CN101775806A - Connection node of steel structure truss and prestressed concrete pipe piles - Google Patents

Connection node of steel structure truss and prestressed concrete pipe piles Download PDF

Info

Publication number
CN101775806A
CN101775806A CN 201010116621 CN201010116621A CN101775806A CN 101775806 A CN101775806 A CN 101775806A CN 201010116621 CN201010116621 CN 201010116621 CN 201010116621 A CN201010116621 A CN 201010116621A CN 101775806 A CN101775806 A CN 101775806A
Authority
CN
China
Prior art keywords
concrete pipe
steel
prestressed concrete
truss
pipe piles
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 201010116621
Other languages
Chinese (zh)
Inventor
王晓东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin MCC20 Construction Co Ltd
Original Assignee
Tianjin MCC20 Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin MCC20 Construction Co Ltd filed Critical Tianjin MCC20 Construction Co Ltd
Priority to CN 201010116621 priority Critical patent/CN101775806A/en
Publication of CN101775806A publication Critical patent/CN101775806A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The invention discloses a connection node of a steel structure truss and prestressed concrete pipe piles. The connection node comprises a top plate and steel members, wherein the top plate is welded on the steel structure truss, the steel members are anchored to the prestressed concrete pipe piles, and the steel members are welded with the top plate. In the invention, the upper part is provided with the top plate which is welded on the steel structure truss, the lower part is provided with the steel members which are anchored to the concrete pipe pile, and the firm welded structure of the top plate and the steel members reliably connects the steel truss with the concrete pipe piles, so that the steel structure truss on the top and the prestressed concrete pipe piles as the support structure constitute an integral body to bear force together. The connection node can indirectly regulate the pile top levels of the concrete pipe piles to be consistent, thereby ensuring the required external appearance size and favorable mechanical properties of the formed structural system. The invention has the advantages of simple structure and easy manufacture.

