CN101250853B - 钢塔自升式安装方法 - Google Patents

钢塔自升式安装方法 Download PDF

Info

Publication number
CN101250853B
CN101250853B CN200710055068XA CN200710055068A CN101250853B CN 101250853 B CN101250853 B CN 101250853B CN 200710055068X A CN200710055068X A CN 200710055068XA CN 200710055068 A CN200710055068 A CN 200710055068A CN 101250853 B CN101250853 B CN 101250853B
Authority
CN
China
Prior art keywords
head tower
steel tower
auxiliary leg
tower
main body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN200710055068XA
Other languages
English (en)
Other versions
CN101250853A (zh
Inventor
冯广胜
李艳哲
周功建
李富仓
郭荣春
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
No1 Engineering Co Ltd Zhongtie Bridge Bureau Group
1st Engineering Co Ltd of MBEC
Original Assignee
No1 Engineering Co Ltd Zhongtie Bridge Bureau Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by No1 Engineering Co Ltd Zhongtie Bridge Bureau Group filed Critical No1 Engineering Co Ltd Zhongtie Bridge Bureau Group
Priority to CN200710055068XA priority Critical patent/CN101250853B/zh
Publication of CN101250853A publication Critical patent/CN101250853A/zh
Application granted granted Critical
Publication of CN101250853B publication Critical patent/CN101250853B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

本发明公开一种钢塔自升式安装方法,在钢塔主体底部设有转动铰,在所述钢塔主体上铰接辅助腿,钢塔主体与辅助腿在现场地面拼装支架上拼焊完成后,在钢塔底座与辅助腿底部之间设置张拉系统,通过张拉装置张拉使钢塔实现竖转并起升到达预定位置,然后安装钢塔底部转动铰处固定结构。本发明的优点在于:1、在钢塔与辅助腿(对于“人”字形的钢塔其辅助腿可直接利用钢塔的斜腿)之间以及钢塔与其底座之间设置转动铰,方便钢塔及辅助腿利用地面上起吊设备在地面附近拼焊,易于保证拼焊质量。2、在钢塔底座与辅助腿底部之间设置预应力筋,通过千斤顶张拉为钢塔竖转提供动力,使钢塔自升到达预定位置,设施简单,操作高度小,操作便捷。

