CN101250867A - Method for sand-prevention, sand-fixation and planting in desert area - Google Patents

Method for sand-prevention, sand-fixation and planting in desert area Download PDF

Info

Publication number
CN101250867A
CN101250867A CNA200810008732XA CN200810008732A CN101250867A CN 101250867 A CN101250867 A CN 101250867A CN A200810008732X A CNA200810008732X A CN A200810008732XA CN 200810008732 A CN200810008732 A CN 200810008732A CN 101250867 A CN101250867 A CN 101250867A
Authority
CN
China
Prior art keywords
sand
prevention
concrete stake
fixation
planting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA200810008732XA
Other languages
Chinese (zh)
Other versions
CN100532728C (en
Inventor
铁生年
王宁峰
李昀珺
岛井骏藏
铁生兰
张风娟
崔岩
董超
赵乐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CNB200810008732XA priority Critical patent/CN100532728C/en
Publication of CN101250867A publication Critical patent/CN101250867A/en
Application granted granted Critical
Publication of CN100532728C publication Critical patent/CN100532728C/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A40/00Adaptation technologies in agriculture, forestry, livestock or agroalimentary production
    • Y02A40/10Adaptation technologies in agriculture, forestry, livestock or agroalimentary production in agriculture
    • Y02A40/22Improving land use; Improving water use or availability; Controlling erosion

Abstract

The invention discloses a method for sand prevention, sand fixation and planting biology in a desert area. The method is that first fixed sand or half-flowing sand area whose length is 5-6 kilometer and width is 5-6 kilometer is selected to be used as a square or a rectangle prevention area, the flowing main direction of blown sand is rightly selected according to natural law of each area, a blown sand resistance wall whose length is 5-6 kilometer and is made through a cement pile and a cement wall plate is horizontally intercepted and fixedly arranged on the flowing main direction of the blown sand, the distance between the cement piles is 3-4 meter, the height of exposed sand surface of the cement pile is 2.0-2.5meter, a cement pile is fixed on the 50mm of buried sandy land, the cement piles are connected by wire ropes, the cement wall plate is hung on the wire ropes between the cement piles, and other three surfaces use the cement pile and a wire netting to make a link fence whose length is 5-6 kilometer. Referring to the method, the area of the sand prevention, the sand fixation and the planting biology are further enlarged based on an original sand fixation boundary. The method has the effects that the method for sand prevention, sand fixation and planting biology in a desert area is capable of effectively preventing fixing sand, the method is suitable to popularize in large area, the cost is low, and the effect is lasting.

