CN202139587U - Steel pile tube with closed conical end - Google Patents

Steel pile tube with closed conical end Download PDF

Info

Publication number
CN202139587U
CN202139587U CN201120219053U CN201120219053U CN202139587U CN 202139587 U CN202139587 U CN 202139587U CN 201120219053 U CN201120219053 U CN 201120219053U CN 201120219053 U CN201120219053 U CN 201120219053U CN 202139587 U CN202139587 U CN 202139587U
Authority
CN
China
Prior art keywords
pile tube
steel pipe
steel
pile
pipe pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201120219053U
Other languages
Chinese (zh)
Inventor
张雷
颜东锋
章国强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Sino Transport Technology Co., Ltd.
Original Assignee
SINO TRANSPORT MATERIALS GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SINO TRANSPORT MATERIALS GROUP CO Ltd filed Critical SINO TRANSPORT MATERIALS GROUP CO Ltd
Priority to CN201120219053U priority Critical patent/CN202139587U/en
Application granted granted Critical
Publication of CN202139587U publication Critical patent/CN202139587U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model relates to a steel pile tube with a closed conical end. The object of the utility model is to provide a steel pile tube with a closed conical end, which is simple in structure, and easy and rapid for manufacturing. The steel pile tube can rapidly penetrate a hard soil layer or can be effectively hammered into a hard soil layer to increase supporting force and increase the bearing capacity of a pile tube body. Moreover, the objects of the utility model also include reducing the number of steel pile tubes, saving steel and lowing construction cost. The steel pile tube with a closed conical end comprises a pile tube body and pile tube head and is characterized in that the pile tube body is a circular steel pipe, the pile tube head is an integrally structure which is made by welding together a conical hollow cover, reinforcing ribs and central pillars, and the peripheral cylindrical portion of the conical hollow cover is welded together with the pile tube body. The steel pile tube can be used as a temporary pile in building construction.

