CN101220593A - Fastening method of post-treating pipe pile break with pre-stress pipe pile construction - Google Patents

Fastening method of post-treating pipe pile break with pre-stress pipe pile construction Download PDF

Info

Publication number
CN101220593A
CN101220593A CNA2008100260198A CN200810026019A CN101220593A CN 101220593 A CN101220593 A CN 101220593A CN A2008100260198 A CNA2008100260198 A CN A2008100260198A CN 200810026019 A CN200810026019 A CN 200810026019A CN 101220593 A CN101220593 A CN 101220593A
Authority
CN
China
Prior art keywords
pipe pile
pile tube
pile
reinforcing bar
reinforcement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CNA2008100260198A
Other languages
Chinese (zh)
Inventor
徐醒华
徐情根
彭跃莺
刘淑芬
伍锦湛
肖学兰
林龙奖
陈晓凯
黎绍桃
周志明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
DONGGUAN HUAYE CIVIL FOUNDATION ENGINEERING Co Ltd
Original Assignee
DONGGUAN HUAYE CIVIL FOUNDATION ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by DONGGUAN HUAYE CIVIL FOUNDATION ENGINEERING Co Ltd filed Critical DONGGUAN HUAYE CIVIL FOUNDATION ENGINEERING Co Ltd
Priority to CNA2008100260198A priority Critical patent/CN101220593A/en
Publication of CN101220593A publication Critical patent/CN101220593A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The invention relates to a reinforcing method for dealing with the rupture of a pipe pile after the construction of the prestressed pipe pile. The procedures are as following: (1) the position of the rupture of the prestressed pipe pile is detected first; (2) the laitance on the inner wall of the pipe pile is cleared; (3) a reinforced skeleton frame is put into the pipe pile and the reinforced skeleton extends to the position three meters under the pipe pile from the pile top; (4) concrete under pile level is poured into the pipe pile, and the strength grade is not smaller than C30; (5) after the condensation of the concrete, the reinforced skeleton frame is led to be fixed with the reinforced steel in a cushion cap, and further the reinforced technique of the rupture of the pipe pile is finished. The reinforcing method of the invention can ensure the safety of the structure and does not affect the construction of the next working procedure; besides, the invention has the advantages of convenient construction, short constructing period, low cost and good effect.