Description

The method of sand-prevention, sand-fixation and planting in desert area
Technical field
The invention belongs to the sand-prevention, sand-fixation and planting in desert area field of engineering technology, be specifically related to a kind of method of sand-prevention, sand-fixation and planting in desert area.
Background technology
Desertification is a great ecological environment problem.Desert of China and desertification land area are about 160.7 ten thousand square kilometres, account for 16.7% of area.Current China desertification land area is just with annual 2460 square kilometres speed expanded, and also has the trend that enlarges quickened.The measure that China takes aspect preventing and treating in desertification is a lot, can reduce following three aspects: sand consolidation with biologic, chemical sand-fixing, engineering is fixed the sand, various sand fixing technologies can effectively stop the expansion in desert in short-term, but As time goes on, have the influence of the various human factors and the natural law to cause new desertification, defending and controlling sand is a complicated system engineering, relates to ecology, fixes the sand many-sided problems such as structure design, economy, society.Therefore, defend and control sand and will obtain long effect, must at first formulate reasonably to defend and control sand and plant living structure design on above-mentioned basis of fixing the sand measure, integral layout, subregion are administered, and promote comprehensively long-term plan; Must take into account economic benefit, ecological benefits and social benefit, give birth under the prerequisite of structure design, give top priority to what is the most important at correct sand-prevention, sand-fixation and planting; Prevent, control, use combination, planning of science activities, suit measures to local conditions, easy first and difficult later, earlier big, the key breakthrough in little back, focus on actual effects, carry out the work of defending and controlling sand.
Summary of the invention
The present invention can effectively stop the expansion in desert in order to solve various sand fixing technologies in short-term, but As time goes on, there is the influence of the various human factors and the natural law to cause new desertification problem, defend and control sand and to obtain long effect, must formulation reasonably defend and control sand and plant living structure design; The comprehensive each side factor of the present invention, and proposed a kind of method of sand-prevention, sand-fixation and planting in desert area, can be permanently effective defend and control sand and large scale application.
Technical scheme of the present invention is: the method for sand-prevention, sand-fixation and planting in desert area of the present invention, this method is at first to select a block length 5-6 kilometer, the moving husky district of the fixedly sand of wide 5-6 kilometer or semi-fluid is square or rectangular control district, correctly select the mobile principal direction of dust storm according to the natural law of each department, laterally tackle the husky wall of choke that utilizes concrete stake and the long 5-6 kilometer of cement wall plate manufacturing with Dingan County's dress one side in the moving principal direction of the sand drift that facings the wind, between the concrete stake apart from 3-4 rice, concrete stake reveals the high 2.0-2.5 rice of Shamian Island, bury fixedly concrete stake of 50 centimetres of sand grounds, connect with wire rope between the concrete stake, cement wall plate is suspended on the wire rope between the concrete stake, all the other 3 netting fences that utilize concrete stake and the long 5-6 kilometer of wire gauze manufacturing stop humans and animals to destroy in going into to fix the sand structure.
Netting fence be by between the concrete stake apart from 3-4 rice, concrete stake reveals the high 2.0-2.5 rice of Shamian Island, buries fixedly concrete stake of 50 centimetres of sand grounds, connects with wire gauze between the concrete stake.
Secondly, in the sand prevention district, pile 40-50 centimetre wide with sand, high 30-40 centimetre semicircular body Leng bank forms long 2.0-2.5 rice, the grid of wide 2.0-2.5 rice, 4 suitable little saplings of 4 angles of grid top plantation, to make with the Leng bank and at first spray suitable grass seeds and nutrient in the grid,, guarantee that grass seeds germinates at last with the Leng bank with spilt grass seeds and sprayed chemical sand-fixing materials that water mixes above the nutrient layer again and form sky more than 0.8-1.5 centimetre and fix the sand layer, absorb moisture, fixedly sand flows.
Method according to above-mentioned sand-prevention, sand-fixation and planting in desert area forms 25-36 square kilometre of zone,. after treating that the growth of trees and grass seeds survives, give birth at the original large tracts of land sand-prevention, sand-fixation and planting that fixes the sand on the basis, border further with reference to same method, year after year, day by day, will form large-area oasis band, society brings benefit to the mankind.
Advantage of the present invention and effect: the method for a kind of sand-prevention, sand-fixation and planting in desert area of the present invention, effectively sand-prevention, sand-fixation and planting is given birth to, and is applicable to the large tracts of land popularization, and the low effect of cost is lasting.