Description

Steel structure truss and prestressed concrete pipe pile connected node
Technical field
The present invention relates to building engineering field, particularly a kind of steel structure truss and prestressed concrete pipe pile connected node.
Background technology
In engineering construction, usually can run into soft foundation pattern foundation pit supporting structure problem, and in double prestressed concrete pipe pile+waterproof of man+top steel truss supporting and protection structure the top steel truss to be connected with prestressed concrete pipe pile be difficult point, if top truss is directly welded and will certainly have many drawbacks with the pile crown flange, for example hammer piling process king-pile top mark height differs, if directly welding can be welded after will adjusting levelling with billet in advance; And because that tubular pile head flange and pile body are connected shear strength is lower, also might in being subjected to exogenic processes, cause weld seam after being welded to connect, have very big potential safety hazard by drawing crack.
Summary of the invention
The present invention provides a kind of connect steel structure truss and prestressed concrete pipe pile connected node reliable, that can adjust prestressed concrete pipe pile stake top mark high level error indirectly for solving the technical problem that exists in the known technology.
The technical scheme that the present invention takes for the technical problem that exists in the solution known technology is: a kind of steel structure truss and prestressed concrete pipe pile connected node, comprise with the top board of described steel structure truss welding and with steel member, described steel member and the welding of described top board of described prestressed concrete pipe pile anchor connection.
Described steel member is a H shaped steel.
Described top board is circular.
Described H shaped steel is connected with described top board full weld.
Advantage and good effect that the present invention has are: adopt top that the top board that welds with steel structure truss is set, the bottom is provided with the steel member with the concrete tubular pile anchor connection, top board reliably is connected steel truss with concrete tubular pile with the firm welded structure of steel member, makes top steel structure truss and supporting and protection structure prestressed concrete pipe pile form unified whole common load; And can adjust concrete tubular pile stake top mark height indirectly and make its horizontal absolute altitude unanimity, the apparent size requirement of structural system after guaranteeing to be shaped, good mechanical performance; Simple in structure, be easy to make.
Description of drawings
Fig. 1 is a structural representation of the present invention;
Fig. 2 is the lateral view of Fig. 1;
Fig. 3 is the structural representation that the present invention uses;
Fig. 4 is the concrete support holder structure schematic diagram that the present invention uses when constructing.
Among the figure: 1, steel structure truss, 2, top board, 3, H shaped steel, 4, pile tube, 5, concrete, 6, the concrete pallet, 7, reinforcing bar.
The specific embodiment
For further understanding summary of the invention of the present invention, characteristics and effect, exemplify following examples now, and conjunction with figs. is described in detail as follows:
See also Fig. 1~Fig. 4, a kind of steel structure truss of the present invention and prestressed concrete pipe pile connected node, comprise with the top board 2 of steel structure truss 1 welding and with H shaped steel 3, H shaped steel 3 and top board 2 welding of prestressed concrete pipe pile 4 anchor connections.Be connected with top board 2 reliably in order to ensure H shaped steel 3, should adopt full weld to connect between the two.Being not limited to H shaped steel 3 with the steel member of prestressed concrete pipe pile 4 anchor connections, also can be i iron, also can adopt the member of steel plate welding, can also be the steel member etc. of shaped steel Combination Welding.
In order to ensure the good mechanical performance of above-mentioned connected node, top board 2 preferably adopts circular slab.
The work progress of present embodiment:
1) making of above-mentioned connected node adopts the circular steel plate of thick 20mm, diameter 600mm to be formed by connecting as the H200 * 200 shaped steel full welds of top board 2 with long 1000mm.2) installation of above-mentioned connected node is lowered to concrete pallet 6 in advance in prestressed concrete pipe pile, concrete pallet 6 is the thick steel plate of 3mm, and the reinforcing bar 7 by Φ 16mm hangs on the pile crown of prestressed concrete pipe pile 4.The H shaped steel of above-mentioned connected node is partly put into the stake core of pile tube 4, adjust circular top plate 2 end face absolute altitudes after satisfy the truss installation requirement, the tack weld support plate supports circular top plate 2 on the pile crown flange of pile tube 4; 3) above-mentioned connected node grouting anchoring, with all nodes support finish after, adopt 5 pairs of pile tubes 4 of C25 concrete anchoring H shaped steel 3 that is in the milk; 4) top truss is installed, and concrete to be in the milk reaches the installation of carrying out truss 1 after the intensity.
Although in conjunction with the accompanying drawings the preferred embodiments of the present invention are described above; but the present invention is not limited to the above-mentioned specific embodiment; the above-mentioned specific embodiment only is schematic; be not restrictive; those of ordinary skill in the art is under enlightenment of the present invention; not breaking away under the scope situation that aim of the present invention and claim protect, can also make a lot of forms, these all belong within protection scope of the present invention.

Claims (4)

1. steel structure truss and prestressed concrete pipe pile connected node is characterized in that, comprise with the top board of described steel structure truss welding and with steel member, described steel member and the welding of described top board of described prestressed concrete pipe pile anchor connection.
2. steel structure truss according to claim 1 and prestressed concrete pipe pile connected node is characterized in that, described steel member is a H shaped steel.
3. steel structure truss according to claim 1 and prestressed concrete pipe pile connected node is characterized in that, described top board is circular.
4. steel structure truss according to claim 2 and prestressed concrete pipe pile connected node is characterized in that, described H shaped steel is connected with described top board full weld.
CN 201010116621 2010-03-02 2010-03-02 Connection node of steel structure truss and prestressed concrete pipe piles Pending CN101775806A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201010116621 CN101775806A (en) 2010-03-02 2010-03-02 Connection node of steel structure truss and prestressed concrete pipe piles

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201010116621 CN101775806A (en) 2010-03-02 2010-03-02 Connection node of steel structure truss and prestressed concrete pipe piles

Publications (1)

Publication Number Publication Date
CN101775806A true CN101775806A (en) 2010-07-14

Family

ID=42512378

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201010116621 Pending CN101775806A (en) 2010-03-02 2010-03-02 Connection node of steel structure truss and prestressed concrete pipe piles

Country Status (1)