Description

Closed cone-shaped end steel pipe pile
Technical field
The utility model relates to a kind of steel pipe pile, especially a kind of closed cone-shaped end steel pipe pile.Be applicable to the provisional pile foundation of using in the engineering construction.
Background technology
In recent years, along with the rapid development various places of the economy dynamics of investment to infrastructure construction strengthens, object of construction production is also more and more.In many Engineering Project Construction, owing to receive the restriction of execution conditions or duration, just seem extremely important as the temporary works trestle of auxiliary construction.For example, Ningbo Construction of Hangzhou Bay Cross-sea Bridge south bank construction bridge, 9444 meters of total lengths 633 are striden totally, are unique passages that marine main bridge construction material supply and traffic are come in and gone out, and also are the basic engineering and the controlled engineerings of bed rearrangement bridge spanning the sea construction.
Temporary steel pipe pile foundation or prestressed concrete steel pipe stake can be adopted at present interim trestle basis, and steel pipe pile is compared with prestressed concrete pile, and steel pipe pile has the intensity height; Rigidity is big, and the discreteness of material is little, and extensibility is high; Shock-resistant, piling injection performance is good, adapts to characteristics such as all kinds of soil properties.Steel pipe pile can penetrate hardpan or squeeze into hardpan effectively, obtains higher bearing capacity, helps the settlement Control of temporary structure engineering; And can bear bigger horizontal force; Flexible design, also can vertically, laterally put down to join through welding increases resistance to overturning, thereby is used widely.But because the steel tube surface smoother can descend its bearing capacity to some extent, can influence workmanship when serious, jeopardize construction safety, just become extremely important so improve the steel pipe pile bearing capacity.
Summary of the invention
The technical problem that the utility model will solve is: according to the problem of above-mentioned existence; A kind of simple in structure, convenient for production, closed efficiently cone-shaped end steel pipe pile of manufacturing is provided; Can penetrate hardpan or squeeze into hardpan effectively and increase support force; Improve pile body bearing capacity, reduce piling quantity, practice thrift steel and reduce construction cost.
The technical scheme that the utility model adopted is: closed cone-shaped end steel pipe pile; Comprise body and pile crown; It is characterized in that: said body is a round steel pipe; Pile crown is welded into overall structure by hollow taper skull, deep floor and intermediolateral column, and wherein the outer rim circle ring column portion and the body of taper skull are welded.
Said deep floor is triangular in shape, and quantity is 3 ~ 4 and is uniformly distributed with.
Said intermediolateral column is hollow circular-tube or solid cylinder.
Said taper skull forms smooth outer surface by the whole spinning of an iron plate.
The beneficial effect of the utility model is: the sealing pyramidal structure is adopted in the utility model steel pipe pile termination, and the termination sealing has bigger contact area than the open-type stake at tip position and soil, significantly promotes bearing capacity; Seal because of its termination, in construction, increased soil compaction effect, the compactness shear strength of the soil body increases, thereby the side skin friction of stake is increased greatly, and the bearing capacity of stake improves, and can reduce the piling number.The design of taper reduces pile body construction resistance, meets hardpan and also more is prone to penetrate, and construction speed is accelerated.The utility model is manufactured convenient and swift, and production efficiency is high, can effectively practice thrift steel in the use, reduces construction cost.
Description of drawings
Fig. 1 is the sectional drawing of the utility model.
Fig. 2 is the stereogram of the utility model pile crown.
Fig. 3 is the vertical view of the utility model.
The specific embodiment
Like Fig. 1, shown in Figure 2, present embodiment is a kind of closed cone-shaped end steel pipe pile, and its body 1 is formed with pile crown 2 two parts, and pile crown is connected an end (see figure 1) of body.Body is a round steel pipe, and described pile crown comprises deep floor 3, intermediolateral column 4 and taper skull 5, and the taper skull is the integral body that whole block material is processed, and does not have to connect seam, and the lower end is shaped as taper shape, and the upper end is provided with one section straight flange that matches with body; Intermediolateral column is arranged on the center of taper skull, it can be hollow also can be solid; Deep floor can be 3 or 4, is uniformly distributed in the taper skull, is connected (seeing Fig. 2, Fig. 3) with the taper skull with intermediolateral column.
Described reinforcing rib is a thick iron plate, but the cold punching mode is produced dimensionally stable, production efficiency height; But also simple machine after the blanking.Intermediolateral column can with after round steel or the direct blanking of seamless steel pipe again with end face a little the worker polish and get final product, production process is simple, efficient is high, and does not have waste material and produce.The taper skull is the integral body that whole block material is processed, and can adopt spin-on process processing, and its equipment and mold is all fairly simple, does not need too many input, can produce with lower cost, and the product quality performance is all stablized.
At first confirm the convenient lifting of putting position of steel pipe pile during construction according to order about the use successively of steel pipe pile, steel pipe pile adopts outstanding play construction, with pedrail crane vibrating hammer injection steel pipe pile.Utilize the cantilever guiding trestle accurately to squeeze into basic steel pipe pile, after definite verticality with stake of measurement group meets the demands, start vibrating hammer and sink to putting in place, weld next joint more on request, the continuation sinking construction is so repeatedly to the designing requirement degree of depth.Single pile is heavy to be put after construction finishes, and immediately it is put with heavy that the steel pipe pile that finishes is flat to be joined construction and be linked to be integral body, prevents that single pile from deflection taking place under flow action.After stake top laid distribution beam, Bei Leiliang and bridge floor, the crawler crane reach was inserted and is laid one and stride steel pipe pile, according to said method, constructs by easy stages.

Claims (4)

1. closed cone-shaped end steel pipe pile; Comprise body (1) and pile crown (2); It is characterized in that: said body (1) is a round steel pipe; Pile crown (2) is welded into overall structure by hollow taper skull (5), deep floor (3) and intermediolateral column (4), and wherein the outer rim circle ring column portion of taper skull (5) and body (1) are welded.
2. closed cone-shaped end steel pipe pile according to claim 1 is characterized in that: said deep floor (3) is triangular in shape, and quantity is 3 ~ 4 and is uniformly distributed with.
3. closed cone-shaped end steel pipe pile according to claim 1 is characterized in that: said intermediolateral column (4) is hollow circular-tube or solid cylinder.
4. closed cone-shaped end steel pipe pile according to claim 1 is characterized in that: said taper skull (5) forms smooth outer surface by the whole spinning of an iron plate.
CN201120219053U 2011-06-27 2011-06-27 Steel pile tube with closed conical end Expired - Fee Related CN202139587U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201120219053U CN202139587U (en) 2011-06-27 2011-06-27 Steel pile tube with closed conical end

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201120219053U CN202139587U (en) 2011-06-27 2011-06-27 Steel pile tube with closed conical end

Publications (1)

Publication Number Publication Date
CN202139587U true CN202139587U (en) 2012-02-08

Family

ID=45550650

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201120219053U Expired - Fee Related CN202139587U (en) 2011-06-27 2011-06-27 Steel pile tube with closed conical end

Country Status (1)

Country Link
CN (1) CN202139587U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103696430A (en) * 2014-01-03 2014-04-02 张延策 Construction process of non-grouted recyclable steel-pipe piles
CN103911984A (en) * 2014-03-28 2014-07-09 中交一航局第五工程有限公司 Novel steel pipe pile
CN104631445A (en) * 2014-12-31 2015-05-20 云南建工基础工程有限责任公司 SMW construction method for arranging elliptic-cone-shaped pile head at end of H-shaped steel
CN108103939A (en) * 2017-12-08 2018-06-01 中交路桥北方工程有限公司 Oblique section steel trestle construction composite reinforcement mode and construction technology