Description of drawings
Below in conjunction with the drawings and specific embodiments the present invention is described in further detail:
Fig. 1 is husky wall concrete stake of choke of the present invention and cement wall plate structural representation.
Fig. 2 is netting fence of the present invention and concrete stake structural representation.
Fig. 3 is the floor map of sand grid structure of the present invention.
Fig. 4 is a sand Leng bank cross-sectional view of the present invention.
Fig. 5 is a sand fixing and growing layer structural representation in the sand grid of the present invention.
Fig. 6 is a sand-prevention, sand-fixation and planting in desert area integral planar layout structure vertical view of the present invention.
Among the figure: 1, be concrete stake, 2, be wire rope, 3, be sand, 4, be wire gauze, 5, be the chemical sand-fixing layer, 6, be grass seeds and nutrient layer.7, be sand Leng bank, 8, be seeds, 9, be little grass, 10, be cement wall plate.
The specific embodiment
Embodiment 1
Shown in Fig. 1-6, select 5 kilometers of block lengths, the moving husky district of wide 5 kilometers fixedly sand or semi-fluid is square control district, correctly select the mobile principal direction of dust storm according to the natural law of each department, utilize concrete stake 1 and cement wall plate 10 to make long 5 kilometers the husky wall of choke, 3 meters of distances between the concrete stake 1, it is high 2 meters that concrete stake 1 reveals Shamian Island, buries fixedly concrete stake of 50 centimetres of sand grounds, connect with wire rope 2 between the concrete stake 1, cement wall plate 10 is suspended on the wire rope 2 between the concrete stake 1, sees Fig. 1, and all the other 3 are utilized concrete stake 1 and wire gauze 4 to make long 5 kilometers netting fences, stop humans and animals to destroy in going into to fix the sand structure, it is high 2 meters that 3 meters of distances between the concrete stake 1, concrete stake are revealed Shamian Island, buries fixedly concrete stake of 50 centimetres of sand grounds, connect with wire gauze 4 between the concrete stake 1, see Fig. 2.Secondly, pile 40 centimetres wide with sand in the sand prevention district, high 30 centimetres semicircular body Leng bank 7 forms long 2 meters, and wide 2 meters grid is seen Fig. 3 and Fig. 4.At 4 suitable little tree seedlings 8 of 4 angles of grid top plantation, to make with Leng bank 7 and at first spray suitable grass seeds and nutrient in the grid, at last with Leng bank 7 with spilt grass seeds and sprayed chemical sand-fixing materials that water mixes above the nutrient layer 6 again and form sky more than 0.8 centimetre and fix the sand layer 5, see Fig. 5, the assurance grass seeds germinates, absorb moisture, fixedly sand flows.Method according to above-mentioned sand-prevention, sand-fixation and planting in desert area forms 25 square kilometres of zones, after treating that the growth of trees and grass seeds survives, give birth at the original large tracts of land sand-prevention, sand-fixation and planting that fixes the sand on the basis, border further with reference to same method, year after year, day by day, will form large-area oasis band.
Embodiment 2
Select 5.5 kilometers of block lengths, the moving husky district of wide 5 kilometers fixedly sand or semi-fluid is rectangle control district, correctly select the mobile principal direction of dust storm according to the natural law of each department, utilize concrete stake 1 and cement wall plate 10 to make long 5.5 kilometers the husky wall of choke, 3.5 meters of distances between the concrete stake 1, it is high 2.5 meters that concrete stake 1 reveals Shamian Island, bury fixedly concrete stake of 50 centimetres of sand grounds, connect with wire rope 2 between the concrete stake 1, cement wall plate 10 is suspended on the wire rope 2 between the concrete stake, see Fig. 1, choke Sha Qiang opposite utilizes concrete stake 1 and wire gauze 4 to make long 5.5 kilometers netting fence, all the other 3 are utilized concrete stake 1 and wire gauze 4 to make long 5 kilometers netting fences, stop humans and animals to destroy in going into to fix the sand structure, 3.5 meters of the distances between the concrete stake 1, it is high 2.5 meters that concrete stake 1 reveals Shamian Island, bury fixedly concrete stake of 50 centimetres of sand grounds, connect with wire gauze 4 between the concrete stake, see Fig. 2.Secondly, pile 45 centimetres wide with sand in the sand prevention district, high 35 centimetres semicircular body Leng bank 7 forms long 2.5 meters, and wide 2.5 meters grid is seen Fig. 3 and Fig. 4.At 4 suitable little tree seedlings 8 of 4 angles of grid top plantation, to make with Leng bank 7 and at first spray suitable grass seeds and nutrient in the grid, at last with the Leng bank with spilt grass seeds and sprayed chemical sand-fixing materials that water mixes above the nutrient layer again and form sky more than 1 centimetre and fix the sand layer 5, see Fig. 5, the assurance grass seeds germinates, absorb moisture, fixedly sand flows.Method according to above-mentioned sand-prevention, sand-fixation and planting in desert area forms 27.5 square kilometres of zones, after treating that the growth of trees and grass seeds survives, give birth at the original large tracts of land sand-prevention, sand-fixation and planting that fixes the sand on the basis, border further with reference to same method, year after year, day by day, will form large-area oasis band.