Description

The reinforcement means of this pile tube fracture of a kind of prestressing pipe pile construction post processing
Technical field
The present invention relates to prestressing pipe pile construction method, refer in particular to the reinforcement means of this pile tube fracture of a kind of prestressing pipe pile construction post processing.
Background technology
In the pile foundation construction process, on-the-spot discovery has fractured tubular piles can utilize former stake machine to carry out piling, when finding fractured tubular piles is arranged after testing after if the stake machine is moved, can be because do not allow that a machine enters construction operation again behind the excavation of construction site, so only can take the reinforcing measure, all be to adopt the pile extension reinforcement means at present generally speaking, adopt the manually digging hole form, dig to the pile body breaking place, the epimere stake utilizes the reinforcing cage bar straightening with manually cutting, so comparatively trouble, loaded down with trivial details, and claim for eot, be unfavorable for that engineering runs smooth, and the compacted effect of stake week soil weakens, a stake Zhou Tuxiang hole intrinsic displacement can cause former stake off normal, retaining wall is subjected to displacement even avalanche, does not obviously meet the demand of current building trade.
Summary of the invention
Main purpose of the present invention is to provide the reinforcement means of this pile tube fracture of a kind of prestressing pipe pile construction post processing, its easy construction, duration weak point and effective.
For realizing above-mentioned purpose, the present invention adopts following technical scheme:
The reinforcement means of this pile tube fracture of a kind of prestressing pipe pile construction post processing, step is as follows:
(1) detects the position that pile for prestressed pipe ruptures earlier;
(2) pile tube inwall laitance is removed totally;
(3) put into cage of reinforcement in pile tube, this cage of reinforcement is to extend below 3 meters of pile tube fracture from stake jack-up;
(4) concrete below the pouring stake top mark height in pile tube again, its strength grade is not less than C 30
(5) after concrete condenses, the reinforcing bar in above-mentioned cage of reinforcement and the cushion cap is fixed, and then finished the reinforcement process of pile tube fracture.
Adopt inwall brushing cement paste or methods such as concrete interface agent or slightly expanded concrete to remove in above-mentioned steps (2).
Cage of reinforcement in above-mentioned steps (3) is welded by vertical fixedly reinforcing bar and crosswise fixed reinforcing bar, is positioned at vertical fixedly reinforcing bar bottom welding one undersized in the supporting plate of pile tube internal diameter.It is above-mentioned that vertically fixedly reinforcing bar, crosswise fixed reinforcing bar are evenly arranged along the pile tube circumference.
Between interlocking, above-mentioned vertical fixedly reinforcing bar, crosswise fixed reinforcing bar be provided with the stirrup of an affixed usefulness.
Above-mentioned supporting plate is a steel plate, and its thickness is 4~5mm.
The present invention's advantage is to utilize cage of reinforcement to pour into strength grade C in back below 3 meters from the stake tip cutting to the pile tube fracture 30The scheme of above concrete, it can guarantee structural safety, does not influence the subsequent processing construction, and easy construction, duration are short, effective.
Description of drawings
Fig. 1 is the present invention's a constructing structure schematic diagram;
Fig. 2 is the A-A schematic cross-section of Fig. 1.
The drawing reference numeral explanation:
1, pile tube 11, stake top
2, cage of reinforcement 21, vertically fixedly reinforcing bar 22, crosswise fixed reinforcing bar 23, supporting plate 24, stirrup
3, cushion cap
4, concrete
The specific embodiment
Below in conjunction with the accompanying drawing and the specific embodiment the present invention is further described.
As shown in Figure 1 and Figure 2, the reinforcement means of this pile tube fracture of a kind of prestressing pipe pile construction post processing, its step is as follows:
(1) detect the position a that pile for prestressed pipe 1 ruptures earlier, for example the degree of depth of ordering at a is h 1Place's fracture; Wherein detecting can be to adopt high or low deformation dynamic inspection method to carry out.
(2) pile tube 1 inwall laitance is removed totally, it adopts inwall brushing cement paste or methods such as concrete interface agent or slightly expanded concrete to remove, to improve the globality of follow-up perfusion concrete and tubular pile body concrete.
(3) prepare complex root cage of reinforcement 2, its reinforcing bar 2 whole heights calculate according to the position a of pile tube fracture, as the degree of depth h according to above-mentioned fracture position a 1If meter is cage of reinforcement 2 whole height h 2, this h so 2Be more than or equal to h 1+ h 3, h 3More than or equal to 3 meters; It is welded by vertical fixedly reinforcing bar 21 and crosswise fixed reinforcing bar 22, is positioned at vertical fixedly reinforcing bar 21 bottoms and welds the supporting plate 23 of a undersized in pile tube 1 internal diameter.It is above-mentioned that vertically fixedly reinforcing bar 21, crosswise fixed reinforcing bar 22 are evenly arranged along pile tube 1 circumference, for further vertically fixedly reinforcing bar 21, crosswise fixed reinforcing bar 22 are affixed with above-mentioned, between it is staggered, be provided with a stirrup 24, wherein vertically fixedly reinforcing bar select 6 Φ, 20 model reinforcing bars for use, and crosswise fixed reinforcing bar 22 is selected the reinforcing bar of 3 Φ, 10 models for use, and stirrup 24 is selected Φ 8@200 arrangement of reinforcement for use.Above-mentioned supporting plate 23 is a steel plate, and its thickness is 4~5mm.
(4) put into above-mentioned cage of reinforcement 2 in pile tube 1, this cage of reinforcement 2 is to extend below 3 meters of pile tube 1 fracture a from stake top 11.Certainly this top is to imbed the degree of depth in the cushion cap 3.
(5) concrete 4 below the pouring stake top mark height in pile tube 1 again, its strength grade is not less than C 30
(6) after concrete 4 condenses, above-mentioned reinforcing bar 2 and the reinforcing bar in the cushion cap are fixed, and then finished the reinforcement process of pile tube 1 fracture.
The inventor utilizes said method to carry out the construction of tens case histories, all attain the results expected, also obtained the consistent approval of Construction unit, designing unit, quality supervision and supervisor and certainly, think that this reinforcing method is simple, convenient, practical, cost is low, do not influence the subsequent processing construction, be other reinforcing method incomparable advantage, stronger economic benefit and social benefit are arranged.
After design focal point of the present invention is its prestressing pipe pile construction, when finding fractured tubular piles after testing after promptly piling machinery is withdrawn from the arena, utilize cage of reinforcement to pour into strength grade C in back below 3 meters from the stake tip cutting to the pile tube fracture 30The scheme of above concrete, it can guarantee structural safety, and easy construction, the duration is short, cost is low, effective.
The above, it only is structure preferred embodiment of the present invention, be not that technical scope of the present invention is imposed any restrictions, so every foundation technical spirit of the present invention all still belongs in the scope of technical solution of the present invention any trickle modification, equivalent variations and modification that above embodiment did.