Description

钢塔自升式安装方法
技术领域
本发明涉及一种桥梁钢塔的安装方法。
背景技术
钢塔主要用于斜拉桥等桥梁工程中,在已有的竖转施工方法中,一般需要设置庞大的提升塔架,提升塔架下设置强大的基础,为提高塔架稳定性往往还需要设置锚索结构,提升设备一般置于塔顶,在钢塔竖转过程中,施工投入的安装辅助设施多且操作不便。
发明内容
本发明的目的是提供一种新的桥梁钢塔安装方法。
为实现上述目的,本发明采用如下技术方案:一种钢塔自升式安装方法,在钢塔主体底部设有转动铰,在所述钢塔主体上铰接辅助腿,钢塔主体与辅助腿在现场地面拼装支架上拼焊完成后,在钢塔底座与辅助腿底部之间设置张拉系统,通过张拉装置张拉使钢塔实现竖转并起升到达预定位置,然后安装钢塔底部转动铰处固定结构。
所述辅助腿顶端铰接在钢塔主体上,底端通过球靴或转铰与滑板配合,滑板位于滑道上,所述张拉系统包括在钢塔底座与辅助腿底部之间设置的预应力筋,所述张拉装置为穿心式千斤顶,所述千斤顶设在钢塔底座处,预应力筋一端固定在滑板上,另一端从千斤顶中穿过。
如果钢塔为“人”字形的钢塔,所述辅助腿为钢塔的斜腿,钢塔主体竖转并起升到达预定位置后,安装辅助腿顶部转铰处的固定结构,安装辅助腿底部球靴或转铰处的固定结构。
如果钢塔在转动平面内为独柱式的钢塔,在钢塔主体定位后,再利用钢塔顶部设置的吊挂装置或地面起吊设备拆除辅助腿。
为了保险起见,在所述球靴后方的滑板处设有防滑装置。
本发明的优点在于:1、在钢塔与辅助腿(对于“人”字形的钢塔其辅助腿可直接利用钢塔的斜腿)之间以及钢塔与其底座之间设置转动铰,方便钢塔及辅助腿利用地面上起吊设备在地面附近拼焊,易于保证拼焊质量。2、在钢塔底座与辅助腿底部之间设置预应力筋,通过千斤顶张拉为钢塔竖转提供动力,使钢塔自升到达预定位置,设施简单,操作高度小,操作便捷。
附图说明
图1为本发明的钢塔拼装状态结构布置示意图;
图2为本发明的钢塔自升到达预定位置示意图;
图3为本发明的钢塔恢复结构布置示意图。
具体实施方式
如图1所示,以“人”字形钢塔施工为例:首先在钢塔1及斜腿2下搭设简易临时支架13,并使钢塔1与斜腿2之间有一定夹角a,钢塔1与斜腿2不能平行重叠,以免自升困难,然后利用地面上起吊设备在临时支架13上拼焊钢塔1及斜腿2。安装钢塔底部转铰3;安装钢塔1与斜腿2(对于独柱式钢塔可在钢塔1主体上设置辅助腿2)之间转铰4;安装滑道6;安装斜腿2底端球靴14(或转铰)及滑板5,滑板5位于滑道6上;然后在钢塔底座与辅助腿底部之间设置预应力钢绞线7,在钢塔底座处设置千斤顶8,预应力钢绞线7一端固定在滑板5上,另一端从千斤顶8中穿过;在球靴14后方的滑板5处安装防滑保护装置9,避免球靴14滑脱及张拉系统破坏而引起安全隐患。上述工作结束后拆除临时支架13,如图2所示,张拉千斤顶8使斜腿2底端球靴14(或转铰)及滑板5沿滑道6向钢塔1一侧滑移,斜腿2以顶部转铰4为中心转动,钢塔1及转铰4同时以钢塔底部转铰3为转动中心转动,从而实现钢塔1的自升。这一自升系统及受力体系充分发挥了预应力钢绞线7的受拉性能,使整个结构受力简捷,操作方便。
如图3所示,钢塔1自升到达预定位置后,安装钢塔底部转动部位恢复结构10,对于“人”字形的钢塔,还需安装辅助腿顶部转动部位恢复结构11和辅助腿底部恢复结构12。对于钢塔在转动平面内为独柱式的钢塔,安装完钢塔底部转动部位恢复结构10后,再利用钢塔顶部设置的吊挂装置或地面起吊设备拆除辅助腿2。
本发明中张拉系统的千斤顶也可采用连续式千斤顶,达到连续自升钢塔架的目的,这种变换方式应认为同样属于本发明的保护范围。

Claims (5)

1.一种钢塔自升式安装方法,在钢塔主体底部设有转动铰,其特征是:在所述钢塔主体上铰接辅助腿,钢塔主体与辅助腿在现场地面拼装支架上拼焊完成后,在钢塔底座与辅助腿底部之间设置张拉系统,通过张拉装置张拉使钢塔实现竖转并起升到达预定位置,然后安装钢塔底部转动铰处固定结构。
2.如权利要求1所述的钢塔自升式安装方法,其特征是:所述辅助腿顶端铰接在钢塔主体上,底端通过球靴或转铰与滑板配合,滑板位于滑道上,所述张拉系统包括在钢塔底座与辅助腿底部之间设置的预应力筋,所述张拉装置为穿心式千斤顶,所述千斤顶设在钢塔底座处,预应力筋一端固定在滑板上,另一端从千斤顶中穿过。
3.如权利要求2所述的钢塔自升式安装方法,其特征是:所述钢塔为“人”字形的钢塔,所述辅助腿为钢塔的斜腿,钢塔主体竖转并起升到达预定位置后,安装辅助腿顶部转铰处的固定结构,安装辅助腿底部球靴或转铰处的固定结构。
4.如权利要求2所述的钢塔自升式安装方法,其特征是:在钢塔主体定位后,再利用钢塔顶部设置的吊挂装置或地面起吊设备拆除辅助腿。
5.如权利要求2或3或4所述的钢塔自升式安装方法,其特征是:所述球靴后方的滑板处设有防滑装置。
CN200710055068XA 2007-08-30 2007-08-30 钢塔自升式安装方法 Active CN101250853B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200710055068XA CN101250853B (zh) 2007-08-30 2007-08-30 钢塔自升式安装方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200710055068XA CN101250853B (zh) 2007-08-30 2007-08-30 钢塔自升式安装方法