Claims (4)

1. the method for a sand-prevention, sand-fixation and planting in desert area, it is characterized in that this method is: at first select a block length 5-6 kilometer, the moving husky district of the fixedly sand of wide 5-6 kilometer or semi-fluid is square or rectangular control district, correctly select the mobile principal direction of dust storm according to the natural law of each department, laterally tackling the fixed installation one side in the moving principal direction of sand drift of facining the wind utilizes concrete stake (1) and cement wall plate (10) to make the husky wall of choke of long 5-6 kilometer, between the concrete stake (1) apart from 3-4 rice, concrete stake (1) reveals the high 2.0-2.5 rice of Shamian Island, bury fixedly concrete stake of 50 centimetres of sand grounds, connect with wire rope (2) between the concrete stake (1), cement wall plate (10) is suspended on the wire rope (2) between the concrete stake (1), all the other 3 netting fences that utilize concrete stake (1) and wire gauze (4) to make long 5-6 kilometer.
2. the method for sand-prevention, sand-fixation and planting in desert area according to claim 1, it is characterized in that described netting fence be by between the concrete stake (1) apart from 3-4 rice, concrete stake reveals the high 2.0-2.5 rice of Shamian Island, bury fixedly concrete stake (1) of 50 centimetres of sand grounds, connect with wire gauze (4) between the concrete stake (1).
3. the method for sand-prevention, sand-fixation and planting in desert area according to claim 1, it is characterized in that, in the sand prevention district, pile 40-50 centimetre wide with sand, high 30-40 centimetre semicircular body Leng bank (7), form long 2.0-2.5 rice, the grid of wide 2.0-2.5 rice, 4 suitable little saplings (8) of 4 angles of grid top plantation, to make with Leng bank (7) and at first spray suitable grass seeds and nutrient in the grid, at last with the Leng bank with spilt grass seeds and sprayed chemical sand-fixing materials that water mixes above the nutrient layer again and form sky more than 0.8-1.5 centimetre and fix the sand layer (5).
4. the method for sand-prevention, sand-fixation and planting in desert area according to claim 1 forms 25-36 square kilometre of zone. after treating that the growth of trees and grass seeds survives, give birth at the original large tracts of land sand-prevention, sand-fixation and planting that fixes the sand on the basis, border further with reference to same method.
CNB200810008732XA 2008-01-22 2008-01-22 Method for sand-prevention, sand-fixation and planting in desert area Expired - Fee Related CN100532728C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB200810008732XA CN100532728C (en) 2008-01-22 2008-01-22 Method for sand-prevention, sand-fixation and planting in desert area

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB200810008732XA CN100532728C (en) 2008-01-22 2008-01-22 Method for sand-prevention, sand-fixation and planting in desert area

Publications (2)

Publication Number Publication Date
CN101250867A true CN101250867A (en) 2008-08-27
CN100532728C CN100532728C (en) 2009-08-26

Family

ID=39954450

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB200810008732XA Expired - Fee Related CN100532728C (en) 2008-01-22 2008-01-22 Method for sand-prevention, sand-fixation and planting in desert area

Country Status (1)

Country Link
CN (1) CN100532728C (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102261062A (en) * 2010-05-31 2011-11-30 南瑶 Desert green net
CN102518113A (en) * 2011-12-30 2012-06-27 刘忠龙 Ecological desert control method
CN103503603A (en) * 2013-10-28 2014-01-15 四川省草原科学研究院 Desertification control land and control method thereof
CN104032724A (en) * 2013-11-06 2014-09-10 宋俊生 Sand fixation and water retention device
CN104196006A (en) * 2014-08-30 2014-12-10 武汉橄石代环境资源科技有限公司 Desertification soil treatment method
CN105909056A (en) * 2016-06-28 2016-08-31 蒋爱君 Method for preventing windy sand by adopting fence with screen
CN106576477A (en) * 2016-11-29 2017-04-26 安庆市鼎升环保科技有限公司 Method for controlling desertified soil by utilizing environment-friendly straw vegetation carpets
CN106836174A (en) * 2017-03-14 2017-06-13 中国科学院寒区旱区环境与工程研究所 Using the sand-prevention structure and system of Gobi desert gravel
CN108343047A (en) * 2018-02-07 2018-07-31 陕西地建土地工程技术研究院有限责任公司 A kind of feldspathic sandstone sand-protecting barrier sand-fixation method
CN110805358A (en) * 2019-11-11 2020-02-18 赵锡海 Auxiliary device for ecological restoration and greening