Claims (6)

1. the reinforcement means of this pile tube fracture of a prestressing pipe pile construction post processing, it is characterized in that: step is as follows
(1) detects the position that pile for prestressed pipe ruptures earlier;
(2) pile tube inwall laitance is removed totally;
(3) put into cage of reinforcement in pile tube, this cage of reinforcement is to extend below 3 meters of pile tube fracture from stake jack-up;
(4) concrete below the pouring stake top mark height in pile tube again, its strength grade is not less than C 30
(5) after concrete condenses, the reinforcing bar in above-mentioned cage of reinforcement and the cushion cap is fixed, and then finished the reinforcement process of pile tube fracture.
2. according to the reinforcement means of this pile tube fracture of the described a kind of prestressing pipe pile construction post processing of claim 1, it is characterized in that: above-mentioned steps (2) adopts inwall brushing cement paste or methods such as concrete interface agent or slightly expanded concrete to remove.
3. according to the reinforcement means of this pile tube of the described a kind of prestressing pipe pile construction post processing of claim 1 fracture, it is characterized in that: the cage of reinforcement in the above-mentioned steps (3) is welded by vertical fixedly reinforcing bar and crosswise fixed reinforcing bar, is positioned at vertical fixedly reinforcing bar bottom welding one undersized in the supporting plate of pile tube internal diameter.
4. according to the reinforcement means of this pile tube fracture of the described a kind of prestressing pipe pile construction post processing of claim 3, it is characterized in that: above-mentioned vertically fixedly reinforcing bar, crosswise fixed reinforcing bar are evenly arranged along the pile tube circumference.
5. according to the reinforcement means of this pile tube fracture of the described a kind of prestressing pipe pile construction post processing of claim 4, it is characterized in that: the stirrup that is provided with an affixed usefulness between above-mentioned vertical fixedly reinforcing bar, crosswise fixed reinforcing bar interlock.
6. according to the reinforcement means of this pile tube fracture of the described a kind of prestressing pipe pile construction post processing of claim 3, it is characterized in that: above-mentioned supporting plate is a steel plate, and its thickness is 4~5mm.
CNA2008100260198A 2008-01-25 2008-01-25 Fastening method of post-treating pipe pile break with pre-stress pipe pile construction Pending CN101220593A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNA2008100260198A CN101220593A (en) 2008-01-25 2008-01-25 Fastening method of post-treating pipe pile break with pre-stress pipe pile construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNA2008100260198A CN101220593A (en) 2008-01-25 2008-01-25 Fastening method of post-treating pipe pile break with pre-stress pipe pile construction

Publications (1)

Publication Number Publication Date
CN101220593A true CN101220593A (en) 2008-07-16

Family

ID=39630642

Family Applications (1)

Application Number Title Priority Date Filing Date
CNA2008100260198A Pending CN101220593A (en) 2008-01-25 2008-01-25 Fastening method of post-treating pipe pile break with pre-stress pipe pile construction

