CN206707932U - 预应力抗疲劳组合结构风塔 - Google Patents

预应力抗疲劳组合结构风塔 Download PDF

Info

Publication number
CN206707932U
CN206707932U CN201720203329.7U CN201720203329U CN206707932U CN 206707932 U CN206707932 U CN 206707932U CN 201720203329 U CN201720203329 U CN 201720203329U CN 206707932 U CN206707932 U CN 206707932U
Authority
CN
China
Prior art keywords
diaphragm
post
cross bar
king
brace
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720203329.7U
Other languages
English (en)
Inventor
王同华
吕兆华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
QINGDAO HUASIZHUANG ENERGY TECHNOLOGY Co.,Ltd.
Original Assignee
Qingdao Zhongtian Stro Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao Zhongtian Stro Technology Co Ltd filed Critical Qingdao Zhongtian Stro Technology Co Ltd
Priority to CN201720203329.7U priority Critical patent/CN206707932U/zh
Application granted granted Critical
Publication of CN206707932U publication Critical patent/CN206707932U/zh
Priority to US16/309,005 priority patent/US10823150B2/en
Priority to ES18760920T priority patent/ES2924690T3/es
Priority to PCT/CN2018/077822 priority patent/WO2018157849A1/zh
Priority to EP18760920.1A priority patent/EP3450748B1/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/72Wind turbines with rotation axis in wind direction
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/728Onshore wind turbines

Abstract

本实用新型公开了风力发电塔技术领域的一种预应力抗疲劳组合结构风塔,包括塔筒、过渡结构、构架式塔架和基础固定装置,所述构架式塔架包括塔柱、预应力钢绞线、斜杆、横杆、横膈;所述斜杆通过节点板及螺栓交叉固定于塔柱上,所述横杆通过节点板及螺栓水平固定于塔柱上,所述横膈通过节点板及螺栓固定于横杆上;所述斜杆和横杆之间安装有再分式腹杆,所述横杆和横膈之间安装有再分式横膈。有益效果在于:对塔柱施加预应力,斜杆、横杆及横膈采用型钢,减少焊接,提高杆件的疲劳强度,降低加工难度,安装便利;弯折成型的双C型斜杆可以有效增大构件稳定系数,提高材料利用率。

Description

预应力抗疲劳组合结构风塔
技术领域
本实用新型属于风力发电塔技术领域,具体涉及一种预应力抗疲劳组合结构风塔。
背景技术
近年来,我国三北地区风电快速发展而地区消纳不足引发弃电;南方能源结构调整需要增加风电,然而低空风资源不足。为了克服以上两个矛盾,选择在南方地区建设风力发电高塔,高空风速加大,紊流减少,年发电量增加,可以达到较好的经济效益。理论研究证明,当风力发电塔高度超过100米以上时,构架式塔架与塔筒组合形式的结构优势凸显,这种结构形式可以大幅节约材料、解决运输费用昂贵等问题,进而节约工程造价。然而,由于风力发电塔结构存在疲劳问题,对于焊接结构,疲劳允许应力幅较低,材料的利用率低。
发明内容
为了克服现有技术领域存在的上述技术问题,本实用新型的目的在于提供一种预应力抗疲劳组合结构风塔,用以提高材料的利用率,延长疲劳寿命,方便施工。
一种预应力抗疲劳组合结构风塔,包括塔筒、过渡结构、构架式塔架和基础固定装置,所述塔筒固定于过渡结构内,所述过渡结构位于构架式塔架顶部,所述构架式塔架安装在基础固定装置上,所述构架式塔架包括塔柱、预应力钢绞线、斜杆、横杆、横膈、再分式腹杆和再分式横膈,塔柱底端通过预应力锚栓固定于基础固定装置中,所述预应力钢绞线从塔柱底部贯穿至顶部,预应力钢绞线顶端张拉固定于塔柱顶部,预应力钢绞线底端锚固于基础固定装置中的拉锁锚固段中;所述斜杆通过节点板及螺栓交叉固定于塔柱上,所述横杆通过节点板及螺栓水平固定于塔柱上,所述横膈通过节点板及螺栓固定于横杆上;所述斜杆和横杆之间安装有再分式腹杆,所述横杆和横膈之间安装有再分式横膈。
进一步地,所述斜杆为钢板弯折成型的双C型钢斜杆,所述横杆为钢板弯折成型的双C型钢横杆,所述横膈为型钢横膈。
进一步地,所述塔柱为钢管塔柱。
进一步地,所述连接横杆及横膈的螺栓为摩擦型高强螺栓。
预应力抗疲劳组合结构风塔的安装方法,具体步骤如下:
一、安装基础固定装置: 在基础固定装置内预埋预应力钢绞线的拉索锚固段及预埋预应力锚栓;
二、安装构架式塔架:
安装底层塔柱:将底层塔柱安装于基础固定装置的预应力锚栓上,安装该层塔柱段斜杆、横杆、横膈、再分式腹杆以及再分式横膈;
安装第二层塔柱于底层塔柱,安装该层塔柱段斜杆、横杆、横膈、再分式腹杆以及再分式横膈;
重复步骤的操作,直至各层塔柱安装完毕;
三、安装过渡结构及塔筒,张拉塔柱内预应力钢绞线,将预应力钢绞线底部锚固于基础固定装置中的拉索锚固段内,在塔柱顶部张拉预应力钢绞线。
本实用新型提供的预应力抗疲劳组合结构风塔,其有益效果在于:对塔柱施加预应力,疲劳寿命延长,结构合理,受力可靠,用料少,施工方便;斜杆、横杆及横膈采用型钢,减少焊接,提高杆件的疲劳强度,降低加工难度,安装便利;弯折成型的双C型斜杆可以有效增大构件稳定系数,提高材料利用率。
附图说明
图1是本实用新型一个实施例的整体结构示意图;
图2是构架式塔架的结构示意图;
图3是横膈结构示意图;
图4是塔柱节点结构示意图。
图5是双C型钢横杆和双C型钢斜杆的结构示意图;
图6是基础固定装置的结构示意图。
图中标注:
1.构架式塔架;2.预应力钢绞线;3.斜杆;4.横杆;5.塔筒;6.过渡结构;7.节点板;8.螺栓;9.横膈;10.基础固定装置;11.塔柱;12.再分式腹杆;13.再分式横膈;14.拉索锚固段;15.预应力锚栓。
具体实施方式
下面参照附图,结合一个实施例,对本实用新型提供的预应力抗疲劳组合结构风塔进行详细的说明。
实施例1
一种预应力抗疲劳组合结构风塔,包括塔筒5、过渡结构6、构架式塔架1和基础固定装置10,所述塔筒5固定于过渡结构6内,所述过渡结构6位于构架式塔架1顶部,所述构架式塔架1安装在基础固定装置10上,所述构架式塔架1包括钢管塔柱11、预应力钢绞线2、双C型钢斜杆3、双C型钢横杆4、型钢横膈9、再分式腹杆12和再分式横膈13,塔柱11底端通过预应力锚栓15固定于基础固定装置10中,所述预应力钢绞线2从塔柱底部贯穿至顶部,预应力钢绞线2顶端张拉固定于塔柱11顶部,预应力钢绞线2底端锚固于基础固定装置10中的拉锁锚固段14中;所述双C型钢斜杆3通过节点板7及螺栓8交叉固定于钢管塔柱11上,所述双C型钢横杆4通过节点板7及螺栓8水平固定于钢管塔柱11上,所述型钢横膈9通过节点板7及摩擦型高强螺栓8固定于双C型钢横杆4上;所述双C型钢斜杆3和双C型钢横杆4之间安装有再分式腹杆12,所述双C型钢横杆4和型钢横膈9之间安装有再分式型钢横膈13。

Claims (4)

1.一种预应力抗疲劳组合结构风塔,包括塔筒、过渡结构、构架式塔架和基础固定装置,所述塔筒固定于过渡结构内,所述过渡结构位于构架式塔架顶部,所述构架式塔架安装在基础固定装置上,其特征在于:所述构架式塔架包括塔柱、预应力钢绞线、斜杆、横杆、横膈、再分式腹杆和再分式横膈,塔柱底端通过预应力锚栓固定于基础固定装置中,所述预应力钢绞线从塔柱底部贯穿至顶部,预应力钢绞线顶端张拉固定于塔柱顶部,预应力钢绞线底端锚固于基础固定装置中的拉锁锚固段中;所述斜杆通过节点板及螺栓交叉固定于塔柱上,所述横杆通过节点板及螺栓水平固定于塔柱上,所述横膈通过节点板及螺栓固定于横杆上;所述斜杆和横杆之间安装有再分式腹杆,所述横杆和横膈之间安装有再分式横膈。
2.根据权利要求1所述预应力抗疲劳组合结构风塔,其特征在于:所述斜杆为双C型钢斜杆,所述横杆为双C型钢横杆,所述横膈为型钢横膈。
3.根据权利要求1所述预应力抗疲劳组合结构风塔,其特征在于:所述塔柱为钢管塔柱。
4.根据权利要求1所述预应力抗疲劳组合结构风塔,其特征在于:所述连接横杆及横膈的螺栓为摩擦型高强螺栓。
CN201720203329.7U 2017-03-03 2017-03-03 预应力抗疲劳组合结构风塔 Active CN206707932U (zh)

Priority Applications (5)

Application Number Priority Date Filing Date Title
CN201720203329.7U CN206707932U (zh) 2017-03-03 2017-03-03 预应力抗疲劳组合结构风塔
US16/309,005 US10823150B2 (en) 2017-03-03 2018-03-02 Connecting structure for steel tube truss and tower barrel of lattice wind power generation tower, prestressed polygon wind tower provided with circular box girder for direct fan on top of tower, wind power generation tower, and wind tower having prestressed anti-fatigue structure
ES18760920T ES2924690T3 (es) 2017-03-03 2018-03-02 Estructura de conexión para armadura de tubo de acero y barril de torre de una torre de generación de energía eólica de celosía
PCT/CN2018/077822 WO2018157849A1 (zh) 2017-03-03 2018-03-02 格构式风力发电塔的钢管桁架与塔筒的连接结构以及带有塔顶直接风机环形箱梁的预应力多边形风塔、风力发电塔以及预应力抗疲劳结构风塔
EP18760920.1A EP3450748B1 (en) 2017-03-03 2018-03-02 Connecting structure for steel tube truss and tower barrel of lattice wind power generation tower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720203329.7U CN206707932U (zh) 2017-03-03 2017-03-03 预应力抗疲劳组合结构风塔

Publications (1)

Publication Number Publication Date
CN206707932U true CN206707932U (zh) 2017-12-05

Family

ID=60469398

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720203329.7U Active CN206707932U (zh) 2017-03-03 2017-03-03 预应力抗疲劳组合结构风塔

Country Status (1)

Country Link
CN (1) CN206707932U (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2018157849A1 (zh) * 2017-03-03 2018-09-07 青岛中天斯壮科技有限公司 格构式风力发电塔的钢管桁架与塔筒的连接结构以及带有塔顶直接风机环形箱梁的预应力多边形风塔、风力发电塔以及预应力抗疲劳结构风塔
CN112523967A (zh) * 2020-12-01 2021-03-19 上海电气风电集团股份有限公司 一种格构式综合轴风机塔架

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2018157849A1 (zh) * 2017-03-03 2018-09-07 青岛中天斯壮科技有限公司 格构式风力发电塔的钢管桁架与塔筒的连接结构以及带有塔顶直接风机环形箱梁的预应力多边形风塔、风力发电塔以及预应力抗疲劳结构风塔
US10823150B2 (en) 2017-03-03 2020-11-03 Qindao Hua-Strong Energy Technology Co., Ltd. Connecting structure for steel tube truss and tower barrel of lattice wind power generation tower, prestressed polygon wind tower provided with circular box girder for direct fan on top of tower, wind power generation tower, and wind tower having prestressed anti-fatigue structure
CN112523967A (zh) * 2020-12-01 2021-03-19 上海电气风电集团股份有限公司 一种格构式综合轴风机塔架
CN112523967B (zh) * 2020-12-01 2022-02-15 上海电气风电集团股份有限公司 一种格构式综合轴风机塔架

Similar Documents

Publication Publication Date Title
CN204024928U (zh) 一种可装配自立式风力发电机组预应力混凝土钢组合塔架
CN206917805U (zh) 全向预应力抗疲劳组合钢结构风塔
CN203755778U (zh) 装配式体外预应力活性粉末混凝土风电塔架
CN103867019B (zh) 装配式体外预应力活性粉末混凝土风电塔架
CN103899499A (zh) 一种风力发电机塔架
CN206481251U (zh) 一种采用张弦桁架梁的光伏支架装置
CN105179183A (zh) 一种预应力混凝土风电塔架体系及其施工方法
CN206015707U (zh) 一种预应力锚栓风机基础加固装置
CN206707932U (zh) 预应力抗疲劳组合结构风塔
CN217216418U (zh) 一种光伏面板用檩条支撑系统
CN203420836U (zh) 一种钢-混凝土风机塔架
CN206190458U (zh) 全向预应力抗疲劳组合钢结构风塔
CN206313716U (zh) 一种山地灌注桩调节立柱光伏电站支架
CN208763818U (zh) 一种风电机组预应力拉线式塔架增高结构
CN209398539U (zh) 一种基于斜拉索-钢梁自平衡体系的风电塔筒
CN204282845U (zh) 寒冷地区建筑用保温棚结构
CN205036512U (zh) 一种预应力混凝土风电塔架体系
CN206468489U (zh) 一种预应力混凝土塔螺栓与钢绞线连接转换装置
CN214366540U (zh) 一种垂直式风力发电机组的塔架
CN204163937U (zh) 一种风力发电机组混凝土塔架用体内预应力束张拉连接机构
CN205046924U (zh) 带有可一次张拉柔性斜杆的风力发电塔
CN103291562A (zh) 海上风电塔架结构
CN209510530U (zh) 一种风机塔架
CN106655986A (zh) 一种大跨度钢网格梁光伏支架系统
CN206402153U (zh) 一种可调节倾角的光伏电站支架

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20210402

Address after: No.8, Zhejiang Road, Beiguan Industrial Park, Jiaobei sub district office, Jiaozhou City, Qingdao City, Shandong Province 266000

Patentee after: QINGDAO HUASIZHUANG ENERGY TECHNOLOGY Co.,Ltd.

Address before: 266300, Qingdao, Shandong City, Jiaozhou Province North Industrial Park

Patentee before: QINGDAO ZHONGTIAN STRONG SCIENCE AND TECHNOLOGY Co.,Ltd.

TR01 Transfer of patent right