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102261062A (en) * 2010-05-31 2011-11-30 南瑶 Desert green net
CN102261062B (en) * 2010-05-31 2014-05-14 南瑶 Desert green net
CN102518113A (en) * 2011-12-30 2012-06-27 刘忠龙 Ecological desert control method
CN102518113B (en) * 2011-12-30 2014-04-02 刘忠龙 Ecological desert control method
CN103503603A (en) * 2013-10-28 2014-01-15 四川省草原科学研究院 Desertification control land and control method thereof
CN104032724A (en) * 2013-11-06 2014-09-10 宋俊生 Sand fixation and water retention device
CN104196006A (en) * 2014-08-30 2014-12-10 武汉橄石代环境资源科技有限公司 Desertification soil treatment method
CN104196006B (en) * 2014-08-30 2016-06-29 武汉橄石代环境资源科技有限公司 Desertification soil remediation method
CN105909056A (en) * 2016-06-28 2016-08-31 蒋爱君 Method for preventing windy sand by adopting fence with screen
CN105909056B (en) * 2016-06-28 2017-12-19 衢州市易凡设计有限公司 A kind of method using the fence sand-proof for having gauze
CN106576477A (en) * 2016-11-29 2017-04-26 安庆市鼎升环保科技有限公司 Method for controlling desertified soil by utilizing environment-friendly straw vegetation carpets
CN106836174A (en) * 2017-03-14 2017-06-13 中国科学院寒区旱区环境与工程研究所 Using the sand-prevention structure and system of Gobi desert gravel
CN108343047A (en) * 2018-02-07 2018-07-31 陕西地建土地工程技术研究院有限责任公司 A kind of feldspathic sandstone sand-protecting barrier sand-fixation method
CN110805358A (en) * 2019-11-11 2020-02-18 赵锡海 Auxiliary device for ecological restoration and greening

Also Published As

Publication number Publication date
CN100532728C (en) 2009-08-26

Similar Documents

Publication Publication Date Title
CN100532728C (en) Method for sand-prevention, sand-fixation and planting in desert area
CN105484275B (en) A kind of high steep waste side slope reinforcement anchoring Ecosystem restoration system of mountain area wind power plant
CN104805845B (en) A kind of flexible bank protecting method of feldspathic sandstone natural slope
CN201730256U (en) Light greening roof
CN105210619B (en) For side slope, the microbial matrices blanket and installation method of revetment vegetation repair
CN101949147B (en) Desert soil moisture conservation method and application
CN105625443B (en) High-steep soil nail grass planting slope protection structure system and construction method thereof
CN208266847U (en) Quickly repair structure in Gullied suitable for Canal in Loess Area
CN105569281B (en) A kind of environmental roof greening structure and its construction method
CN105325226A (en) Stripped live plant fence type sand-barrier protection system planting method
CN107100176B (en) A kind of expressway slope greening system
CN104164863A (en) Arid area desert sand fixation method
CN109328978A (en) One type loam matrix plant pad and its application in control of desert
CN101793079A (en) Novel root stopping material and green roof planting technology
CN102322155B (en) Unconcerned table Great Wall extra large, multi-functional and Prevention of Sandstorm
CN207891760U (en) Road sand storm protection system suitable for drift sand area
CN202524735U (en) Composite concealed conduit for salt elimination and alkalinity reduction in saline-alkali land
CN103422466A (en) Black and odorous river regulating and recovering method
CN201972156U (en) Slope protection system with stereoscopic afforestation vegetation cushions
CN103321194A (en) Dry land ecological interception channel adopting slope protection technology and construction method thereof
CN104294830A (en) Side slope ecological protection and recovery method and arrangement structure
CN207392215U (en) A kind of rock side slope ecological afforestation slope protection device
CN101548615A (en) Porous nest brick 3D green plant technology
CN105200972A (en) Method for comprehensive treatment of moving dune through top sealing, slope fixing and side locking
CN113186945A (en) Intelligent maintenance system and method for ecological slope protection

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20090826

Termination date: 20120122