Country Status (1)

Country Link
CN (1) CN101220593A (en)

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101775806A (en) * 2010-03-02 2010-07-14 天津二十冶建设有限公司 Connection node of steel structure truss and prestressed concrete pipe piles
CN101413265B (en) * 2008-10-07 2010-10-06 天津二十冶建设有限公司 Defect reinforcing and processing construction method of drill filling pile
CN101748759B (en) * 2009-12-16 2011-02-09 江苏建华管桩有限公司 Method for strengthening and repairing tubular pile head
CN102094418A (en) * 2011-01-10 2011-06-15 江河建设集团有限公司 Construction method for connecting concrete thin-wall pipe pile by wooden supporting plate
CN102433901A (en) * 2011-09-28 2012-05-02 孔超 Repair and treatment method of prestressed pipe pile with bending and breaking defects
CN102505685A (en) * 2011-11-22 2012-06-20 苏州市建筑设计研究院有限责任公司 Tubular pile defect processing method
CN103174176A (en) * 2011-12-26 2013-06-26 贵阳铝镁设计研究院有限公司 Heightening method and structure of high cup opening prefabricated column foundation cup opening
CN103437351A (en) * 2013-09-18 2013-12-11 浙江省岩土基础公司 Treatment method of deviation and fracture remediation of pile body of filling pile
CN106351218A (en) * 2016-08-31 2017-01-25 南京工业大学 Broken pile remedying method
CN108468331A (en) * 2018-03-14 2018-08-31 中国建筑第八工程局有限公司 There is the saw piling method of the pile for prestressed pipe of lightning protection demand
CN111021353A (en) * 2019-12-30 2020-04-17 中国建筑第四工程局有限公司 Reinforcement method and structure for prestressed pipe pile defects
CN112878320A (en) * 2021-01-18 2021-06-01 中国十七冶集团有限公司 Construction method for reinforcing PHC tubular pile core in mucky soil layer area
CN113062312A (en) * 2021-03-31 2021-07-02 山东建筑大学 Reinforcing method for anti-floating pile burst pile
CN114293600A (en) * 2021-12-22 2022-04-08 珠海华发人居生活研究院有限公司 Method for processing broken pile defect of precast pile in weak soil area
CN114657977A (en) * 2022-02-24 2022-06-24 中建一局集团第二建筑有限公司 Prestressed concrete tubular pile tip crack reinforcing and strengthening device
CN115434310A (en) * 2022-09-22 2022-12-06 国网河北省电力有限公司经济技术研究院 PHC inclined pipe pile post-fracture compensation tensioning connection device and construction method