Publications (2)

Publication Number Publication Date
CN101250853A CN101250853A (zh) 2008-08-27
CN101250853B true CN101250853B (zh) 2010-07-07

Family

ID=39954436

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200710055068XA Active CN101250853B (zh) 2007-08-30 2007-08-30 钢塔自升式安装方法

Country Status (1)

Country Link
CN (1) CN101250853B (zh)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102277837B (zh) * 2011-05-10 2013-03-20 吴江市明港道桥工程有限公司 一种转体桥梁施工的顶推装置
CN102877412B (zh) * 2011-07-13 2015-06-17 上海振华重工(集团)股份有限公司 钢塔整体竖立式预拼装方法
CN104088231B (zh) * 2014-08-01 2016-05-18 武船重型工程股份有限公司 一种重型桥梁钢塔节段的翻身方法
CN105064211A (zh) * 2015-08-05 2015-11-18 武船重型工程股份有限公司 一种钢索塔适配胎架及其使用方法
CN105464001A (zh) * 2015-11-05 2016-04-06 中铁十八局集团有限公司 一种钢塔反向竖转的施工方法
CN110847689B (zh) * 2019-10-15 2021-07-30 黄子磊 一种自升式钢塔的建造方法
CN113718663A (zh) * 2021-05-24 2021-11-30 中铁三局集团有限公司 一种跨越多股道运营线的铁路钢索塔施工方法
CN113309012A (zh) * 2021-05-24 2021-08-27 中铁三局集团有限公司 一种跨越多股道运营线的铁路钢索塔施工装置

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4221088A (en) * 1979-01-02 1980-09-09 Pre Corporation Mfg. Co. Low lift, elevatable high floor drilling mast and substructure arrangement therefor
CN1590273A (zh) * 2003-04-08 2005-03-09 美国格若沃责任有限公司 用于移动式伸缩起重机的张拉系统
CN1824906A (zh) * 2006-02-06 2006-08-30 孙光年 自行正杆器

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4221088A (en) * 1979-01-02 1980-09-09 Pre Corporation Mfg. Co. Low lift, elevatable high floor drilling mast and substructure arrangement therefor
CN1590273A (zh) * 2003-04-08 2005-03-09 美国格若沃责任有限公司 用于移动式伸缩起重机的张拉系统
CN1824906A (zh) * 2006-02-06 2006-08-30 孙光年 自行正杆器

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
JP特开2003-328323A 2003.11.19

Also Published As

Publication number Publication date
CN101250853A (zh) 2008-08-27

Similar Documents

Publication Publication Date Title
CN101250853B (zh) 钢塔自升式安装方法
CN202247688U (zh) 一种上跨高速铁路防气动力防护棚架
EP2368834B1 (en) Equipment for raising/lowering of wind generator turbines
CN205772984U (zh) 一种单片钢桁架的吊装装置
WO2012062968A1 (en) Scaffolding attachment arrangement
CN101284628A (zh) 大吨位压力机架的吊装方法
CN105839543A (zh) 桥梁高墩自升外架翻模施工工艺
CN101684885A (zh) 稀油密封型干式煤气柜柜顶系统拆除方法
CN207048345U (zh) 建筑施工卸料平台装置
CN202481956U (zh) 附着爬升式定型化两用平台
CN204224064U (zh) 自动扶梯楼层板的开启及支撑结构
CN105016220A (zh) 一种抱杆加节装置
CN202482772U (zh) 铁路桥梁防落梁挡块安装系统
CN201355750Y (zh) 用于配电线路带电作业的旋转式绝缘梯
CN206917390U (zh) 塔段分段吊立装置
CN112374346B (zh) 装配式建筑预制构件吊装装置
CN202831591U (zh) 可提升超高空间异形桁架施工平台
CN105253793B (zh) 一种镀锌车间锌锅牵引运输吊装的施工方法
CN212803478U (zh) 偏航卡钳的工装
CN110203825B (zh) 高炉斜桥拆除方法
CN203288976U (zh) 隔离开关吊装装置
CN204490295U (zh) 一种提升机
CN102535347A (zh) 连续落梁系统及连续落梁方法
CN204454369U (zh) 桥梁预制梁板卷扬机起梁架
CN104085823B (zh) 地铁铺轨门吊拆装及运输用旋转升降机

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant