风机环形箱梁的预应力多边形风塔
CN106979131A (zh) * 2017-05-04 2017-07-25 青岛中天斯壮科技有限公司 一种风力发电塔
CN108397355A (zh) * 2018-02-27 2018-08-14 新疆金风科技股份有限公司 塔架和风力发电机组
CN108930636A (zh) * 2017-05-24 2018-12-04 上海电气风电集团有限公司 陆上型风机支撑结构
CN110359755A (zh) * 2019-07-31 2019-10-22 柳州欧维姆机械股份有限公司 一种混合结构风塔的固结拉索体系及其制作安装方法
CN111441325A (zh) * 2020-04-08 2020-07-24 青岛理工大学 一种海洋平台及其制作方法
CN112177857A (zh) * 2020-09-03 2021-01-05 重庆大学 一种预应力中空夹层钢管混凝土格构式混合塔架及其生产安装方法
CN113982845A (zh) * 2021-10-18 2022-01-28 袁晓世 一种具有上下环梁结构过渡段的风机塔筒结构

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106545472A (zh) * 2016-11-11 2017-03-29 青岛中天斯壮科技有限公司 全向预应力抗疲劳组合钢结构风塔及其安装方法

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102005014025A1 (de) * 2005-03-23 2006-09-28 Rudolf Eckart Als Stahlfachwerkkonstruktion ausgebildeter Turm, vorzugsweise für Windkraftanlagen
EP2182209A2 (de) * 2008-10-28 2010-05-05 Gisela Wendling-Lenz Hybrides Turmbauwerk
US20120042585A1 (en) * 2009-02-27 2012-02-23 Roger Ericsson Prefabricated wall element for tower construction, and tower construction
CN202530823U (zh) * 2012-03-30 2012-11-14 浙江八方电信有限公司 一种预应力桁架式管塔
CN103899499A (zh) * 2014-04-25 2014-07-02 湖南大学 一种风力发电机塔架
CN103994035A (zh) * 2014-06-13 2014-08-20 湖南大学 一种组合风电塔架预应力混凝土和钢塔段连接过渡装置
CN204783489U (zh) * 2015-05-27 2015-11-18 天津大学建筑设计研究院 一种格构式风力发电机塔架
CN105201010A (zh) * 2015-09-30 2015-12-30 浙江大学 海上风机装配式斜桩基础
CN205046924U (zh) * 2015-10-13 2016-02-24 青岛中天斯壮科技有限公司 带有可一次张拉柔性斜杆的风力发电塔
CN106013212A (zh) * 2016-07-25 2016-10-12 福建永福电力设计股份有限公司 一种海上风机塔基础结构及安装方法
CN206190458U (zh) * 2016-11-11 2017-05-24 青岛中天斯壮科技有限公司 全向预应力抗疲劳组合钢结构风塔
CN206917805U (zh) * 2016-11-11 2018-01-23 青岛中天斯壮科技有限公司 全向预应力抗疲劳组合钢结构风塔

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102005014025A1 (de) * 2005-03-23 2006-09-28 Rudolf Eckart Als Stahlfachwerkkonstruktion ausgebildeter Turm, vorzugsweise für Windkraftanlagen
EP2182209A2 (de) * 2008-10-28 2010-05-05 Gisela Wendling-Lenz Hybrides Turmbauwerk
US20120042585A1 (en) * 2009-02-27 2012-02-23 Roger Ericsson Prefabricated wall element for tower construction, and tower construction
CN202530823U (zh) * 2012-03-30 2012-11-14 浙江八方电信有限公司 一种预应力桁架式管塔
CN103899499A (zh) * 2014-04-25 2014-07-02 湖南大学 一种风力发电机塔架
CN103994035A (zh) * 2014-06-13 2014-08-20 湖南大学 一种组合风电塔架预应力混凝土和钢塔段连接过渡装置
CN204783489U (zh) * 2015-05-27 2015-11-18 天津大学建筑设计研究院 一种格构式风力发电机塔架
CN105201010A (zh) * 2015-09-30 2015-12-30 浙江大学 海上风机装配式斜桩基础
CN205046924U (zh) * 2015-10-13 2016-02-24 青岛中天斯壮科技有限公司 带有可一次张拉柔性斜杆的风力发电塔
CN106013212A (zh) * 2016-07-25 2016-10-12 福建永福电力设计股份有限公司 一种海上风机塔基础结构及安装方法
CN206190458U (zh) * 2016-11-11 2017-05-24 青岛中天斯壮科技有限公司 全向预应力抗疲劳组合钢结构风塔
CN206917805U (zh) * 2016-11-11 2018-01-23 青岛中天斯壮科技有限公司 全向预应力抗疲劳组合钢结构风塔