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103696430A (en) * 2014-01-03 2014-04-02 张延策 Construction process of non-grouted recyclable steel-pipe piles
CN103696430B (en) * 2014-01-03 2018-07-06 张延策 The construction technology of the recyclable steel-pipe pile of not slip casting
CN103911984A (en) * 2014-03-28 2014-07-09 中交一航局第五工程有限公司 Novel steel pipe pile
CN104631445A (en) * 2014-12-31 2015-05-20 云南建工基础工程有限责任公司 SMW construction method for arranging elliptic-cone-shaped pile head at end of H-shaped steel
CN108103939A (en) * 2017-12-08 2018-06-01 中交路桥北方工程有限公司 Oblique section steel trestle construction composite reinforcement mode and construction technology
CN108103939B (en) * 2017-12-08 2020-04-10 中交路桥北方工程有限公司 Combined reinforcement mode and construction process for construction of oblique-section steel trestle

Similar Documents

Publication Publication Date Title
CN107299643B (en) Steel lattice column combined type tower crane foundation structure in foundation pit and construction method
CN203514315U (en) Reinforced connecting structure between pile and pile cap
CN101220593A (en) Fastening method of post-treating pipe pile break with pre-stress pipe pile construction
CN202139587U (en) Steel pile tube with closed conical end
CN203222809U (en) Pre-stressed concrete pipe pile foundation for pole and tower of power transmission line
CN108914961B (en) Communication iron tower foundation adopting spiral anchors and construction method
CN103225304A (en) Marine foundation supporting structure and construction method thereof
CN107700480A (en) A kind of concrete-pile suitable for basement process
CN210066722U (en) Pretensioning prestressed spiral concrete multi-thorn precast tubular pile
CN206346183U (en) A kind of reducing precast concrete hollow pile and foundation structure of building
CN202830936U (en) Supporting structure of foundation pit
CN210049631U (en) Basement increases a layer and drags to trade construction structures
CN202124855U (en) Rotary drilling prefabricate composite pile
CN208933973U (en) A kind of positioning connection structure of steel-pipe pile and bored concrete pile
CN206158226U (en) Quick reinforced concrete column structure of steel pipe slip casting
CN111663521A (en) Club-footed pile for building immersed tube
CN110144894A (en) A kind of pile end grouting miniature steel pipe static pressed pile
CN202865827U (en) Multi-hole type hollow pile easy to sink
CN102134856B (en) Tower crane foundation
CN203741835U (en) Pile tip structure for prefabricated pipe pile
CN209816835U (en) Club-footed pile for building immersed tube
CN211396213U (en) Large-span large-column-pitch quasi-rib floor type prestressed steel grid roof
CN114657977A (en) Prestressed concrete tubular pile tip crack reinforcing and strengthening device
CN107842031A (en) A kind of composite pile foundation of large bearing capacity
CN201857609U (en) Fabricated water-permeating thin-wall tapered pile

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: ZHEJIANG ZHONGJIAO TECHNOLOGY CO., LTD.

Free format text: FORMER OWNER: SINO TRANSPORT MATERIALS GROUP CO., LTD.

Effective date: 20120209

C41 Transfer of patent application or patent right or utility model
C53 Correction of patent for invention or patent application
CB03 Change of inventor or designer information

Inventor after: Chen Hefu

Inventor after: Zhang Lei

Inventor after: Yan Dongfeng

Inventor after: Zhang Guoqiang

Inventor before: Zhang Lei

Inventor before: Yan Dongfeng

Inventor before: Zhang Guoqiang

COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 310014 HANGZHOU, ZHEJIANG PROVINCE TO: 310020 HANGZHOU, ZHEJIANG PROVINCE

Free format text: CORRECT: INVENTOR; FROM: ZHANG LEI YAN DONGFENG ZHANG GUOQIANG TO: CHEN HEFU ZHANG LEI YAN DONGFENGZHANG GUOQIANG

TR01 Transfer of patent right

Effective date of registration: 20120209

Address after: The Zhonghao Grand Hotel Building No. 76 North Qiutao Road Hangzhou city Zhejiang province 310020 room 9006

Patentee after: Zhejiang Sino Transport Technology Co., Ltd.

Address before: Blue City Plaza No. 203 Hangzhou Zhaohui Road, Zhejiang province 310014 City office room 1601

Patentee before: Sino Transport Materials Group Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120208

Termination date: 20140627

EXPY Termination of patent right or utility model