Country Link
CN (1) CN101775806A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102777047A (en) * 2012-08-22 2012-11-14 河北二十冶工程技术有限公司 Assembling and splicing installation method of large-span tube-truss roof beam

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006316495A (en) * 2005-05-12 2006-11-24 Kobe Steel Ltd Foundation structure of bridge pier and its construction method
CN101220593A (en) * 2008-01-25 2008-07-16 东莞市桦业土木基础工程有限公司 Fastening method of post-treating pipe pile break with pre-stress pipe pile construction
CN101608453A (en) * 2009-07-06 2009-12-23 广州市第二市政工程有限公司 The process of rectifying deviation of open caisson by jacking balance of jack
CN201605583U (en) * 2010-03-02 2010-10-13 天津二十冶建设有限公司 Connecting node of steel structure trussed beam and prestressed concrete tubular pile

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006316495A (en) * 2005-05-12 2006-11-24 Kobe Steel Ltd Foundation structure of bridge pier and its construction method
CN101220593A (en) * 2008-01-25 2008-07-16 东莞市桦业土木基础工程有限公司 Fastening method of post-treating pipe pile break with pre-stress pipe pile construction
CN101608453A (en) * 2009-07-06 2009-12-23 广州市第二市政工程有限公司 The process of rectifying deviation of open caisson by jacking balance of jack
CN201605583U (en) * 2010-03-02 2010-10-13 天津二十冶建设有限公司 Connecting node of steel structure trussed beam and prestressed concrete tubular pile

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102777047A (en) * 2012-08-22 2012-11-14 河北二十冶工程技术有限公司 Assembling and splicing installation method of large-span tube-truss roof beam
CN102777047B (en) * 2012-08-22 2014-08-20 河北二十冶工程技术有限公司 Assembling and splicing installation method of large-span tube-truss roof beam

Similar Documents

Publication Publication Date Title
CN101775844B (en) Connecting joint of ring beam of steel core concrete column used for topdown construction method foundation pit engineering
CN109680835A (en) A kind of self-bearing type precast concrete wall panel, concrete walls, structural system and engineering method
CN103122691A (en) Tower crane standard knot bearing upper air supporting formwork steel platform structure and construction method
CN202073100U (en) Temporary vertical steel support structure for compensating displacement or missed piling of steel lattice columns
CN107013046B (en) A kind of antidote of big section steel pipe concrete combination column
CN201605583U (en) Connecting node of steel structure trussed beam and prestressed concrete tubular pile
CN212866371U (en) Reverse construction method anchoring steel bar type first floor beam column connecting node
CN211666206U (en) Overhanging and landing dual-purpose scaffold
CN103321237B (en) A kind of pile tube combining structure and for the method for construction of Wharf Engineering
CN107675792A (en) Steel construction is encorbelmented gallery structure and construction method
CN203034799U (en) Tower hoist standard knot bearing overhead support formwork steel platform structure
CN109356190B (en) Lattice column type pier concrete tower crane foundation and construction method thereof
CN101775806A (en) Connection node of steel structure truss and prestressed concrete pipe piles
CN103821258B (en) The steel plate shear force wall that a kind of tensile force of belt supports
CN102134856B (en) Tower crane foundation
CN206941372U (en) Concrete-filled steel tube with dumbbell sections assembled pier and the attachment structure with cushion cap
CN201301431Y (en) Joint construction for spandrel steel-tube upright post
CN210216491U (en) Easily build formula tower crane foundation structure
CN204402496U (en) A kind of vertical shaft steel strand jack hangs slip-form lifting device
CN108104136B (en) Foundation pit supporting structure and construction method thereof
CN108457200B (en) Temporary supporting structure for underpinning of curved bridge section pile foundation and construction method
CN108867548B (en) Construction platform and construction platform erection method for on-site watering high pile wharf
CN205369292U (en) Control framing formula bridge steel structure tower crane basis
CN111962549A (en) Anti-overturning construction method for existing tower crane under working condition of adjacent foundation pile
CN112695621A (en) Construction method of counterweight type bridge pier

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Open date: 20100714