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106836937A (zh) * 2017-04-01 2017-06-13 青岛中天斯壮科技有限公司 一种带有塔顶直接风机环形箱梁的预应力多边形风塔
CN106979131A (zh) * 2017-05-04 2017-07-25 青岛中天斯壮科技有限公司 一种风力发电塔
CN108930636A (zh) * 2017-05-24 2018-12-04 上海电气风电集团有限公司 陆上型风机支撑结构
CN108397355A (zh) * 2018-02-27 2018-08-14 新疆金风科技股份有限公司 塔架和风力发电机组
CN110359755A (zh) * 2019-07-31 2019-10-22 柳州欧维姆机械股份有限公司 一种混合结构风塔的固结拉索体系及其制作安装方法
CN111441325A (zh) * 2020-04-08 2020-07-24 青岛理工大学 一种海洋平台及其制作方法
CN112177857A (zh) * 2020-09-03 2021-01-05 重庆大学 一种预应力中空夹层钢管混凝土格构式混合塔架及其生产安装方法
CN113982845A (zh) * 2021-10-18 2022-01-28 袁晓世 一种具有上下环梁结构过渡段的风机塔筒结构

Also Published As

Publication number Publication date
CN206917805U (zh) 2018-01-23

Similar Documents

Publication Publication Date Title
CN106545472A (zh) 全向预应力抗疲劳组合钢结构风塔及其安装方法
CN106321367B (zh) 斜拉预应力钢与混凝土组合式风机塔架
CN103821677B (zh) 装配式预应力活性粉末混凝土风电塔架
CN108266330A (zh) 一种风电机组预应力钢混塔筒
EP2427603B1 (en) Fatigue resistant foundation
CN102767303B (zh) 一种预制混凝土塔架及其构建方法
CN103867019B (zh) 装配式体外预应力活性粉末混凝土风电塔架
CN201972237U (zh) 一种节段预制矩形钢管混凝土桁架
CN203668815U (zh) 一种混凝土预制节段拼装桥墩
CN103899499A (zh) 一种风力发电机塔架
CN203755778U (zh) 装配式体外预应力活性粉末混凝土风电塔架
CN109184737A (zh) 可让压吸能的隧道预应力约束充填衬砌支护体系及工艺
CN102099538A (zh) 用于组装塔架的方法和塔架
CN203809220U (zh) 一种风力发电机塔架
CN105179183A (zh) 一种预应力混凝土风电塔架体系及其施工方法
CN210563692U (zh) 一种先张法分片预制装配式预应力混凝土塔架结构
CN206190456U (zh) 斜拉预应力钢与混凝土组合式风机塔架
CN108301983A (zh) 一种分片预制式风电机组预应力混凝土塔筒
CN206190458U (zh) 全向预应力抗疲劳组合钢结构风塔
CN108999088A (zh) 一种斜拉桥的施工方法
CN107100322B (zh) 后张法竖向预应力现浇混凝土柱结构及施工方法
CN207047885U (zh) 一种体外预应力混凝土风机塔架空心基础
CN208219689U (zh) 预制构件混凝土塔架风机基础结构
CN106592622A (zh) 一种基于环形砼带竖向预应力的风机基础结构
CN111197319A (zh) 一种风力发电塔多向预应力预制装配式梁板基础

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication