CN101347703B - 冶金烟气脱硫吸收塔安装方法 - Google Patents
冶金烟气脱硫吸收塔安装方法 Download PDFInfo
- Publication number
- CN101347703B CN101347703B CN2008101960578A CN200810196057A CN101347703B CN 101347703 B CN101347703 B CN 101347703B CN 2008101960578 A CN2008101960578 A CN 2008101960578A CN 200810196057 A CN200810196057 A CN 200810196057A CN 101347703 B CN101347703 B CN 101347703B
- Authority
- CN
- China
- Prior art keywords
- tower
- band
- welding
- lifting
- installation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Butt Welding And Welding Of Specific Article (AREA)
Abstract
Description
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2008101960578A CN101347703B (zh) | 2008-09-12 | 2008-09-12 | 冶金烟气脱硫吸收塔安装方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2008101960578A CN101347703B (zh) | 2008-09-12 | 2008-09-12 | 冶金烟气脱硫吸收塔安装方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101347703A CN101347703A (zh) | 2009-01-21 |
CN101347703B true CN101347703B (zh) | 2011-03-16 |
Family
ID=40266767
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2008101960578A Active CN101347703B (zh) | 2008-09-12 | 2008-09-12 | 冶金烟气脱硫吸收塔安装方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101347703B (zh) |
Families Citing this family (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102392550A (zh) * | 2011-09-09 | 2012-03-28 | 沈阳远达环保工程有限公司 | 烟气脱硫吸收塔倒序安装方法 |
CN103286465A (zh) * | 2013-06-08 | 2013-09-11 | 中国十七冶集团有限公司 | 一种转炉煤气柜柜底板防焊接变形的施工方法 |
CN105345288B (zh) * | 2015-11-20 | 2017-09-19 | 天津二十冶建设有限公司 | 一种使用电动倒链组合设备安装脱硫塔的方法 |
CN105397351B (zh) * | 2015-12-02 | 2017-01-25 | 中国化学工程第十四建设有限公司 | 一种分段预制后的塔体现场立式安装方法 |
CN108930260A (zh) * | 2017-05-23 | 2018-12-04 | 烟台中集来福士海洋工程有限公司 | 自升式平台桩腿的安装方法 |
CN107297579B (zh) * | 2017-08-30 | 2019-11-05 | 中化二建集团有限公司 | 一塔式脱硫再生塔施工方法 |
WO2020024137A1 (zh) * | 2018-08-01 | 2020-02-06 | 乔治洛德方法研究和开发液化空气有限公司 | 一种在板式塔中安装塔板的方法 |
CN110005576B (zh) * | 2019-03-25 | 2023-12-22 | 明阳智慧能源集团股份公司 | 准确修正垂直度的风力发电测风塔及其安装和维护方法 |
CN110594536B (zh) * | 2019-09-04 | 2020-12-11 | 河南省安装集团有限责任公司 | 一种塔类设备的垂直度调整方法 |
-
2008
- 2008-09-12 CN CN2008101960578A patent/CN101347703B/zh active Active
Non-Patent Citations (2)
Title |
---|
惠晓峰.火电厂湿法脱硫装置中吸收塔的安装.《电力建设》.2005,第26卷(第11期),第56-59页. * |
陈浩.湿法脱硫装置吸收塔壳体安装新工艺.《上海电力》.2007,(第4期),第420-422页. * |
Also Published As
Publication number | Publication date |
---|---|
CN101347703A (zh) | 2009-01-21 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101347703B (zh) | 冶金烟气脱硫吸收塔安装方法 | |
CN103015781B (zh) | 一种双壁储罐内罐带外罐顶提升安装方法 | |
CN101956457B (zh) | 一种矩形钢管混凝土柱施工工法 | |
CN104264902A (zh) | 钢管柱圆盘定位装置、钢管混凝土柱与桩基连接结构 | |
CN206616184U (zh) | 焦炉逸散烟尘集尘罩支撑结构 | |
CN104674665A (zh) | 大空间钢结构连廊桥安装方法 | |
CN103046788B (zh) | 配煤仓钢漏斗及配煤仓钢漏斗安装方法 | |
CN104801836A (zh) | 海上风力发电导管架基础法兰安装方法 | |
CN107489163A (zh) | 一种冶金工业炉体环形螺栓安装方法 | |
CN101838986B (zh) | 一种拆卸工具式格构柱及其施工方法 | |
CN107267165B (zh) | 一种干熄焦炉体环形布置预埋螺栓固定结构及安装方法 | |
CN105803154A (zh) | 炼钢氧枪固定导轨组装安装方法 | |
CN113338333A (zh) | 一种盖挖逆作条件下型钢梁板的快速安装方法 | |
CN202808704U (zh) | 焦炉下喷管安装辅助装置 | |
CN202925975U (zh) | 一种配煤仓钢漏斗 | |
CN105714935B (zh) | Ap1000叠合式穹顶组拼工艺 | |
CN113794430B (zh) | 一种光伏支架立柱与预应力管桩连接系统及其工作方法 | |
CN106049286A (zh) | 一种预制临时钢管支架整体吊装安装施工方法 | |
CN109252526A (zh) | 基于预应力鱼腹梁支撑技术的装配式支护结构施工工艺 | |
CN213015474U (zh) | 一种加载孔预埋件定位工装 | |
CN210529741U (zh) | 独立基础预埋螺栓安装结构 | |
CN115012575A (zh) | 一种铁路站房双曲方管桁架屋盖分块提升施工工艺 | |
CN114961286A (zh) | 一种超高外倾大截面k型劲性钢骨柱吊装施工方法 | |
CN108729448B (zh) | 钢圆筒振沉设备及其制作工艺 | |
CN106988293B (zh) | 一种升船机主机房钢格构柱施工方法及安装精度控制方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder |
Address after: 243061 Anhui province Ma'anshan Yushan Road No. 88 Patentee after: CHINA MCC17 CONSTRUCTION Co.,Ltd. Address before: 243061 Anhui province Ma'anshan Yushan Road No. 88 Patentee before: THE 17TH CHINA METALLURGICAL CONSTRUCTION Co.,Ltd. Address after: 243061 Anhui province Ma'anshan Yushan Road No. 88 Patentee after: CHINA MCC17 GROUP Co.,Ltd. Address before: 243061 Anhui province Ma'anshan Yushan Road No. 88 Patentee before: CHINA MCC17 CONSTRUCTION Co.,Ltd. |
|
CP01 | Change in the name or title of a patent holder | ||
TR01 | Transfer of patent right |
Effective date of registration: 20201123 Address after: No.28 Shuguang Xili, Chaoyang District, Beijing 100028 Patentee after: China Metallurgical Industry Co.,Ltd. Address before: 243061 Anhui province Ma'anshan Yushan Road No. 88 Patentee before: CHINA MCC17 GROUP Co.,Ltd. |
|
TR01 | Transfer of patent right |