Cited By (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101413265B (en) * 2008-10-07 2010-10-06 天津二十冶建设有限公司 Defect reinforcing and processing construction method of drill filling pile
CN101748759B (en) * 2009-12-16 2011-02-09 江苏建华管桩有限公司 Method for strengthening and repairing tubular pile head
CN101775806A (en) * 2010-03-02 2010-07-14 天津二十冶建设有限公司 Connection node of steel structure truss and prestressed concrete pipe piles
CN102094418A (en) * 2011-01-10 2011-06-15 江河建设集团有限公司 Construction method for connecting concrete thin-wall pipe pile by wooden supporting plate
CN102094418B (en) * 2011-01-10 2012-08-15 江河建设集团有限公司 Construction method for connecting concrete thin-wall pipe pile by wooden supporting plate
CN102433901A (en) * 2011-09-28 2012-05-02 孔超 Repair and treatment method of prestressed pipe pile with bending and breaking defects
CN102433901B (en) * 2011-09-28 2015-03-11 孔超 Repair and treatment method of prestressed pipe pile with bending and breaking defects
CN102505685A (en) * 2011-11-22 2012-06-20 苏州市建筑设计研究院有限责任公司 Tubular pile defect processing method
CN103174176A (en) * 2011-12-26 2013-06-26 贵阳铝镁设计研究院有限公司 Heightening method and structure of high cup opening prefabricated column foundation cup opening
CN103437351A (en) * 2013-09-18 2013-12-11 浙江省岩土基础公司 Treatment method of deviation and fracture remediation of pile body of filling pile
CN106351218A (en) * 2016-08-31 2017-01-25 南京工业大学 Broken pile remedying method
CN108468331A (en) * 2018-03-14 2018-08-31 中国建筑第八工程局有限公司 There is the saw piling method of the pile for prestressed pipe of lightning protection demand
CN108468331B (en) * 2018-03-14 2020-04-24 中国建筑第八工程局有限公司 Pile sawing method for prestressed pipe pile with lightning protection requirement
CN111021353A (en) * 2019-12-30 2020-04-17 中国建筑第四工程局有限公司 Reinforcement method and structure for prestressed pipe pile defects
CN112878320A (en) * 2021-01-18 2021-06-01 中国十七冶集团有限公司 Construction method for reinforcing PHC tubular pile core in mucky soil layer area
CN113062312A (en) * 2021-03-31 2021-07-02 山东建筑大学 Reinforcing method for anti-floating pile burst pile
CN113062312B (en) * 2021-03-31 2022-10-25 山东建筑大学 Reinforcing method for anti-floating pile burst pile
CN114293600A (en) * 2021-12-22 2022-04-08 珠海华发人居生活研究院有限公司 Method for processing broken pile defect of precast pile in weak soil area
CN114657977A (en) * 2022-02-24 2022-06-24 中建一局集团第二建筑有限公司 Prestressed concrete tubular pile tip crack reinforcing and strengthening device
CN114657977B (en) * 2022-02-24 2023-10-20 中建一局集团第二建筑有限公司 Prestressed concrete pipe pile end crack reinforcing device
CN115434310A (en) * 2022-09-22 2022-12-06 国网河北省电力有限公司经济技术研究院 PHC inclined pipe pile post-fracture compensation tensioning connection device and construction method
CN115434310B (en) * 2022-09-22 2023-11-28 国网河北省电力有限公司经济技术研究院 PHC inclined tube pile post-fracture repair tensioning connection device and construction method

Similar Documents

Publication Publication Date Title
CN101220593A (en) Fastening method of post-treating pipe pile break with pre-stress pipe pile construction
CN102162258B (en) Concrete-filled steel tubular high-pile tower footing structure of tower crane and construction method thereof
CN204753615U (en) Bridge pile foundation reinforced structure
CN203222809U (en) Pre-stressed concrete pipe pile foundation for pole and tower of power transmission line
CN102864780A (en) Supporting structure and supporting method of foundation pit
CN102828533B (en) Vertical pressure resistance static load test pile head advanced processing node of cast-in-place pile and construction method
CN205024712U (en) Modular tower crane basis
CN106013834A (en) Device and method for storey addition of basement
CN209339171U (en) A kind of transmission line of electricity assembled sheet pile composite foundation
CN202139587U (en) Steel pile tube with closed conical end
CN114657977B (en) Prestressed concrete pipe pile end crack reinforcing device
CN102505685A (en) Tubular pile defect processing method
CN205999898U (en) Internal support of foundation pit pile for prestressed pipe vertical supporting structure
CN209339172U (en) A kind of novel peg board composite foundation
CN205776152U (en) Prestressed anchor waveform sheet pile retaining structure
CN204780892U (en) Tubular pile crack reinforcement structure of high strength
CN102505668B (en) Construction method for reinforcing horizontal crack of gravity dam head by using steel bar
CN108914942A (en) A kind of system of deep foundation pit support and its construction method
CN212175798U (en) Whole strutting arrangement of deep basal pit
CN212866008U (en) Single pile reinforcing device
CN210288522U (en) Dam foundation rock mass reinforced structure based on prefabricated hollow pile
CN203022018U (en) Plant column foundation in reclamation areas
CN205742249U (en) A kind of prestressed concrete back cover cushion cap template
CN109440800A (en) A kind of novel peg board composite foundation and construction method
CN216339318U (en) Template device is consolidated to bank protection for hydraulic construction engineering

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Open date: 20080716